| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| S00881156 ↗ | 355 BARD AVENUE STATEN ISLAND | Alteration | Permit Issued | 07/05/2023 | 08/25/2026 | Design STEVEN PAUL HAMMER Filer JMV ASSOCIATES LLC | RUMC-BI-PLANE EP LAB-SETON & SPELLMAN WINGS - Medical Use Bldg- Proposing Interior Reno on Floor #1 for new Cardiac Cath Labs, Impatient/Out… |
| M00872327 ↗ | 222 EAST 64 STREET MANHATTAN | Alteration | Permit Issued | 06/27/2023 | 08/07/2026 | Design LIZARDOS ENGINEERING Filer UPRIGHT EXPEDITERS, INC. | Northwell Health: Lab Relocation Project: modify Mechanical systems to conform with new layouts as per plans filed herewith. |
| X01214816 ↗ | 3030 BRONX PARK EAST BRONX | New Building | Permit Issued | 07/03/2025 | 06/29/2026 | Owner 3030 Bronx Park East LLC | Structural work in conjunction with NB application #X01214816-I1 |
| M01116242 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Permit Issued | 10/11/2024 | 05/28/2026 | Design GILSANZ MURRAY STEFICEK LLP Filer UPRIGHT EXPEDITERS, INC. | Northwell Health Greenwich Village: structural scope (framing of new wall opening for electrical conduit) in conjunction with new incoming C… |
| M01281789 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 09/18/2025 | 11/06/2025 | — | Northwell Greenwich Village: STAT Lab project: Limited rearrangement of interior, non-bearing partitions, install wall and floor finishes, m… |
| M01282001 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 09/18/2025 | 11/06/2025 | Design AKF ENGINEERS, LLP Filer UPRIGHT EXPEDITERS, INC. | Northwell Greenwich Village: STAT Lab project: Mechanical systems to remain. Re-balance existing air outlets and remove existing lab fume ho… |
| Name | Projects together | Most recent |
|---|---|---|
| GILSANZ MURRAY STEFICEK LLP | 16 | 08/22/2025 |
| ICOR ASSOCIATES | 8 | 01/22/2025 |
| LIZARDOS ENGINEERING | 6 | 09/23/2025 |
| LORING CONSULTING ENGINEERS, INC. | 6 | 04/15/2025 |
| AKF ENGINEERS, LLP | 4 | 09/23/2025 |
| CHARLES CALCAGNI ARCHITECT | 4 | 11/22/2023 |
| JAROS BAUM & BOLLES | 4 | 05/19/2025 |
| PAMELA A. SMITH | 4 | 09/19/2025 |
| INTEGRATED DESIGN GROUP | 3 | 07/03/2023 |
| POLISE CONSULTING ENGINEERS DPC | 3 | 08/16/2023 |
| GKG ARCHITECT PC | 2 | 03/04/2024 |
| HALSEY MCCORMACK HELMER INC | 2 | 05/01/2025 |
| MASCIONI & BEHRMANN, ARCHITECTURE & | 2 | 01/22/2025 |
| SEVERUD ASSOCIATES | 2 | 11/28/2022 |
| STEVEN LEONE | 2 | 01/15/2024 |
| STEVEN PAUL HAMMER | 2 | 08/22/2025 |
| STUDIO A+T ARCHITECTS | 2 | 01/18/2024 |
| THE MCGUIRE GROUP ARCHITECTS | 2 | 12/19/2025 |
| BELMONT FREEMAN ARCHITECTS | 1 | 04/24/2024 |
| CARDARELLI DESIGN & ARCHITECTURE, P | 1 | 09/04/2024 |
| COSENTINI ASSOCIATES | 1 | 06/24/2025 |
| COSTA ARCH & ENG LLP | 1 | 05/26/2021 |
| DANIEL SCHUNKEWITZ ARCHITECT | 1 | 08/22/2025 |
| DENNIS NOSKIN ARCHITECT, PC | 1 | 10/26/2021 |
| EWINGCOLE | 1 | 08/22/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| CAPITAL CONTR P&H CORP | 4 | 08/22/2025 |
| B.R. FRIES & ASSOCIATES L | 2 | 11/09/2021 |
| A & F FIRE PROTECTION CO | 1 | 04/15/2025 |
| AGGRESSIVE FIRE PROT LLC | 1 | 08/22/2025 |
| ALLIANCE PLUMBING CORP | 1 | 01/22/2025 |
| AMERICON CONSTRUCTION INC | 1 | 08/22/2025 |
| EBM PLUMBING CORP | 1 | 02/16/2026 |
| IGNITE PLUMBING & HEATING | 1 | 02/16/2026 |
| NEW LINE CONSTRUCTION LLC | 1 | 02/16/2026 |
| PAR FIRE PROTECTION LLC | 1 | 02/14/2022 |
| PAR PLUMBING CO., INC | 1 | 02/14/2022 |
| SIRINA FIRE PROT CORP | 1 | 01/22/2025 |
| TRISTATE PLBG SVCS CORP | 1 | 05/19/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| NORTHWELL HEALTH LENOX HILL HOSPITA | 19 | 12/19/2025 |
| COLUMBIA UNIVERSITY | 8 | 04/24/2024 |
| METHODIST HOME FOR NURSING AND REHA | 4 | 02/02/2024 |
| NORTHWELL HEALTH | 3 | 10/13/2022 |
| 250 HUDSON STREET, LLC | 2 | 03/01/2022 |
| BENJAMIN PARTNERS | 2 | 07/11/2022 |
| MEMBER | 2 | 01/15/2026 |
| 3030 Bronx Park East LLC | 1 | 02/16/2026 |
| ALEXANDRIA REAL ESTATE EQUITIES | 1 | 09/01/2020 |
| Montefiore Medical Center | 1 | 10/07/2024 |
| NEW YORK PRESBYTERIAN HOSPITAL | 1 | 06/24/2025 |
| RICHMOND UNIVERSITY MEDICAL CENTER | 1 | 08/22/2025 |
| ROSENBAUM/ROSENFELD THIRD AVENUE PA | 1 | 04/17/2020 |
| SBH HEALTH SYSTEM BRONX | 1 | 01/22/2025 |
| STONEHENGE MANAGEMENT LLC | 1 | 04/15/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| OUTSOURCE CONSULTANTS, INC. | 17 | 05/19/2025 |
| UPRIGHT EXPEDITERS, INC. | 17 | 12/19/2025 |
| CBA CONSULTANTS, INC. | 3 | 09/27/2023 |
| JAM CONSULTANTS, INC. | 3 | 04/24/2024 |
| SUPPORT BUILDINGS OF NEW YORK | 3 | 10/13/2022 |
| CITY WIDE EXPEDITING INC. | 2 | 11/22/2023 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 02/02/2024 |
| BMB BUILDING CONSULTING INC. | 1 | 01/15/2026 |
| CONVERSANO ASSOCIATES, INC. | 1 | 02/14/2022 |
| COSTA ARCHITECTURE & ENGINEERING LL | 1 | 05/26/2021 |
| GREEN LIGHT EXPEDITING LLC | 1 | 08/16/2023 |
| GRID DRAFTING AND CONSULTING LLC | 1 | 02/16/2026 |
| JMV ASSOCIATES LLC | 1 | 08/22/2025 |
| MUNICIPAL EXPEDITING INC | 1 | 06/24/2025 |
| WILLIAM VITACCO ASSOCIATES | 1 | 08/26/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| S00881156 ↗ | 355 BARD AVENUE STATEN ISLAND | Alteration | Permit Issued | 07/05/2023 | 08/25/2026 | Design STEVEN PAUL HAMMER Filer JMV ASSOCIATES LLC | RUMC-BI-PLANE EP LAB-SETON & SPELLMAN WINGS - Medical Use Bldg- Proposing Interior Reno on Floor #1 for new Cardiac Cath Labs, Impatient/Out… |
| M00872327 ↗ | 222 EAST 64 STREET MANHATTAN | Alteration | Permit Issued | 06/27/2023 | 08/07/2026 | Design LIZARDOS ENGINEERING Filer UPRIGHT EXPEDITERS, INC. | Northwell Health: Lab Relocation Project: modify Mechanical systems to conform with new layouts as per plans filed herewith. |
| X01214816 ↗ | 3030 BRONX PARK EAST BRONX | New Building | Permit Issued | 07/03/2025 | 06/29/2026 | Owner 3030 Bronx Park East LLC | Structural work in conjunction with NB application #X01214816-I1 |
| M01116242 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Permit Issued | 10/11/2024 | 05/28/2026 | Design GILSANZ MURRAY STEFICEK LLP Filer UPRIGHT EXPEDITERS, INC. | Northwell Health Greenwich Village: structural scope (framing of new wall opening for electrical conduit) in conjunction with new incoming C… |
| M01281789 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 09/18/2025 | 11/06/2025 | — | Northwell Greenwich Village: STAT Lab project: Limited rearrangement of interior, non-bearing partitions, install wall and floor finishes, m… |
| M01282001 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 09/18/2025 | 11/06/2025 | Design AKF ENGINEERS, LLP Filer UPRIGHT EXPEDITERS, INC. | Northwell Greenwich Village: STAT Lab project: Mechanical systems to remain. Re-balance existing air outlets and remove existing lab fume ho… |
| M00872302 ↗ | 222 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 06/13/2023 | 08/14/2025 | Design THE MCGUIRE GROUP ARCHITECTS Filer UPRIGHT EXPEDITERS, INC. | Northwell Health: Lab Relocation Project: rearrange interior, non-bearing partitions, install hung ceiling, wall & floor finishes, at portio… |
| M01135780 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 12/11/2024 | 06/30/2025 | Design LANGAN ENGINEERING | Northwell Health Lenox Hill Village Care: Support of Excavation in conjunction with new ConEd utility Transfomer Vault, Bus Compartment Vaul… |
| M01218084 ↗ | 1176 YORK AVENUE MANHATTAN | Alteration | Signed-off | 05/19/2025 | 06/27/2025 | Design COSENTINI ASSOCIATES Filer MUNICIPAL EXPEDITING INC | L Wing Biomed Shielding: Modification to mechanical ductwork to accommodate renovation within the hospital building. |
| M01181387 ↗ | 141 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 04/10/2025 | 06/16/2025 | NYU CWI RENO - SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY. | |
| M01217748 ↗ | 141 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 05/01/2025 | 05/06/2025 | Design HALSEY MCCORMACK HELMER INC | NYU - CWI - INTERIOR DEMO MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| S00594224 ↗ | 475 SEAVIEW AVENUE STATEN ISLAND | Alteration | Signed-off | 11/09/2021 | 02/20/2025 | Owner NORTHWELL HEALTH (SIUH) | General construction per plans filed herewith, |
| S00594350 ↗ | 475 SEAVIEW AVENUE STATEN ISLAND | Alteration | Signed-off | 11/02/2021 | 02/20/2025 | Design AKF ENGINEERS, LLP Owner NORTHWELL HEALTH (SIUH) | Mechanical Modifications per plans filed herewith |
| B01091295 ↗ | 5501 1 AVENUE BROOKLYN | Alteration | Permit Issued | 12/06/2024 | 02/14/2025 | Design JAROS BAUM & BOLLES | PLUMBING MODIFICATIONS ON THE 3RD FL INSTALLATION O FNEW DOMESTIC HOT/COLD WATER, ACID WASTE, VENT CONNECTION FROM EXISTING BASE BLDG INFRAS… |
| X01118571 ↗ | 4487 3 AVENUE BRONX | Alteration | Signed-off | 10/14/2024 | 12/20/2024 | Owner SBH HEALTH SYSTEM BRONX | Herewith filing sprinkler modifications for Ambulatory Care Center Renovation, SBH Health System. No change in use, egress, or occupancy. |
| M01132312 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 11/12/2024 | 11/18/2024 | Design GILSANZ MURRAY STEFICEK LLP | Northwell Old MEETH: installation of new steel lintel for new louver wall opening as per plans filed herewith. |
| M01121736 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/28/2024 | 11/01/2024 | Design GILSANZ MURRAY STEFICEK LLP Filer UPRIGHT EXPEDITERS, INC. | Northwell Health Lenox Hill Cath Lab B: installation of framing (including Unistrut) & related scope at portion of 11th floor, for support o… |
| X00958891 ↗ | 111 EAST 210 STREET BRONX | Alteration | Signed-off | 10/07/2024 | 10/15/2024 | Design JOSEPH A. LECCE P.E.,P.C. | 111 EAST 210 STREET - RADIOLOGY K-ROOM REPLACEMENT - MECHANICAL MODIFICATIONS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01052453 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 07/18/2024 | 10/09/2024 | Design LIZARDOS ENGINEERING | INTERIOR RENO ON 9TH FLOOR WET LAB - PARTITIONS, CEILINGS AND DOOR MODIFICATIONS. NO CHNAGE IN USE EGRESS OR OCCUPANCY |
| X00958886 ↗ | 111 EAST 210 STREET BRONX | Alteration | Signed-off | 09/04/2024 | 10/09/2024 | 111 EAST 210TH STREET - RADIOLOGY K-ROOM REPLACEMENT - GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPA… | |
| M01105394 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 09/19/2024 | 09/26/2024 | Design LIZARDOS ENGINEERING | Northwell: Old MEETH: Remove existing ConEd High Pressure (H.P.) piping & related infrastructure; connect new ConEd H.P. steam service & re… |
| M01031771 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 05/01/2024 | 09/06/2024 | Design ICOR ASSOCIATES | Northwell Health Old MEETH Ambulatory Surgery Exhaust Upgrades: modify mechanical exhaust systems in Ambulatory Surgery suite as per plans f… |
| M01031774 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 05/01/2024 | 09/06/2024 | Design THE MCGUIRE GROUP ARCHITECTS Filer UPRIGHT EXPEDITERS, INC. | Northwell Health Old MEETH Ambulatory Surgery Exhaust Project: rearrange interior non-bearing partitions, install hung ceiling, wall and flo… |
| M00949016 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 11/22/2023 | 07/03/2024 | Design AKF ENGINEERS, LLP Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care project: modify mechanical systems to conform to new interior modifications as … |
| M01032610 ↗ | 530 WEST 120 STREET MANHATTAN | Alteration | Signed-off | 04/24/2024 | 07/03/2024 | Design BELMONT FREEMAN ARCHITECTS Owner COLUMBIA UNIVERSITY Filer JAM CONSULTANTS, INC. | Renovation, interior construction work as per plans filed herewith. No change of use, occupancy, or egress as of right. |
| X00974164 ↗ | 4499 WALDO AVENUE BRONX | Alteration | Signed-off | 01/15/2024 | 07/03/2024 | Design STEVEN LEONE | REPLACE CONCRETE RAMP AND HANDRAILS FOR THE ENTRANCE TO THE EXISTING PARKING GARAGE ON 2ND FLOOR AS PER PLANS FILED HEREWITH, NO CHANGE TO U… |
| B00859368 ↗ | 1089 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 04/18/2023 | 07/02/2024 | Design SKYLINE ENGINEERING, LLC Owner MEMBER | Propose Mechanical work as part of interior tenant fitout filed in conjunction with Alt-2 # 340724265. |
| M00917131 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 09/26/2023 | 07/02/2024 | Design PAMELA A. SMITH Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care: rearrange interior non-bearing partitions, install wall & floor finishes, hung… |
| M00923653 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 09/27/2023 | 07/02/2024 | Design GILSANZ MURRAY STEFICEK LLP Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care project: minor structural scope in support of project, consisting of framing in… |
| M00923711 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 10/23/2023 | 07/02/2024 | Design AKF ENGINEERS, LLP Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care project: modify mechanical systems to conform to new interior modifications as … |
| M00944860 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 11/01/2023 | 07/02/2024 | Design GILSANZ MURRAY STEFICEK LLP | Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care project: minor structural scope in support of project, as per plans filed herew… |
| M00944864 ↗ | 20 7 AVENUE MANHATTAN | Alteration | Signed-off | 10/25/2023 | 07/02/2024 | Design PAMELA A. SMITH Filer UPRIGHT EXPEDITERS, INC. | Northwell Lenox Hill: Cardio Cath Lab Suite & Inpatient Care: rearrange interior non-bearing partitions, install wall & floor finishes, hung… |
| X00995939 ↗ | 4499 WALDO AVENUE BRONX | Alteration | Signed-off | 02/02/2024 | 07/02/2024 | Design GILSANZ MURRAY STEFICEK LLP | STRUCTURAL FRAMING AND CONCRETE RAMP CONSTRUCTION FOR THE OPEN GARAGE ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR … |
| 340724265BIS | 1089 PRESIDENT STREET BROOKLYN | — | ISSUED | 03/22/2023 | 07/02/2024 | — | OT |
| B00971962 ↗ | 3201 KINGS HIGHWAY BROOKLYN | Alteration | Signed-off | 01/18/2024 | 01/24/2024 | Design STUDIO A+T ARCHITECTS | Mount Sinai - Telemetry/ADA Upgrades - Interior renovations including modifications to non load bearing partitions, flooring, ceilings, doo… |
| B00913363 ↗ | 1089 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 09/27/2023 | 10/06/2023 | Design GILSANZ MURRAY STEFICEK LLP Owner MEMBER Filer CBA CONSULTANTS, INC. | Structural Work as per plans in conjunction with Alt #340724265 . No change in use, egress or occupancy. |
| M00875093 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 08/22/2023 | 09/14/2023 | Design EWINGCOLE | Northwell Health OLD MEETH: Infusion Project: rearrange interior, non-bearing partitions, install hung ceiling, wall and floor finishes @ 4t… |
| M00875562 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 08/16/2023 | 09/01/2023 | Design LIZARDOS ENGINEERING Filer UPRIGHT EXPEDITERS, INC. | Northwell Health: Old MEETH Out Patient Infusion project: modify mechanical systems to conform with new layouts as per plans filed herewith. |
| M00893040 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 08/02/2023 | 08/17/2023 | Design GILSANZ MURRAY STEFICEK LLP Filer UPRIGHT EXPEDITERS, INC. | Northwell Health Old MEETH Infusion Project: Minor structural work in conjunction with Infusion project as per plans filed herewith (ceiling… |
| B00631422 ↗ | 1370 EAST 32 STREET BROOKLYN | Alteration | Signed-off | 03/28/2022 | 06/30/2023 | MECHANICAL MODIFCIATIONS INCLUDING THE INSTALLATION OF AC UNIT AND ASSOCIATED DUCT AND PIPING AS INDICATED ON THE PLANS FILED HEREWITH. NO C… | |
| B00752793 ↗ | 508A 16 STREET BROOKLYN | Alteration | Signed-off | 06/27/2022 | 06/30/2023 | Design CHARLES CALCAGNI ARCHITECT | Renovation to existing 2 family dwelling to include interior and exterior work as shown on plans. No change in use egress or occupancy. This… |
| M00823104 ↗ | 530 WEST 120 STREET MANHATTAN | Alteration | Signed-off | 03/29/2023 | 06/20/2023 | Design INTEGRATED DESIGN GROUP Owner COLUMBIA UNIVERSITY | INTERIOR GENERAL CONSTRUCTION CONSISITING OF PARITITON, DOORS, AND FINISHES. NO CHANGES TO EGRESS, OCCUPANCY OR USE. |
| M00823110 ↗ | 530 WEST 120 STREET MANHATTAN | Alteration | Signed-off | 03/28/2023 | 06/14/2023 | Owner COLUMBIA UNIVERSITY | INTERIOR MECHANICAL WORK AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. |
| M00847341 ↗ | 2900 BROADWAY MANHATTAN | Alteration | Signed-off | 04/18/2023 | 05/30/2023 | Owner COLUMBIA UNIVERSITY | Modifications to existing interior ductwork |
| M00847299 ↗ | 2900 BROADWAY MANHATTAN | Alteration | Signed-off | 04/18/2023 | 05/26/2023 | Design INTEGRATED DESIGN GROUP | Interior renovations to bathrooms on floors 3 to 13 |
| S00535131 ↗ | 475 SEAVIEW AVENUE STATEN ISLAND | Alteration | Signed-off | 06/30/2021 | 05/11/2023 | Design STANTEC | Staten Island University Hospital: architectural site work in conjunction with reconfiguration of traffic oval on private hospital property.… |
| B00845113 ↗ | 1370 EAST 32 STREET BROOKLYN | Alteration | Signed-off | 03/23/2023 | 03/28/2023 | Design STUDIO A+T ARCHITECTS | Herewith filing for facade renovations. No change in use, egress, or occupancy. |
| B00819068 ↗ | 4802 10 AVENUE BROOKLYN | Alteration | Signed-off | 03/24/2023 | 03/24/2023 | Design ICOR ASSOCIATES | FILING FOR CHILLER REPLACEMENT; NO CHANGE TO USE EGRESS OR OCCUPANCY |
| B00819398 ↗ | 4802 10 AVENUE BROOKLYN | Alteration | Signed-off | 03/16/2023 | 03/24/2023 | Design GILSANZ MURRAY STEFICEK LLP | Filing structural work in conjunction with chiller replacement. Structural steel to support chiller replacement. |
| M00836076 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/14/2023 | 03/20/2023 | Design GILSANZ MURRAY STEFICEK LLP Filer UPRIGHT EXPEDITERS, INC. | Lenox Hill Hospital Nuclear Camera Project: installation of structural reinforcement to support medical equipment at portion of third floor |
| B00631433 ↗ | 1370 EAST 32 STREET BROOKLYN | Alteration | Signed-off | 03/22/2022 | 03/15/2023 | Design GKG ARCHITECT PC | PARTITIONS, DOORS AND CEILIING MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00762712 ↗ | 508A 16 STREET BROOKLYN | Alteration | Signed-off | 11/27/2022 | 01/27/2023 | Design CHARLES CALCAGNI ARCHITECT | INSTALLATION OF HVAC UNITS AND RELATED DUCTS AND PIPING, RELOCATION OF EXHAUST FANS IN BATHROOMS. |
| M08011173 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/17/2022 | 11/09/2022 | Design GILSANZ MURRAY STEFICEK LLP | Structural work associated with LINAC Replacement. Concrete slab, steel support for the equipment No change in use egress or occupancy. |
| M08011695 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/14/2022 | 10/31/2022 | Design LIZARDOS ENGINEERING | Linear Accelerator Equipment Replacement No change in use or egress |
| M08011154 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/04/2022 | 10/26/2022 | Design PAMELA A. SMITH Owner NORTHWELL HEALTH | General construction work associated with LINAC Replacement. No change in use egress or occupancy MH, ST an PL SP work associated with the L… |
| M00548818 ↗ | 133 WEST 11 STREET MANHATTAN | Alteration | Signed-off | 08/19/2021 | 10/12/2022 | — | Interior renovation of 2nd and 3rd floors as shown on plans filed herewith. |
| B00642783 ↗ | 1370 EAST 32 STREET BROOKLYN | Alteration | Signed-off | 03/24/2022 | 09/14/2022 | Design SEVERUD ASSOCIATES | STRUCTURAL MODIFICATIONS ON THE ROOF AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00771163 ↗ | 424 10 AVENUE MANHATTAN | Alteration | Signed-off | 07/20/2022 | 08/24/2022 | Design SYSKA HENNESSY GROUP | Mechanical modifications as indicated on the plans filed herewith at the Winston Building. No change in use, egress or occupancy. |
| M00771022 ↗ | 424 10 AVENUE MANHATTAN | Alteration | Signed-off | 07/14/2022 | 08/18/2022 | Design POSEN ARCHITECTS | General construction including partitions , doors and ceiling modifications as indicated on the plans filed herewith at the Winston Building… |
| B00766033 ↗ | 1370 EAST 32 STREET BROOKLYN | Alteration | Signed-off | 07/13/2022 | 07/25/2022 | Design GKG ARCHITECT PC | MOUNT SINAI - MS INFUSION EXPANSION AND MAMMOGRAPHY - RENOVATION INCLUDING MODIFICATIONTS TO INTERIOR PARTITION, EXTERIOR WALLS, CEILING, D… |
| B00766055 ↗ | 1370 EAST 32 STREET BROOKLYN | Alteration | Signed-off | 07/13/2022 | 07/25/2022 | Mount Sinai - MS Infusion Expansion and Mammography - MECHANICAL MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES… | |
| B00766150 ↗ | 1370 EAST 32 STREET BROOKLYN | Alteration | Signed-off | 07/13/2022 | 07/25/2022 | Design SEVERUD ASSOCIATES | Mount Sinai - MS Infusion Expansion and Mammography - STRUCTURAL MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES… |
| X00427473 ↗ | 4499 WALDO AVENUE BRONX | Alteration | Signed-off | 11/25/2020 | 06/23/2022 | Design JFK&M CONSULTING ENGINEERS | AC UNITS INSTALLATION AND ASSOCIATED DUCT WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| X00457968 ↗ | 4499 WALDO AVENUE BRONX | Alteration | Signed-off | 02/25/2021 | 06/23/2022 | Design STEVEN LEONE | CONSTRUCTION FOR CHANGE OF USE FOR DYALYSIS SPACE FILED IN CONJUNCTION WITH ALT1 NO WORK AS PER PLANS FILED HEREWITH. ALT1 NO WORK FILED UND… |
| M00463948 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/22/2021 | 03/18/2022 | Design H.F. LENZ COMPANY | GENERAL CONSTRUCTION & STRUCTURAL ALTERATIONS IN CONNECTION WITH BULK OXYGEN SYSTEM UPGRADES AS PER PLANS. NO CHANGE TO EGRESS, USE, OR OCC… |
| M00638287 ↗ | 250 HUDSON STREET MANHATTAN | Alteration | Signed-off | 12/22/2021 | 01/03/2022 | Design CHARLES CALCAGNI ARCHITECT Owner 250 HUDSON STREET, LLC Filer JAM CONSULTANTS, INC. | general construction for temporary storage area |
| M00638310 ↗ | 250 HUDSON STREET MANHATTAN | Alteration | Signed-off | 12/22/2021 | 01/03/2022 | Design CHARLES CALCAGNI ARCHITECT Owner 250 HUDSON STREET, LLC Filer JAM CONSULTANTS, INC. | Demolition of selected ductwork and installation of new ductwork. No new AC equipment. New exhaust fan to replace existing fan in existing… |
| M00502048 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 04/19/2021 | 12/27/2021 | Design PAMELA A. SMITH Filer UPRIGHT EXPEDITERS, INC. | Northwell: URIS 3RD FLOOR IMAGING 3T MRI SUITE: rearrange interior, non-bearing partitions,install hung ceiling, wall and floor finishes as … |
| X00620063 ↗ | 4487 3 AVENUE BRONX | Alteration | Signed-off | 11/01/2021 | 11/04/2021 | Design ICOR ASSOCIATES | Minor Mechanical reconfiguration of ductwork to accommodate accessory pharmacy at ground level. No change in use, egress or occupancy |
| M00548828 ↗ | 133 WEST 11 STREET MANHATTAN | Alteration | Signed-off | 08/26/2021 | 11/03/2021 | Design JAROS BAUM & BOLLES | Mechanical work related to interior renovation of 2nd and 3rd floors as shown on plans filed herewith. |
| X00605837 ↗ | 4487 3 AVENUE BRONX | Alteration | Signed-off | 10/26/2021 | 11/03/2021 | Design DENNIS NOSKIN ARCHITECT, PC Filer CBA CONSULTANTS, INC. | Interior configuration of an accessory pharmacy at ground level for St Barnabas Hospital. no change in use, egress or occupancy. |
| X00306064 ↗ | 4422 3 AVENUE BRONX | Alteration | Signed-off | 02/19/2020 | 08/31/2021 | Design GILSANZ MURRAY STEFICEK LLP | Minor renovation consisting of raised floor and reinforcement for new MRI/CT equipment |
| X00466411 ↗ | 4422 3 AVENUE BRONX | Alteration | Signed-off | 02/16/2021 | 08/30/2021 | Design ICOR ASSOCIATES Filer CBA CONSULTANTS, INC. | Direct replacement of an Air Handler Unit at Sub Basement. No change in use, egress or occupancy |
| 220686014BIS | 4422 3 AVENUE BRONX | — | ISSUED | 11/21/2019 | 08/30/2021 | — | OT |
| Q00453585 ↗ | 79-01 BROADWAY QUEENS | Alteration | Signed-off | 06/18/2021 | 08/12/2021 | Design GOLDMAN COPELAND ASSOCIATES | Thermostat to be relocated to position shown on new work plan, control wiring to be extended/provide new as required. Mechanical work as sho… |
| M00556207 ↗ | 615 WEST 131 STREET MANHATTAN | Alteration | Signed-off | 07/28/2021 | 08/02/2021 | Owner COLUMBIA UNIVERSITY | Herewith Filing Mechanical Application to obtain Certificates of Compliance (AKA EUP Cards) for Mechanical Equipment installed under applica… |
| M00214102 ↗ | 633 WEST 131 STREET MANHATTAN | Alteration | Signed-off | 12/03/2019 | 07/25/2021 | Owner COLUMBIA UNIVERSITY | HEREWITH FILING MECHANICAL IN CONJUNCTION WITH SEPARATE MECHANICAL APPLICATION #M00206166.SCOPE INCLUDES INSTALLATION OF COMPRESSOR ON ROOF… |
| 123880951BIS | 633 WEST 131 STREET MANHATTAN | — | ISSUED | 11/26/2019 | 07/22/2021 | — | OT |
| X00523914 ↗ | 4499 WALDO AVENUE BRONX | Alteration | Signed-off | 05/26/2021 | 07/21/2021 | Design COSTA ARCH & ENG LLP | Herewith filing application to supersede proposed work under application # 2001119585 for sign off purposes only. |
| 220686005BIS | 4511 THIRD AVENUE BRONX | — | ISSUED | 05/15/2019 | 07/01/2021 | — | MH, PL, SD, SP |
| 321960847BIS | 218 MYRTLE AVENUE BROOKLYN | — | ISSUED | 08/02/2019 | 06/28/2021 | — | MH, OT |
| 123745028BIS | 208 EAST 64 STREET MANHATTAN | — | ISSUED | 03/03/2021 | 06/16/2021 | — | OT |
| 240284349BIS | 4499 WALDO AVENUE BRONX | — | ISSUED | 10/28/2020 | 06/16/2021 | — | OT |
| M00317495 ↗ | 208 EAST 64 STREET MANHATTAN | Alteration | Signed-off | 02/28/2020 | 06/03/2021 | Design ICOR ASSOCIATES Filer UPRIGHT EXPEDITERS, INC. | Northwell Health Ophthalmology Project: modify existing mechanical systems to conform to new layouts; installation of split-system AC conden… |
| M00502090 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 04/20/2021 | 06/02/2021 | Design GILSANZ MURRAY STEFICEK LLP Filer UPRIGHT EXPEDITERS, INC. | Northwell: URIS 3RD FLOOR IMAGING 3T MRI SUITE: structural scope in conjunction with MRI suite renovations, as per plans filed herewith. |
| M00502207 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 04/30/2021 | 05/14/2021 | Design JAROS BAUM & BOLLES Filer UPRIGHT EXPEDITERS, INC. | Northwell: URIS 3RD FLOOR IMAGING 3T MRI SUITE: modify existing mechanical systems to conform with new MRI suite installation in existing ho… |
| X00314056 ↗ | 4422 3 AVENUE BRONX | Alteration | Signed-off | 04/16/2020 | 04/15/2021 | Design ICOR ASSOCIATES | Installation of 6 split system units at 4th floor MRI/CT scan room in conjunction with application #220686014. no change in egress, use, or … |
| M00417782 ↗ | 589 BROADWAY MANHATTAN | Alteration | Signed-off | 02/25/2021 | 04/14/2021 | Design WSP Owner BENJAMIN PARTNERS | modification to mechanical ducts and units per plans. |
| 140910968BIS | 855 PARK AVENUE MANHATTAN | — | ISSUED | 10/29/2020 | 10/29/2020 | — | OT |
| M00354232 ↗ | 2824 BROADWAY MANHATTAN | Alteration | Signed-off | 09/03/2020 | 09/30/2020 | Owner COLUMBIA UNIVERSITY | Herewith filing mechanical work as indicated on plans. no change to egress use or occupancy. |
| M00394625 ↗ | 589 BROADWAY MANHATTAN | Alteration | Signed-off | 09/04/2020 | 09/15/2020 | Design GILSANZ MURRAY STEFICEK LLP Owner BENJAMIN PARTNERS | REPAIR TO STRUCTURAL FLOOR SUPPORT AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. THIS APPLICATION IN CONJUNCTION WITH APPLICATION #140… |
| 140947135BIS | 589 BROADWAY MANHATTAN | — | ISSUED | 09/10/2020 | 09/10/2020 | — | OT |
| M00375794 ↗ | 430 EAST 29 STREET MANHATTAN | Alteration | Signed-off | 09/01/2020 | 09/04/2020 | Design JAROS BAUM & BOLLES Filer UPRIGHT EXPEDITERS, INC. | Northwell Health: Installation of supplemental AC unit to provide cooling to existing research lab freezer room at portion of 9th floor. No … |
| 240280067BIS | 501 EAST 161 STREET BRONX | — | ISSUED | 08/11/2020 | 08/11/2020 | — | OT |
| M00352480 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/17/2020 | 08/10/2020 | Design GILSANZ MURRAY STEFICEK LLP | Northwell Health Lenox Hill Hospital: Cath Lab F: structural work in conjunction with new Cath Lab (installation of unistrut framing support… |
| 140929379BIS | 606 WEST 115 STREET MANHATTAN | — | ISSUED | 08/04/2020 | 08/04/2020 | — | OT |
| 220628088BIS | 4499 WALDO AVENUE BRONX | — | ISSUED | 11/02/2018 | 07/31/2020 | — | MH, OT, PL |
| M00353979 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/18/2020 | 07/27/2020 | Design LIZARDOS ENGINEERING Filer UPRIGHT EXPEDITERS, INC. | Northwell Health Lenox Hill Hospital: Cath Lab F: modify HVAC system to conform with new Cath Lab layout at portion of 11th and 12th floors. |
| 140905493BIS | 2824 BROADWAY MANHATTAN | — | ISSUED | 07/15/2020 | 07/15/2020 | — | OT |
| 123709022BIS | 615 WEST 131 STREET MANHATTAN | — | ISSUED | 06/26/2020 | 06/26/2020 | — | OT |