| Owner | Filings | Most Recent |
|---|---|---|
| Nyulh | 165 | 07/08/2026 |
| NYU Langone Health | 8 | 03/22/2026 |
| Bigman Brothers | 2 | 03/22/2026 |
| Lutherine Medical Hospital | 1 | 03/21/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| Outsource Consultants | 303 | 03/21/2026 |
| Eurocelt Expediting | 14 | 03/21/2026 |
| A1 Expediting Service | 30 | 03/21/2026 |
| AE Design Solution | 28 | 03/21/2026 |
| Rigid Structural Design | 19 | 03/21/2026 |
| Direct Access Expediting | 2 | 03/21/2026 |
| William Vitacco Associates | 19 | 03/21/2026 |
| Construction Permit Services | 1 | 03/21/2026 |
| RPO | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Empire General Contracting | General Contractor | 49 | 10/04/2026 |
| B.R. Fries & Associates | General Contractor | 42 | 07/08/2026 |
| Skyline Scaffolding Group | Scaffold | 37 | 10/09/2026 |
| Skanska USA Building | General Contractor | 24 | 08/05/2026 |
| Safway Atlantic | Scaffold | 22 | 10/03/2026 |
| Powers Bridging & Scaffolding | Scaffold | 22 | 07/08/2026 |
| L.F. Driscoll Company | General Contractor | 16 | 07/08/2026 |
| Universal Builders Supply | Scaffold | 15 | 07/08/2026 |
| Alliance Plumbing | Plumbing | 12 | 09/18/2026 |
| Nelson Air Device | General Contractor | 12 | 07/08/2026 |
| Cardoza Plumbing | Plumbing | 11 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 9 | 07/08/2026 |
| NYC Fire Sprinkler | Fire Protection | 9 | 09/13/2026 |
| Lendlease (US) Construction | General Contractor | 8 | 07/08/2026 |
| King Hoist & Scaffolding | Scaffold | 7 | 07/08/2026 |
| Paul M Maintenance | General Contractor | 6 | 07/08/2026 |
| Glass Armor of New York I | specialty_contractor | 6 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 5 | 07/08/2026 |
| Benjamin Construction | Scaffold | 4 | 07/08/2026 |
| Bigman Brothers | Electrical | 4 | 03/21/2026 |
| Expert Maintenance | General Contractor | 4 | 04/09/2026 |
| Bigman Brothers | Electrical | 4 | 03/22/2026 |
| J T & T Air Conditioning | specialty_contractor | 4 | 07/08/2026 |
| Americon Construction | General Contractor | 4 | 04/09/2026 |
| Tristate Plumbing Services | Plumbing | 3 | 07/08/2026 |
| Holt Construction | General Contractor | 3 | 07/08/2026 |
| Expert Maintenance | Scaffold | 3 | 03/21/2026 |
| L.F. Driscoll Company | Scaffold | 3 | 03/21/2026 |
| Fresh Meadow Mechanical Plumbing | Plumbing | 3 | 09/01/2026 |
| Par Fire Protection | Fire Protection | 3 | 09/09/2026 |
| Lendlease (US) Construction | Scaffold | 2 | 04/09/2026 |
| Fresh Meadow Mechanical | specialty_contractor | 2 | 08/30/2026 |
| Tri-State Dismantling | Scaffold | 2 | 04/09/2026 |
| Archer Consultants Group | Fire Protection | 2 | 08/20/2026 |
| Capital Contracting P&H | Plumbing | 2 | 06/27/2026 |
| Cardoza Plumbing | Fire Protection | 2 | 07/08/2026 |
| Gilston Electrical Contracting | Electrical | 2 | 03/22/2026 |
| Manengeering Bureau | Fire Protection | 2 | 07/08/2026 |
| Stat Electric | Electrical | 2 | 03/21/2026 |
| E-J Electric Installation Co | Electrical | 2 | 03/22/2026 |
| Suffolk Construction Company | General Contractor | 2 | 03/21/2026 |
| Par Plumbing Co | Plumbing | 2 | 08/01/2026 |
| Racanelli Construction Co | General Contractor | 2 | 08/20/2026 |
| Switch Electric of the Five | Electrical | 1 | 03/21/2026 |
| Preferred Sprinkler and Mechanical | Fire Protection | 1 | 07/08/2026 |
| Olympic Plumbing & Heating Service | Plumbing | 1 | 07/08/2026 |
| Central Consulting & Cont | General Contractor | 1 | 07/08/2026 |
| Benjamin Construction | General Contractor | 1 | 07/08/2026 |
| J.M. Botto | Plumbing | 1 | 06/28/2026 |
| Hig Electric Assc NYC | Electrical | 1 | 03/21/2026 |
| A & F Fire Protection Co | Fire Protection | 1 | 07/08/2026 |
| R.C.M. Electric | Electrical | 1 | 03/21/2026 |
| Louis L.buttermark & Sons | Plumbing | 1 | 07/08/2026 |
| R & L Systems | Electrical | 1 | 03/21/2026 |
| Pace Plumbing | Plumbing | 1 | 07/08/2026 |
| Glass Armor of New York I | Scaffold | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Alan Margolin & Associates | 423 | 163 | 09/30/2026 |
| Soni Engineering Consulting | 9819 | 1 | 11/12/2025 |
| G. Blinn Consulting | 2894 | 2 | 06/18/2025 |
| Atlantic Engineeringlabor | 1381 | 14 | 07/06/2023 |
| Atlas ATC Engineering | 8011 | 2 | 05/12/2021 |
| Joel Phagoo, PE | 2416 | 1 | 03/06/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | Skyline Scaffolding Group | 10/08/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Safway Atlantic | 10/02/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Skyline Scaffolding Group | 09/17/2026 |
| DOB NOW | Plumbing | Permit Issued | Alliance Plumbing | 09/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Safway Atlantic | 09/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Safway Atlantic | 09/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Safway Atlantic | 09/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Safway Atlantic | 09/17/2026 |
| DOB NOW | Construction Fence | Permit Issued | Safway Atlantic | 09/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Skyline Scaffolding Group | 09/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Safway Atlantic | 09/17/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Benjamin Constructn | 09/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | NYC Fire Sprinkler | 09/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Empire General Contracting | 09/11/2026 |
| DOB NOW | General Construction | Permit Issued | Empire General Contracting | 09/09/2026 |
| DOB NOW | Sprinklers | Permit Issued | Par Fire Protection | 09/08/2026 |
| DOB NOW | Plumbing | Permit Issued | Fresh Meadow Mechanical Plumbing | 08/31/2026 |
| DOB NOW | Boiler Equipment | Permit Issued | Champion Combustion | 08/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Fresh Meadow Mechanical | 08/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Fresh Meadow Mechanical | 08/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Racanelli Construction Co | 08/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | Archer Consultants Group | 08/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Skanska USA Building | 08/04/2026 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 07/31/2026 |
| DOB NOW | Sprinklers | Permit Issued | Par Fire Protection | 07/31/2026 |
| DOB NOW | Structural | Permit Issued | Skanska USA Building | 07/30/2026 |
| DOB NOW | General Construction | Permit Issued | Skanska USA Building | 07/29/2026 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 07/24/2026 |
| DOB NOW | General Construction | Permit Issued | Racanelli Construction Co | 07/22/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Skyline Scaffolding Group | 07/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Archer Consultants Group | 06/22/2026 |
| DOB NOW | Plumbing | Permit Issued | Capital Contracting P&H | 06/10/2026 |
| DOB NOW | Plumbing | Permit Issued | Capital Contracting P&H | 06/09/2026 |
| DOB NOW | Standpipe | Permit Issued | Sirina Fire Protection | 05/19/2026 |
| DOB NOW | Sprinklers | Permit Issued | Sirina Fire Protection | 05/18/2026 |
| DOB NOW | Construction Fence | Permit Issued | Skyline Scaffolding Group | 05/15/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Topline NYC Contracting | 05/15/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Skyline Scaffolding Group | 04/28/2026 |
| DOB NOW | General Construction | Permit Issued | Skanska USA Building | 04/28/2026 |
| DOB NOW | General Construction | Permit Issued | Skanska USA Building | 04/27/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/19/2026 | — | — | Air Conditioning Systems | Cooling Liebert PW011UC 42,500 BTU · Crac Unit ×1 |
| 09/30/2026 | Permit Issued | Skanska USA Building | Air Conditioning Systems | Cooling |
| 09/25/2026 | Signed-off | Americon Construction | Heating Systems, Ventilation Systems | |
| 09/25/2026 | — | — | Air Conditioning Systems | Cooling Iec HPY-08 24,300 BTU · Fan Coil Indoor ×1 |
| 08/18/2026 | Permit Issued | Fresh Meadow Mechanical | Ventilation Systems | Ventilation Acrovent DDR 1,500 CFM · Exhaust Fan ×1 |
| 07/07/2026 | Permit Issued | Empire General Contracting | Heating Systems | Heating Precision Coils HW58S01Q10-24x56-RH 3,100 CFM ×1 |
| 05/20/2026 | Permit Issued | Racanelli Construction Co | Air Conditioning Systems, Ventilation Systems | Cooling Climatemaster SR-024 24,000 BTU · Wshp ×1 Ventilation — DDM-16 2,700 CFM · Ductwork ×2 |
| 04/21/2026 | Permit Issued | Americon Construction | Air Conditioning Systems, Ventilation Systems | Cooling Liebert ×4 Ventilation Twin City Fan TL-400R 275 CFM · Exhaust Fan ×3 |
| 03/29/2026 | — | — | Ventilation Systems | Ventilation Twin City Fan BAV-122 1,300 CFM ×2 |
| 10/29/2025 | Permit Issued | Skanska USA Building | Air Conditioning Systems, Generators | Cooling Generators Caterpillar 3516C 2,000 kW · Generator ×3 |
| 05/19/2025 | Permit Issued | Central Consulting & Cont | Ventilation Systems | Ventilation Twin City Fan BCV-122 1,300 CFM · Exhaust Fan ×1 |
| 04/13/2022 | Permit Issued | B.R. Fries & Associates | Heating Systems | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/19/2026 | — | — | Sprinkler System |
| 09/30/2026 | Permit Issued | Par Fire Protection | Sprinkler System |
| 09/25/2026 | — | — | Sprinkler System |
| 07/07/2026 | Permit Issued | NYC Fire Sprinkler | — |
| 05/20/2026 | Permit Issued | Archer Consultants Group | — |
| 04/23/2026 | Permit Issued | A & F Fire Protection Co | 72 heads |
| 03/29/2026 | — | — | Sprinkler System |
| 03/27/2026 | — | — | 87 heads |
| 03/06/2026 | — | — | 4 heads |
| 01/05/2026 | Permit Issued | Par Fire Protection | 236 heads |
| 12/19/2025 | Permit Issued | Preferred Sprinkler and Mechanical | Sprinkler System |
| 11/21/2025 | Permit Issued | Archer Consultants Group | 52 heads |
| 10/29/2025 | Permit Issued | Sirina Fire Protection | — |
| 04/19/2022 | Permit Issued | Ashlar Mechanical | 36 heads |
| 07/16/2021 | Permit Issued | NYC Fire Sprinkler | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/19/2026 | — | — | Medical Gas, Water/Sanitary |
| 09/30/2026 | Permit Issued | Cardoza Plumbing | Water/Sanitary |
| 09/25/2026 | Permit Issued | Capital Contracting P&H | Water/Sanitary |
| 09/25/2026 | — | — | Water/Sanitary |
| 08/18/2026 | Permit Issued | Fresh Meadow Mechanical Plumbing | Gas, Water/Sanitary |
| 07/07/2026 | Permit Issued | Cardoza Plumbing | Water/Sanitary |
| 05/20/2026 | Permit Issued | Par Plumbing Co | Water/Sanitary |
| 04/23/2026 | — | — | — |
| 04/21/2026 | Permit Issued | Capital Contracting P&H | Water/Sanitary |
| 03/29/2026 | — | — | Medical Gas, Water/Sanitary |
| 03/27/2026 | — | — | Water/Sanitary |
| 03/27/2026 | — | — | Gas, Water/Sanitary |
| 03/06/2026 | — | — | Water/Sanitary |
| 01/05/2026 | Permit Issued | Par Plumbing Co | Medical Gas, Water/Sanitary |
| 12/19/2025 | Permit Issued | Alliance Plumbing | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | Hugh O'Kane Electric Co | General Wiring |
| 07/17/2026 | Permit Issued | Allan Briteway Electrical | General Wiring |
| 06/19/2026 | Permit Issued | Top Shelf Electric | — |
| 01/13/2026 | Permit Issued | Bigman Brothers | General Wiring |
| 10/10/2025 | Permit Issued | Bigman Brothers | General Wiring |
| 09/10/2025 | Permit Issued | Hugh O'Kane Electric Co | General Wiring |
| 09/02/2025 | Permit Issued | Forest Electric | General Wiring |
| 09/02/2025 | Complete | Forest Electric | General Wiring |
| 09/02/2025 | Permit Issued | Forest Electric | General Wiring |
| 07/29/2025 | Permit Issued | Forest Electric | General Wiring |
| 04/22/2025 | Permit Issued | E-J Electric Installation Co | General Wiring |
| 03/12/2025 | Complete | Rigid Electric | General Wiring |
| 02/11/2025 | Permit Issued | E-J Electric Installation Co | — |
| 01/06/2025 | Permit Issued | Bigman Brothers | General Wiring |
| 12/02/2024 | Permit Issued | Corporate Electric Group | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/19/2026 | — | — | Steel |
| 09/30/2026 | Permit Issued | Par Fire Protection | Steel, Concrete |
| 03/29/2026 | — | — | Steel |
| 10/29/2025 | Permit Issued | Sirina Fire Protection | Steel, Concrete |
| 02/07/2025 | Permit Issued | Skanska USA Building | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/12/2025 | Permit Issued | Benjamin Constructn | Suspended Scaffold (SC) |
| 12/14/2023 | Permit Issued | C&C Daley's Construction | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/30/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/14/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/17/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/23/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/25/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/24/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/19/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/27/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/19/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/02/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/24/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/05/2025 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| 02/05/2025 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 02/05/2025 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 01/30/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/10/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/08/2025 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| 01/08/2025 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 01/08/2025 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/30/2026 | Post-installed Anchors | — | special |
| 09/22/2026 | Final | Young Suh | progress |
| 09/22/2026 | Fire-Resistance Rated Construction | Young Suh | progress |
| 09/22/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 09/22/2026 | Fenestration areas | Young Suh | energy_progress |
| 09/22/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 09/22/2026 | Fenestration air leakage | Young Suh | energy_progress |
| 09/22/2026 | Masonry | Young Suh | special |
| 09/22/2026 | Post-installed Anchors | Young Suh | special |
| 09/22/2026 | Fenestration and door U-factor and product ratings | Young Suh | energy_progress |
| 09/22/2026 | Exterior Insulation and Finish Systems (EIFS) | Young Suh | special |
| 09/21/2026 | Maintenance information | — | energy_progress |
| 09/21/2026 | Lighting controls | — | energy_progress |
| 09/21/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 09/21/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 09/21/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 09/21/2026 | Shutoff dampers | — | energy_progress |
| 09/21/2026 | Interior lighting power | — | energy_progress |
| 09/18/2026 | Structural Steel - Welding | — | special |
| 09/18/2026 | Structural Steel - High Strength Bolting | — | special |
| 09/18/2026 | Structural Steel - Details | — | special |
| 09/18/2026 | Energy Code Compliance Inspections | — | progress |
| 09/18/2026 | Post-installed Anchors | — | special |
| 09/18/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 09/18/2026 | Post-installed Anchors | — | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| NYU Langone Health | Medical / Healthcare | Cellar, Ground, Floors 1–7, Penthouse, Roof | Project B01442006 Project B01408513 Project B01358261 Project B01371313 Project B01371459 Project B01377358 Project B01343732 Project B01329714 Project B01270357 Project B01326594 Project B01267752 Project B01267521 |
| NYU Lutheran | Medical / Healthcare | Floors 1, 4 | Project B01107884 Project B00442815 Project B00442845 |
| New York University (NYU) | Education | Floors 3–8 | Project B01239220 Project B01239231 Project B01144126 |
| Lutheran Medical Center | Medical / Healthcare | Floors 1–6 | Project B01204280 Project B00456966 |
| NYU LHB | Medical / Healthcare | Floors 1–6, Roof | Project B01102988 |
| Verizon | Telecom site | Roof | Project B00921586 |
| Lutheran Hospital | Medical / Healthcare | Roof | Project B00479043 Project B00479007 |