| Owner | Filings | Most Recent |
|---|---|---|
| VORNADO REALTY TRUST | 455 | 09/13/2026 |
| 962 THIRD AVENUE ASSOCIATES | 20 | 04/09/2026 |
| WILLIAMSBURG SALON LLC-DBA SHOBHA | 3 | 04/09/2026 |
| LEXINGTON 58 PARKING LLC | 1 | 03/22/2026 |
| 962 3 AVE ASSOCIATES LLC | 1 | 03/22/2026 |
| 962 THIRD AN ASSOCIATES L | 1 | 03/22/2026 |
| VORNADO OFFICE MANAGEMENT LLC | 647 | 03/22/2026 |
| VORNADO REALTY TRUST CONT | 2 | 03/22/2026 |
| MELVA CONST. CO | 1 | 03/22/2026 |
| CENTRAL PARKING SYSTEMS I | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GOLDMAN COPELAND ASSOCIATES | 122 | 06/02/2026 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 9 | 05/28/2026 |
| EDG | 6 | 03/16/2026 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 1 | 01/12/2026 |
| THOMAS LANZELOTTI | 1 | 01/08/2026 |
| COLIN CLELAND | 2 | 08/28/2025 |
| OPN ARCHITECTS | 1 | 04/23/2025 |
| ASDA ARCHITECTURE + DESIGN | 31 | 03/04/2025 |
| M. CHETRIT CONSULTING ENGINEERS P.C | 5 | 11/08/2024 |
| RANDALL P. COLLINS ARCHITECT, PC | 2 | 11/07/2024 |
| GILSANZ MURRAY STEFICEK LLP | 3 | 09/03/2024 |
| HRM ENGINEERING SERVICES, PC | 4 | 07/24/2024 |
| RCGA ARCHITECTS, P.C | 1 | 07/24/2024 |
| MARK GOULD ARCHITECT | 1 | 04/02/2024 |
| SANTINI STUDIO | 2 | 02/23/2024 |
| KTA ENGINEERING | 1 | 10/25/2023 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 8 | 10/20/2023 |
| MOED DE ARMAS & SHANNON | 2 | 04/27/2023 |
| LEON SKVIRSKY PE | 1 | 12/14/2022 |
| TOHFAZ UDDIN PE PC | 1 | 09/26/2022 |
| YORAM OZER | 3 | 07/28/2022 |
| WINTON GROUP ARCHITECTURE | 1 | 04/25/2022 |
| CARL GUINTA ASSOCIATES | 5 | 04/19/2022 |
| LAWRENCE DIGENNARO, ARCHITECT | 3 | 04/01/2022 |
| JOSEPH A. LECCE P.E.,P.C. | 3 | 03/31/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| ARCHETYPE CONSULTANTS | 400 | 03/21/2026 |
| RIZZO GROUP | 8 | 03/21/2026 |
| BUILDING BROTHERS | 2 | 03/21/2026 |
| DIRECT ACCESS EXPEDITING, INC. | 2 | 03/21/2026 |
| PROFESSIONAL DESIGN CONSULTANTS LL | 2 | 03/21/2026 |
| RCGA ARCHITECTS | 2 | 03/21/2026 |
| LMS-ACE SERVICES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| L&K PARTNERS, INC | General Contractor | 35 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 34 | 07/08/2026 |
| JOHN GALLIN & SON, INC | General Contractor | 25 | 07/08/2026 |
| W5 GROUP LLC | General Contractor | 25 | 07/08/2026 |
| AMBASSADOR CONSTRUCTION C | General Contractor | 11 | 07/08/2026 |
| ELITE TECH USA INC | General Contractor | 10 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 10 | 07/08/2026 |
| S.B.A. PLUMBING CORP | Plumbing | 10 | 07/08/2026 |
| SKYLINE FIRE SPRINKLER CO | Fire Protection | 7 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 7 | 04/09/2026 |
| PETRETTI & ASSOCIATES LLC | General Contractor | 6 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 6 | 07/08/2026 |
| KING CONSTRUCTION GP LLC | General Contractor | 6 | 03/21/2026 |
| ROBERT B. SAMUELS, INC. | Electrical | 5 | 03/22/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 5 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 4 | 07/08/2026 |
| KING HOIST & SCAFFOLDING | General Contractor | 4 | 03/21/2026 |
| PSI PARTNERS, LLC | Fire Protection | 4 | 07/08/2026 |
| ARAS CONTRACTING INC | General Contractor | 4 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 4 | 03/21/2026 |
| LHOTSE CORP | General Contractor | 4 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 3 | 07/08/2026 |
| INFRASTRUCTURE REPAIR SERVICE | General Contractor | 3 | 04/09/2026 |
| CRESTWOOD RENOVATIONS COR | General Contractor | 3 | 03/21/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 3 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| OUTSOURCE SPECIAL INSPECT | 2827 | 4 | 06/02/2026 |
| EDG | 2578 | 6 | 03/16/2026 |
| HANSEN ENGINEERING PC | 8174 | 46 | 01/23/2026 |
| ETI CONSULTANTS LLC | 7694 | 6 | 10/17/2025 |
| PROJECT TACTICAL SOLUTION | 5859 | 11 | 08/28/2025 |
| ADVANCED ENGINEERING & IN | 1224 | 1 | 07/31/2025 |
| ENGINEERING BUILDING SERV | 7303 | 3 | 04/30/2025 |
| ALAN D MARCUS, PE | 1761 | 42 | 03/07/2025 |
| ASDA ARCHITECTURE + DESIG | 2015 | 18 | 09/23/2024 |
| ASHWANI KHANNA PE | 5256 | 1 | 07/24/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | BEDROCK MECHANICAL INC | 06/22/2026 |
| DOB NOW | General Construction | Permit Issued | VANGUARD CONSTRUCTION AND | 06/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | VANGUARD CONSTRUCTION AND | 06/15/2026 |
| DOB NOW | Plumbing | Permit Issued | WILLIAM C. GERAKARIS P&H | 06/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | AMI AND ASSOCIATES INC | 02/05/2026 |
| DOB NOW | Plumbing | Signed-off | ACCURATE MECH INDSTRS INC | 02/05/2026 |
| DOB NOW | Structural | Permit Issued | TURNER CONSTRUCTION COMPANY | 01/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 01/22/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 01/21/2026 |
| DOB NOW | Structural | Signed-off | INFRASTRUCTURE REPAIR SER | 09/08/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | SPYDER WINDOW CLEANING IN | 08/18/2025 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 05/01/2025 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 05/01/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | OMARA ORGANIZATION INC | 05/01/2025 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 04/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 03/11/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 03/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JAMES E FITZGERALD INC | 01/17/2025 |
| DOB NOW | General Construction | Signed-off | JAMES E FITZGERALD INC | 01/17/2025 |
| DOB NOW | Plumbing | Signed-off | ARMON MECHANICAL INC | 01/17/2025 |
| DOB NOW | Sprinklers | Signed-off | ARMON MECHANICAL INC | 01/17/2025 |
| DOB NOW | Sprinklers | Signed-off | P & D MECHANICAL CORP | 01/03/2025 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 12/30/2024 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 12/30/2024 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 12/30/2024 |
| DOB NOW | Sprinklers | Signed-off | BLUEWATER P&H, INC | 11/19/2024 |
| DOB NOW | Plumbing | Signed-off | BLUEWATER PLBG& HTG INC | 11/14/2024 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 10/25/2024 |
| DOB NOW | Sprinklers | Permit Issued | BYPASS MECHANICAL CORP | 10/25/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CLUNE CONSTRUCTION CO LP | 10/23/2024 |
| DOB NOW | Plumbing | Permit Issued | BLUEWATER PLBG& HTG INC | 10/22/2024 |
| DOB NOW | Sprinklers | Signed-off | BLUEWATER P&H, INC | 10/16/2024 |
| DOB NOW | Plumbing | Signed-off | BLUEWATER PLBG& HTG INC | 10/15/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CLUNE CONSTRUCTION CO LP | 10/04/2024 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 09/29/2024 |
| DOB NOW | General Construction | Signed-off | W5 GROUP LLC | 09/24/2024 |
| DOB NOW | Structural | Signed-off | INFRASTRUCTURE REPAIR SER | 09/17/2024 |
| DOB NOW | General Construction | Signed-off | ATRIUM CONSTRUCTIONS LLC | 09/13/2024 |
| DOB NOW | General Construction | Signed-off | W5 GROUP LLC | 09/09/2024 |
| DOB NOW | General Construction | Signed-off | TRI-STATE DISMANTLING COR | 07/29/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/02/2026 | Permit Issued | VANGUARD CONSTRUCTION AND | Ventilation Systems | Ventilation Greenheck SP-LP0810W 100 CFM · Exhaust Fan ×1 |
| 04/30/2025 | Permit Issued | OMARA ORGANIZATION INC | Air Conditioning Systems | Cooling Sigma SIG-SDSV120C-2 10 tons · Wshp ×1 |
| 04/03/2024 | Permit Issued | ARAS CONTRACTING INC | Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/02/2026 | Permit Issued | BEDROCK MECHANICAL INC | 5 heads |
| 04/30/2025 | Permit Issued | AGGRESSIVE FIRE PROT LLC | 137 heads |
| 10/18/2024 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/02/2026 | Permit Issued | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| 01/08/2026 | Signed-off | ACCURATE MECH INDSTRS INC | Water/Sanitary |
| 10/18/2024 | Permit Issued | PLUMBING WORKS CORP | — |
| 10/18/2024 | Permit Issued | BLUEWATER PLBG& HTG INC | Water/Sanitary |
| 07/24/2024 | Permit Issued | PETER MICELI PLUMBING | Water/Sanitary |
| 03/02/2021 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2026 | Complete | NEE ELECTRICAL, LLC | General Wiring |
| 07/06/2026 | Permit Issued | RONAN ELECTRICAL LLC | General Wiring |
| 05/13/2026 | Complete | PATRIOT ELECTRIC CORP | General Wiring |
| 03/09/2026 | Complete | ENNELL GRP ELECTRIC CORP | General Wiring |
| 02/05/2026 | Complete | FREEDOM ELECTRIC & DATA | General Wiring |
| 12/19/2025 | Complete | NEE ELECTRICAL, LLC | General Wiring |
| 06/27/2025 | Complete | EPIC ELECTRIC INC | General Wiring |
| 06/15/2025 | Complete | EPIC ELECTRIC INC | General Wiring |
| 06/11/2025 | Complete | C. W. GREENE INC | General Wiring |
| 05/06/2025 | Permit Issued | MATROS AUTOMATED ELEC'L C | General Wiring |
| 01/28/2025 | Complete | ALLSTATE ELEC'L CONT INC | General Wiring |
| 11/08/2024 | Complete | ALLSTATE ELEC'L CONT INC | General Wiring |
| 10/14/2024 | Permit Issued | EPIC ELECTRIC INC | General Wiring |
| 07/25/2024 | Complete | PRUDENT ELECTRIC INC | General Wiring |
| 04/18/2024 | Permit Issued | CRESCO ELECTRICAL CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/12/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2025 | Permit Issued | SPYDER WINDOW CLEANING IN | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/05/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/04/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/24/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/23/2025 | Pass-Final Sign Permit Inspection | Pass | View ↗ |
| 11/17/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/12/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/12/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/06/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/22/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/09/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/28/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/23/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/23/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/27/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/27/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/22/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/21/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/14/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/13/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/12/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 05/12/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 05/12/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/12/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/27/2026 | HVAC-R and service water piping design and insulation | JONAR MADRIAGA | energy_progress |
| 05/01/2026 | Lighting controls | JONAR MADRIAGA | energy_progress |
| 05/01/2026 | Final | JONAR MADRIAGA | progress |
| 05/01/2026 | Mechanical Systems | JONAR MADRIAGA | special |
| 05/01/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 05/01/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 05/01/2026 | Interior lighting power | JONAR MADRIAGA | energy_progress |
| 05/01/2026 | Sprinkler Systems | JONAR MADRIAGA | special |
| 05/01/2026 | Mastic and Intumescent Fire-resistant Coatings | JONAR MADRIAGA | special |
| 05/01/2026 | Energy Code Compliance Inspections | JONAR MADRIAGA | progress |
| 05/01/2026 | Final | JONAR MADRIAGA | progress |
| 05/01/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 05/01/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 03/17/2026 | Subgrade Inspections | Anthony Stasio | special |
| 03/17/2026 | Structural Steel - Details | Anthony Stasio | special |
| 03/17/2026 | Post-installed Anchors | Anthony Stasio | special |
| 03/17/2026 | Concrete - Cast-In-Place | Anthony Stasio | special |
| 03/17/2026 | Final | Anthony Stasio | progress |
| 03/17/2026 | Structural Steel - High Strength Bolting | Anthony Stasio | special |
| 03/17/2026 | Structural Stability – Alterations of existing buildings | Anthony Stasio | special |
| 02/26/2026 | Structural Stability – Alterations of existing buildings | Anthony Stasio | special |
| 02/26/2026 | Post-installed Anchors | Anthony Stasio | special |
| 02/26/2026 | Structural Steel - High Strength Bolting | Anthony Stasio | special |
| 02/26/2026 | Final | Anthony Stasio | progress |
| 02/26/2026 | Concrete - Cast-In-Place | Anthony Stasio | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Tai Ping Carpets Americas | Office | Floor 11 | Project M01320406 Project M01320383 Project M01320399 |
| Tai Ping Edward Fields Showroom | Retail | Floor 11 | Project M01320397 |
| Sub-Zero | Office | Floor 5 | Project M01187076 |
| Wolf Sub-Zero Cove | Retail | Floor 5 | Project M01187071 Project M01187050 |
| Michelle Gerson | Office | Floor 23 | Project M01162493 Project M01162503 Project M00598316 Project M00598322 |
| Fisher & Paykel | Office | Floor 3 | Project M01143040 Project M01143254 |
| Gameday Men's Health | Medical / Healthcare | Floor 14 | Project M01117347 Project M01117360 |
| Moulinos & Levinas | Office | Floor 29 | Project M01096005 Project M01096012 Project M01095960 |
| Bosch | Office | Floor 7 | Project M01025385 |
| BSH | Office | Floor 7 | Project M01025354 |
| Cuzine | Retail | Floor 4 | Project M01021535 Project M01021658 Project M01021670 Project M01021504 |
| Florense | Retail | Floor 3 | Project M00957697 Project M00957739 |
| NY Spine Specialists | Medical / Healthcare | Floor 32 | Project M00958334 Project M00940223 |
| Bakes & Kropp | Retail | Floor 4 | Project M00900935 Project M00900973 Project M00900979 |
| Castle Harlan | Office | Floor 38 | Project M00880897 |
| B&B Italia USA | Retail | Floors 1, 2, Mezzanine | Project M00822302 Project M00371956 |
| True Residential | Residential | Floor 6 | Project M08028600 Project M08028587 Project M08028610 Project M08028620 |
| Hill Path Capital | Office | Floor 33 | Project M00737620 |
| ENT and Allergy Associates | Medical / Healthcare | Floor 34 | Project M00679280 Project M00679367 Project M00679376 Project M00679384 |
| Ferguson | Retail | Floors 11, 12 | Project M00496195 |
| Morsly | Office | Floor 24 | Project M00385891 Project M00385897 Project M00385899 |
| Cosentino | Retail | Floor 3 | Project M00333308 Project M00333315 Project M00333317 |
| Sitaras | Fitness / Recreation | Floors 11, 12 | Project M00378147 Project M00298190 |
| Consulate of Spain | Office | Floor 30 | Project M00322058 Project M00322061 Project M00322066 |
| Ratio Advisors | Office | Floor 20 | Project M00303402 Project M00303920 Project M00303922 |
| Davis Ward & Hochman | Office | Floor 20 | Project M00246756 Project M00246759 |
| Snaidero | Retail | Floor 8 | Project M00214522 |