150 WEST 87TH STREET
MANHATTAN · BIN 1032215
💬 Discuss this project
1914Year Built
9Stories
D4Building Class
R7-2Zoning
59,175 sfGross Floor Area
41Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator cooperative · Owner of record: 150 West 87th Owners · 8,280 sf lot · 7.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsTemporary pipe scaffold installation1 filing
RoofFacade repairs1p · 1 filing · 3 docs
BulkheadOutrigger application1p · 1 filing · 3 docs
Floor 9Unit 9D4p · 2 filings · 20 docs
Floor 8Unit 8D2 filings · 6 docs
Floor 7
Floor 6
Floor 5Unit 5B1 filing · 3 docs
Floor 4Unit 4D3p · 2 filings · 20 docs
Floor 3
Floor 2Unit 2D3p · 1 filing · 13 docs
Floor 1Unit 1A, Unit 1B3 filings · 15 docs
Site & exteriorHeavy duty sidewalk shed installation3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
150 West 87th Owners6003/22/2026
RSP Companies2107/08/2026
ZS Holdings1003/21/2026
104 West 32nd Street Partnership503/21/2026
150 West 87th Street303/21/2026
Phoenix103/21/2026
Century103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A2 Architect1208/20/2024
Ashraf105/06/2024
Dario Pasquariello Architect108/30/2023
Mohammad Ahead, PE106/28/2023
Stone104/13/2023
Truong Montgomery Architect310/12/2022
Marin Architects205/31/2022
Royal T&E203/14/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A Expediting603/21/2026
J Callahan Consulting603/21/2026
Arsenal Building Consultants203/21/2026
Kma Designs203/21/2026
Stone203/21/2026
Rigging Consultants203/21/2026
Canas Solutions403/21/2026
Jenny Flores Expediting903/21/2026
DJL Architect103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Real Deal DecorationGeneral Contractor603/21/2026
Garcia Home ImprovementGeneral Contractor407/08/2026
J & G Construction ServicesScaffold407/08/2026
Dutchess Cabinets of NY *specialty_contractor303/21/2026
SoraGeneral Contractor303/21/2026
Castcapa ConstructionGeneral Contractor203/21/2026
Phoenix Sutton STRScaffold207/08/2026
Cottam Heating & Air Conditspecialty_contractor203/21/2026
Carreras Home ImprovementPlumbing207/08/2026
City Gas Heating Service CoPlumbing207/08/2026
Pat Sementa P & H CoPlumbing207/08/2026
Top Tier ElectricElectrical203/22/2026
QMB Plumbing & HeatingPlumbing107/08/2026
Elpo Electrical ContgElectrical103/21/2026
Intelogic ElectricElectrical103/21/2026
Lintech ElectricElectrical103/22/2026
AL-Wes Electric ServicesElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A2 Architect2504608/20/2024
Dario Architecture & Desig6878108/30/2023
Metric Consulting and Ins1803204/13/2023
Milrose Consultants2003110/12/2022
Building Lifecycle
All (190)Filed (24)Permit Issued (21)Signed Off (15)Facade (FISP) (19)Violation (60)Inspection (15)Objection (6)Special Inspection (30)
07/07/2026
Cycle 10 facade report submitted
07/07/2026
Cycle 10 facade report signed — SAFE
05/27/2026
Cycle 10 facade inspection completed
04/07/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00891242-I1
04/07/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00891242-S1
02/04/2025
Signed off — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 2D ON THE SECOND FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01029124-S1
12/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/11/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2024
Signed off — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 2D ON THE SECOND FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01029124-I1
09/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/20/2024
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 2D ON THE SECOND FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01029124-P1
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
08/12/2024
Signed off — Alteration
M00849114-I1
08/12/2024
Cycle 9 facade report signed — SAFE
08/06/2024
Signed off — Alteration
M00922097-I1
07/29/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/24/2024
Cycle 9 facade report submitted
07/23/2024
Cycle 9 facade inspection completed
05/14/2024
Permit issued — Plumbing
M01029124-S1-PL
05/13/2024
Permit issued — General Construction
M01029124-I1-GC-CX
05/07/2024
Permit issued — Sidewalk Shed
M00891242-S1-SH
05/06/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00891242-S1
04/09/2024
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 2D ON THE SECOND FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01029124-S1
04/09/2024
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 2D ON THE SECOND FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01029124-I1
04/09/2024
Special inspection requirement — Duct leakage testing, insulation and design
Ann Macklin
04/02/2024
Special inspection requirement — HVAC-R and service water heating system controls
Ann Macklin
04/02/2024
Special inspection requirement — Maintenance information
Ann Macklin
04/02/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ann Macklin
04/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
04/02/2024
Special inspection requirement — Final
Ann Macklin
04/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
04/02/2024
Special inspection requirement — Mechanical Systems
Ann Macklin
04/02/2024
Special inspection requirement — Lighting in dwelling units
Ann Macklin
03/14/2024
Permit issued — Suspended Scaffold
M01016673-I1-SC
03/08/2024
Filed — Alteration
M01016673-I1
10/19/2023
Signed off — Alteration
M00748148-I1
09/21/2023
Signed off — Alteration
MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00761973-I1
09/21/2023
Signed off — Alteration
PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00761966-I1
09/12/2023
Permit issued — Mechanical Systems
M00761973-I1-MS
09/12/2023
Permit issued — General Construction
M00922097-I1-GC
08/30/2023
Filed — Alteration
M00922097-I1
08/04/2023
Permit issued — General Construction
M00849114-I1-GC
06/28/2023
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00891242-I1
06/28/2023
Permit issued — Sidewalk Shed
M00891242-I1-SH
05/24/2023
Signed off — Alteration
Remove and install plumbing fixtures with related piping as shown on drawings. Construction work filed under separate application M00748148.
M00742637-I1
05/17/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AT VARIOUS LEVELS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF 2014 THE NYC BUILDING CODE
M00001146-I1
05/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/13/2023
Filed — Alteration
M00849114-I1
03/23/2023
Cycle 9 facade report signed — SWARMP
03/21/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/21/2023
Permit issued — Plumbing
M00761966-I1-PL
02/21/2023
Permit issued — General Construction
M00748148-I1-GC
01/24/2023
Cycle 9 facade report submitted
12/21/2022
Cycle 9 facade inspection completed
10/12/2022
Filed — Alteration
MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00761973-I1
08/11/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/09/2022
Permit issued — Plumbing
M00761966-I1-PL
Latest 60 of 190 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCarreras Home Improvements05/14/2024
DOB NOWGeneral ConstructionSigned-offWise Construction Safety05/13/2024
DOB NOWSidewalk ShedSigned-offJ & G Construction Services05/07/2024
DOB NOWSuspended ScaffoldPermit IssuedSPD Construction03/14/2024
DOB NOWMechanical SystemsSigned-offCottam Heating Air Cond09/12/2023
DOB NOWGeneral ConstructionSigned-offSora09/12/2023
DOB NOWGeneral ConstructionSigned-offCastcapa Construction08/04/2023
DOB NOWSidewalk ShedSigned-offJ & G Construction Services06/28/2023
DOB NOWPlumbingSigned-offCity Gas Heating Service Co02/21/2023
DOB NOWGeneral ConstructionSigned-offGarcia Home Improvement02/21/2023
DOB NOWPlumbingSigned-offCity Gas Heating Service Co08/09/2022
DOB NOWGeneral ConstructionPermit IssuedDutchess Cabinets of NY *07/29/2022
DOB NOWPlumbingSigned-offQMB Plumbing & Heating07/21/2022
DOB NOWGeneral ConstructionSigned-offGarcia Home Improvement06/10/2022
DOB NOWPlumbingSigned-offPat Sementa P & H Co01/05/2022
DOB NOWGeneral ConstructionSigned-offWise Construction Safety09/16/2021
DOB NOWPlumbingSigned-offCarreras Home Improvements09/16/2021
DOB NOWMechanical SystemsSigned-offWise Construction Safety12/20/2019
DOB NOWPlumbingSigned-offPat Sementa P & H Co11/21/2019
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR03/19/2018
DOB NOWSupported ScaffoldSigned-offPhoenix Sutton STR10/31/2017
BISPLISSUEDJohn Fitzgerald Plumbing & Heating02/04/2026
BISPLISSUEDA. M. Plumbing Company03/08/2021
BISOTISSUEDReal Deal Decoration11/22/2019
BISPLISSUEDCarreras Home Improvement08/01/2019
BISPLISSUEDAdriatic Plumbing & Heating06/03/2019
BISMHISSUEDKTC Design Group04/30/2019
BISOTISSUEDCanido Basonas Construction Service04/24/2019
BISPLISSUEDAMC Plumbing, Heating & CLNG04/17/2019
BISOTISSUEDPiedra Construction10/24/2018
BISOTISSUEDReal Deal Decoration09/10/2018
BISMHISSUEDReal Deal Decoration09/10/2018
BISOTISSUEDReal Deal Decoration09/10/2018
BISPLISSUEDCarreras Home Improvement07/24/2018
BISPLISSUEDGreat City Plumbing07/23/2018
BISOTISSUEDBilt NYG07/17/2018
BISMHISSUEDReal Deal Decoration07/13/2018
BISOTISSUEDReal Deal Decoration07/13/2018
BISOTISSUEDReal Deal Decoration07/13/2018
BISPLISSUEDFerko Plumbing & Heating09/20/2017
+ 31 more permits on file
14 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026CompleteIntelogic ElectricGeneral Wiring
03/25/2026CompleteGalaxy ElectricGeneral Wiring
02/19/2025CompleteLintech ElectricGeneral Wiring
02/01/2025CompleteWise Electric SolutionsGeneral Wiring
08/18/2024CompleteNew York City ElectricGeneral Wiring
09/25/2023CompleteCresco ElectricalGeneral Wiring
06/15/2023CompleteRichard Neu—
05/05/2023CompleteBNH ElectricalGeneral Wiring
05/04/2022CompleteEverest Electrical ContractingGeneral Wiring
04/20/2022CompleteTop Tier ElectricGeneral Wiring
02/23/2022CompleteAll City ElectricalGeneral Wiring
11/12/2020Permit IssuedTop Tier ElectricGeneral Wiring
08/08/2019Permit IssuedTop Tier ElectricGeneral Wiring
12/10/2018CompleteGMJ ElectricGeneral Wiring
1 project · most recent 03/14/2018
Scaffold
FiledStatusContractorScope
03/14/2018Signed-offPhoenix Sutton STRScaffold
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
12/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/21/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/20/2024Fire-Resistant Penetrations and JointsAnn Macklinspecial
04/09/2024Duct leakage testing, insulation and designAnn Macklinenergy_progress
04/02/2024HVAC-R and service water heating system controlsAnn Macklinenergy_progress
04/02/2024Maintenance informationAnn Macklinenergy_progress
04/02/2024HVAC-R and service water heating equipmentAnn Macklinenergy_progress
04/02/2024Energy Code Compliance InspectionsAnn Macklinprogress
04/02/2024FinalAnn Macklinprogress
04/02/2024Fire-Resistant Penetrations and JointsAnn Macklinspecial
04/02/2024Mechanical SystemsAnn Macklinspecial
04/02/2024Lighting in dwelling unitsAnn Macklinenergy_progress
09/15/2021Mechanical SystemsAnn Macklinspecial
09/15/2021Fire-Resistant Penetrations and JointsAnn Macklinspecial
09/15/2021Energy Code Compliance InspectionsAnn Macklinprogress
09/15/2021FinalAnn Macklinprogress
09/15/2021Lighting in dwelling unitsAnn Macklinenergy_progress
09/15/2021Shutoff dampersAnn Macklinenergy_progress
09/15/2021HVAC-R and service water piping design and insulationAnn Macklinenergy_progress
09/15/2021HVAC-R and service water heating equipmentAnn Macklinenergy_progress
09/15/2021Maintenance informationAnn Macklinenergy_progress
09/15/2021HVAC-R and service water heating system controlsAnn Macklinenergy_progress
09/14/2021Fire-Resistant Penetrations and JointsAnn Macklinspecial
09/14/2021Lighting in dwelling unitsAnn Macklinenergy_progress
09/14/2021Shutoff dampersAnn Macklinenergy_progress
09/14/2021HVAC-R and service water piping design and insulationAnn Macklinenergy_progress
09/14/2021HVAC-R and service water heating equipmentAnn Macklinenergy_progress
Latest 25 of 36.
▾Documents — 818 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch21
09/06/2026M00001146-I1Request digital key ↗
09/06/2026M00001146-P1Request digital key ↗
09/03/2026M00576436-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00256138-P2Request digital key ↗
09/05/2026M00256138-P1Request digital key ↗
09/05/2026M00256138-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00255983-I1Request digital key ↗
▸Applications & Permits163
▸BISPLAN / WORK APPROVAL APPLICATION94
11/25/2025123380402Open ↗
10/08/2020104479468Open ↗
02/14/2020123425276Open ↗
Showing 3 of 94 on file for this type
▸BISWORK PERMIT APPLICATION69
02/04/2026123380402Open ↗
11/25/2019123742682Open ↗
10/04/2019140871554Open ↗
Showing 3 of 69 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZRD1-Zoning Resolution Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications169
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION91
02/21/2020140871554Open ↗
02/21/2020140871554Open ↗
02/21/2020140871554Open ↗
Showing 3 of 91 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/05/2026M00256138-P2Open ↗
09/05/2026M00256138-P1Open ↗
09/05/2026M00256138-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
08/31/2026M01029124-I1Open ↗
08/31/2026M01029124-I1Open ↗
08/31/2026M01029124-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
11/08/2019123742682Open ↗
10/02/2019140871554Open ↗
06/26/2018123379833Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
11/08/2019123742682Open ↗
06/26/2018123379833Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026M01029124-I1Open ↗
08/25/2026M00255983-I1Open ↗
08/25/2026M00255983-I1Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
10/02/2019140871554Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
10/02/2019140871554Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment60
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE24
02/14/2020123425276Open ↗
09/24/2019104344791Open ↗
09/16/2019104344791Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISEQUIPMENT USE PERMITS2
08/13/2019123325455Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/13/2019123325455Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes12
11/08/2019123742682Open ↗
07/31/2018123380402Open ↗
07/05/2018123325455Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00256138-I1Open ↗
09/05/2026M00256138-P2Open ↗
09/05/2026M00256138-P1Open ↗
Showing 3 of 4 on file for this type
▸BISDS1-Demolition Submittal Certification Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos50
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
10/02/2019140871554Open ↗
07/31/2018123380402Open ↗
06/27/2018123425276Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/03/2026M00576436-P1Open ↗
09/03/2026M00576436-I1Open ↗
09/02/2026M00751217-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/05/2026M00256138-I1Open ↗
09/02/2026M00748148-I1Open ↗
08/13/2026M00742637-I1Open ↗
Showing 3 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
11/25/2019123742682Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance65
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS37
02/21/2020140871554Open ↗
02/21/2020140871554Open ↗
11/08/2019123742682Open ↗
Showing 3 of 37 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
10/02/2020123742682Open ↗
02/21/2020140871554Open ↗
08/27/2019123379833Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
04/05/2021123425276Open ↗
10/02/2020123742682Open ↗
10/02/2020123742682Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS1
10/02/2019140871554Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/02/2019140871554Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/05/2021123425276Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00576436-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY12
04/05/2021123425276Open ↗
10/02/2020123742682Open ↗
10/02/2020123742682Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs65
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
04/05/2021123425276Open ↗
10/02/2020123742682Open ↗
02/21/2020140871554Open ↗
Showing 3 of 32 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
08/19/2019123325455Open ↗
06/03/2019104344791Open ↗
Showing 2 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
06/06/2018101840545Open ↗
06/06/2018101840545Open ↗
Showing 2 of 7 on file for this type
▸BISSUPERSEDING LETTER4
02/04/2026123380402Open ↗
05/03/2019123425276Open ↗
Showing 2 of 4 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership58
▸BISCOST AFFIDAVIT54
10/02/2020123742682Open ↗
02/21/2020140871554Open ↗
11/08/2019123742682Open ↗
Showing 3 of 54 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
10/24/2018123380402Open ↗
Showing 1 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/05/2021123425276Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms121
▸BISADDITIONAL INFORMATION44
07/22/2020123425276Open ↗
02/18/2020123742682Open ↗
02/14/2020123425276Open ↗
Showing 3 of 44 on file for this type
▸BISBOROUGH INTAKE FORM43
02/21/2020140871554Open ↗
02/14/2020123425276Open ↗
10/15/2019104344791Open ↗
Showing 3 of 43 on file for this type
▸BISEFILING COVER SHEET25
11/08/2019123742682Open ↗
07/31/2018123380402Open ↗
06/27/2018123425276Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
10/02/2019140871554Open ↗
Showing 1 of 9 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
07/13/2018123325455Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWDHCR Document2
08/13/2026M00751217-I1Open ↗
08/13/2026M00751217-P1Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01016673-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01016673-I1Open ↗