← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Parkchester South Condominium
1510 ARCHER ROAD · Parkchester · BIN 2096616
💬 Discuss this project
0Year Built
—Stories
RMBuilding Class
R6Zoning
1,842,649 sfGross Floor Area
2,141Units
Rent Stabilized655 Active Violations 648 unresolved · 7 paperwork only ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Parkchester South Condominium Associates · 914,087 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4p · 1 filing · 10 docs
Bulkhead1p · 1 filing · 10 docs
Floor 710p · 1 filing · 3 docs
Floor 6
Floor 5
Floor 4Unit 4A9p · 1 filing · 3 docs
Floor 3
Floor 2Unit 2A, Unit 7A, Unit 7B +210p · 1 filing · 3 docs
Floor 1
Site & exteriorHeavy duty sidewalk shed installation7p · 2 filings · 5 docs
Filed — no permit issuedHeavy duty sidewalk shed installation3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parkchester South Condo603/21/2026
PSC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf103/14/2024
Mohammad Ahead, PE103/07/2024
Rimkus New York101/24/2024
Connolly Engineering101/16/2024
Syed Engineering103/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants303/21/2026
Arsenal Building Consultants203/21/2026
AE Design Solution203/21/2026
Kma Designs203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vinco BuildersGeneral Contractor407/08/2026
Pna ContractingGeneral Contractor203/21/2026
Kings Group NYScaffold207/08/2026
High Quality Electric ofElectrical103/21/2026
High Quality Electric ofElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Leo Y Lee Associates2481102/07/2024
Outsource Special Inspection2827201/24/2024
Rimkus New York8123101/24/2024
Connolly Engineering, PLL3427101/16/2024
Building Lifecycle
All (89)Filed (6)Permit Issued (6)Signed Off (4)Facade (FISP) (12)Violation (53)Special Inspection (8)
12/07/2025
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
I
05/13/2025
Signed off — Alteration
X00959273-I1
12/24/2024
Signed off — Alteration
X00959580-I1
08/05/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYC
X01020139-I1
07/30/2024
Permit issued — Structural
X00959580-I1-GC-CX
05/22/2024
Violation issued (HPD, closed)
C
04/12/2024
Permit issued — General Construction
X00959273-I1-GC
04/01/2024
Permit issued — Suspended Scaffold
X00991720-I1-SC
03/26/2024
Permit issued — Structural
X00959580-I1-GC-CX
03/15/2024
Permit issued — Sidewalk Shed
X01020139-I1-SH
03/14/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYC
X01020139-I1
03/07/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYC
X01006661-I1
02/07/2024
Filed — Alteration
X00991720-I1
01/24/2024
Filed — Alteration
X00959273-I1
01/16/2024
Filed — Alteration
X00959580-I1
11/15/2023
Special inspection requirement — Energy Code Compliance Inspections
JAMES MONAHAN
11/15/2023
Special inspection requirement — Air barrier - visual inspection
JAMES MONAHAN
11/15/2023
Special inspection requirement — Masonry
JAMES MONAHAN
11/15/2023
Special inspection requirement — Post-installed Anchors
JAMES MONAHAN
11/15/2023
Special inspection requirement — Insulation placement and R values
JAMES MONAHAN
11/07/2023
Special inspection requirement — Final
JAMES MONAHAN
11/07/2023
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
09/02/2023
Violation issued (HPD, closed)
B
09/02/2023
Violation issued (HPD, closed)
B
09/02/2023
Violation issued (HPD, open)
C
09/02/2023
Violation issued (HPD, closed)
C
09/02/2023
Violation issued (HPD, closed)
C
09/02/2023
Violation issued (HPD, closed)
C
09/02/2023
Violation issued (HPD, closed)
A
09/02/2023
Violation issued (HPD, closed)
C
08/16/2023
Violation issued (HPD, closed)
C
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Cycle 9 facade report signed — SAFE
02/06/2023
Cycle 9 facade inspection completed
12/05/2022
Violation issued (FDNY_NOV, closed)
02/04/2022
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED
X00468435-I1
04/22/2021
Violation issued (HPD, closed)
C
03/05/2021
Permit issued — Sidewalk Shed
X00468435-I1-SH
03/04/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED
X00468435-I1
02/10/2021
Special inspection requirement — Final
RAFI HAMID
07/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/18/2018
Violation issued (HPD, closed)
B
07/19/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/06/2018
Cycle 8 facade report submitted
01/12/2018
Cycle 8 facade report signed — SWARMP
01/11/2018
Cycle 8 facade inspection completed
11/13/2017
Violation issued (HPD, closed)
I
07/31/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/24/2016
Violation issued (ECB, closed)
Elevators
10/05/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/16/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/05/2016
Violation issued (ECB, closed)
Elevators
10/23/2015
Violation issued (HPD, open)
B
10/23/2015
Violation issued (HPD, open)
C
10/23/2015
Violation issued (HPD, closed)
B
10/23/2015
Violation issued (HPD, closed)
A
10/23/2015
Violation issued (HPD, open)
B
10/23/2015
Violation issued (HPD, closed)
B
06/03/2015
Violation issued (HPD, closed)
B
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offVinco Builders07/30/2024
DOB NOWGeneral ConstructionSigned-offPna Contracting04/12/2024
DOB NOWSuspended ScaffoldPermit IssuedPna Contracting04/01/2024
DOB NOWStructuralSigned-offVinco Builders03/26/2024
DOB NOWSidewalk ShedSigned-offKings Group NY03/15/2024
DOB NOWSidewalk ShedSigned-offKings Group NY03/05/2021
BISOTISSUEDProto Restoration Construction03/18/2021
BISEQISSUEDRock Group NY11/23/2015
BISOTISSUEDApa Group11/04/2015
BISPLISSUEDBlueprint Plumbing02/21/2001
BISOTISSUEDP.P.C. Construction02/21/2001
1 project · most recent 03/15/2024
FiledStatusContractorScope
03/15/2024CompleteHigh Quality Electric of—
1 project · most recent 03/07/2024
Sidewalk Shed
FiledStatusContractorScope
03/07/2024——Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/15/2023Energy Code Compliance InspectionsJAMES MONAHANprogress
11/15/2023Air barrier - visual inspectionJAMES MONAHANenergy_progress
11/15/2023MasonryJAMES MONAHANspecial
11/15/2023Post-installed AnchorsJAMES MONAHANspecial
11/15/2023Insulation placement and R valuesJAMES MONAHANenergy_progress
11/07/2023FinalJAMES MONAHANprogress
11/07/2023Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
02/10/2021FinalRAFI HAMIDprogress
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/21/2026X00959580-I1Request digital key ↗
08/21/2026X00959273-I1Request digital key ↗
08/21/2026X00991720-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00468435-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION4
03/09/2021240298753Open ↗
08/30/2016220483340Open ↗
11/21/2015240123950Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
03/24/2021240298753Open ↗
11/21/2015240123950Open ↗
11/04/2015220483340Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/09/2021240298753Open ↗
03/09/2021240298753Open ↗
▸BISPROVIDE SIDEWALK SHED APPLICATION INFORMATION1
03/18/2021240298753Open ↗
▸BISPROVIDE TYPE OF SCAFFOLD APPLICATION INFORMATION1
03/18/2021240298753Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026X00468435-I1Open ↗
08/29/2026X00959273-I1Open ↗
08/29/2026X00959273-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026X00468435-I1Open ↗
08/21/2026X00959580-I1Open ↗
08/21/2026X00959273-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026X00959273-I1Open ↗
08/29/2026X00959273-I1Open ↗
08/29/2026X00959273-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/23/2017220483340Open ↗
10/14/2015220483340Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/21/2015240123950Open ↗
10/14/2015220483340Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/09/2021240298753Open ↗
11/21/2015240123950Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/21/2015240123950Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/09/2021240298753Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/14/2015220483340Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
03/18/2021240298753Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/30/2020240298753Open ↗
10/14/2015220483340Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026X00959580-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026X00959273-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/23/2017220483340Open ↗
10/14/2015220483340Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/18/2021240298753Open ↗
03/09/2021240298753Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/22/2023240298753Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/22/2023240298753Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/23/2017220483340Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/09/2021240298753Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/22/2023240298753Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/22/2023240298753Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/18/2021240298753Open ↗
03/09/2021240298753Open ↗
11/21/2015240123950Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/24/2023240298753Open ↗
08/07/2017220483340Open ↗
08/07/2017220483340Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL1
02/22/2023240298753Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/07/2017220483340Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
12/30/2020240298753Open ↗
01/23/2017220483340Open ↗
10/14/2015220483340Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/22/2023240298753Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
12/15/2016220483340Open ↗
08/30/2016220483340Open ↗
10/14/2015220483340Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
03/09/2021240298753Open ↗
11/21/2015240123950Open ↗
▸BISEFILING COVER SHEET1
10/14/2015220483340Open ↗
▸Other Documents3
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
11/21/2015240123950Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X00991720-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X00991720-I1Open ↗