← Back
BuildNYC
Elevator apt, fireproof without stores
Rockaway Village
1518 VILLAGE LANE · BIN 4625133
💬 Discuss this project
2024Year Built
12Stories
D3Building Class
R7-1Zoning
288,869 sfGross Floor Area
261Units
0 Active Violations
Elevator apt, fireproof without stores · Owner of record: Mott Center · 68,444 sf lot · 4.22 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFire protection sprinkler and standpipe work5 filings
RoofSolar panel installation on residential roof3p · 2 filings · 3 docs
Floor 4Temporary Plywood Construction Fence1p · 1 filing
Floor 3Sidewalk shed1p · 1 filing
Floor 2Temporary Plywood Construction Fence1p · 1 filing
Floor 1Manhole, sign, and barricade installation1 filing
CellarChange in grade and concrete work2p · 3 filings · 20 docs
Site & exteriorChange in grade and concrete work6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Phipps Houses Services6409/13/2026
FRP Phase 5 Lihtc903/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lettire Construction203/21/2026
JM Zoning1903/21/2026
S R Solar Design203/21/2026
Eurocelt Expediting203/21/2026
Expedite Dem203/21/2026
A1 Expediting Service403/21/2026
Valjato Engineering P203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Lettire ConstructionGeneral Contractor1507/08/2026
Cosan ConstructionScaffold707/08/2026
Upright Fire ProtctnFire Protection607/08/2026
Lettire ConstructionScaffold506/27/2026
Rockledge ScaffoldScaffold407/08/2026
Adrias PlumbingPlumbing307/08/2026
United Industries & ConstructionScaffold207/08/2026
Moore GroupScaffold203/21/2026
BT's Plumbing and HeatingPlumbing207/08/2026
Parkview P&HPlumbing207/08/2026
Agir Electrical Ltd D/B/AElectrical103/22/2026
770 Electricspecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8431604/14/2026
NKM Engineering6244203/30/2026
Amm Engineering725107/22/2024
Geodesign627502/07/2023
Building Lifecycle
All (152)Filed (30)Permit Issued (41)Signed Off (17)Violation (3)Inspection (13)Objection (18)Special Inspection (30)
09/18/2026
Signed off — Alteration
INSTALL ACTIVE SSDS SYSTEM INCLUDED GRAVEL TRENCHES, SLOTTED/SOLID PVC PIPING, MANIFOLDS, AND ACCESSORIES, ABOVE GROUD STEEL PIPING, ROOF MOUNTED VENT STACK W FAN. FILED IN CONJUNCTION WITH NB #421134187
Q00718236-S2
09/16/2026
Signed off — Alteration
Sprinkler standpipe work as per plans filed, in conjunction with NB #421134187. No change to use egress or occupancy.
Q00718340-I1
09/16/2026
Signed off — Alteration
INSTALL ACTIVE SSDS SYSTEM INCLUDED GRAVEL TRENCHES, SLOTTED/SOLID PVC PIPING, MANIFOLDS, AND ACCESSORIES, ABOVE GROUD STEEL PIPING, ROOF MOUNTED VENT STACK W FAN. FILED IN CONJUNCTION WITH NB #421134187
Q00718236-S3
06/25/2026
Signed off — Alteration
INSTALL ACTIVE SSDS SYSTEM INCLUDED GRAVEL TRENCHES, SLOTTED/SOLID PVC PIPING, MANIFOLDS, AND ACCESSORIES, ABOVE GROUD STEEL PIPING, ROOF MOUNTED VENT STACK W FAN. FILED IN CONJUNCTION WITH NB #421134187
Q00718236-I1
06/25/2026
Signed off — Alteration
Temp. Plywood Construction Fence filed in conjunction to NB App#421134187.
Q00863353-I1
06/24/2026
Signed off — Alteration
Q00718101-I1
06/24/2026
Signed off — Alteration
INSTALL ACTIVE SSDS SYSTEM INCLUDED GRAVEL TRENCHES, SLOTTED/SOLID PVC PIPING, MANIFOLDS, AND ACCESSORIES, ABOVE GROUD STEEL PIPING, ROOF MOUNTED VENT STACK W FAN. FILED IN CONJUNCTION WITH NB #421134187
Q00718236-S1
06/24/2026
Signed off — Alteration
Mechanical work as per plans filed, in conjunction with NB #421134187. No change to use, egress, or occupancy.
Q00718165-I1
06/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
Q01074034-I1
06/23/2026
Signed off — Alteration
Q00718258-I1
06/22/2026
Signed off — Alteration
Q00718116-I1
05/12/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON SIDEWALK/ROADWAY
Q01025212-I1
04/27/2026
Permit issued — Plumbing
Q00718236-S2-PL
04/21/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01147915-I1
04/21/2026
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
04/21/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
04/21/2026
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
04/21/2026
Special inspection requirement — Final
JOHN MCMONAGLE
04/21/2026
Special inspection requirement — Metering
JOHN MCMONAGLE
04/21/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
04/21/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
04/21/2026
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
04/21/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
04/21/2026
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
04/14/2026
Filed — Alteration
Mechanical work as per plans filed, in conjunction with NB #421134187. No change to use, egress, or occupancy.
Q00718165-P1
04/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
04/02/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
JOHN MCMONAGLE
03/31/2026
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
03/31/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
03/30/2026
Signed off — Alteration
Installation of Multi-Point Suspended Scaffolding as per plan and in accordance with Chapter 33 of the NYC Building Code. No change in use, egress, or occupancy.
Q01081178-I1
03/30/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01147915-P1
03/23/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
03/23/2026
Special inspection requirement — Final
NARESH MAHANGU
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
03/18/2026
Special inspection requirement — Metering
JOHN MCMONAGLE
03/18/2026
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
03/18/2026
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
03/18/2026
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
03/18/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
03/18/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
03/18/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
03/18/2026
Special inspection requirement — Final
JOHN MCMONAGLE
03/18/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
03/18/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
03/18/2026
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
03/12/2026
Filed — Alteration
Sprinkler standpipe work as per plans filed, in conjunction with NB #421134187. No change to use egress or occupancy.
Q00718340-P2
02/12/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/11/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/11/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/10/2026
Filed — Alteration
INSTALL ACTIVE SSDS SYSTEM INCLUDED GRAVEL TRENCHES, SLOTTED/SOLID PVC PIPING, MANIFOLDS, AND ACCESSORIES, ABOVE GROUD STEEL PIPING, ROOF MOUNTED VENT STACK W FAN. FILED IN CONJUNCTION WITH NB #421134187
Q00718236-P3
02/09/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/28/2026
Permit issued — Standpipe
Q00718340-I1-EW-SP
01/28/2026
Permit issued — Standpipe
Q00718340-I1-EW-SD
01/23/2026
Permit issued — Solar
Q01147915-I1-SL
01/22/2026
Filed — Alteration
Plumbing work as per plans filed, in conjunction with NB 421134187. No change to use, egress, or occupancy.
Q00718204-P4
01/22/2026
Permit issued — Mechanical Systems
Q00718236-S3-MS
12/22/2025
Filed — Alteration
INSTALL ACTIVE SSDS SYSTEM INCLUDED GRAVEL TRENCHES, SLOTTED/SOLID PVC PIPING, MANIFOLDS, AND ACCESSORIES, ABOVE GROUD STEEL PIPING, ROOF MOUNTED VENT STACK W FAN. FILED IN CONJUNCTION WITH NB #421134187
Q00718236-S3
11/20/2025
Filed — Alteration
Sprinkler standpipe work as per plans filed, in conjunction with NB #421134187. No change to use egress or occupancy.
Q00718340-P1
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBT's Plumbing and Heating04/27/2026
DOB NOWSprinklersSigned-offH.J. Flood01/28/2026
DOB NOWStandpipeSigned-offH.J. Flood01/28/2026
DOB NOWSolarSigned-off770 Electric01/23/2026
DOB NOWMechanical SystemsSigned-offLettire Construction01/22/2026
DOB NOWConstruction FenceSigned-offLettire Construction09/18/2025
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold05/12/2025
DOB NOWPlumbingPermit IssuedParkview P&H04/24/2025
DOB NOWConstruction FenceSigned-offLettire Construction04/17/2025
DOB NOWPlumbingSigned-offBT's Plumbing and Heating04/08/2025
DOB NOWSuspended ScaffoldSigned-offCosan Construction04/07/2025
DOB NOWSupported ScaffoldSigned-offCosan Construction04/04/2025
DOB NOWPlumbingSigned-offAdrias Plumbing03/18/2025
DOB NOWStandpipeSigned-offH.J. Flood02/04/2025
DOB NOWMechanical SystemsSigned-offLettire Construction01/29/2025
DOB NOWSprinklersSigned-offH.J. Flood12/19/2024
DOB NOWStandpipeSigned-offH.J. Flood12/17/2024
DOB NOWPlumbingSigned-offAdrias Plumbing12/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offMoore Group11/21/2024
DOB NOWSuspended ScaffoldSigned-offCosan Construction11/20/2024
DOB NOWSupported ScaffoldSigned-offCosan Construction11/20/2024
DOB NOWSuspended ScaffoldSigned-offCosan Construction07/24/2024
DOB NOWSupported ScaffoldSigned-offCosan Construction07/01/2024
DOB NOWStructuralSigned-offLettire Construction06/06/2024
DOB NOWProtection and Mechanical MethodsSigned-offRockledge Scaffold05/09/2024
DOB NOWSidewalk ShedSigned-offRockledge Scaffold04/23/2024
DOB NOWPlumbingSigned-offParkview P&H04/19/2024
DOB NOWConstruction FenceSigned-offLettire Construction04/18/2024
DOB NOWFoundationSigned-offLettire Construction04/04/2024
DOB NOWPlumbingSigned-offAdrias Plumbing02/29/2024
DOB NOWStructuralSigned-offLettire Construction02/08/2024
DOB NOWSupport of ExcavationSigned-offLettire Construction02/07/2024
DOB NOWFoundationSigned-offLettire Construction02/07/2024
DOB NOWMechanical SystemsSigned-offLettire Construction02/05/2024
DOB NOWStandpipeSigned-offH.J. Flood01/29/2024
DOB NOWFoundationSigned-offLettire Construction12/19/2023
DOB NOWSupport of ExcavationSigned-offLettire Construction12/19/2023
DOB NOWEarth WorkSigned-offLettire Construction12/19/2023
DOB NOWConstruction FenceSigned-offLettire Construction05/17/2023
DOB NOWConstruction FenceSigned-offUnited Industries & Construction08/06/2019
+ 9 more permits on file
1 project · most recent 02/10/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/10/2026Signed-offLettire ConstructionVentilation Systems
Ventilation
Obar GBR89 400 CFM ×1
1 project · most recent 03/12/2026
FiledStatusContractorScope
03/12/2026Signed-offUpright Fire Protctn3 heads, 3 outlets
3 projects · most recent 03/12/2026
Storm Gas Water/Sanitary
FiledStatusContractorScope
03/12/2026———
02/10/2026Signed-offNY Plumbing ProsStorm
01/22/2026Permit IssuedParkview P&HGas, Storm, Water/Sanitary
10 projects · most recent 07/10/2026
General Wiring Lighting HVAC Wiring Boiler Controls
FiledStatusContractorScope
07/10/2026CompleteGlo ElectricGeneral Wiring, Lighting, HVAC Wiring, Boiler Controls
04/15/2026CompleteAmber Lite Electric—
03/25/2026CancelledGlo Electric—
02/10/2025CompleteTF ElectricalGeneral Wiring
01/20/2025CompleteTF ElectricalGeneral Wiring
12/03/2024CompleteGrid City Electric134 meters, 1 new_meters
05/08/2024CancelledGlo Electric—
05/01/2024CancelledGlo Electric1 meters, 1 new_meters
05/01/2024CancelledGlo Electric—
04/17/2024CompleteAnthony G Ferry—
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
02/12/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/11/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/11/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/09/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/27/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
11/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2024Pass-Final PL - UndergroundPassView ↗
10/02/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/22/2024Pass-Final PL - UndergroundPassView ↗
07/02/2024Pass-Final PL - UndergroundPassView ↗
06/05/2024Pass-Final PL - UndergroundPassView ↗
05/24/2024Fail-Final PL - UndergroundFailView ↗
05/01/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
04/21/2026Heating SystemsJOHN MCMONAGLEspecial
04/21/2026Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
04/21/2026Exterior lighting powerJOHN MCMONAGLEenergy_progress
04/21/2026Maintenance informationJOHN MCMONAGLEenergy_progress
04/21/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
04/21/2026MeteringJOHN MCMONAGLEenergy_progress
04/21/2026Lighting controlsJOHN MCMONAGLEenergy_progress
04/21/2026Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
04/21/2026FinalJOHN MCMONAGLEprogress
04/21/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
04/21/2026Mechanical SystemsJOHN MCMONAGLEspecial
04/02/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesJOHN MCMONAGLEspecial
04/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
03/31/2026Standpipe SystemsJOHN MCMONAGLEspecial
03/31/2026Sprinkler SystemsJOHN MCMONAGLEspecial
03/23/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
03/23/2026FinalNARESH MAHANGUprogress
03/23/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
03/23/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
03/18/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
03/18/2026FinalJOHN MCMONAGLEprogress
03/18/2026Lighting controlsJOHN MCMONAGLEenergy_progress
03/18/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
03/18/2026Exterior lighting powerJOHN MCMONAGLEenergy_progress
03/18/2026Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
Latest 25 of 86.
▾Documents — 240 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch29
08/26/2026Q00718258-I1Request digital key ↗
08/26/2026Q00718101-I1Request digital key ↗
08/26/2026Q00718116-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00193791-I1Request digital key ↗
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION9
02/26/2026421134187Open ↗
02/26/2026421134187Open ↗
07/15/2025421134187Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
01/29/2026421134187Open ↗
12/11/2025421134187Open ↗
02/24/2025421134187Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
01/15/2026421134187Open ↗
12/03/2024421134187Open ↗
▸BISHPD: PERMIT NOTICE1
02/26/2024421134187Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/15/2022440730639Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/12/2025421134409Open ↗
▸BISZONING DIAGRAM ACCEPTANCE1
11/28/2023421134187Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/12/2025421134409Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/12/2025421134409Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/09/2025421134187Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/12/2025421134409Open ↗
▸Seals & Professional Certifications69
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/28/2026Q00193791-I1Open ↗
08/26/2026Q00718258-I1Open ↗
08/22/2026Q01074034-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/28/2026Q00718204-I1Open ↗
09/02/2026Q00718101-I1Open ↗
09/01/2026Q00718340-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/28/2026Q00718204-I1Open ↗
09/28/2026Q00718204-I1Open ↗
09/23/2026Q00718236-S1Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/15/2022440730639Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/15/2022440730639Open ↗
▸Trade Schedules & Equipment6
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
02/13/2026421134187Open ↗
11/08/2023421134187Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
11/08/2023421134187Open ↗
▸BISFDNY APPROVAL OF FRONTAGE AREA1
02/26/2024421134187Open ↗
▸BISSTANDPIPE ALARM DRAWINGS & AI1 (OR AI1 PROOF)1
02/26/2024421134187Open ↗
▸BISSTANDPIPE WORK PERMIT1
02/26/2024421134187Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
06/05/2024440730639Open ↗
11/13/2023421134187Open ↗
06/15/2023421134187Open ↗
▸BISSTREET TREES SITE PLAN2
06/23/2025440730639Open ↗
06/23/2025421134187Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
05/05/2025440730639Open ↗
05/05/2025421134187Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
07/23/2024440730639Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/05/2024440730639Open ↗
▸Environmental & Asbestos36
▸DOB NOWOER: Notice to Proceed19
08/28/2026Q00193791-I1Open ↗
08/26/2026Q00718116-I1Open ↗
08/25/2026Q00718236-S2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWOER: Notice of Satisfaction15
08/28/2026Q00193791-I1Open ↗
08/26/2026Q00718101-I1Open ↗
08/26/2026Q00718101-I1Open ↗
Showing 3 of 15 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
06/03/2024440730639Open ↗
11/08/2023421134187Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/28/2023421134187Open ↗
11/13/2023421134187Open ↗
04/11/2023421134187Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/18/2026Q00718204-I1Open ↗
08/17/2026Q00718165-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/18/2026Q00718204-I1Open ↗
08/17/2026Q00718165-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/28/2023421134187Open ↗
11/13/2023421134187Open ↗
11/13/2023421134187Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/03/2024421134187Open ↗
▸BISSOIL REPORT1
11/13/2023421134187Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/13/2023421134187Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
11/28/2023421134187Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026Q00718101-I1Open ↗
▸Approvals, Objections & Sign-offs23
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/12/2025421134409Open ↗
04/24/2025421134187Open ↗
04/24/2025421134187Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
02/11/2026421134187Open ↗
01/29/2026421134187Open ↗
02/24/2025421134187Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER5
07/17/2025421134187Open ↗
05/23/2025421134187Open ↗
05/23/2025421134187Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/17/2026Q01147915-I1Open ↗
08/17/2026Q01147915-P1Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
08/22/2023421134187Open ↗
▸BISNYCDEP APPROVAL FOR CATCHBASIN FRAME & GRATINGS1
07/23/2024440730639Open ↗
▸BISDOT APPROVAL FOR PEDRAMP/ADA RAMP_AT CORNERS1
06/05/2024440730639Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01147915-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE4
02/26/2026421134187Open ↗
07/16/2025421134187Open ↗
04/24/2025421134187Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
02/24/2026421134187Open ↗
04/10/2025421134187Open ↗
05/02/2023421134187Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/15/2022440730639Open ↗
▸BISBOROUGH INTAKE FORM1
04/08/2025421134187Open ↗
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
11/13/2023421134187Open ↗
06/15/2023421134187Open ↗
05/02/2023421134187Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT2
07/24/2024440730639Open ↗
06/05/2024440730639Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
07/23/2024440730639Open ↗
07/23/2024440730639Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00718236-I1Open ↗
08/13/2026Q00718236-S1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
11/13/2023421134187Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
04/08/2025421134187Open ↗
▸BISPLOT DIAGRAM1
05/12/2025421134409Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
06/05/2024440730639Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01081178-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q01081178-I1Open ↗