← Back
Two stories - detached, small or mid-size
152-21 ROOSEVELT AVENUE
QUEENS · Murray Hill-Broadway Flushing · BIN 4119204
💬 Discuss this project
1930Year Built
2.75Stories
A1Building Class
R4AZoning
2,208 sfGross Floor Area
1Units
7 Open Violations 6 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 152-21 ROOSEVELT LLC · 3,200 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
AtticUnder Construction35p · 1 filing · 20 docs
Floor 2Under Construction38p · 2 filings · 20 docs
Floor 1Under Construction37p · 2 filings · 20 docs
CellarUnder Construction52p · 3 filings · 20 docs
Site & exteriorUnder Construction43p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L&L COSTRUCTION DEVELOP403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/15/2025$1.2M—— → —$553/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FLUSHING ENGINEERING SERVICE PC603/27/2026
MOHAMMAD AHEAD, PE209/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M2 DESIGN1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor908/06/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373603/27/2026
MOHAMMAD AHEAD - PROFESSI9286209/26/2025
Building Lifecycle
All (108)Filed (8)Permit Issued (8)Violation (7)Inspection (1)Objection (54)Special Inspection (30)
08/05/2026
Permit issued — Mechanical Systems
Q01170648-I1-GC-CX
08/05/2026
Permit issued — Construction Fence
Q01170648-S1-FN
06/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2026
Filed — Alteration CO
HORIZONTAL EXTENT EXISTING ONE FAMILY IN THE REAR AND VERTICAL EXTENT 2ND FLOOR IN THE FRONT. AND CONVERT EXISTING ONE FAMILY INTO TWO FAMILY. REQUIRED NEW C OF O FOR TWO FAMILY, PLUMBING AND FENCE TO BE FILED UNDER SEPARATED APPLICATION
Q01170648-P3
11/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
11/07/2025
Special inspection requirement — Metering
KY FU
11/07/2025
Special inspection requirement — Duct leakage testing, insulation and design
KY FU
11/07/2025
Special inspection requirement — Air barrier - visual inspection
KY FU
11/07/2025
Special inspection requirement — Insulation placement and R values
KY FU
11/07/2025
Special inspection requirement — Air barrier — testing
KY FU
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
11/07/2025
Special inspection requirement — Heating Systems
KY FU
11/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
KY FU
11/07/2025
Special inspection requirement — Concrete - Cast-In-Place
KY FU
11/07/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
KY FU
11/07/2025
Special inspection requirement — Masonry
KY FU
11/07/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
KY FU
11/07/2025
Special inspection requirement — Structural Steel - High Strength Bolting
KY FU
11/07/2025
Special inspection requirement — Mechanical Systems
KY FU
11/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
KY FU
11/07/2025
Special inspection requirement — Footing and Foundation
KY FU
11/07/2025
Special inspection requirement — Final
KY FU
11/07/2025
Special inspection requirement — Energy Code Compliance Inspections
KY FU
11/07/2025
Special inspection requirement — Protection of exposed foundation insulation
KY FU
11/07/2025
Special inspection requirement — Interior lighting power
KY FU
11/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
11/07/2025
Special inspection requirement — Fenestration air leakage
KY FU
11/07/2025
Special inspection requirement — Maintenance information
KY FU
11/07/2025
Special inspection requirement — Shutoff dampers
KY FU
11/07/2025
Special inspection requirement — Electric vehicle service equipment requirements
KY FU
11/07/2025
Special inspection requirement — Ventilation and air distribution system
KY FU
11/07/2025
Special inspection requirement — Fenestration areas
KY FU
11/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
KY FU
11/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
10/22/2025
Objection raised — Other
10/22/2025
Objection resolved — Addressed
10/15/2025
Objection resolved — Addressed
10/08/2025
Objection raised — Admin
10/03/2025
Filed — Alteration CO
HORIZONTAL EXTENT EXISTING ONE FAMILY IN THE REAR AND VERTICAL EXTENT 2ND FLOOR IN THE FRONT. AND CONVERT EXISTING ONE FAMILY INTO TWO FAMILY. REQUIRED NEW C OF O FOR TWO FAMILY, PLUMBING AND FENCE TO BE FILED UNDER SEPARATED APPLICATION
Q01170648-P2
09/26/2025
Filed — Alteration
Temporary shoring and stabilization of on-going work as per DOB Construction Safety Unit. Work to lift stop work order and address DOB violations #090225CE40701YU & #090225CE40702YU. No change in use, egress, or occupancy. ALTCO work filed under Q01170648
Q01285286-P1
09/25/2025
Permit issued — General Construction
Q01285286-I1-GC
09/10/2025
Filed — Alteration
Temporary shoring and stabilization of on-going work as per DOB Construction Safety Unit. Work to lift stop work order and address DOB violations #090225CE40701YU & #090225CE40702YU. No change in use, egress, or occupancy. ALTCO work filed under Q01170648
Q01285286-I1
09/02/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/02/2025
Violation issued (ECB, open)
Construction
08/28/2025
Permit issued — Plumbing
Q01170662-I1-PL
08/18/2025
Violation issued (ECB, open)
Construction
08/18/2025
Violation issued (ECB, open)
Construction
08/18/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/18/2025
Violation issued (ECB, open)
Construction
07/01/2025
Permit issued — General Construction
Q01170648-I1-ST
07/01/2025
Permit issued — Structural
Q01170648-I1-GC-CX
06/20/2025
Permit issued — Foundation
Q01170648-I1-FO-EA
06/05/2025
Objection resolved — Addressed
06/05/2025
Objection resolved — Addressed
06/04/2025
Objection raised — Structural
06/04/2025
Objection raised — Inspections
05/16/2025
Permit issued — Construction Fence
Q01170648-S1-FN
05/14/2025
Filed — Alteration CO
HORIZONTAL EXTENT EXISTING ONE FAMILY IN THE REAR AND VERTICAL EXTENT 2ND FLOOR IN THE FRONT. AND CONVERT EXISTING ONE FAMILY INTO TWO FAMILY. REQUIRED NEW C OF O FOR TWO FAMILY, PLUMBING AND FENCE TO BE FILED UNDER SEPARATED APPLICATION
Q01170648-P1
05/06/2025
Objection raised — Cost
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedL&L CONSTRUCTION DEVELOP08/05/2026
DOB NOWConstruction FencePermit IssuedL&L CONSTRUCTION DEVELOP08/05/2026
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP09/25/2025
DOB NOWPlumbingPermit IssuedJOHN FITZGERALD PLBG &HTG08/28/2025
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP07/01/2025
DOB NOWStructuralPermit IssuedL&L CONSTRUCTION DEVELOP07/01/2025
DOB NOWFoundationPermit IssuedL&L CONSTRUCTION DEVELOP06/20/2025
DOB NOWConstruction FencePermit IssuedL&L CONSTRUCTION DEVELOP05/16/2025
1 project · most recent 03/27/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026Permit IssuedL&L CONSTRUCTION DEVELOPAir Conditioning Systems, Heating Systems
Cooling
Green 4 LIV09HP230V1AH(OUTDOOR) TWO ZONE, 4LIV09HP230V1AO (TWO INDOOR, BED ROOM) 9,000 CFM ×4
4LIV12HP230VIAH(OUTDOOR) SINGLE ZONE, 4LIV12HP230V1AO (INDOOR, LIVING RM) 12,000 CFM · Heat Pump Outdoor ×4
Heating
__Junk__ model#NCB-190/060H 160,000 BTU · Boiler ×12
1 project · most recent 02/14/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/14/2025Permit IssuedJOHN FITZGERALD PLBG &HTGGas, Storm, Water/Sanitary
1 project · most recent 08/24/2025
General Wiring
FiledStatusContractorScope
08/24/2025Permit IssuedCL ELECTRICAL CORPGeneral Wiring
1 project · most recent 03/27/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
03/27/2026Permit IssuedL&L CONSTRUCTION DEVELOPSteel, Concrete, Masonry, Wood
1 project · most recent 03/27/2026
Fence
FiledStatusContractorScope
03/27/2026Permit IssuedL&L CONSTRUCTION DEVELOPFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
11/07/2025Air barrier - visual inspectionKY FUenergy_progress
11/07/2025Duct leakage testing, insulation and designKY FUenergy_progress
11/07/2025HVAC-R and service water piping design and insulationKY FUenergy_progress
11/07/2025HVAC-R and service water heating equipmentKY FUenergy_progress
11/07/2025MeteringKY FUenergy_progress
11/07/2025Air barrier — testing KY FUenergy_progress
11/07/2025Insulation placement and R valuesKY FUenergy_progress
11/07/2025Fire-Resistant Penetrations and JointsKY FUspecial
11/07/2025Heating SystemsKY FUspecial
11/07/2025Structural Stability – Alterations of existing buildingsKY FUspecial
11/07/2025Concrete - Cast-In-PlaceKY FUspecial
11/07/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationKY FUspecial
11/07/2025MasonryKY FUspecial
11/07/2025Excavations - Sheeting, Shoring, and BracingKY FUspecial
11/07/2025Structural Steel - High Strength BoltingKY FUspecial
11/07/2025Mechanical SystemsKY FUspecial
11/07/2025Fire-Resistance Rated ConstructionKY FUprogress
11/07/2025Footing and FoundationKY FUprogress
11/07/2025FinalKY FUprogress
11/07/2025Energy Code Compliance InspectionsKY FUprogress
11/07/2025Protection of exposed foundation insulationKY FUenergy_progress
11/07/2025Interior lighting powerKY FUenergy_progress
11/07/2025HVAC-R and service water heating system controlsKY FUenergy_progress
11/07/2025Fenestration air leakageKY FUenergy_progress
11/07/2025Maintenance informationKY FUenergy_progress
Latest 25 of 98.
▾Documents — 136 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026Q01170662-I1Request digital key ↗
08/18/2026Q01285286-P1Request digital key ↗
08/18/2026Q01285286-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q01170648-P2Open ↗
08/13/2026Q01170648-P1Open ↗
08/13/2026Q01170648-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/13/2026Q01170648-P3Open ↗
08/13/2026Q01170648-I1Open ↗
08/13/2026Q01170648-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications90
▸DOB NOWProgress Inspector Seal & Signature51
09/01/2026Q01170662-I1Open ↗
09/01/2026Q01170662-I1Open ↗
09/01/2026Q01170662-I1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/01/2026Q01170662-I1Open ↗
08/31/2026Q01285286-I1Open ↗
08/28/2026Q01170648-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026Q01170662-I1Open ↗
08/18/2026Q01285286-I1Open ↗
08/17/2026Q01170648-I1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026Q01170648-P1Open ↗
08/13/2026Q01170648-I1Open ↗
08/13/2026Q01170648-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026Q01170662-I1Open ↗
08/18/2026Q01285286-I1Open ↗
08/17/2026Q01170648-P3Open ↗
Showing 3 of 8 on file for this type
▸Other Documents17
▸DOB NOWSite Survey: Initial4
08/13/2026Q01170648-P2Open ↗
08/13/2026Q01170648-I1Open ↗
08/13/2026Q01170648-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q01170648-P3Open ↗
08/13/2026Q01170648-P1Open ↗
08/13/2026Q01170648-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026Q01170648-P1Open ↗
08/17/2026Q01170648-P2Open ↗
08/17/2026Q01170648-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q01170648-P1Open ↗
08/13/2026Q01170648-P3Open ↗
08/13/2026Q01170648-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01170648-I1Open ↗