← Back
Three families
152 31 STREET
BROOKLYN · BIN 3009997
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
M1-2DZoning
1,920 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 1,669 sf lot · 1.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 20 docs
Floor 2Under Construction37p · 1 filing · 20 docs
Floor 1Under Construction35p · 1 filing · 20 docs
BasementUnder Construction36p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/02/2024$1.4M—Private party → Private party$719/sf building
02/14/2017$260K—Private party → —$135/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIGID STRUCTURAL DESIGN, LLC108/05/2026
YANG ENGINEERING LLC106/26/2025
ATOZ CONSULTING ENGINEERS, PC305/08/2025
PAOYI CHANG102/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LUDEN LICGeneral Contractor309/22/2026
REDIRECTING LIC INCGeneral Contractor307/08/2026
JABBIE INDUSTRIES INCORP*General Contractor208/07/2026
JEM FIRE PREVENTION INCFire Protection107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376506/26/2025
Building Lifecycle
All (59)Filed (6)Permit Issued (10)Violation (7)Inspection (9)Objection (2)Special Inspection (25)
09/21/2026
Permit issued — General Construction
B01177740-I1-GC
09/21/2026
Permit issued — Foundation
B01177740-S6-GC-CX
09/21/2026
Permit issued — Mechanical Systems
B01177740-S2-MS
09/02/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/06/2026
Permit issued — Supported Scaffold
B01177740-S7-SH
08/06/2026
Permit issued — Sidewalk Shed
B01177740-S7-SF
08/05/2026
Filed — Alteration CO
PROPOSED MECHANICAL WORK IN CONJUCTION TO THE ARCH. DESIGNS. INSTALLATION OF AIR COOLED VRF HEAT PUMP SYSTEMS TO PROVIDE COOLING AND HEATING IN APARTMENT. INSTALLATION OF FANS FOR TOILET AND KITCHEN VENTILATION.
B01177740-S7
05/01/2026
Violation issued (HPD, closed)
A
01/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/26/2025
Permit issued — Sprinklers
B01177740-S4-EW-SP
11/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/31/2025
Permit issued — Plumbing
B01177740-S3-PL
10/01/2025
Permit issued — Earth Work
B01177740-S6-GC-CX
09/03/2025
Permit issued — Mechanical Systems
B01177740-S2-MS
09/03/2025
Permit issued — General Construction
B01177740-I1-GC
06/26/2025
Filed — Alteration CO
PROPOSED MECHANICAL WORK IN CONJUCTION TO THE ARCH. DESIGNS. INSTALLATION OF AIR COOLED VRF HEAT PUMP SYSTEMS TO PROVIDE COOLING AND HEATING IN APARTMENT. INSTALLATION OF FANS FOR TOILET AND KITCHEN VENTILATION.
B01177740-S6
06/18/2025
Special inspection requirement — Structural Cold-Formed Steel
Jian Yang
06/18/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Jian Yang
06/18/2025
Special inspection requirement — Concrete - Cast-In-Place
Jian Yang
06/18/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jian Yang
06/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jian Yang
06/18/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Jian Yang
06/18/2025
Special inspection requirement — Structural Steel - Welding
Jian Yang
06/18/2025
Special inspection requirement — Subgrade Inspections
Jian Yang
06/18/2025
Special inspection requirement — Structural Steel - Details
Jian Yang
06/18/2025
Special inspection requirement — Final
Jian Yang
06/18/2025
Special inspection requirement — Footing and Foundation
Jian Yang
06/18/2025
Special inspection requirement — Structural Wood Frame
Jian Yang
06/06/2025
Violation issued (HPD, closed)
A
05/08/2025
Filed — Alteration CO
PROPOSED MECHANICAL WORK IN CONJUCTION TO THE ARCH. DESIGNS. INSTALLATION OF AIR COOLED VRF HEAT PUMP SYSTEMS TO PROVIDE COOLING AND HEATING IN APARTMENT. INSTALLATION OF FANS FOR TOILET AND KITCHEN VENTILATION.
B01177740-S2
05/08/2025
Filed — Alteration CO
PROPOSED MECHANICAL WORK IN CONJUCTION TO THE ARCH. DESIGNS. INSTALLATION OF AIR COOLED VRF HEAT PUMP SYSTEMS TO PROVIDE COOLING AND HEATING IN APARTMENT. INSTALLATION OF FANS FOR TOILET AND KITCHEN VENTILATION.
B01177740-S4
05/08/2025
Filed — Alteration CO
PROPOSED MECHANICAL WORK IN CONJUCTION TO THE ARCH. DESIGNS. INSTALLATION OF AIR COOLED VRF HEAT PUMP SYSTEMS TO PROVIDE COOLING AND HEATING IN APARTMENT. INSTALLATION OF FANS FOR TOILET AND KITCHEN VENTILATION.
B01177740-S3
04/28/2025
Objection resolved — Addressed
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
04/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
04/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
04/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
04/24/2025
Special inspection requirement — Maintenance information
Jian Yang
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
04/10/2025
Special inspection requirement — Final
Jian Yang
04/10/2025
Special inspection requirement — Mechanical Systems
Jian Yang
04/10/2025
Special inspection requirement — Sprinkler Systems
Jian Yang
03/01/2025
Objection raised — Cost
02/19/2025
Filed — Alteration CO
PROPOSED MECHANICAL WORK IN CONJUCTION TO THE ARCH. DESIGNS. INSTALLATION OF AIR COOLED VRF HEAT PUMP SYSTEMS TO PROVIDE COOLING AND HEATING IN APARTMENT. INSTALLATION OF FANS FOR TOILET AND KITCHEN VENTILATION.
B01177740-I1
06/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2024
Violation issued (HPD, closed)
A
03/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/20/2023
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
A
04/06/2021
Violation issued (HPD, closed)
A
10/06/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLUDEN LIC INC09/21/2026
DOB NOWFoundationPermit IssuedLUDEN LIC INC09/21/2026
DOB NOWMechanical SystemsPermit IssuedLUDEN LIC INC09/21/2026
DOB NOWSupported ScaffoldPermit IssuedJABBIE INDUSTRIES INCORP*08/06/2026
DOB NOWSidewalk ShedPermit IssuedJABBIE INDUSTRIES INCORP*08/06/2026
DOB NOWSprinklersPermit IssuedJEM FIRE PREVENTION INC11/26/2025
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.10/31/2025
DOB NOWEarth WorkPermit IssuedREDIRECTING LIC INC10/01/2025
DOB NOWMechanical SystemsPermit IssuedREDIRECTING LIC INC09/03/2025
DOB NOWGeneral ConstructionPermit IssuedREDIRECTING LIC INC09/03/2025
1 project · most recent 08/05/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026Permit IssuedLUDEN LIC INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXSQ24TAVJU 23,000 BTU · Vrf Outdoor ×1
RXTQ60TAVJU 57,500 BTU · Vrf Outdoor ×1
1 project · most recent 08/05/2026
Sprinkler System
FiledStatusContractorScope
08/05/2026Permit IssuedJEM FIRE PREVENTION INCSprinkler System
1 project · most recent 08/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/05/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Storm, Water/Sanitary
2 projects · most recent 07/13/2026
General Wiring
FiledStatusContractorScope
07/13/2026Permit IssuedNASH ELECTRIC SERVICES IN—
10/20/2025Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
1 project · most recent 08/05/2026
Steel Concrete Wood
FiledStatusContractorScope
08/05/2026Permit IssuedLUDEN LIC INCSteel, Concrete, Wood
1 project · most recent 08/05/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/05/2026Permit IssuedLUDEN LIC INCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/02/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/14/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
06/18/2025Structural Cold-Formed SteelJian Yangspecial
06/18/2025Wood – Prefabricated I-JoistsJian Yangspecial
06/18/2025Concrete - Cast-In-PlaceJian Yangspecial
06/18/2025Excavations - Sheeting, Shoring, and BracingJian Yangspecial
06/18/2025Structural Stability – Alterations of existing buildingsJian Yangspecial
06/18/2025Structural Steel - High Strength BoltingJian Yangspecial
06/18/2025Structural Steel - WeldingJian Yangspecial
06/18/2025Subgrade InspectionsJian Yangspecial
06/18/2025Structural Steel - DetailsJian Yangspecial
06/18/2025FinalJian Yangprogress
06/18/2025Footing and FoundationJian Yangprogress
06/18/2025Structural Wood FrameJian Yangprogress
04/24/2025HVAC-R and service water heating system controlsJian Yangenergy_progress
04/24/2025Energy Code Compliance InspectionsJian Yangprogress
04/24/2025HVAC-R and service water piping design and insulationJian Yangenergy_progress
04/24/2025HVAC-R and service water heating equipmentJian Yangenergy_progress
04/24/2025Energy Code Compliance InspectionsJian Yangprogress
04/24/2025HVAC-R and service water heating equipmentJian Yangenergy_progress
04/24/2025HVAC-R and service water heating system controlsJian Yangenergy_progress
04/24/2025HVAC-R and service water piping design and insulationJian Yangenergy_progress
04/24/2025Maintenance informationJian Yangenergy_progress
04/24/2025Fire-Resistant Penetrations and JointsJian Yangspecial
04/10/2025FinalJian Yangprogress
04/10/2025Mechanical SystemsJian Yangspecial
04/10/2025Sprinkler SystemsJian Yangspecial
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B01177740-S7Request digital key ↗
08/21/2026B01177740-S6Request digital key ↗
08/21/2026B01177740-S4Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01177740-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature13
08/29/2026B01177740-S2Open ↗
08/29/2026B01177740-S2Open ↗
08/29/2026B01177740-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B01177740-S4Open ↗
08/29/2026B01177740-S2Open ↗
08/26/2026B01177740-S6Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01177740-S3Open ↗
08/21/2026B01177740-S7Open ↗
08/21/2026B01177740-S6Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/21/2026B01177740-S6Open ↗
08/14/2026B01177740-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/21/2026B01177740-S7Open ↗
08/21/2026B01177740-S6Open ↗
08/21/2026B01177740-S4Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01177740-S6Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/14/2026B01177740-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01177740-S6Open ↗