← Back
Other college and university
CUNY SC > QC_497_Queens College
152-50 MELBOURNE AVENUE · BIN 4467569
💬 Discuss this project
1970Year Built
3Stories
W6Building Class
R4Zoning
55,485 sfGross Floor Area
0Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Other college and university · 39,232 sf lot · 1.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Permit Issued — active, not yet Signed-off
Roof9p · 5 filings · 20 docs
Floor 3Under Construction4p · 2 filings · 20 docs
Floor 2Under Construction17p · 8 filings · 20 docs
Floor 177p · 14 filings · 20 docs
CellarUnder Construction1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASNY13109/13/2026
CUNY707/08/2026
DORMITORY AUTHORITY OF THE STATE903/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS3603/21/2026
AK CONSULTING SERVICES403/21/2026
WILLIAM VITACCO ASSOCIATES403/21/2026
JMV ASSOCIATES LLC503/21/2026
JM ZONING, LLC.2003/21/2026
MERRITT ENGINEERING CONSULTANT DPC603/21/2026
CASO ASSOCIATES1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARIC MECHANICAL INCGeneral Contractor3207/08/2026
C. D. E. AIR-CONDITIONINGGeneral Contractor1807/08/2026
ALLIANCE TRI-STATE CONSTRGeneral Contractor603/21/2026
VARSITY PLBG AND HTG INCPlumbing507/08/2026
SHARAN BUILDERS INCGeneral Contractor507/08/2026
AKS INTERNATIONAL INCGeneral Contractor408/07/2026
I.M.P. PLBG. & HTG. CORPPlumbing307/08/2026
THE SWEET CONSTRUCTION GRGeneral Contractor203/21/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
I.M.P. PLBG & HTG CORPFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983408/26/2026
TECTONIC ENGINEERING CONS1063804/22/2026
FUTURE TECH CONSULTANTS O589212/08/2020
Building Lifecycle
All (264)Filed (72)Permit Issued (62)Signed Off (13)Violation (5)Inspection (18)Objection (64)Special Inspection (30)
09/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/26/2026
Filed — Alteration
civil work at Razran hall, earth and excavation work as per plans
Q01271763-P2
08/17/2026
Filed — Alteration
civil work at Razran hall, earth and excavation work as per plans
Q01271763-S1
08/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/13/2026
Special inspection requirement — Final
Daniel Warren
08/13/2026
Special inspection requirement — Concrete - Cast-In-Place
MARISA HARTE
08/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MARISA HARTE
08/13/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MARISA HARTE
08/13/2026
Special inspection requirement — Subgrade Inspections
MARISA HARTE
08/06/2026
Permit issued — General Construction
Q01271763-I1-GC-CX
07/13/2026
Permit issued — Construction Fence
Q01420803-I1-FN
06/29/2026
Filed — Alteration
Q01420803-I1
06/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2026
Signed off — Alteration
structural work for Queens College Central Chiller Plant upgrade asper plans filed herewith. no change in use, egress or occupancy
Q00735853-I1
05/21/2026
Permit issued — Structural
Q00925277-S4-ST
05/08/2026
Permit issued — General Construction
Q00925277-I1-GC
05/07/2026
Permit issued — Mechanical Systems
Q01230196-I1-MS
05/07/2026
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
05/07/2026
Special inspection requirement — Masonry
GEORGE GHEBRYAL
05/07/2026
Special inspection requirement — Demolition
GEORGE GHEBRYAL
05/07/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
05/07/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
05/07/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
05/07/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
05/07/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
04/30/2026
Permit issued — Structural
Q01299570-I1-ST
04/27/2026
Permit issued — Construction Fence
Q01310994-I1-FN
04/22/2026
Filed — Alteration
Proposed sprinkler work associated with elevator modernization at CUNY Queens College Razran Hall.
Q00925277-P1
04/16/2026
Signed off — Alteration
Q00720576-I1
03/27/2026
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
03/23/2026
Permit issued — General Construction
Q00925277-I1-GC
03/16/2026
Objection resolved — Addressed
03/04/2026
Signed off — Alteration
FOUNDATION WORK FILED FOR QUEENS COLLEGE RAZRAN HALL UPGRADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00721415-I1
02/05/2026
Objection resolved — Addressed
02/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/04/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
02/04/2026
Special inspection requirement — Subgrade Inspections
02/02/2026
Filed — Alteration
Q01325432-I1
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
01/12/2026
Signed off — Alteration
plumbing piping modification for queens college razran hall hvac upgrade
Q00721306-I1
01/12/2026
Signed off — Alteration
installation of fuel storage tank for the replacement of generators
Q00721356-I1
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/10/2025
Signed off — Alteration
GENERAL CONSTRUCTION WORK FILED FOR QUEENS COLLEGE RAZRAN HALL UPGRADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00720520-I1
11/26/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
11/25/2025
Permit issued — Construction Fence
Q01310994-I1-FN
11/22/2025
Objection raised — Structural
11/22/2025
Objection raised — Scope
11/22/2025
Objection raised — Structural
11/22/2025
Objection raised — Structural
11/22/2025
Objection raised — Structural
11/20/2025
Filed — Alteration
Q01310994-I1
11/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/09/2025
Objection raised — Admin
11/07/2025
Filed — Alteration
Renovate core toilet rooms on all three floors, vivarium space will be modified to accommodate new programming including new sinks and floor drains. Above grade acids waste piping system to be replaced with new PVDF piping and portions removed as required
Q01256516-S1
10/30/2025
Filed — Alteration
Renovate core toilet rooms on all three floors, vivarium space will be modified to accommodate new programming including new sinks and floor drains. Above grade acids waste piping system to be replaced with new PVDF piping and portions removed as required
Q01256516-S5
10/27/2025
Filed — Alteration
Q01299570-I1
10/23/2025
Filed — Alteration
Renovate core toilet rooms on all three floors, vivarium space will be modified to accommodate new programming including new sinks and floor drains. Above grade acids waste piping system to be replaced with new PVDF piping and portions removed as required
Q01256516-S6
Latest 60 of 264 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAKS INTERNATIONAL INC08/06/2026
DOB NOWConstruction FencePermit IssuedAKS INTERNATIONAL INC07/13/2026
DOB NOWStructuralPermit IssuedSHARAN BUILDERS INC05/21/2026
DOB NOWGeneral ConstructionPermit IssuedSHARAN BUILDERS INC05/08/2026
DOB NOWMechanical SystemsPermit IssuedAKS INTERNATIONAL INC05/07/2026
DOB NOWStructuralPermit IssuedAKS INTERNATIONAL INC04/30/2026
DOB NOWConstruction FencePermit IssuedSHARAN BUILDERS INC04/27/2026
DOB NOWGeneral ConstructionPermit IssuedSHARAN BUILDERS INC03/23/2026
DOB NOWConstruction FencePermit IssuedSHARAN BUILDERS INC11/25/2025
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC06/24/2025
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG. & UTL.CO INC05/08/2025
DOB NOWMechanical SystemsSigned-offC. D. E. AIR-CONDITIONING05/05/2025
DOB NOWGeneral ConstructionSigned-offC. D. E. AIR-CONDITIONING05/05/2025
DOB NOWSprinklersPermit IssuedI.M.P. PLBG & HTG CORP04/09/2025
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC04/08/2025
DOB NOWStructuralSigned-offMARIC MECHANICAL INC03/18/2025
DOB NOWGeneral ConstructionSigned-offMARIC MECHANICAL INC03/18/2025
DOB NOWGeneral ConstructionSigned-offMARIC MECHANICAL INC03/18/2025
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC01/27/2025
DOB NOWGeneral ConstructionSigned-offMARIC MECHANICAL INC01/09/2025
DOB NOWStructuralSigned-offMARIC MECHANICAL INC01/09/2025
DOB NOWEarth WorkSigned-offMARIC MECHANICAL INC01/09/2025
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC06/20/2024
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG. & UTL.CO INC06/07/2024
DOB NOWMechanical SystemsSigned-offC. D. E. AIR-CONDITIONING06/03/2024
DOB NOWStructuralSigned-offC. D. E. AIR-CONDITIONING06/03/2024
DOB NOWGeneral ConstructionSigned-offC. D. E. AIR-CONDITIONING06/03/2024
DOB NOWFoundationSigned-offMARIC MECHANICAL INC03/27/2024
DOB NOWGeneral ConstructionSigned-offMARIC MECHANICAL INC03/27/2024
DOB NOWEarth WorkSigned-offMARIC MECHANICAL INC03/26/2024
DOB NOWPlumbingSigned-offI.M.P. PLBG. & HTG. CORP02/08/2024
DOB NOWStructuralSigned-offMARIC MECHANICAL INC11/16/2023
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC10/05/2023
DOB NOWFoundationPermit IssuedC. D. E. AIR-CONDITIONING09/28/2023
DOB NOWConstruction FencePermit IssuedALLIANCE TRI-STATE CONSTR09/22/2023
DOB NOWSidewalk ShedPermit IssuedALLIANCE TRI-STATE CONSTR09/22/2023
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG. & UTL.CO INC07/06/2023
DOB NOWPlumbingSigned-offVARSITY PLBG AND HTG INC06/22/2023
DOB NOWGeneral ConstructionSigned-offC. D. E. AIR-CONDITIONING05/30/2023
DOB NOWStructuralSigned-offC. D. E. AIR-CONDITIONING05/30/2023
+ 38 more permits on file
2 projects · most recent 04/22/2026
Air Conditioning Systems Associated Ducts and Piping Cooling Towers Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2026Permit IssuedSHARAN BUILDERS INCAir Conditioning Systems
Cooling
— FTS24LVJU/RXS24LVJU 30,000 BTU · Split System ×1
09/10/2025Permit IssuedMARIC MECHANICAL INCAssociated Ducts and Piping, Cooling Towers, Refrigeration Systems, Ventilation Systems
Cooling
Trane CVHF1470 5,600 tons · Chiller ×16
Ventilation
N/A N/A ×2
Refrigeration
Trane CVHF1470 5,600 tons · Chiller ×8
Cooling Tower
Trane CVHF1470 5,600 tons · Cooling Tower ×16
Ducts & Piping
N/A N/A Ductwork ×2
4 projects · most recent 04/22/2026
Sprinkler System
FiledStatusContractorScope
04/22/2026——Sprinkler System
11/07/2025——117 heads
11/22/2022Permit IssuedI.M.P. Plumbing & Heating CORP.—
11/08/2021——19 heads
5 projects · most recent 04/22/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
04/22/2026——Water/Sanitary
11/07/2025——Storm, Water/Sanitary
01/05/2024Signed-offVARSITY PLBG AND HTG INCStorm
11/08/2021——Gas, Water/Sanitary
11/08/2021——Gas, Water/Sanitary
10 projects · most recent 09/21/2026
General Wiring Lighting
FiledStatusContractorScope
09/21/2026Permit IssuedAUJLA ELECTRIC CORPGeneral Wiring
09/04/2026Permit IssuedREDD ELECTRICAL SVCS INC—
08/04/2026Permit IssuedTRIBECA ELECTRICAL CORPGeneral Wiring
11/16/2025Permit IssuedDENALI ELECTRIC CORP—
11/25/2024CompleteREDD ELECTRICAL SVCS INCGeneral Wiring
05/16/2024CompletePACIFIC ELEC'L CONTR'G IN—
10/20/2023CompletePACIFIC ELEC'L CONTR'G IN—
09/18/2023CompleteRAIDEN ELECTRIC LLC—
03/29/2022Permit IssuedLEVEST ELECTRIC CORP.General Wiring
12/27/2018Permit IssuedARK SYSTEMS ELEC. CORPGeneral Wiring, Lighting
8 projects · most recent 08/26/2026
Concrete Steel Masonry
FiledStatusContractorScope
08/26/2026Permit IssuedAKS INTERNATIONAL INC3 scope_items
04/22/2026Permit IssuedSHARAN BUILDERS INCSteel, Concrete, Masonry
11/07/2025——Steel, Concrete
09/04/2025——1 scope_items
12/06/2024——1 scope_items
04/25/2024——Concrete
11/21/2022Signed-offMARIC MECHANICAL INCSteel, Concrete
10/27/2022——Concrete
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
09/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2026Fail-Final SP - Up to 3 Requested FloorsFailView ↗
11/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/16/2025Administrative Rejection Boiler CertificationAdministrative RejectionView ↗
05/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2025Fail-Final Boiler Equipment InspectionFailView ↗
04/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2025Fail-Final Boiler Equipment InspectionFailView ↗
04/22/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/14/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/05/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/17/2026Excavations - Sheeting, Shoring, and Bracing—special
08/13/2026Subsurface Conditions – Fill Placement & In-Place DensityMARISA HARTEspecial
08/13/2026Subgrade InspectionsMARISA HARTEspecial
08/13/2026Excavations - Sheeting, Shoring, and BracingMARISA HARTEspecial
08/13/2026Concrete - Cast-In-PlaceMARISA HARTEspecial
08/13/2026FinalDaniel Warrenprogress
05/07/2026Structural Steel - WeldingGEORGE GHEBRYALspecial
05/07/2026FinalGEORGE GHEBRYALprogress
05/07/2026MasonryGEORGE GHEBRYALspecial
05/07/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
05/07/2026DemolitionGEORGE GHEBRYALspecial
05/07/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
05/07/2026Post-installed AnchorsGEORGE GHEBRYALspecial
05/07/2026Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
02/04/2026Subgrade Inspections—special
02/04/2026Subsurface Conditions – Fill Placement & In-Place Density—special
02/04/2026Structural Stability – Alterations of existing buildings—special
02/02/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
11/26/2025Sprinkler SystemsGEORGE GHEBRYALspecial
10/17/2025Subsurface Conditions – Fill Placement & In-Place Density—special
10/17/2025Concrete - Cast-In-Place—special
10/17/2025Subgrade Inspections—special
10/17/2025Final—progress
10/02/2025Fire-Resistant Penetrations and Joints—special
08/05/2025Sprayed fire-resistant materialsGEORGE GHEBRYALspecial
Latest 25 of 150.
▾Documents — 583 on file (BIS + DOB NOW)
▸Plans & Drawings74
▸DOB NOWPlans/Sketch69
08/27/2026Q00586003-P1Request digital key ↗
08/27/2026Q00585999-I1Request digital key ↗
08/27/2026Q00585999-P1Request digital key ↗
Showing 3 of 69 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/23/2026Q00282960-I1Request digital key ↗
08/23/2026Q00282960-P3Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Structural2
08/28/2026Q00268033-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION38
05/10/2024421942250Open ↗
02/28/2024421941484Open ↗
02/14/2024421941484Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION20
09/15/2023421941484Open ↗
12/10/2020421942250Open ↗
07/26/2019421235862Open ↗
Showing 3 of 20 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
06/13/2018421644616Open ↗
11/13/2015421235862Open ↗
▸Seals & Professional Certifications190
▸DOB NOWDPL-1: Design Professional Seal & Signature74
08/27/2026Q00586003-I1Open ↗
08/27/2026Q00586003-P1Open ↗
08/27/2026Q00585999-I1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature51
09/05/2026Q00734862-P3Open ↗
09/05/2026Q00734862-P3Open ↗
09/05/2026Q00734862-P3Open ↗
Showing 3 of 51 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
12/06/2019421942250Open ↗
12/04/2019421941484Open ↗
01/08/2018421235862Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/05/2026Q00734862-P3Open ↗
09/05/2026Q00734862-P3Open ↗
09/05/2026Q00734862-P3Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/06/2019421942250Open ↗
07/13/2016421344726Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/06/2019421942250Open ↗
07/13/2016421344726Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/17/2017421433176Open ↗
02/17/2017421433167Open ↗
▸BISFIRE ALARM TEST1
12/29/2021421235862Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
08/04/2014420302951Open ↗
▸BISEQUIPMENT USE PERMITS1
12/29/2021421235862Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
08/04/2014420302951Open ↗
▸Environmental & Asbestos36
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
08/26/2026Q00735759-P3Open ↗
08/26/2026Q00735759-P2Open ↗
08/25/2026Q00735853-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/26/2026Q00720576-I1Open ↗
08/26/2026Q00721374-I1Open ↗
08/26/2026Q00721415-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/13/2018421644616Open ↗
12/26/2017421235862Open ↗
07/13/2016421344726Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
09/15/2023421941484Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU5464QN171
05/18/2022421235862Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/10/2020421942250Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
12/06/2019421942250Open ↗
12/04/2019421941484Open ↗
02/17/2017421433167Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
01/05/2024421941484Open ↗
05/13/2022421235862Open ↗
10/14/2021421235862Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/20/2024421941484Open ↗
05/08/2024421942250Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/13/2022421235862Open ↗
02/16/2017421344726Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/26/2026Q00720576-I1Open ↗
Showing 1 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/20/2024421941484Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
09/20/2024421941484Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/20/2024421941484Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY20
04/29/2024421942250Open ↗
01/24/2024421942250Open ↗
01/19/2024421942250Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
03/09/2018421235862Open ↗
03/09/2018421235862Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
05/18/2022421235862Open ↗
12/27/2017421235862Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/18/2023421941484Open ↗
▸Approvals, Objections & Sign-offs102
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter72
08/27/2026Q00585999-P1Open ↗
08/27/2026Q00585999-I1Open ↗
08/27/2026Q00586005-I1Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWDEP Variance (V5) letter10
08/26/2026Q00720576-I1Open ↗
08/26/2026Q00721374-I1Open ↗
08/25/2026Q08015473-I1Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
12/06/2019421942250Open ↗
12/04/2019421941484Open ↗
01/23/2019421644616Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
09/25/2024421941484Open ↗
05/16/2024421942250Open ↗
05/18/2022421235862Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
07/13/2016421344726Open ↗
11/13/2015421235862Open ↗
Showing 2 of 5 on file for this type
▸BISFINAL2
09/20/2024421941484Open ↗
05/14/2024421942250Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
05/13/2022421235862Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT21
05/13/2022421235862Open ↗
05/13/2022421235862Open ↗
05/13/2022421235862Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/24/2024421941484Open ↗
05/08/2024421942250Open ↗
▸BISSTEEL AFFIDAVIT- FINAL1
05/13/2022421235862Open ↗
▸BISWELDERS AFFIDAVIT1
05/13/2022421235862Open ↗
▸Filing & Intake Forms34
▸BISADDITIONAL INFORMATION19
05/10/2024421942250Open ↗
01/18/2023421942250Open ↗
11/19/2021421235862Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET15
12/06/2019421942250Open ↗
12/04/2019421941484Open ↗
06/13/2018421644616Open ↗
Showing 3 of 15 on file for this type
▸Other Documents3
▸DOB NOWWaiver Document2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREGISTRATION OF COOLING TOWER/ EVAPORATI1
05/18/2022421235862Open ↗