← Back
BuildNYC
Walk-up apt, over six families with stores
152 7TH AVENUE
MANHATTAN · BIN 1013980
💬 Discuss this project
1901Year Built
4Stories
C7Building Class
C6-3AZoning
7,360 sfGross Floor Area
13Units
Rent Stabilized85 Active Violations 84 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: 152-154 Seventh Avenue Owner · 1,840 sf lot · 4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofT-Mobile1p · 4 filings · 20 docs
Floor 4Midwood Management CORP1 filing · 8 docs
Floor 3Midwood Management CORP1 filing · 8 docs
Floor 2
Floor 1Midwood Management1 filing · 5 docs
CellarMidwood Management8p · 3 filings · 20 docs
Site & exteriorMidwood Management8p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
152-154 Seventh Avenue Owner1703/22/2026
Ballaghaderreen1203/21/2026
DDF203/21/2026
DDF Co Anc Focus Management203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Grant105/20/2026
Ancora Engineering204/17/2026
Rigid Structural Design105/16/2024
Arquitectura Varela105/09/2022
Azimuth Engineering112/01/2021
Levin Engineering708/18/2021
Caesar Bustamante, AIA104/01/2020
A Saxon Design Group105/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design103/21/2026
Levin Engineering1403/21/2026
Codegreen303/21/2026
Amorales103/21/2026
Metropolis Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Triangle ElectricElectrical403/22/2026
Reliable General ContractingScaffold303/21/2026
Bulls Eye ContractorScaffold303/21/2026
Electro Puentes Link WireGeneral Contractor303/21/2026
J. Caiazzo Plumbing & HeatingPlumbing210/04/2026
Alson Electrical ContractingElectrical103/21/2026
Caiazzo AnthonyGeneral Contractor103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Gotham CommunicationsGeneral Contractor107/10/2026
J. Caiazzo Plumbing & HeatingGeneral Contractor103/21/2026
T. Dirusso Electrical ContElectrical103/21/2026
Ceprine ConstructionScaffold107/08/2026
High Quality Electric ofElectrical103/22/2026
High Quality Electric ofElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Grant Engineering Consulting3512105/20/2026
Codegreen510204/17/2026
Jeremy K McKeon, P.E7263112/01/2021
RHL Engineering712508/18/2021
R Marsac Consulting329105/02/2019
Building Lifecycle
All (135)Filed (15)Permit Issued (6)Signed Off (3)Violation (60)Objection (26)Special Inspection (25)
10/02/2026
Signed off — Alteration
Decommission of existing T-MOBILE site on the roof. No change in use, egress or occupancy.
M01274228-I1
07/09/2026
Permit issued — Antenna
M01274228-I1-AN
05/20/2026
Filed — Alteration
Decommission of existing T-MOBILE site on the roof. No change in use, egress or occupancy.
M01274228-I1
04/29/2026
Violation issued (HPD, closed)
A
04/22/2026
Special inspection requirement — Post-installed Anchors
HATIM ELSAID
04/22/2026
Special inspection requirement — Final
HATIM ELSAID
04/22/2026
Special inspection requirement — Structural Steel - Welding
HATIM ELSAID
04/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
HATIM ELSAID
04/22/2026
Special inspection requirement — Structural Cold-Formed Steel
HATIM ELSAID
04/22/2026
Special inspection requirement — Masonry
HATIM ELSAID
04/22/2026
Special inspection requirement — Structural Steel - High Strength Bolting
HATIM ELSAID
04/22/2026
Special inspection requirement — Structural Steel - Details
HATIM ELSAID
04/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/17/2026
Filed — Alteration
Structural stair reinforcement work on floors 3-4 and roof as per plans filed herewith. No changes in use, egress or occupancy.
M01307090-P1
12/10/2025
Objection resolved — Addressed
12/08/2025
Objection raised — Other
11/19/2025
Filed — Alteration
Structural stair reinforcement work on floors 3-4 and roof as per plans filed herewith. No changes in use, egress or occupancy.
M01307090-I1
11/17/2025
Violation issued (HPD, closed)
I
09/02/2025
Violation issued (HPD, open)
B
09/02/2025
Violation issued (HPD, open)
B
08/10/2025
Violation issued (HPD, open)
B
08/10/2025
Violation issued (HPD, open)
B
08/10/2025
Violation issued (HPD, open)
C
08/10/2025
Violation issued (HPD, open)
C
07/20/2025
Violation issued (HPD, open)
A
07/20/2025
Violation issued (HPD, open)
A
07/20/2025
Violation issued (HPD, open)
B
07/20/2025
Violation issued (HPD, open)
A
07/20/2025
Violation issued (HPD, open)
C
07/20/2025
Violation issued (HPD, open)
B
07/20/2025
Violation issued (HPD, open)
B
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
08/11/2024
Violation issued (HPD, open)
B
08/11/2024
Violation issued (HPD, open)
B
08/11/2024
Violation issued (HPD, open)
C
07/09/2024
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01036140-I1
06/12/2024
Violation issued (HPD, open)
B
05/28/2024
Permit issued — Sidewalk Shed
M01036140-I1-SH
05/16/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01036140-I1
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/11/2023
Violation issued (HPD, open)
B
08/11/2023
Violation issued (HPD, open)
B
08/01/2023
Violation issued (HPD, open)
A
08/01/2023
Violation issued (HPD, open)
A
07/31/2023
Violation issued (HPD, open)
B
07/31/2023
Violation issued (HPD, open)
B
03/31/2023
Violation issued (HPD, open)
B
03/31/2023
Violation issued (HPD, open)
B
03/31/2023
Violation issued (HPD, open)
B
03/29/2023
Violation issued (HPD, open)
B
03/29/2023
Violation issued (HPD, open)
B
03/21/2023
Violation issued (HPD, open)
C
03/15/2023
Violation issued (HPD, closed)
A
03/09/2023
Violation issued (HPD, open)
B
03/09/2023
Violation issued (HPD, open)
B
03/09/2023
Violation issued (HPD, open)
B
01/11/2023
Violation issued (ECB, closed)
Construction
01/11/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offGotham Communications07/09/2026
DOB NOWSidewalk ShedSigned-offCeprine Construction05/28/2024
DOB NOWSidewalk ShedPermit IssuedBulls Eye Contractor05/10/2022
DOB NOWAntennaPermit IssuedElectro Puentes Link Wire04/14/2022
DOB NOWPlumbingSigned-offJ. Caiazzo Plumbing & Heating03/04/2021
DOB NOWConstruction FenceSigned-offReliable General Contracting04/08/2020
BISOTISSUEDReliable General Contracting03/10/2020
BISOTISSUEDReliable General Contracting03/09/2020
BISOTISSUEDThe Metro Group03/13/2019
BISOTISSUEDCRF Construction10/12/2018
BISOTISSUEDCRF Construction07/24/2018
BISPLISSUEDFull Circle Plumbing05/17/2018
BISOTISSUEDCRF Construction05/15/2018
BISOTISSUEDCRF Construction04/10/2018
BISOTISSUEDUgb Construction02/15/2018
BISPLISSUEDPlumbing-It Mechanical08/22/2017
BISMHISSUEDUgb Construction07/21/2017
BISPLISSUEDLloyd G Drummond Plumbing & Gen05/16/2014
BISOTISSUEDNespo Developers05/05/2014
BISPLISSUEDLloyd G Drummond Plumbing & Gen03/25/2014
BISOTISSUEDNespo Developers03/24/2014
BISOTISSUEDNespo Developers01/30/2014
BISOTISSUEDArmy Construction05/21/2010
BISPLISSUEDProto P & H Services03/25/2002
BISBLISSUEDProto P & H Services03/25/2002
BISOTISSUEDHighland Construction Associates09/18/2001
BISOTISSUEDCostrotta Construction Mangt04/24/2000
BISOTISSUEDAdr Construction11/12/1996
1 project · most recent 08/18/2021
Gas
FiledStatusContractorScope
08/18/2021Signed-offJ. Caiazzo Plumbing & HeatingGas
6 projects · most recent 10/19/2026
General Wiring
FiledStatusContractorScope
10/19/2026Permit IssuedK.N.C. ElectricGeneral Wiring
04/22/2024CompleteHigh Quality Electric of—
09/14/2022Permit IssuedT. Dirusso Electrical Cont7 meters
06/12/2019CompleteTriangle ElectricGeneral Wiring
04/05/2019CompleteTriangle ElectricGeneral Wiring
07/14/2018Permit IssuedPJZ Maintenance—
1 project · most recent 04/17/2026
Steel Masonry
FiledStatusContractorScope
04/17/2026——Steel, Masonry
1 project · most recent 05/09/2022
Sidewalk Shed
FiledStatusContractorScope
05/09/2022Permit IssuedBulls Eye ContractorSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
04/22/2026Post-installed AnchorsHATIM ELSAIDspecial
04/22/2026FinalHATIM ELSAIDprogress
04/22/2026Structural Steel - WeldingHATIM ELSAIDspecial
04/22/2026Structural Stability – Alterations of existing buildingsHATIM ELSAIDspecial
04/22/2026Structural Cold-Formed SteelHATIM ELSAIDspecial
04/22/2026MasonryHATIM ELSAIDspecial
04/22/2026Structural Steel - High Strength BoltingHATIM ELSAIDspecial
04/22/2026Structural Steel - DetailsHATIM ELSAIDspecial
04/22/2026Tenant Protection Plan Compliance—special
08/23/2021Fire-Resistant Penetrations and JointsVincent Gentilespecial
08/23/2021HVAC and service water heating system controls Vincent Gentileenergy_progress
08/23/2021HVAC insulation and sealing Vincent Gentileenergy_progress
08/23/2021HVAC and service water heating equipment Vincent Gentileenergy_progress
08/23/2021Maintenance informationVincent Gentileenergy_progress
08/13/2021HVAC and service water heating system controls Vincent Gentileenergy_progress
08/13/2021Fire-Resistant Penetrations and JointsVincent Gentilespecial
08/13/2021HVAC insulation and sealing Vincent Gentileenergy_progress
08/13/2021HVAC and service water heating equipment Vincent Gentileenergy_progress
08/13/2021Maintenance informationVincent Gentileenergy_progress
06/08/2021Fire-Resistant Penetrations and Joints—special
06/08/2021Heating Systems—special
06/08/2021HVAC-R and service water heating system controlsVincent Gentileenergy_progress
06/08/2021Maintenance informationVincent Gentileenergy_progress
06/08/2021HVAC-R and service water heating equipmentVincent Gentileenergy_progress
06/26/2019Fire-Resistant Penetrations and JointsVincent Gentilespecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
T-MobileTelecom siteRoof
Project M01274228 Alteration · LOC Issued · 05/20/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 272 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch6
09/05/2026M00082554-I1Request digital key ↗
09/02/2026M00734405-I1Request digital key ↗
08/27/2026M01036140-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00185683-I1Request digital key ↗
09/03/2026M00225141-P2Request digital key ↗
09/03/2026M00225141-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/03/2026M00473181-I1Request digital key ↗
08/15/2026M00473181-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026M00468059-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00424261-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00327612-I1Request digital key ↗
▸Applications & Permits43
▸BISWORK PERMIT APPLICATION23
03/12/2020140887869Open ↗
02/27/2020140887869Open ↗
03/07/2019140835817Open ↗
Showing 3 of 23 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION20
03/09/2020140887869Open ↗
02/27/2020140887869Open ↗
03/07/2019140835817Open ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications65
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
06/17/2019140835817Open ↗
11/01/2018123196255Open ↗
08/14/2018123502842Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/03/2026M00473181-P1Open ↗
09/03/2026M00473181-I1Open ↗
09/03/2026M00225141-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/25/2026M01307090-I1Open ↗
08/26/2026M00225141-P2Open ↗
08/26/2026M00225141-P2Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
02/27/2020140887869Open ↗
03/07/2019140835817Open ↗
03/19/2014121945020Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
05/20/2010120357005Open ↗
05/20/2010120357005Open ↗
05/20/2010120357005Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/19/2014121945020Open ↗
12/24/2013121871144Open ↗
05/20/2010120357005Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/25/2026M01307090-I1Open ↗
08/26/2026M00225141-P2Open ↗
08/25/2026M00185683-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/27/2020140887869Open ↗
03/07/2019140835817Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/27/2020140887869Open ↗
03/07/2019140835817Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
01/24/2019123579289Open ↗
06/25/2018123579289Open ↗
05/02/2018123298369Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
07/23/2014121945020Open ↗
07/23/2014121945020Open ↗
06/30/2014121945020Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
08/14/2018123298369Open ↗
▸BISSCHEDULE B - PLUMBING1
12/24/2013121871144Open ↗
▸DOB NOWFDNY Variance Letter1
08/13/2026M00082554-I1Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes7
06/25/2018123579289Open ↗
05/01/2018123502842Open ↗
02/21/2018123196255Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan4
09/03/2026M00225141-P1Open ↗
08/14/2026M00225141-I1Open ↗
08/13/2026M00424261-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos22
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
03/07/2019140835817Open ↗
06/25/2018123579289Open ↗
04/20/2018123502842Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00473181-I1Open ↗
09/03/2026M00473181-P1Open ↗
09/03/2026M00225141-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/08/2010120313035Open ↗
▸DOB NOWACP5/20/21 or V51
08/13/2026M00082554-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
06/17/2019140835817Open ↗
11/01/2018123196255Open ↗
08/14/2018123298369Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
06/17/2019140835817Open ↗
11/01/2018123196255Open ↗
08/14/2018123502842Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/07/2019140835817Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/07/2019140835817Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00473181-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/12/2020140887869Open ↗
08/12/2020140887869Open ↗
02/27/2020140887869Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
08/12/2020140887869Open ↗
06/17/2019140835817Open ↗
11/01/2018123196255Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
06/17/2019140835817Open ↗
08/14/2018123298369Open ↗
02/09/2011120313035Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/20/2010120357005Open ↗
04/08/2010120313035Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
02/27/2020140887869Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT17
08/12/2020140887869Open ↗
02/27/2020140887869Open ↗
06/17/2019140835817Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWPW3: Cost Affidavit (Before Sign Off)1
08/13/2026M00185683-I1Open ↗
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION9
04/18/2019123579289Open ↗
04/10/2019140835817Open ↗
03/13/2019140835817Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM8
06/17/2019140835817Open ↗
01/24/2019123579289Open ↗
11/01/2018123196255Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET8
06/25/2018123579289Open ↗
04/20/2018123502842Open ↗
01/12/2018123196255Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
02/27/2020140887869Open ↗
03/07/2019140835817Open ↗
05/20/2010120357005Open ↗
▸Other Documents9
▸DOB NOWDHCR Document5
09/03/2026M00225141-P1Open ↗
08/17/2026M01274228-I1Open ↗
08/14/2026M00225141-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD4: CONH Pilot Program4
08/17/2026M01274228-I1Open ↗
08/13/2026M01036140-I1Open ↗
08/13/2026M01307090-P1Open ↗
Showing 3 of 4 on file for this type