← Back
BuildNYC
Over six families without stores
1528 BEDFORD AVENUE
BROOKLYN · BIN 3032185
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R6AZoning
10,544 sfGross Floor Area
8Units
Rent Stabilized19 Active Violations 17 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: 1528 Bedford Ave Realty · 3,177 sf lot · 3.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Unit 4A1p · 1 filing · 10 docs
Floor 3Unit 3A1p · 1 filing · 10 docs
Floor 2Unit 2A1p · 1 filing · 10 docs
Floor 1Unit 1A1p · 1 filing · 10 docs
CellarRemove cellar shower and sink4p · 3 filings · 14 docs
Site & exteriorLincoln Place Fire Escape Renovation5p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1528 Bedford Avenue Realty2607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anthony Bonsignore, RA606/04/2025
RLD3 Engineering105/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Designworks Consultant103/21/2026
City Building NY Architect P403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GstructionGeneral Contractor504/09/2026
Procraft DSGeneral Contractor204/10/2026
GstructionScaffold203/21/2026
U&Z ConstructionGeneral Contractor107/08/2026
Star Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Avt Engineering345406/04/2025
City Building NY Architects1394406/04/2025
Building Lifecycle
08/14/2026
Signed off — Alteration
REMOVE SHOWER & SINK, ON THE CELLAR FLOOR IN ORDER TO COMPLY WITH PENDING ECB VIOLATIONS
B01207911-I1
08/04/2026
Signed off — Alteration
INTERIOR RENOVATION WORK ON THE CELLAR FLOOR, REMOVE SHOWER AND SINK, IERECT NEW INTERIOR WALLS, PROVIDE NEW STEEL LINTELS OVER MASONRY OPENINGS ALL ON THE CELLAR FLOOR. APPLICATION ALSO FILED TO ADDRESS 2 ECB VIOLATIONS AND A PARTIAL VACATE ORDER.
B01207015-I1
07/20/2026
Signed off — Alteration
REPAIR FIRE DAMAGED APARTMENST ON THE 1ST,2ND,3RD & 4TH FLOORS (APT 1A,2A,3A,4A) INCLUDING REPLACEMENT OF WINDOWS AND DOORS ALL AS PER PLANS FILED. APPLICATION ALSO FILED TO ADDRESS VIOLATIONS DUE TO FIRE DAMAGES. NO CHANGE IN EGRESS USE OR OCCUPANCY
B01222673-I1
06/02/2026
Permit issued — Plumbing
B01207911-I1-PL
05/18/2026
Signed off — Alteration
REPAIRS TO FIRE ESCAPE BASKETS, REINFORCE GOOSE NECK AT ROOF DECK, AND DROP LADDER REPLACEMENT.
B01219872-I1
126 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offStar Plumbing & Heating06/02/2026
DOB NOWGeneral ConstructionSigned-offU&Z Construction04/21/2026
DOB NOWStructuralSigned-offProcraft DS04/08/2026
DOB NOWStructuralSigned-offProcraft DS04/07/2026
DOB NOWGeneral ConstructionSigned-offGstruction10/29/2025
DOB NOWGeneral ConstructionSigned-offGstruction10/29/2025
DOB NOWConstruction FenceSigned-offGstruction12/04/2023
DOB NOWGeneral ConstructionSigned-offGstruction12/04/2023
BISFSISSUEDAce-Atlas Plumbing & Heating07/10/2002
BISPLISSUEDD/B/A Performance Plumbing & Heating MEC12/27/1996
BIS—ISSUEDBadolato Contracting12/09/1996
2 projects · most recent 06/04/2025
Water/Sanitary Gas
FiledStatusContractorScope
06/04/2025——Gas, Water/Sanitary
05/09/2025Signed-offStar Plumbing & HeatingWater/Sanitary
2 projects · most recent 09/19/2025
General Wiring
FiledStatusContractorScope
09/19/2025Permit IssuedPower Surge ElectricGeneral Wiring
07/22/2025CompletePower Surge ElectricGeneral Wiring
2 projects · most recent 06/04/2025
Wood
FiledStatusContractorScope
06/04/2025Signed-offProcraft DSWood
05/09/2025Signed-offProcraft DS—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/15/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
06/02/2025Tenant Protection Plan ComplianceYING HAO LIspecial
05/15/2025Fenestration areasJOSEPH PASATUROenergy_progress
05/15/2025Fenestration air leakageJOSEPH PASATUROenergy_progress
05/15/2025Insulation placement and R valuesJOSEPH PASATUROenergy_progress
05/15/2025Fenestration and door U-factor and product ratingsJOSEPH PASATUROenergy_progress
05/15/2025Air barrier - visual inspectionJOSEPH PASATUROenergy_progress
05/08/2025FinalJOSEPH PASATUROprogress
05/08/2025Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
05/08/2025Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
05/08/2025Energy Code Compliance InspectionsJOSEPH PASATUROprogress
05/08/2025Wood – Seismic ResistanceJOSEPH PASATUROspecial
05/07/2025Tenant Protection Plan ComplianceYING HAO LIspecial
05/07/2025Tenant Protection Plan ComplianceYING HAO LIspecial
05/02/2025FinalNAVEEN KUMARprogress
04/07/2025Insulation placement and R valuesJOSEPH PASATUROenergy_progress
04/07/2025Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
04/07/2025Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
04/07/2025Energy Code Compliance InspectionsJOSEPH PASATUROprogress
04/07/2025FinalJOSEPH PASATUROprogress
04/07/2025Lighting controlsJOSEPH PASATUROenergy_progress
30 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account