💬 Discuss this project
1952Year Built
2Stories
K6Building Class
M1-1Zoning
66,482 sfGross Floor Area
9Units
LL97 Covered0 Active Violations 1 likely answered ▸
Shopping center, with or without parking · Owner of record: Feil Whitestone · 198,115 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNorthwell Health33p · 5 filings · 20 docs
Floor 1The Smilist, Northwell Health +265p · 9 filings · 20 docs
Site & exteriorthe Smijst F nily Dentistryi RC, Northwell Health +2Under Construction9p · 5 filings · 20 docs
Filed — no permit issuedFeil Whitestone LLC1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Feil Whitestone8303/22/2026
Waldbaums1803/21/2026
The Great A & P Tea Co1103/21/2026
CP Improvement503/21/2026
Smilist307/08/2026
A P Tea Company303/21/2026
Associates303/21/2026
Long Island Savings Bank303/21/2026
Whitestone Grocery Owners203/21/2026
CVS Pharmacy103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors403/21/2026
J A Expediting1203/21/2026
Metropolis Group403/21/2026
BMB Building Consulting203/21/2026
All in Permit Consultants403/21/2026
Building Brothers203/21/2026
Youn Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Degiaimo Group BuildingGeneral Contractor903/21/2026
Marick ContractingGeneral Contractor303/21/2026
Manengeering BureauFire Protection207/08/2026
American Sign & Electrical ConSign hanger207/08/2026
Paul SignsSign hanger207/08/2026
Full Capacity FireFire Protection207/08/2026
NU-Wire ElectricElectrical103/21/2026
Dimensional ConceptsGeneral Contractor107/08/2026
Star Electrical ContractorsElectrical103/21/2026
Joseph O'Grady P & HPlumbing107/08/2026
L & N PlumbingPlumbing107/08/2026
Unitech DesignSign hanger107/08/2026
Integral Electrical PWR & CNTRElectrical103/21/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
J.A. Lee Electric ServicesElectrical103/22/2026
Comfort Zone Mechanicalspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Integrity Consulting Service666107/16/2025
Domani Inspection Service843101/31/2023
SGM Engineering2366407/18/2022
AK Engineering678306/21/2022
Building Lifecycle
All (140)Filed (21)Permit Issued (18)Signed Off (11)Violation (39)Inspection (15)Objection (6)Special Inspection (30)
04/30/2026
Permit issued — Sign
Q01381586-I1-SG
04/29/2026
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN ( THE SMILIST)
Q01381586-I1
04/01/2026
Special inspection requirement — Final
LEON SKVIRSKY
11/20/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/14/2025
Permit issued — Sprinklers
Q01253004-I1-EW-SP
10/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/13/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
08/15/2025
Permit issued — Sprinklers
Q01253004-I1-EW-SP
07/16/2025
Filed — Alteration
Relocation of 30 Automatic Fire Sprinkler Heads for Tenant Space due to Renovation of Space Filed Under Job # Q01094001-I1 & S1
Q01253004-I1
07/08/2025
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
07/08/2025
Special inspection requirement — Sprinkler Systems
ALEKSANDR LEVIN
04/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2025
Signed off — Alteration
RELOCATION OF INTERIOR NON LOAD BEARING WALLS, NO WORK TO EXTERIOR WALLS OR ROOF
Q01094001-I1
11/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/11/2024
Permit issued — Plumbing
Q01094001-S1-PL
09/06/2024
Filed — Alteration
RELOCATION OF INTERIOR NON LOAD BEARING WALLS, NO WORK TO EXTERIOR WALLS OR ROOF
Q01094001-S1
08/15/2024
Permit issued — General Construction
Q01094001-I1-GC
08/13/2024
Filed — Alteration
RELOCATION OF INTERIOR NON LOAD BEARING WALLS, NO WORK TO EXTERIOR WALLS OR ROOF
Q01094001-I1
08/09/2024
Special inspection requirement — Final
Martin Passante
03/14/2024
Signed off — Alteration
Installation of plumbing fixtures in existing retail space as per plans filed herewith. No change to use, egress, or occupancy.
Q00733867-I1
03/14/2024
Signed off — Alteration
interior renovation of retail space including installation of non bearing partitions, and modification of storefront as per plans filed herewith. No change to use, egress or occupancy.
Q00731616-I1
07/06/2023
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR NORTHWELL HEALTH STARS REHABILITATION.
Q08028503-I1
07/06/2023
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGNS FOR NORTHWELL HEALTH STARS REHABILITATION.
Q08028508-I1
06/07/2023
Signed off — Alteration
HEREBY FILING FOR THE REMOVAL, RELOCATION AND INSTALLATION OF SPRINKLER HEADS IN RELATION TO INTERIOR RENOVATION OF EXISTING TENANT SPACE TO NEW REHABILITATION CENTER. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q00627512-I1
06/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/31/2023
Signed off — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING TENANT SPACE AT 1ST FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q00627484-I1
05/30/2023
Signed off — Alteration
Installation of ducts and piping in commercial space as per plans filed herewith. No change in use, egress or occupancy.
Q00627495-I1
05/30/2023
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES IN RELATION TO INTERIOR RENOVATION OF EXISTING TENANT SPACE TO NEW REHABILITATION CENTER. NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q00627498-I1
04/07/2023
Permit issued — Mechanical Systems
Q00809980-I1-MS
04/06/2023
Special inspection requirement — Final
SALVATOR CARADONNA
04/04/2023
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGNS FOR NORTHWELL HEALTH STARS REHABILITATION.
Q08028508-P1
04/04/2023
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR NORTHWELL HEALTH STARS REHABILITATION.
Q08028503-P1
04/04/2023
Special inspection requirement — Final
SALVATOR CARADONNA
03/21/2023
Special inspection requirement — Final
SALVATOR CARADONNA
03/21/2023
Special inspection requirement — Final
SALVATOR CARADONNA
02/27/2023
Permit issued — General Construction
Q00627484-I1-GC
02/16/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/09/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/09/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/06/2023
Permit issued — Sprinklers
Q00627512-I1-EW-SP
01/31/2023
Filed — Alteration
Mechanical Systems work as reflected in plans herewith. No change to use, egress, or occupancy.
Q00809980-I1
01/31/2023
Filed — Alteration
Q00810235-I1
01/10/2023
Permit issued — Sign
Q08028503-I1-SG
01/10/2023
Permit issued — Sign
Q08028508-I1-SG
01/05/2023
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR NORTHWELL HEALTH STARS REHABILITATION.
Q08028503-I1
01/04/2023
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGNS FOR NORTHWELL HEALTH STARS REHABILITATION.
Q08028508-I1
11/21/2022
Special inspection requirement — Energy Code Compliance Inspections
11/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/12/2022
Permit issued — Plumbing
Q00733867-I1-PL
10/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
10/06/2022
Special inspection requirement — Maintenance information
10/06/2022
Special inspection requirement — Shutoff dampers
10/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
10/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/17/2022
Permit issued — General Construction
Q00731616-I1-GC-CX
08/12/2022
Special inspection requirement — Final
08/12/2022
Special inspection requirement — Mechanical Systems
07/20/2022
Special inspection requirement — Permanent certificate
MATTHEW DEGIAIMO
Latest 60 of 140 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedPaul Signs04/30/2026
DOB NOWSprinklersSigned-offManengeering Bureau11/14/2025
DOB NOWSprinklersSigned-offManengeering Bureau08/15/2025
DOB NOWPlumbingSigned-offL & N Plumbing09/11/2024
DOB NOWGeneral ConstructionSigned-offDimensional Concepts08/15/2024
DOB NOWMechanical SystemsPermit IssuedComfort Zone Mechanical04/07/2023
DOB NOWGeneral ConstructionSigned-offDegiaimo Group Building02/27/2023
DOB NOWSprinklersSigned-offFull Capacity Fire02/06/2023
DOB NOWSignSigned-offAmerican Sign & Electrical Con01/10/2023
DOB NOWSignSigned-offAmerican Sign & Electrical Con01/10/2023
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I10/12/2022
DOB NOWGeneral ConstructionSigned-offMarick Contracting08/17/2022
DOB NOWPlumbingSigned-offJoseph O'Grady P & H02/08/2022
DOB NOWSprinklersSigned-offFull Capacity Fire02/04/2022
DOB NOWGeneral ConstructionSigned-offDegiaimo Group Building02/01/2022
DOB NOWMechanical SystemsSigned-offDegiaimo Group Building02/01/2022
DOB NOWSignSigned-offUnitech Design05/17/2018
DOB NOWSignSigned-offPaul Signs05/11/2018
BISSPISSUEDUpright Fire Protctn03/31/2021
BISPLISSUEDRock E Small Plumbing & Heating06/17/2019
BISOTISSUEDPristine Construction06/12/2019
BISPLISSUEDAqua Plumbing & Heating04/19/2019
BISFPISSUEDMaster Fire Systems10/31/2018
BISSPISSUEDJ. Caiazzo Plumbing & Heating10/30/2018
BISPLISSUEDJ. Caiazzo Plumbing & Heating10/13/2018
BISOTISSUEDKama Construction09/20/2018
BISMHISSUEDKama Construction09/20/2018
BISOTISSUEDKama Construction09/20/2018
BISOTISSUEDKama Construction09/20/2018
BISSPISSUEDUpright Fire Protctn09/06/2018
BISSPISSUEDJ. Caiazzo Plumbing & Heating08/31/2018
BISPLISSUEDJ. Caiazzo Plumbing & Heating08/31/2018
BISPLISSUEDAqua Plumbing & Heating08/30/2018
BISSPISSUEDJ. Caiazzo Plumbing & Heating08/08/2018
BISMHISSUEDPrecision Worldwide08/03/2018
BISOTISSUEDRoss & Associates07/24/2018
BISOTISSUEDRoss & Associates07/20/2018
BISMHISSUEDRoss & Associates07/20/2018
BISOTISSUEDMarangos Construction06/20/2018
BISPLISSUED7 C'S Plumbing & Heating04/30/2018
+ 28 more permits on file
2 projects · most recent 01/31/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/31/2023Permit IssuedComfort Zone MechanicalHeating and Air Conditioning Systems
Heat / Cool
Carrier 48LCRA07L2M5 6 tons · Rooftop Unit ×1
48LCRA14H2A5 12 tons · Rooftop Unit ×1
———Heating and Air Conditioning Systems
Heat / Cool
Carrier 48LCRA07L2M5 6 tons · Rooftop Unit ×1
48LCRA14H2A5 12 tons · Rooftop Unit ×1
17 projects · most recent 05/01/2026
General Wiring HVAC Wiring Lighting
FiledStatusContractorScope
05/01/2026Permit IssuedLimitless Electric Resources—
06/24/2025CompleteJ.A. Lee Electric Services1 meters
08/28/2024CompleteJS Electric & ConstructionGeneral Wiring
01/19/2023CompleteRainbow Electric Co—
01/19/2023CompleteRainbow Electric Co—
10/19/2022CompleteDelta Electrical ContractingGeneral Wiring
05/16/2022CompleteHanison ElectricGeneral Wiring
06/27/2019CompletePark Square ElectricGeneral Wiring
11/29/2018CompleteVertex ElectricGeneral Wiring
11/29/2018CompleteVertex ElectricHVAC Wiring
11/07/2018Permit IssuedMore Power ElectricGeneral Wiring
11/03/2018Permit IssuedControl Spec Electrical SystemGeneral Wiring, Lighting
10/08/2018CompleteJong Hyun Kim—
05/09/2018CompleteAtmos Electric Svce—
05/09/2018CompleteAtmos Electric Svce—
1 project · most recent 09/06/2024
FiledStatusContractorScope
09/06/2024Signed-offL & N Plumbing1 scope_items
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
11/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/13/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
04/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
04/01/2026FinalLEON SKVIRSKYprogress
07/08/2025Post-installed AnchorsALEKSANDR LEVINspecial
07/08/2025Sprinkler SystemsALEKSANDR LEVINspecial
08/09/2024FinalMartin Passanteprogress
04/06/2023FinalSALVATOR CARADONNAprogress
04/04/2023FinalSALVATOR CARADONNAprogress
03/21/2023FinalSALVATOR CARADONNAprogress
03/21/2023FinalSALVATOR CARADONNAprogress
11/21/2022Energy Code Compliance Inspections—progress
10/06/2022HVAC-R and service water heating equipment—energy_progress
10/06/2022Maintenance information—energy_progress
10/06/2022Shutoff dampers—energy_progress
10/06/2022HVAC-R and service water heating system controls—energy_progress
10/06/2022Fire-Resistant Penetrations and Joints—special
08/12/2022Final—progress
08/12/2022Mechanical Systems—special
07/20/2022Permanent certificateMATTHEW DEGIAIMOenergy_progress
07/20/2022Fire-Resistant Penetrations and Jointssteven Giammonaspecial
07/20/2022Mechanical Systemssteven Giammonaspecial
07/20/2022Fire-Resistance Rated ConstructionMATTHEW DEGIAIMOprogress
07/20/2022FinalMATTHEW DEGIAIMOprogress
07/20/2022Energy Code Compliance InspectionsMATTHEW DEGIAIMOprogress
07/20/2022Maintenance informationMATTHEW DEGIAIMOenergy_progress
07/20/2022HVAC-R and service water piping design and insulationMATTHEW DEGIAIMOenergy_progress
07/20/2022HVAC-R and service water heating equipmentMATTHEW DEGIAIMOenergy_progress
Latest 25 of 49.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
the Smijst F nily Dentistryi RCMedical / Healthcare—
Project Q01381586 Alteration · Permit Entire · 04/29/2026
The SmilistMedical / HealthcareFloor 1
Project Q01253004 Alteration · Permit Entire · 07/16/2025
Project Q01094001 Alteration · Permit Entire · 08/13/2024
Project Q00040999 Alteration · LOC Issued · 05/09/2018
Northwell HealthMedical / HealthcareFloor 1, Roof
Project Q08028503 Alteration · LOC Issued · 01/05/2023
Project Q08028508 Alteration · LOC Issued · 01/04/2023
Project Q00627495 Alteration · LOC Issued · 01/05/2022
Project Q00627498 Alteration · LOC Issued · 01/05/2022
Project Q00627484 Alteration · LOC Issued · 12/16/2021
Project Q00792625 Alteration · Filing Withdrawn
FFC Kiosk at North Shore FarmsRestaurant / Food ServiceFloor 1
Project Q00731616 Alteration · LOC Issued · 06/21/2022
Project Q00733867 Alteration · LOC Issued · 06/21/2022
Stars Rehabilitation CenterMedical / HealthcareFloor 1
Project Q00627512 Alteration · LOC Issued · 12/17/2021
North Shore FarmsRetailFloor 1
Project Q00041771 Alteration · LOC Issued · 05/17/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 827 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/29/2026Q00792669-I1Request digital key ↗
08/29/2026Q00792625-I1Request digital key ↗
08/29/2026Q00040999-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits178
▸BISPLAN / WORK APPROVAL APPLICATION108
07/14/2023401972692Open ↗
06/26/2023401972692Open ↗
01/13/2022401972692Open ↗
Showing 3 of 108 on file for this type
▸BISWORK PERMIT APPLICATION65
06/03/2021421653311Open ↗
06/18/2019421862256Open ↗
05/02/2019421688329Open ↗
Showing 3 of 65 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications5
05/03/2019421466354Open ↗
01/29/2019421394565Open ↗
Showing 2 of 5 on file for this type
▸Seals & Professional Certifications208
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION85
01/15/2020421396484Open ↗
01/15/2020421396484Open ↗
01/15/2020421652820Open ↗
Showing 3 of 85 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT32
11/10/2018421393762Open ↗
Showing 1 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/01/2026Q01381586-I1Open ↗
08/31/2026Q08028503-P1Open ↗
08/26/2026Q00040999-I1Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST23
12/20/2019421652820Open ↗
12/20/2019421396484Open ↗
11/10/2018421393762Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/29/2026Q00792625-I1Open ↗
08/29/2026Q00040999-I1Open ↗
08/26/2026Q00627512-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/26/2026Q01253004-I1Open ↗
08/26/2026Q00627512-I1Open ↗
08/26/2026Q00627512-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
11/08/2018421688329Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment65
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE36
03/20/2020421688329Open ↗
03/09/2020421688329Open ↗
11/12/2019421862256Open ↗
Showing 3 of 36 on file for this type
▸BISEQUIPMENT USE PERMITS14
11/22/2021421396484Open ↗
01/15/2020421652820Open ↗
02/12/2019421394565Open ↗
Showing 3 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
04/27/2020421396484Open ↗
03/23/2020421396484Open ↗
02/12/2019421394565Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
01/23/2019421659921Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
11/08/2018421688329Open ↗
Showing 1 of 3 on file for this type
▸Environmental & Asbestos45
▸BISASBESTOS: CERTIFICATION (DEP ACP5)27
05/16/2019421862256Open ↗
11/08/2018421688329Open ↗
Showing 2 of 27 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/29/2026Q00040999-I1Open ↗
08/26/2026Q00627512-I1Open ↗
08/26/2026Q00627495-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/25/2026Q00810235-I1Open ↗
08/13/2026Q00809980-I1Open ↗
▸Energy Compliance55
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS33
01/15/2020421396484Open ↗
01/15/2020421652820Open ↗
01/13/2020421862256Open ↗
Showing 3 of 33 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
04/20/2021421653311Open ↗
09/30/2020421597061Open ↗
09/17/2020421688329Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/20/2021421653311Open ↗
09/30/2020421597061Open ↗
09/17/2020421688329Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026Q00627495-I1Open ↗
08/13/2026Q00731616-I1Open ↗
08/13/2026Q00627484-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY7
04/20/2021421653311Open ↗
09/30/2020421597061Open ↗
09/17/2020421688329Open ↗
Showing 3 of 7 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs71
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
04/20/2021421653311Open ↗
10/02/2020421597061Open ↗
09/17/2020421688329Open ↗
Showing 3 of 31 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE15
06/26/2023401972692Open ↗
01/07/2022401972692Open ↗
01/04/2022401972692Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
01/13/2020421862256Open ↗
05/16/2019421862256Open ↗
04/16/2019421466354Open ↗
Showing 3 of 9 on file for this type
▸BISSUPERSEDING LETTER5
01/19/2019421466354Open ↗
11/27/2018421394609Open ↗
Showing 2 of 5 on file for this type
▸Cost, Insurance & Ownership70
▸BISCOST AFFIDAVIT69
04/20/2021421653311Open ↗
09/30/2020421597061Open ↗
09/17/2020421688329Open ↗
Showing 3 of 69 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
02/03/2020421862256Open ↗
▸Filing & Intake Forms100
▸BISEFILING COVER SHEET42
05/16/2019421862256Open ↗
11/10/2018421393762Open ↗
11/08/2018421688329Open ↗
Showing 3 of 42 on file for this type
▸BISADDITIONAL INFORMATION32
01/13/2022401972692Open ↗
12/30/2019421652820Open ↗
12/30/2019421396484Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM24
06/03/2021421653311Open ↗
05/19/2020421688329Open ↗
04/27/2020421396484Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents3
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS2
01/08/2019421393762Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation1
08/29/2026Q00040999-I1Open ↗