← Back
BuildNYC
Primarily 4 family with 1 store or office
153 MERCER STREET
MANHATTAN · BIN 1007980
💬 Discuss this project
1879Year Built
5Stories
S4Building Class
M1-5/R7XZoning
10,825 sfGross Floor Area
5Units
Rent Stabilized0 Active Violations
Primarily 4 family with 1 store or office · Owner of record: Manhattan Realty Company 1 · 2,500 sf lot · 4.33 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Bulkhead1 filing
Floor 51 filing
Floor 4
Floor 3
Floor 21 filing
Floor 16 filings
Cellar2 filings
Site & exterior2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Only Realty Company2303/21/2026
Manhattan Realty Co1403/22/2026
Mario Ciuffarin Architect103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Outsource Consultants1603/21/2026
Stacie Scorcia Company803/21/2026
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MichilliGeneral Contractor1207/09/2026
First Standard ConstructionGeneral Contractor603/21/2026
All Tech Mechanicalspecialty_contractor107/08/2026
Lume ElectricElectrical103/22/2026
York Electrical ContractorsElectrical103/22/2026
A.M.A. HoldingsSign hanger107/08/2026
Bedrock MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Biz Designs6312101/29/2026
Kadan5956201/29/2026
The Eipel Engineering Group2714211/04/2025
Outsource Special Inspection2827612/23/2024
Munyc Architecture5224110/12/2023
Jack Green Associates422204/25/2022
Building Lifecycle
All (124)Filed (13)Permit Issued (10)Signed Off (10)Violation (43)Inspection (3)Objection (19)Special Inspection (20)
10/09/2026
Signed off — Alteration
Roof removal, new skylight install with aluminum frame, HSS beam, curb wall reinforcement, mech louver at bulkhead. Minor structural work. No change in use, egress, or occupancy under this application
M01044775-I1
07/27/2026
Signed off — Alteration
STRUCTURAL WORK RELATED TO PORTION OF EXISTING MASONRY WALL AND EXISTING ROOF REMOVAL, NEW CMU WALL INFILL AND STRUCTURAL ELEMENTS SUPPORT OF NEW SKYLIGHT. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01133558-I1
07/07/2026
Permit renewed — General Construction
Renewed without changes
M01044775-I1-GC-CX
05/26/2026
Signed off — Alteration
Reduction in size of existing loft in 5th floor apartment.
M01348723-I1
02/09/2026
Permit issued — Structural
M01348723-I1-ST
01/29/2026
Filed — Alteration
Reduction in size of existing loft in 5th floor apartment.
M01348723-I1
12/11/2025
Elevator Category 1 inspection report filed
12/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
12/08/2025
Special inspection requirement — Final
MARIO CIUFFARIN
11/25/2025
Objection resolved — Addressed
11/24/2025
Special inspection requirement — Structural Steel - Details
Bix Ellenbecker
11/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
11/24/2025
Special inspection requirement — Masonry
Bix Ellenbecker
11/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Bix Ellenbecker
11/24/2025
Special inspection requirement — Structural Steel - Welding
Bix Ellenbecker
11/24/2025
Special inspection requirement — Post-installed Anchors
Bix Ellenbecker
11/24/2025
Special inspection requirement — Final
Bix Ellenbecker
11/19/2025
Objection raised — Admin
11/04/2025
Filed — Alteration
STRUCTURAL WORK RELATED TO PORTION OF EXISTING MASONRY WALL AND EXISTING ROOF REMOVAL, NEW CMU WALL INFILL AND STRUCTURAL ELEMENTS SUPPORT OF NEW SKYLIGHT. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01133558-P1
11/03/2025
Filed — Alteration
Roof removal, new skylight install with aluminum frame, HSS beam, curb wall reinforcement, mech louver at bulkhead. Minor structural work. No change in use, egress, or occupancy under this application
M01044775-P1
07/08/2025
Permit issued — General Construction
M01044775-I1-GC-CX
07/08/2025
Permit issued — Structural
M01133558-I1-ST
03/04/2025
Signed off — Alteration
NON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - PROENZA SCHOULER. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01157577-I1
02/20/2025
Signed off — Alteration
SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH TO INCLUDE REMOVAL OF EXISTING SPRINKLER HEADS AND INSTALLATION OF NEW SPRINKLER HEADS ON ASSOCIATED PIPING
M01039203-I1
02/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/11/2025
Signed off — Alteration
Removal of exterior partial stair & ladder at 2nd floor fire escape & replacement with new drop down ladder. No change in use, occupancy or egress.
M00888915-I1
02/11/2025
Permit issued — Sign
M01157577-I1-SG
02/07/2025
Objection resolved — Addressed
02/06/2025
Signed off — Alteration
MECHANICAL WORK RELATED TO INSTALLATION OF NEW VRF HEAT PUMP UNITS AND ASSOCIATED DUCTWORK & AIR REGISTERS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01064492-I1
02/06/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/04/2025
Objection raised — Zoning
02/04/2025
Objection resolved — Addressed
01/31/2025
Signed off — Alteration
M01060562-I1
01/30/2025
Signed off — Alteration
REMOVAL OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILING AND RELATED INTERIOR RENOVATION WORK AS SHOWN ON PLANS FILED. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01037738-I1
01/30/2025
Objection resolved — Addressed
01/23/2025
Objection resolved — Addressed
01/17/2025
Permit issued — General Construction
M01060562-I1-GC
01/15/2025
Objection raised — Admin
01/15/2025
Objection resolved — Addressed
01/06/2025
Objection raised — Admin
01/06/2025
Objection resolved — Addressed
01/03/2025
Permit renewed — General Construction
Renewed without changes
M01037738-I1-GC
01/03/2025
Permit renewed — Mechanical Systems
Renewed without changes
M01064492-I1-MS
01/03/2025
Objection raised — Structural
01/03/2025
Objection raised — Scope
12/30/2024
Objection raised — Scope
12/30/2024
Objection raised — Structural
12/30/2024
Objection raised — Admin
12/30/2024
Objection raised — Admin
12/30/2024
Objection raised — Zoning
12/30/2024
Objection raised — Fire_Protection
12/27/2024
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - PROENZA SCHOULER. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01157577-I1
12/27/2024
Special inspection requirement — Final
Ryan Hung
12/23/2024
Filed — Alteration
M01060562-I1
12/18/2024
Filed — Alteration
Roof removal, new skylight install with aluminum frame, HSS beam, curb wall reinforcement, mech louver at bulkhead. Minor structural work. No change in use, egress, or occupancy under this application
M01044775-I1
12/18/2024
Filed — Alteration
STRUCTURAL WORK RELATED TO PORTION OF EXISTING MASONRY WALL AND EXISTING ROOF REMOVAL, NEW CMU WALL INFILL AND STRUCTURAL ELEMENTS SUPPORT OF NEW SKYLIGHT. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01133558-I1
12/18/2024
Permit renewed — General Construction
Renewed without changes
M01037738-I1-GC
12/18/2024
Permit renewed — Mechanical Systems
Renewed without changes
M01064492-I1-MS
10/22/2024
At time of inspection i observed no DOB stamped approved plans on site during active construction under permit#M01037738-I1., provide approved…
ECB violation · closed
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Michilli—
DOB NOW—First Standard Construction—
DOB NOW—Michilli—
DOB NOW—Michilli—
DOB NOW—A.M.A. Holdings—
DOB NOW—Michilli—
DOB NOW—Michilli—
DOB NOW—Michilli—
DOB NOW—Michilli—
DOB NOW—Michilli—
DOB NOW—Bedrock Mechanical—
DOB NOW—Michilli—
DOB NOW—Michilli—
DOB NOW—First Standard Construction—
DOB NOW—All Tech Mechanical—
BIS—First Standard Construction—
BIS—First Standard Construction—
BIS—Marob Management—
BIS—Marob Management—
BIS—Michilli—
BIS—Marob Management—
BIS—Aqua Plumbing & Heating—
BIS—Aqua Plumbing & Heating—
BIS—Aqua Plumbing & Heating—
BIS—Demar Plumbing—
BIS—Marob Management—
BIS—Marob Management—
BIS—Marob Management—
BIS—Marob Management—
BIS—Marob Management—
BIS—Marob Management—
BIS—Marob Management—
BIS—Bronze Plumbing Heat—
BIS—Marob Management—
BIS—Bronze Plumbing Heat—
BIS—Town Restoration Group—
BIS—Town Restoration Group—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 178 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026M00626486-I1Request the plans ↗
09/03/2026M00626486-P1Request the plans ↗
08/29/2026M00888915-I1Request the plans ↗
Showing 3 of 13 on file for this type
▸Applications & Permits29
▸DOB NOWLPC Approval/Permit12
08/13/2026M01037738-I1Open ↗
08/13/2026M01060562-I1Open ↗
08/13/2026M01044775-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
11/18/2019140877905Open ↗
06/08/2018140772901Open ↗
02/01/2016140267342Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION7
03/03/2020140877905Open ↗
09/06/2019140772901Open ↗
06/28/2018140772901Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/06/2010120181560Open ↗
▸Seals & Professional Certifications47
▸DOB NOWSpecial Inspector Seal & Signature14
08/27/2026M01044775-I1Open ↗
08/27/2026M00626486-P1Open ↗
08/26/2026M01064492-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/29/2026M00888915-I1Open ↗
08/26/2026M01039203-I1Open ↗
08/25/2026M01060562-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
09/20/2019140772901Open ↗
09/02/2010120401181Open ↗
07/06/2010120401181Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/27/2026M01157577-I1Open ↗
08/27/2026M01044775-I1Open ↗
08/27/2026M00626486-P1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/08/2018140772901Open ↗
01/08/2015140267342Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/18/2019140877905Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/06/2010120401181Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/18/2019140877905Open ↗
▸BISPC FULL REPORT1
12/17/2007110065704Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/18/2019140877905Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/06/2010120401181Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE1
08/12/2008110065704Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
10/27/2008110065704Open ↗
▸BISSCHEDULE B - PLUMBING1
10/20/2009120181560Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
11/18/2019140877905Open ↗
06/08/2018140772901Open ↗
▸BISSTREET TREE CHECKLIST1
10/01/2010120181560Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/29/2026M00888915-I1Open ↗
08/26/2026M01039203-I1Open ↗
08/25/2026M01060562-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
03/25/2010120181560Open ↗
12/30/2009120234219Open ↗
12/30/2009120234219Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/18/2019140877905Open ↗
06/08/2018140772901Open ↗
12/02/2014140267342Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/06/2010120401181Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026M01133558-I1Open ↗
▸Energy Compliance1
▸BISNYCECC EXEMPTION1
11/18/2019140877905Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
09/17/2020140877905Open ↗
11/18/2019140877905Open ↗
06/28/2018140772901Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs23
▸BISLANDMARKS APPROVAL7
11/18/2019140877905Open ↗
09/20/2019140772901Open ↗
06/26/2018140772901Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/17/2020140877905Open ↗
09/20/2019140772901Open ↗
07/02/2013120181560Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
07/02/2010120401181Open ↗
12/30/2009120234219Open ↗
10/20/2009120181560Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
03/01/2010120181560Open ↗
10/20/2009120181560Open ↗
03/01/2010120181560Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/02/2010120401181Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT10
11/18/2019140877905Open ↗
09/20/2019140772901Open ↗
06/08/2018140772901Open ↗
Showing 3 of 10 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
03/09/2010120181560Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/17/2020140877905Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION5
06/26/2018140772901Open ↗
01/08/2015140267342Open ↗
07/06/2010120401181Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/18/2019140877905Open ↗
06/08/2018140772901Open ↗
12/02/2014140267342Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
07/02/2010120401181Open ↗
10/20/2009120181560Open ↗
▸BISBOROUGH INTAKE FORM1
09/20/2019140772901Open ↗
▸Other Documents9
▸DOB NOWProof of Historic Building7
08/13/2026M01060562-I1Open ↗
08/13/2026M01037738-I1Open ↗
08/13/2026M01044775-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPLOT DIAGRAM1
10/20/2009120181560Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/08/2018140772901Open ↗