| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01196759 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 04/16/2025 | 09/22/2026 | Design ROSINI ENGINEERING, PC Filer GILLMAN CONSULTING INC | Filing herewith sprinkler modification to the existing systems as per plans. No change to use, egress or occupancy. |
| M01370221 ↗ | 65 GREENE STREET MANHATTAN | Alteration | Permit Issued | 06/19/2026 | 09/16/2026 | Owner Greene Propco LLC Filer DVA Advisors | Interior renovation of partitions, ceilings and doors on the cellar and 1st floors of the existing commercial space. No change in use, egres… |
| M01313105 ↗ | 530 BROADWAY MANHATTAN | Alteration | Permit Issued | 01/13/2026 | 09/01/2026 | Design MG ENGINEERING D.P.C. Owner BSD 530 BROADWAY PROPCO Filer GILLMAN CONSULTING INC | Hereby filing upgrades to spring street lobby including millwork as shown on plans filed herewith. No change to use, occupancy or egress. |
| M01386317 ↗ | 155 FRANKLIN STREET MANHATTAN | Alteration | Permit Issued | 05/15/2026 | 08/28/2026 | Design SHREMSHOCK | Propose sprinkler modifications at existing commercial space all as per plans herewith filed. |
| M01421628 ↗ | 82 MAC DOUGAL STREET MANHATTAN | Alteration | Permit Issued | 06/24/2026 | 08/10/2026 | Design ANASTASIO ARCHITECTS Filer YBL NY INC | INTERIOR RENOVATION WITH NEW KITCHEN CABINETS, CLOSET AND BATHROOM. NO CHNAGE OF USE, EGRESS OR OCCUPANCY. |
| M01428528 ↗ | 90 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 08/04/2026 | 08/10/2026 | Design MB ARCHITECTURE DESIGN Owner Evergreen Peak LLC Filer PWF | INTERIOR ALTERATIONS TO EXISTING GROUND FLOOR COMMERCIAL TENANT SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHAN… |
| Name | Projects together | Most recent |
|---|---|---|
| ROSINI ENGINEERING, PC | 19 | 06/16/2026 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 13 | 09/16/2026 |
| CROWN ARCHITECTURE & CONSULT., DPC | 12 | 02/28/2025 |
| MARIO CIUFFARIN ARCHITECT | 10 | 11/03/2025 |
| MG ENGINEERING D.P.C. | 9 | 06/15/2026 |
| VALERIO ARCHITECTS | 9 | 06/26/2026 |
| E4P CONSULTING ENGINEERING PLLC | 7 | 06/19/2026 |
| SAWICKITARELLA ARCHITECTURE+DESIGN | 6 | 03/04/2024 |
| ATMOSPHERE DESIGN & ARCH PLLC | 5 | 01/24/2024 |
| CALLISONRTKL ARCHITECTS, P.C. | 5 | 03/12/2026 |
| DESIMONE CONSULTING ENGINEERS | 5 | 02/28/2025 |
| GILSANZ MURRAY STEFICEK LLP | 5 | 02/28/2024 |
| LALIRE MARCH ARCHITECTS LLP | 5 | 01/21/2026 |
| ARMOUR UNSDERFER ENGINEERING INC, P | 4 | 09/20/2024 |
| DESIGN REPUBLIC | 4 | 05/29/2025 |
| EP ENGINEERING LLC | 4 | 11/28/2022 |
| FISKAA ENGINEERING | 4 | 04/27/2026 |
| SARGENTI ARCHITECTS | 4 | 06/15/2026 |
| SCHNACKEL ENGINEERS | 4 | 04/16/2026 |
| STEFANO MORISI R.A. | 4 | 01/10/2022 |
| DANIEL C. RUZEU | 3 | 06/23/2026 |
| JIM BROWNING, AIA | 3 | 04/29/2025 |
| SPACE 4 ARCHITECTURE | 3 | 07/21/2022 |
| SSUPERETTE DESIGN LLC | 3 | 04/15/2025 |
| TAKFEN ARCHITECTURE | 3 | 04/29/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| BEDROCK PLUMBING & HEATING INC | 4 | 07/16/2026 |
| HENRY MYERS P & H, INC | 4 | 06/15/2026 |
| MIDNIGHT EXPRESS MECH CRP | 4 | 08/14/2026 |
| A PLUS PLUMBING CORP | 3 | 08/26/2026 |
| PETER MICELI PLUMBING | 3 | 06/15/2026 |
| MILLER PLUMBING & HTG INC | 2 | 02/28/2025 |
| PLAZA CONSTRUCTION LLC | 2 | 03/22/2023 |
| ACCURATE MECH INDSTRS INC | 1 | 06/15/2026 |
| ALL MAKES HTG & A/C CORP | 1 | 03/27/2024 |
| ALLSTATE SPRINKLER LLC | 1 | 04/21/2025 |
| AMI AND ASSOCIATES INC | 1 | 06/15/2026 |
| ARROW MECHANICAL CORP | 1 | 10/27/2023 |
| AVID NYC CORP | 1 | 07/05/2022 |
| BEDROCK MECHANICAL INC | 1 | 06/15/2026 |
| BLUEWATER PLBG& HTG INC | 1 | 08/25/2023 |
| BUCKMILLER AUTO.SPKLR.COR | 1 | 08/26/2026 |
| CARUSO CONTRACTING LLC | 1 | 10/27/2021 |
| GO PRO FIRE PROTECTION C | 1 | 01/13/2026 |
| H M SPRINKLER INC | 1 | 04/14/2025 |
| INTEGRATED HVAC SYS & SVC | 1 | 10/25/2024 |
| PROCORE MECHANICAL CORP | 1 | 03/27/2024 |
| RZ PROJECT MANAGEMENT COR | 1 | 09/13/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| BSD 530 BROADWAY PROPCO | 18 | 06/15/2026 |
| VORNADO REALTY TRUST | 13 | 03/06/2026 |
| JSRE MANAGEMENT | 7 | 11/29/2023 |
| DOUGLAS ELLIMAN | 6 | 06/23/2026 |
| WINTER MANAGEMENT CORP. | 6 | 06/15/2026 |
| TF CORNERSTONE INC. | 5 | 10/30/2024 |
| BROADWAY MERCER CONDO | 4 | 06/26/2026 |
| MAROB MANAGEMENT CORP | 4 | 11/04/2025 |
| MIDWOOD MANAGEMENT CORP | 4 | 09/16/2026 |
| THOR EQUITIES, LLC | 4 | 12/12/2023 |
| ACHS MANAGMENT | 3 | 04/25/2025 |
| Digby Management Company, LLC | 3 | 05/20/2021 |
| FIAO | 3 | 10/12/2023 |
| TIDAL REAL ESTATE PARTNERS LP | 3 | 08/24/2022 |
| 150GREENESTREETCORP@GMAIL.COM | 2 | 02/15/2023 |
| 96-100 PRINCE STREET INC. | 2 | 02/22/2024 |
| BUCHBINDER & WARREN LLC | 2 | 11/09/2021 |
| Building Equity Management LLC | 2 | 08/14/2026 |
| CROWN ACQUISITIONS | 2 | 06/30/2022 |
| DAYAN 552-26 LLC | 2 | 08/09/2021 |
| DOUGLAS ELLIMAN PROPERTY MANAGEMENT | 2 | 09/25/2025 |
| GRAND AND MERCER STREET CORP. | 2 | 08/25/2023 |
| MAGIM MANAGEMENT | 2 | 06/24/2021 |
| MAXWELL-KATES, INC. | 2 | 06/15/2026 |
| MEMBER | 2 | 03/13/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| OUTSOURCE CONSULTANTS, INC. | 29 | 06/23/2026 |
| A1 EXPEDITING SERVICE CORP. | 20 | 03/12/2026 |
| CROWN DESIGN & CONSULTING | 14 | 02/28/2025 |
| ARCHETYPE CONSULTANTS, INC. | 12 | 10/30/2024 |
| RIZZO GROUP | 10 | 01/21/2026 |
| MARY MCKEOWN | 8 | 06/15/2026 |
| JAM CONSULTANTS, INC. | 7 | 06/15/2026 |
| ADAM MAISER | 6 | 06/16/2026 |
| METROPOLIS GROUP INC | 6 | 09/16/2026 |
| VALERIO ARCHITECTS | 6 | 04/16/2026 |
| GILLMAN CONSULTING INC | 5 | 06/15/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 5 | 07/16/2026 |
| PWF | 4 | 08/04/2026 |
| STECC CORP | 4 | 10/29/2025 |
| EA DESIGN GROUP, INC. | 3 | 01/21/2026 |
| ANTHONY MORALI ARCHITECT PLLC | 2 | 08/26/2026 |
| BURNHAM NATIONWIDE INC | 2 | 03/22/2023 |
| CONVERSANO ASSOCIATES, INC. | 2 | 08/14/2026 |
| JM ZONING, LLC. | 2 | 03/13/2023 |
| SOL BUILDING CONSULTING SERVICES | 2 | 05/23/2025 |
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 07/23/2026 |
| CORNERSTONE CONSULTING | 1 | 09/02/2021 |
| DVA Advisors | 1 | 06/19/2026 |
| ENKAY DESIGN & CONSULTING, LLC | 1 | 03/27/2024 |
| N AND N CONSULTANT CORP. | 1 | 07/27/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01196759 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Permit Issued | 04/16/2025 | 09/22/2026 | Design ROSINI ENGINEERING, PC Filer GILLMAN CONSULTING INC | Filing herewith sprinkler modification to the existing systems as per plans. No change to use, egress or occupancy. |
| M01370221 ↗ | 65 GREENE STREET MANHATTAN | Alteration | Permit Issued | 06/19/2026 | 09/16/2026 | Owner Greene Propco LLC Filer DVA Advisors | Interior renovation of partitions, ceilings and doors on the cellar and 1st floors of the existing commercial space. No change in use, egres… |
| M01313105 ↗ | 530 BROADWAY MANHATTAN | Alteration | Permit Issued | 01/13/2026 | 09/01/2026 | Design MG ENGINEERING D.P.C. Owner BSD 530 BROADWAY PROPCO Filer GILLMAN CONSULTING INC | Hereby filing upgrades to spring street lobby including millwork as shown on plans filed herewith. No change to use, occupancy or egress. |
| M01386317 ↗ | 155 FRANKLIN STREET MANHATTAN | Alteration | Permit Issued | 05/15/2026 | 08/28/2026 | Design SHREMSHOCK | Propose sprinkler modifications at existing commercial space all as per plans herewith filed. |
| M01421628 ↗ | 82 MAC DOUGAL STREET MANHATTAN | Alteration | Permit Issued | 06/24/2026 | 08/10/2026 | Design ANASTASIO ARCHITECTS Filer YBL NY INC | INTERIOR RENOVATION WITH NEW KITCHEN CABINETS, CLOSET AND BATHROOM. NO CHNAGE OF USE, EGRESS OR OCCUPANCY. |
| M01428528 ↗ | 90 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 08/04/2026 | 08/10/2026 | Design MB ARCHITECTURE DESIGN Owner Evergreen Peak LLC Filer PWF | INTERIOR ALTERATIONS TO EXISTING GROUND FLOOR COMMERCIAL TENANT SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHAN… |
| M01294097 ↗ | 237 LAFAYETTE STREET MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 07/23/2026 | Design JAE CHUNG ARCHITECT, P.C. | TEMP CONSTRUCTION FENCE FILED IN CONJUNCTION WITH DOB NOW GC JOB M01294097-I1 |
| M01406609 ↗ | 597 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/26/2026 | 07/16/2026 | Design VALERIO ARCHITECTS Owner BROADWAY MERCER CONDO | EXTERIOR STOREFRONT DOORS / BLADE / SIGNAGE UPDATES FOR MAGDA BUTRYM. NO CHANGE IN USE. NO INCREASE IN SQUARE FOOTAGE. |
| M01044775 ↗ | 153 MERCER STREET MANHATTAN | Alteration | Permit Issued | 12/18/2024 | 07/07/2026 | Design MARIO CIUFFARIN ARCHITECT Owner MAROB MANAGEMENT CORP | Roof removal, new skylight install with aluminum frame, HSS beam, curb wall reinforcement, mech louver at bulkhead. Minor structural work. N… |
| M01415457 ↗ | 782 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 06/23/2026 | 06/30/2026 | Design DANIEL C. RUZEU Owner Douglas Elliman | STORE FRONT WORK OF RETAIL SPACE. NO CHANGE OF USE, EGRESS OR OCCUPANCY. |
| M01395924 ↗ | 929 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 05/20/2026 | 06/25/2026 | Design ROSINI ENGINEERING, PC Filer ADAM MAISER | NO CHANGE OF USE, OCCUPANCY, EGRESS OR ZONING IN THIS APPLICATION.SCOPE OF WORK CONTAINED IN THIS FILING TO BE LIMITED TO INTERIOR OF 1ST AN… |
| M01353199 ↗ | 929 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/04/2026 | 06/24/2026 | PLUMBING WORK FOR ACCESSORY BATHROOM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | |
| M01196439 ↗ | 530 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/02/2025 | 06/18/2026 | Owner BSD 530 BROADWAY PROPCO Filer GILLMAN CONSULTING INC | Hereby filing to remove, replace, and install plumbing fixtures with related piping for restaurant reno as shown on plans filed herewith. No… |
| M01359946 ↗ | 597 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/16/2026 | 06/17/2026 | Design SCHNACKEL ENGINEERS Owner BROADWAY MERCER CONDO Filer VALERIO ARCHITECTS | MECHANICAL UPDATES FOR THE NEW MAGDA BUTRYM TENANT SPACE AT THE CELLAR, 1ST FLOOR and 2ND FLOOR LEASE SPACE AS PER PLANS SUBMITTED HEREWITH.… |
| M01413436 ↗ | 597 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/15/2026 | 06/16/2026 | Owner BROADWAY MERCER CONDO | INSTALLATION OF TEMPORARY CONSTRUCTON FENCE |
| M01361934 ↗ | 782 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 04/22/2026 | 06/09/2026 | Design FISKAA ENGINEERING Owner Douglas Elliman | STRUCTURAL WORK IN CONNECTION WITH RETAIL RENOVATION AN DUNNAGE WORK |
| M01345070 ↗ | 155 FRANKLIN STREET MANHATTAN | Alteration | Permit Issued | 04/17/2026 | 06/05/2026 | Design SHREMSHOCK | Propose removal of interior elements and related finishes at existing commercial space at 001 floor all as per plans filed herewith. No chan… |
| B08051421 ↗ | 8703 18 AVENUE BROOKLYN | Alteration | Permit Issued | 10/12/2023 | 06/03/2026 | Design GENSLER Owner FIAO | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or oc… |
| M01405058 ↗ | 31 CROSBY STREET MANHATTAN | Alteration | Permit Issued | 05/28/2026 | 06/01/2026 | Design MATTHEW HART Owner ZADA REALTY CORP Filer GILLMAN CONSULTING INC | RENOVATION OF GROUND FLOOR STOREFRONT. SCOPE OF WORK IS LIMITED TO THE GROUND FLOOR FACADE. REPLACEMENT OF EXISTING DOORS AT FRONT FACADE… |
| X00587633 ↗ | 260 EAST 138 STREET BRONX | Alteration | Permit Issued | 10/27/2021 | 05/18/2026 | Design FC CONSULTING ENGINEER, PLLC | INSTALLATION OF MECHANICAL UNITS ON ROOF WITH DUCTWORK AS PER PLANS HEREWITH. |
| M01355485 ↗ | 655 5 AVENUE MANHATTAN | Alteration | Permit Issued | 03/06/2026 | 05/01/2026 | Design ROSINI ENGINEERING, PC Owner VORNADO REALTY TRUST | Modifying ductwork and supply diffuser to accommodate new partition layout. Demolition of existing AC systems and ductwork that are from the… |
| M01357500 ↗ | 655 5 AVENUE MANHATTAN | Alteration | Permit Issued | 03/06/2026 | 05/01/2026 | Design RJC Engineers Owner VORNADO REALTY TRUST | demolition of the existing staircase and replacement with a new staircase. A new non-load-bearing party wall separating building no. 655 fro… |
| M01358649 ↗ | 597 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/15/2026 | 04/27/2026 | Design VALERIO ARCHITECTS Owner BROADWAY MERCER CONDO | INTERIOR RENOVATION OF THE MAGDA BUTRYM RETAIL STORE AT CELLAR, 1ST AND 2ND FLOOR LEVELS INCLUDING NEW PARTITIONS, FINISHES, FURNITURE, AND … |
| M01355429 ↗ | 655 5 AVENUE MANHATTAN | Alteration | Permit Issued | 03/06/2026 | 04/13/2026 | Demising of Existing Retail & Build Out of 655 Fifth Avenue Temporary Retail Store. Scope includes demolition, new doors/partitions, ceiling… | |
| M01355636 ↗ | 659 5 AVENUE MANHATTAN | Alteration | Permit Issued | 03/11/2026 | 04/13/2026 | Design ROSINI ENGINEERING, PC | Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air condition… |
| M01355713 ↗ | 659 5 AVENUE MANHATTAN | Alteration | Permit Issued | 03/12/2026 | 04/13/2026 | Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load … | |
| M01357509 ↗ | 659 5 AVENUE MANHATTAN | Alteration | Permit Issued | 03/11/2026 | 04/13/2026 | Design RJC Engineers | The project includes the installation of new steel beams to close existing floor openings at the second and third floors. A new non-load-bea… |
| M01248815 ↗ | 652 HUDSON STREET MANHATTAN | Alteration | Signed-off | 08/25/2025 | 03/26/2026 | Owner MAXWELL KATES Filer JAM CONSULTANTS, INC. | PLUMBING MODIFICATIONS AND FIXTURES INSTALLATIONS FOR APARTMENT RENOVATION. |
| M01368069 ↗ | 140 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 03/19/2026 | 03/23/2026 | Owner NEXT CAPITAL NYC LLC Filer METROPOLIS GROUP INC | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M01322680 ↗ | 408 WEST 14 STREET MANHATTAN | Alteration | Signed-off | 02/27/2026 | 03/12/2026 | Design TAKFEN ARCHITECTURE Owner WINTER MANAGEMENT CORP Filer MARY MCKEOWN | Lululemon Replacement of metal and glass section of existing storefront for new tenant build out. No change in egress, use or occupancy |
| M01365527 ↗ | 408 WEST 14 STREET MANHATTAN | Alteration | Signed-off | 03/09/2026 | 03/12/2026 | Design OSBORN ENGINEERING Owner WINTER MANAGEMENT CORP Filer MARY MCKEOWN | Lululemon - Structural work associated with storefront work. No change to egress use or occupancy. |
| M01329680 ↗ | 31 CROSBY STREET MANHATTAN | Alteration | Permit Issued | 12/12/2025 | 03/05/2026 | Owner ZADA REALTY CORP Filer GILLMAN CONSULTING INC | RENOVATION OF EXISTING GROUND FLOOR INTERIOR RETAIL SPACE INCLUDING REMOVAL OF NON-LOAD BEARING PARTITIONSAND FINISHES, AND INSTALLATION OF … |
| M01303757 ↗ | 140 WOOSTER STREET MANHATTAN | Alteration | Signed-off | 01/11/2026 | 02/27/2026 | Design THOMAS W HUT ARCHITECT PLLC Owner NEXT CAPITAL NYC LLC Filer ADAM MAISER | Mechanical renovation of 1st floor retail space and associate mezzanine space. |
| M01321548 ↗ | 408 WEST 14 STREET MANHATTAN | Alteration | Signed-off | 02/06/2026 | 02/25/2026 | Design M-ENGINEERING NEW YORK, LLC Owner WINTER MANAGEMENT CORP Filer MARY MCKEOWN | Mechanical work in conjunction with new tenant layout for Lululemon as per plans filed herewith. No change in egress, use or occupancy |
| M01321602 ↗ | 408 WEST 14 STREET MANHATTAN | Alteration | Signed-off | 02/06/2026 | 02/25/2026 | Design OSBORN ENGINEERING Owner WINTER MANAGEMENT CORP Filer MARY MCKEOWN | Lululemon - Structural work associated with dunnage for root fop RTU per plans filed herewith. No change to egress use or occupancy. |
| M01354589 ↗ | 782 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/19/2026 | 02/20/2026 | Design DANIEL C. RUZEU Owner Douglas Elliman | INTERIOR DEMOLITION OF NON-STRUCTURAL PARTITIONS AND RELATED FINISHES. REMOVAL OF 2 AC UNITS. NO CHANGE OF USE, EGRESS OR OCCUPANCY |
| M01319353 ↗ | 408 WEST 14 STREET MANHATTAN | Alteration | Signed-off | 12/10/2025 | 02/09/2026 | Design TAKFEN ARCHITECTURE Owner WINTER MANAGEMENT CORP Filer MARY MCKEOWN | LULULEMON New tenant build out. Remove/install non load bearing partitions, flooring, ceiling, finishes as per plans filed herewith. No ch… |
| M01323760 ↗ | 92 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 01/15/2026 | 02/09/2026 | Owner MIDWOOD MANAGEMENT CORP Filer METROPOLIS GROUP INC | Herewith filing for removal of existing mechanical systems throughout and installation of new mechanical systems on the cellar, 1st, 2nd & r… |
| M01331598 ↗ | 92 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 01/15/2026 | 02/09/2026 | Owner MIDWOOD MANAGEMENT CORP Filer METROPOLIS GROUP INC | Herewith filing for modifications to existing structural system on the 1st, 2nd and roof levels. No change in use, occupancy, or egress. |
| M01266197 ↗ | 92 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 01/14/2026 | 02/05/2026 | Design MARINASASSUARCHITECTS Owner MIDWOOD MANAGEMENT CORP Filer METROPOLIS GROUP INC | Herewith filing for interior architectural fit out work on the cellar, 1st, 2nd, and roof as indicated on plans. No change in use, occupancy… |
| M01335957 ↗ | 251 PARK AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 01/20/2026 | 01/29/2026 | Design LALIRE MARCH ARCHITECTS LLP Filer RIZZO GROUP | Filing for Mechanical modifications as per plans filed herewith. No change in use, egress, or occupancy. |
| B00801635 ↗ | 8703 18 AVENUE BROOKLYN | Alteration | Signed-off | 09/12/2023 | 01/23/2026 | Design THORNTON TOMASETTI Owner FIAO | Structural modifications as per plans filed herewith (Miscellaneous steel support for moveable partition wall at 1st floor, construction of … |
| M01256190 ↗ | 815 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/25/2025 | 01/22/2026 | Design RISE PROJECTS Filer STECC CORP | interior renovation in apt 10A |
| M01321877 ↗ | 408 WEST 14 STREET MANHATTAN | Alteration | Signed-off | 12/03/2025 | 01/22/2026 | Design TAKFEN ARCHITECTURE Owner WINTER MANAGEMENT CORP Filer MARY MCKEOWN | Lululemon. Installation of temporary plywood fence. No change in egress, use or occupancy. |
| M01288351 ↗ | 92 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 12/22/2025 | 12/30/2025 | — | Herewith filing for exterior removal of existing facade as per plans. No change in use, occupancy, or egress. |
| M01202711 ↗ | 92 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 04/09/2025 | 12/11/2025 | Design MARINASASSUARCHITECTS Filer METROPOLIS GROUP INC | Herewith filing for interior removals of non-load bearing partitions and finishes on the cellar, 1st and 2nd floors as indicated on plans. N… |
| 122944074BIS | 250 EAST HOUSTON STREET MANHATTAN | — | ISSUED | 01/16/2018 | 12/04/2025 | — | — |
| M01271053 ↗ | 218 5 AVENUE MANHATTAN | Alteration | Permit Issued | 09/23/2025 | 11/07/2025 | Design ALL CITY ENGINEERING, P.C. Owner STELLAR MANAGEMENT | RELATED PLUMBING AND SPRINKLER WORK TO ACCOMODATE NEW COMMERCIAL TENANT AT EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE TO USE , EG… |
| M01295880 ↗ | 92 PRINCE STREET MANHATTAN | Alteration | Permit Issued | 10/31/2025 | 11/03/2025 | Owner MIDWOOD MANAGEMENT CORP Filer METROPOLIS GROUP INC | Herewith filing for construction barricade along South side of Prince Street and East side of Mercer Street. No change in use, occupancy, or… |
| M01066438 ↗ | 521 WEST STREET MANHATTAN | Alteration | Signed-off | 07/11/2024 | 10/30/2025 | Design SCHNACKEL ENGINEERS Owner TF CORNERSTONE INC. Filer VALERIO ARCHITECTS | MECHANICAL MODIFICATIONS FOR EXISTING RETAIL PER PLANS FILED HEREWITH. |
| B08051432 ↗ | 8703 18 AVENUE BROOKLYN | Alteration | Permit Issued | 09/08/2023 | 10/22/2025 | Design FISKAA ENGINEERING Owner FIAO | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. |
| B08051847 ↗ | 8703 18 AVENUE BROOKLYN | Alteration CO | Permit Issued | 09/08/2023 | 10/22/2025 | Design GENSLER | Modification to existing building use and egress to establish Place of Assembly on the First Floor and occupancy increase on the Roof. |
| M01268323 ↗ | 218 5 AVENUE MANHATTAN | Alteration | Permit Issued | 09/18/2025 | 10/17/2025 | Design MORALI ARCHITECTURE Owner STELLAR MANAGEMENT | INTERIOR RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENT AS PER PLANS FILED HEREWITH. PARTITION, FINISH AND FIXTURE WORK. NEW AWNING … |
| M01248835 ↗ | 652 HUDSON STREET MANHATTAN | Alteration | Signed-off | 08/27/2025 | 09/05/2025 | — | Structural modifications related to the creation of new access stair openings and RTU support as per plans filed. No change to use, egress, … |
| M01206601 ↗ | 511 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/15/2025 | 07/22/2025 | Design SSUPERETTE DESIGN LLC Owner ACHS MANAGMENT Filer RIZZO GROUP | Minor interior demolition. Interior Fit-out and Installation of new staircase, carpentry and finishes on the Cellar, 1-2nd Floors as per pla… |
| M01231383 ↗ | 114 HUDSON STREET MANHATTAN | Alteration | Signed-off | 05/27/2025 | 07/22/2025 | Design NEW YORK ENGINEERS LLC Filer STECC CORP | MECHANICAL AND DUCT WORK IN APT 4 |
| M01229569 ↗ | 114 HUDSON STREET MANHATTAN | Alteration | Signed-off | 05/23/2025 | 07/18/2025 | Design TYLin Filer STECC CORP | structural work in apt 4 |
| M01234640 ↗ | 29 9 AVENUE MANHATTAN | Alteration | Signed-off | 06/25/2025 | 07/11/2025 | Design MEYERS+ ENGINEERS | Baccarat. Mechanical work associated with tenant build out. No change in egress, use or occupancy. |
| M01205160 ↗ | 393 LAFAYETTE STREET MANHATTAN | Alteration | Permit Issued | 04/25/2025 | 07/10/2025 | Design STARK CONSULTING, LLC Owner Fisher Realty Corp | Interior renovations consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy |
| M01249768 ↗ | 33 GREENE STREET MANHATTAN | Alteration | Signed-off | 07/08/2025 | 07/10/2025 | Design VALERIO ARCHITECTS Owner ULJ Studios MGT LLC | CONSTRUCTION FENCE AT GREENE STREET ENTRY FOR STOREFRONT WORK PER PLANS FILED HEREWITH |
| M01133558 ↗ | 153 MERCER STREET MANHATTAN | Alteration | Signed-off | 12/18/2024 | 07/08/2025 | Owner MAROB MANAGEMENT CORP | STRUCTURAL WORK RELATED TO PORTION OF EXISTING MASONRY WALL AND EXISTING ROOF REMOVAL, NEW CMU WALL INFILL AND STRUCTURAL ELEMENTS SUPPORT O… |
| M01157221 ↗ | 33 GREENE STREET MANHATTAN | Alteration | Signed-off | 01/08/2025 | 07/08/2025 | Filer VALERIO ARCHITECTS | STRUCTURAL UPDATES TO ACNE STUDIOS RETAIL STORE PER PLANS FILED HEREWITH. NO UPDATES TO EGRESS, OCCUPANCY OR USE. |
| M01219260 ↗ | 114 HUDSON STREET MANHATTAN | Alteration | Signed-off | 05/23/2025 | 07/08/2025 | Design RISE PROJECTS Filer STECC CORP | interior renovation in the apt 4. |
| M01235961 ↗ | 29 9 AVENUE MANHATTAN | Alteration | Signed-off | 06/26/2025 | 07/08/2025 | Design CHRISTIE ENGINEERING, PC Owner MIDTOWN EQUITIES Filer MARY MCKEOWN | Baccarat Structural work associated with tenant build out per plans filed herewith. Structural support for HVAC units, new had rail and ada… |
| M00706830 ↗ | 597 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 04/20/2022 | 07/07/2025 | Owner VORNADO REALTY TRUST | STRUCTURAL WORK ON BASEMENT, FIRST FLOOR AND 2ND FLOOR AS INDICATED ON PLANS |
| M01176156 ↗ | 652 HUDSON STREET MANHATTAN | Alteration | Signed-off | 05/05/2025 | 07/07/2025 | Design SARGENTI ARCHITECTS Owner MAXWELL KATES Filer JAM CONSULTANTS, INC. | Structural modifications related to the creation of new access stair openings as per plans filed. No change to use, egress, or occupancy. |
| M01222052 ↗ | 29 9 AVENUE MANHATTAN | Alteration | Signed-off | 05/14/2025 | 07/07/2025 | Design O'NEIL LANGAN ARCHITECTS, PC | Baccarat Minor selective demo of interior partitions, flooring, ceilings, finishes and fixtures per plans filed herewith. No change in egre… |
| M01234559 ↗ | 29 9 AVENUE MANHATTAN | Alteration | Signed-off | 06/23/2025 | 07/07/2025 | Design O'NEIL LANGAN ARCHITECTS, PC Owner MIDTOWN EQUITIES Filer MARY MCKEOWN | Baccarat Install non load bearing partition, flooring, ceilings, finishes, ADA ramp and fixtures per plans filed herewith. No change in egr… |
| M01206716 ↗ | 511 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/15/2025 | 07/01/2025 | Design SEVERUD ASSOCIATES Owner ACHS MANAGMENT Filer RIZZO GROUP | Structural Modifications: Installation of structural steel for vestibule & internal staircase on the Ground Floor, Mezzanine, 2-3rd Floors a… |
| M01206773 ↗ | 511 5 AVENUE MANHATTAN | Alteration | Permit Issued | 04/25/2025 | 07/01/2025 | Owner ACHS MANAGMENT Filer RIZZO GROUP | Modifications to the existing HVAC System: Install new ductwork distribution, condensate piping, pumps, exhaust fans and associated wiring o… |
| M01147741 ↗ | 33 GREENE STREET MANHATTAN | Alteration | Signed-off | 12/18/2024 | 06/11/2025 | Design VALERIO ARCHITECTS | TENANT IMPROVEMENT FOR ACNE STUDIOS RETAIL STORE AT GREENE STREET ENTRY FOR NEW ACCESSIBLE ENTRY AS PER PLANS FILED HEREWITH. REPLACE ENTRY … |
| M01196961 ↗ | 530 5 AVENUE MANHATTAN | Alteration | Permit Issued | 03/25/2025 | 04/21/2025 | Design SSUPERETTE DESIGN LLC Owner SCF MANAGEMENT LLC Filer RIZZO GROUP | Sprinkler modification taking place on the 2nd floor as indicated on the drawings. |
| M01180389 ↗ | 641 5 AVENUE MANHATTAN | Alteration | Signed-off | 03/20/2025 | 04/03/2025 | Filer JAM CONSULTANTS, INC. | HUBLOT-- STRUCTURAL WORK TO INSTALL SUPPORT OF NEW STOREFRONT FACADE ELEMENTS RELATED TO RETAIL RENOVATION. NO CHANGE TO USE, EGRESS, OR OC… |
| M01012611 ↗ | 1254 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/25/2024 | 03/24/2025 | Design ELLEN MARTIN ARCHITECT PC | RENOVATION OF EXISTING DWELLING UNIT REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INST… |
| M01157252 ↗ | 530 BROADWAY MANHATTAN | Alteration | Signed-off | 01/07/2025 | 01/31/2025 | Owner BSD 530 BROADWAY PROPCO | INTERIOR RENOVATION WORK AT GROUND FLOOR AND CELLAR LEVEL RETAIL SPACES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY. |
| M01060562 ↗ | 153 MERCER STREET MANHATTAN | Alteration | Signed-off | 12/23/2024 | 01/17/2025 | — | GENERAL CONSTRUCTION WORK RELATED TO THE INSTALLATION OF NEW DRYWALL PARTITIONS, DOOR, FINISHES, AND RCP WORK AS SHOWN ON PLANS FILED HERWIT… |
| M01066162 ↗ | 521 WEST STREET MANHATTAN | Alteration | Signed-off | 07/09/2024 | 01/15/2025 | Design VALERIO ARCHITECTS Owner TF CORNERSTONE INC. | MINOR INTERIOR TENANT IMPROVEMENT PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01054556 ↗ | 521 WEST STREET MANHATTAN | Alteration | Signed-off | 07/09/2024 | 01/10/2025 | Design VALERIO ARCHITECTS | Tenant improvement for new retail store within existing tenant space as per plans filed herewith. Scope incl: non-bearing partition walls; n… |
| M01056172 ↗ | 521 WEST STREET MANHATTAN | Alteration | Signed-off | 07/11/2024 | 01/10/2025 | Design SCHNACKEL ENGINEERS Owner TF CORNERSTONE INC. Filer VALERIO ARCHITECTS | MECHANICAL MODIFICATIONS FOR EXISTING RETAIL STORE PER PLANS FILED HEREWITH. |
| M01013460 ↗ | 15 EAST 69 STREET MANHATTAN | Alteration | Signed-off | 04/16/2024 | 01/09/2025 | Design ROBERT DERECTOR ASSOCIATES Owner DOUGLAS ELLIMAN | Piping shall be routed to landlord installed AC Units. Ductwork shall be distributed to provide heating and cooling to space. No change to u… |
| M01091905 ↗ | 641 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/31/2024 | 01/09/2025 | Design HALLBERG ENGINEERING Filer JAM CONSULTANTS, INC. | HUBLOT-- PLUMIBING MODIFICATIONS AND INSTALLATIONS FOR RETAIL RENOVATION. |
| M01013474 ↗ | 15 EAST 69 STREET MANHATTAN | Alteration | Signed-off | 04/17/2024 | 01/08/2025 | Design DESIGN REPUBLIC Owner DOUGLAS ELLIMAN | INTERIOR FIT-OUT OF EXISTING 2,142 SF GROSS DEMISED RETAIL SPACE WITHIN EXISTING BUILDING. WORK INCLUDES NEW CEILING, RESTROOM, NON-LOAD-BEA… |
| M01056308 ↗ | 530 BROADWAY MANHATTAN | Alteration | Signed-off | 10/17/2024 | 01/08/2025 | Owner BSD 530 BROADWAY PROPCO | Interior demolition for new convenience door opening. No change of use, egress, or occupancy. |
| M01095163 ↗ | 15 EAST 69 STREET MANHATTAN | Alteration | Signed-off | 08/20/2024 | 01/08/2025 | Owner DOUGLAS ELLIMAN | New one-story exterior storefront in multiple bays in two elevations. Storefront attachments, sill attachments / design and light-gauge head… |
| M01037738 ↗ | 153 MERCER STREET MANHATTAN | Alteration | Signed-off | 08/01/2024 | 01/03/2025 | Design MARIO CIUFFARIN ARCHITECT Owner MAROB MANAGEMENT CORP | REMOVAL OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILING AND RELATED INTERIOR RENOVATION WORK AS SHOWN ON PLANS FILE… |
| M01064492 ↗ | 153 MERCER STREET MANHATTAN | Alteration | Signed-off | 08/01/2024 | 01/03/2025 | Design FISKAA ENGINEERING Owner MAROB MANAGEMENT CORP | MECHANICAL WORK RELATED TO INSTALLATION OF NEW VRF HEAT PUMP UNITS AND ASSOCIATED DUCTWORK & AIR REGISTERS AS SHOWN ON PLANS FILED HEREWITH.… |
| M01023309 ↗ | 530 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/05/2024 | 12/03/2024 | Owner BSD 530 BROADWAY PROPCO | Structural work associated with alteration of street level storefront at 532-534 Broadway, including floor modifications. No change of use, … |
| M01092232 ↗ | 641 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/31/2024 | 11/12/2024 | Design CARUSO TURLEY SCOTT, INC Filer JAM CONSULTANTS, INC. | HUBLOT-- STRUCTURAL WORK FOR STOREFRONT MODIFICATIONS RELATED TO RETAIL RENOVATION. |
| M01123774 ↗ | 521 WEST STREET MANHATTAN | Alteration | Signed-off | 10/16/2024 | 10/22/2024 | Design VALERIO ARCHITECTS Owner TF CORNERSTONE INC. | CONSTRUCTION FENCE BARRICADE AT WASHINGTON STREET AND GANSEVOORT STREET ENTRANCES PER PLANS SUBMITTED HEREWITH. FOR CONSTRUCTION PURPOSES ON… |
| M00810497 ↗ | 530 BROADWAY MANHATTAN | Alteration | Signed-off | 02/22/2023 | 09/20/2024 | Design MG ENGINEERING D.P.C. | Filing mechanical work for 4th-5th fl tenant build out, including demo of ex. mechanical ductwork/equipment. Installation of AC/OA units and… |
| M00810638 ↗ | 530 BROADWAY MANHATTAN | Alteration | Signed-off | 01/26/2023 | 09/10/2024 | Owner BSD 530 BROADWAY PROPCO | Structural work associated with removal of interior stair and elevator shaft per approved Alt 1 #120942757, including masonry wall and floor… |
| M00949221 ↗ | 530 BROADWAY MANHATTAN | Alteration | Signed-off | 10/26/2023 | 09/09/2024 | Design MG ENGINEERING D.P.C. Owner BSD 530 BROADWAY PROPCO | Modification and demolition of existing plumbing and sprinkler work at ground floor retail spaces, as shown on plans. No change of use, egre… |
| M01054534 ↗ | 521 WEST STREET MANHATTAN | Alteration | Signed-off | 06/11/2024 | 07/26/2024 | Design VALERIO ARCHITECTS Owner TF CORNERSTONE INC. | Interior non-structural demo to existing non-bearing partition walls, finishes and fixtures as per plans filed herewith. No change to existi… |
| 320580634BIS | 79 WARREN STREET BROOKLYN | — | ISSUED | 08/06/2021 | 07/03/2024 | — | PL |
| M00951880 ↗ | RANDALLS ISLAND MANHATTAN | Alteration | Signed-off | 05/03/2024 | 05/09/2024 | Design VINCENT J. LIOTTA P.E. | INSTALLATION OF TWO 30 TON CAPACITY HEAT PUMPS WITH A TOTAL CAPACITY OF 60 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| M00995131 ↗ | 580 BROADWAY MANHATTAN | Alteration | Signed-off | 03/19/2024 | 04/23/2024 | Design SRW ENGINEERS Owner RAM HOLDINGS | The work proposed is the installation of new indoor ac units providing heating and cooling. The units are connected to two existing to remai… |
| M01016139 ↗ | 43 GRAND STREET MANHATTAN | Alteration | Signed-off | 03/28/2024 | 04/22/2024 | Design J X 2 DESIGN CONSULING LLC | INSTALL SUPPORT SYSTEM FOR DISPLAY, INSTALL MILLWORK, AND CEILING LIGHT FIXTURE FOR TEMPORARY POP UP STORE, NO CHANGE OF USE, EGRESS, OR OCC… |
| M00995125 ↗ | 580 BROADWAY MANHATTAN | Alteration | Signed-off | 02/19/2024 | 04/19/2024 | Design MKO ARCHITECTURE Owner RAM HOLDINGS | Constructing new partitions with new fixtures at existing and new locations. Placing new finishes throughout and installing decorative light… |
| 410159135BIS | 69-01 CENTRAL AVENUE QUEENS | — | ISSUED | 04/15/2009 | 04/18/2024 | — | OT, PL |
| M00962349 ↗ | 251 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 12/14/2023 | 04/17/2024 | Design ALVINE CONSULTING GROUP LLC Filer RIZZO GROUP | Filing for Structural modifications to include interior tenant build out within an existing demised leased office space to the 6th and 7th f… |