← Back
One story retail building
302 EAST 80 STREET
MANHATTAN · Upper East Side-Yorkville · BIN 1049259
💬 Discuss this project
1955Year Built
1Stories
K1Building Class
C1-9Zoning
6,919 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: LESTER'S NYC REALTY PARTNERS LLC · 5,216 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Roof2p · 1 filing · 14 docs
Floor 145p · 4 filings · 20 docs
Cellar47p · 4 filings · 20 docs
Basement1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOLDFISH SWIM SCHOOL507/08/2026
LESTERS703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
I L CONSULTING2603/21/2026
GREEN STUDIO403/21/2026
LOUIS STRIAR403/21/2026
WHIDDEN SILVER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
F-INT LLCGeneral Contractor707/08/2026
ADVANCED PLBG LLCPlumbing207/08/2026
Z-CAR-DScaffold207/08/2026
BISSESSAR, MARTINElectrical103/21/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor107/08/2026
MASTER 2 PLBG & HTG INCPlumbing107/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor107/08/2026
FONTANA, JOHNElectrical103/21/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRANT ENGINEERING26271204/08/2026
Building Lifecycle
All (85)Filed (19)Permit Issued (11)Signed Off (7)Violation (10)Inspection (8)Special Inspection (30)
04/08/2026
Filed — Alteration CO
CONVERT AN EXISTING COMMERCIAL RETAIL SALES BUILDING INTO HEALTH AND FITNESS ESTABLISHMENT, ALL AS PER PLAN. OBTAIN NEW C OF O UPON COMPLETION. SEPARATE APPLICATIONS ARE NOTED UNDER THE COMMENTS AND ADDITIONAL INFO. SECTIONS.
M00779667-P3
02/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/12/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/04/2024
Signed off — Alteration
STRUCTURAL WORK IN CONJUNCTION WITH THE PROPOSED SWIM SCHOOL WHICH REQUIRED STRUCTURAL STEEL MASONRY AND CONCRETE WORK . AND ADDING FOUNDATION. GENERAL CONSTRUCTION WAS FILED UNDER ALT TYPE 1 #M00779667-I1
M00782809-I1
11/04/2024
Signed off — Alteration
GENERAL CONSTRUCTION FOR SWIMMING POOL AND FILTER ROOM (DESIGN PROFESSIONAL ) . WORK IN CONJUNCTION WITH ALT TYP 1 FOR GC. #M00779667 STRUCTURAL AND FOUNDATION WORK #M00782809.
M08033911-I1
11/04/2024
Signed off — Alteration
SPRINKLER AND PLUMBING WORK AS PER PLANS SUBMITTED HEREWITH.
M00781053-I1
10/31/2024
Violation issued (FDNY_NOV, closed)
10/31/2024
Violation issued (FDNY_NOV, closed)
05/24/2024
Permit issued — Sprinklers
M00781053-I1-PL
05/16/2024
Permit issued — Plumbing
M00781053-I1-PL
03/18/2024
Violation issued (FDNY_NOV, closed)
02/07/2024
Signed off — Alteration
INSTALLATION OF NEW HAVC SYSTEM IN CONJUNCTION WITH THE CONSTRUCTION ON A NEW SWIM SCHOOL FILED UNDER ALT TYPE 1 APPLICATION #M00779667-I1. ALL AS PER PLAN. NO CHANGE IN USE EGREES UNDER THIS APPLICATION.
M00784421-I1
12/07/2023
Filed — Alteration CO
CONVERT AN EXISTING COMMERCIAL RETAIL SALES BUILDING INTO HEALTH AND FITNESS ESTABLISHMENT, ALL AS PER PLAN. OBTAIN NEW C OF O UPON COMPLETION. SEPARATE APPLICATIONS ARE NOTED UNDER THE COMMENTS AND ADDITIONAL INFO. SECTIONS.
M00779667-P2
11/22/2023
Special inspection requirement — Post-installed Anchors
Stephen Morse
11/22/2023
Special inspection requirement — Sprinkler Systems
Stephen Morse
11/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Morse
11/17/2023
Filed — Alteration
SPRINKLER AND PLUMBING WORK AS PER PLANS SUBMITTED HEREWITH.
M00781053-P3
11/15/2023
Special inspection requirement — Post-installed Anchors
Stephen Morse
11/15/2023
Special inspection requirement — Sprinkler Systems
Stephen Morse
11/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Morse
11/02/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00827625-I1
11/01/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/20/2023
Filed — Alteration
SPRINKLER AND PLUMBING WORK AS PER PLANS SUBMITTED HEREWITH.
M00781053-P2
10/19/2023
Special inspection requirement — Post-installed Anchors
Stephen Morse
10/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Morse
10/19/2023
Special inspection requirement — Sprinkler Systems
Stephen Morse
10/13/2023
Signed off — Alteration
M00860351-I1
10/13/2023
Signed off — Alteration
M00860352-I1
10/12/2023
Special inspection requirement — Public Assembly Emergency Lighting
frank denner
10/10/2023
Filed — No Work
M00880887-P1
10/10/2023
Filed — Alteration CO
CONVERT AN EXISTING COMMERCIAL RETAIL SALES BUILDING INTO HEALTH AND FITNESS ESTABLISHMENT, ALL AS PER PLAN. OBTAIN NEW C OF O UPON COMPLETION. SEPARATE APPLICATIONS ARE NOTED UNDER THE COMMENTS AND ADDITIONAL INFO. SECTIONS.
M00779667-P1
10/10/2023
Special inspection requirement — Public Assembly Emergency Lighting
frank denner
09/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/17/2023
Permit issued — Construction Fence
M00827625-I1-FN
08/15/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/31/2023
Filed — No Work
M00880887-I1
05/30/2023
Special inspection requirement — Fenestration air leakage
Stephen Morse
05/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Stephen Morse
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Morse
05/30/2023
Special inspection requirement — Energy Code Compliance Inspections
Stephen Morse
05/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
Stephen Morse
05/30/2023
Special inspection requirement — Air barrier - visual inspection
Stephen Morse
05/30/2023
Special inspection requirement — Fenestration areas
Stephen Morse
05/30/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Stephen Morse
05/30/2023
Special inspection requirement — Interior lighting power
Stephen Morse
05/30/2023
Special inspection requirement — Lighting controls
Stephen Morse
05/11/2023
Filed — Alteration
SPRINKLER AND PLUMBING WORK AS PER PLANS SUBMITTED HEREWITH.
M00781053-P1
05/11/2023
Filed — Alteration
INSTALLATION OF NEW HAVC SYSTEM IN CONJUNCTION WITH THE CONSTRUCTION ON A NEW SWIM SCHOOL FILED UNDER ALT TYPE 1 APPLICATION #M00779667-I1. ALL AS PER PLAN. NO CHANGE IN USE EGREES UNDER THIS APPLICATION.
M00784421-P2
05/03/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00827625-P1
05/01/2023
Permit issued — General Construction
M00779667-I1-GC
04/21/2023
Permit issued — Sign
M00860351-I1-SG
04/21/2023
Permit issued — Sign
M00860352-I1-SG
04/21/2023
Violation issued (ECB, closed)
Construction
04/20/2023
Filed — Alteration
M00860351-I1
04/20/2023
Filed — Alteration
M00860352-I1
04/20/2023
Special inspection requirement — Lighting controls
Stephen Morse
04/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Stephen Morse
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offMASTER 2 PLBG & HTG INC05/24/2024
DOB NOWPlumbingSigned-offADVANCED PLBG LLC05/16/2024
DOB NOWConstruction FenceSigned-offMC SUPERSTRUCTURE INC08/17/2023
DOB NOWGeneral ConstructionPermit IssuedFINT LLC05/01/2023
DOB NOWSignSigned-offZ-CAR-D CORP04/21/2023
DOB NOWSignSigned-offZ-CAR-D CORP04/21/2023
DOB NOWFoundationSigned-offFINT LLC03/07/2023
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING02/14/2023
DOB NOWPlumbingSigned-offADVANCED PLBG LLC02/14/2023
DOB NOWMechanical SystemsSigned-offFINT LLC02/03/2023
DOB NOWGeneral ConstructionSigned-offFINT LLC02/02/2023
BISPLISSUEDALL DAY PLUMBING & HEATING05/17/2006
BISEQISSUEDCLARK & WILKINS INDUSTRIES INC12/06/2005
BISMHISSUEDJ&S CONSTRUCITON & CONSULTANTS,11/23/2005
BIS—ISSUEDJ & S CONSTRUC. & CONSULTANTS IN09/01/2005
BISSPISSUEDHEADS UP FIRE SPRINKLER11/10/2004
BISOTISSUEDJ&S CONSTRUCITON & CONSULTANTS,07/19/2004
BISOTISSUEDAMERICAN SIGN & ELECL CON10/30/2002
BISOTISSUEDJ & S CONSTRUCTION & CONSULTANTS07/24/2002
BISOTISSUEDJ & S CONSTRUCTION & CONSULTANTS07/24/2002
BISPLISSUEDR.E.P. CONSTRUCTION08/15/2001
BISOTISSUEDJ&S CONSTRUCITON & CONSULTANTS,08/09/2001
BISEQISSUEDJ&S CONSTRUCITON & CONSULTANTS,08/09/2001
BISOTRE-ISSUEDMRC 11CONST INC.06/08/2001
BISOTRE-ISSUEDMRC 11 CONTR. INC.06/08/2001
7 projects · most recent 11/14/2023
General Wiring
FiledStatusContractorScope
11/14/2023CompleteABILENE ELECTRIC INC—
11/13/2023CompleteMATROS AUTOMATED ELEC'L C—
08/22/2023CompleteMATROS AUTOMATED ELEC'L CGeneral Wiring
08/11/2023CompleteISLAND ELECTRIC CORP—
08/11/2023CompleteISLAND ELECTRIC CORP—
02/27/2023CompleteMATROS AUTOMATED ELEC'L C—
08/25/2021CancelledGSA ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/12/2025Fail-Final CND-Occupancy InspectionFailView ↗
05/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
11/22/2023Post-installed AnchorsStephen Morsespecial
11/22/2023Sprinkler SystemsStephen Morsespecial
11/22/2023Fire-Resistant Penetrations and JointsStephen Morsespecial
11/15/2023Post-installed AnchorsStephen Morsespecial
11/15/2023Sprinkler SystemsStephen Morsespecial
11/15/2023Fire-Resistant Penetrations and JointsStephen Morsespecial
10/19/2023Post-installed AnchorsStephen Morsespecial
10/19/2023Fire-Resistant Penetrations and JointsStephen Morsespecial
10/19/2023Sprinkler SystemsStephen Morsespecial
10/12/2023Public Assembly Emergency Lightingfrank dennerprogress
10/10/2023Public Assembly Emergency Lightingfrank dennerprogress
05/30/2023Fenestration air leakageStephen Morseenergy_progress
05/30/2023Structural Stability – Alterations of existing buildingsStephen Morsespecial
05/30/2023Fire-Resistant Penetrations and JointsStephen Morsespecial
05/30/2023Energy Code Compliance InspectionsStephen Morseprogress
05/30/2023Fire-Resistance Rated ConstructionStephen Morseprogress
05/30/2023Air barrier - visual inspectionStephen Morseenergy_progress
05/30/2023Fenestration areasStephen Morseenergy_progress
05/30/2023Fenestration and door U-factor and product ratingsStephen Morseenergy_progress
05/30/2023Interior lighting powerStephen Morseenergy_progress
05/30/2023Lighting controlsStephen Morseenergy_progress
04/20/2023Lighting controlsStephen Morseenergy_progress
04/20/2023Energy Code Compliance InspectionsStephen Morseprogress
04/20/2023FinalStephen Morseprogress
04/20/2023HVAC-R and service water heating system controlsStephen Morseenergy_progress
Latest 25 of 45.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Goldfish Swim SchoolFitness / RecreationCellar, Floors 1–5
Project M00880887 No Work · PA Certificate of Operation Issued · 05/31/2023
Project M00860351 Alteration · LOC Issued · 04/20/2023
Project M00860352 Alteration · LOC Issued · 04/20/2023
Project M08033911 Alteration · LOC Issued · 11/04/2022
Project M00784421 Alteration · LOC Issued · 10/18/2022
Project M00781053 Alteration · LOC Issued · 10/12/2022
Project M00779667 Alteration CO · Permit Entire · 08/24/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch17
09/01/2026M00782809-I1Request digital key ↗
09/01/2026M08033911-I1Request digital key ↗
08/31/2026M00827625-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/31/2026M00880887-P1Request digital key ↗
08/31/2026M00880887-I1Request digital key ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/01/2026M08033911-I1Open ↗
08/31/2026M00827625-I1Open ↗
08/31/2026M00827625-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/29/2026M00779667-P1Open ↗
09/29/2026M00779667-P1Open ↗
09/29/2026M00779667-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/29/2026M00779667-P1Open ↗
09/04/2026M00781053-P3Open ↗
08/29/2026M00781053-P1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026M00779667-P3Open ↗
08/13/2026M00779667-P2Open ↗
08/13/2026M00779667-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026M08033911-I1Open ↗
08/31/2026M00860351-I1Open ↗
08/31/2026M00860352-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/28/2026M00781053-I1Open ↗
08/18/2026M00779667-I1Open ↗
08/13/2026M00782809-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00779667-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00784421-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/18/2026M00779667-P2Open ↗
08/18/2026M00779667-P1Open ↗
08/18/2026M00779667-P3Open ↗
Showing 3 of 4 on file for this type