BuildNYC
Five to six families
1536 DEKALB AVENUE
BROOKLYN · BIN 3073878
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6Zoning
5,100 sfGross Floor Area
6Units
Rent Stabilized1 Active Violation ▸FDNY Report ↗
Five to six families · Owner of record: 1536 Dekalb Ave · 2,500 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 13 docs
Floor 3Unit 3R7p · 2 filings · 20 docs
Floor 2Unit 2L8p · 2 filings · 20 docs
Floor 1Unit 1L6p · 2 filings · 20 docs
CellarRepair partitions and ceiling5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1536 Dekalb Ave103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/02/2018$1.2M—1536 DEKALB LLC → 1536 DEKALB AVENUE LLC$245/sf building
07/07/2016$1.2M—Private party → 1536 DEKALB, LLC$245/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Longtin Solutions602/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Basic Groups1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Method General Contractorspecialty_contractor303/21/2026
S&R ElectricalElectrical103/22/2026
P.H. WorksPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Longtin Solutions8320602/07/2023
Building Lifecycle
11/20/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
10/29/2025
Borough commissioner has ordered all work stopped underpermit#B00771082-I2 on 10/24/25 due to revocation of approval(s) and permit(s).
DOB violation · open
06/09/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/03/2023
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH OT JOB# B00771082-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00771102-I1
02/28/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
66 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offP.H. Works07/18/2022
DOB NOWMechanical SystemsSigned-offMethod General Contractor07/12/2022
1 project · most recent 09/14/2022
Air Conditioning Systems
FiledStatusContractorScope
09/14/2022Signed-offMethod General ContractorAir Conditioning Systems
1 project · most recent 01/05/2023
General Wiring
FiledStatusContractorScope
01/05/2023CompleteS&R ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/28/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/03/2023Fail-Final General Construction Non-Directive 14FailView ↗
11/04/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
02/07/2023Energy Code Compliance InspectionsTIM TSAIprogress
02/07/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
02/03/2023Energy Code Compliance InspectionsTIM TSAIprogress
02/03/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
01/05/2023Energy Code Compliance InspectionsTIM TSAIprogress
01/05/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
09/15/2022Fenestration and door U-factor and product ratingsTIM TSAIenergy_progress
09/15/2022HVAC-R and service water heating system controlsTIM TSAIenergy_progress
09/15/2022HVAC-R and service water piping design and insulationTIM TSAIenergy_progress
09/15/2022Interior lighting powerTIM TSAIenergy_progress
09/15/2022HVAC-R and service water heating equipmentTIM TSAIenergy_progress
09/15/2022Fenestration areasTIM TSAIenergy_progress
09/15/2022Mechanical SystemsTIM TSAIspecial
09/15/2022Fire-Resistant Penetrations and JointsTIM TSAIspecial
09/15/2022Energy Code Compliance InspectionsTIM TSAIprogress
09/15/2022Fire-Resistance Rated ConstructionTIM TSAIprogress
09/15/2022FinalTIM TSAIprogress
09/15/2022Maintenance informationTIM TSAIenergy_progress
07/11/2022HVAC-R and service water heating equipmentTIM TSAIenergy_progress
07/11/2022Fenestration areasTIM TSAIenergy_progress
07/11/2022Fenestration and door U-factor and product ratingsTIM TSAIenergy_progress
07/11/2022Interior lighting powerTIM TSAIenergy_progress
07/11/2022HVAC-R and service water piping design and insulationTIM TSAIenergy_progress
07/11/2022Maintenance informationTIM TSAIenergy_progress
07/11/2022HVAC-R and service water heating system controlsTIM TSAIenergy_progress
Latest 25 of 32.
33 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account