← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
1539 DEAN STREET
BROOKLYN · BIN 3035659
💬 Discuss this project
2022Year Built
3Stories
RMBuilding Class
R6Zoning
8,005 sfGross Floor Area
9Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: DEAN ST. APARTMENTS NY LLC · 2,144 sf lot · 3.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof10p · 2 filings · 14 docs
Floor 78p · 1 filing · 11 docs
Floor 68p · 1 filing · 11 docs
Floor 58p · 1 filing · 11 docs
Floor 48p · 1 filing · 11 docs
Floor 38p · 1 filing · 11 docs
Floor 28p · 1 filing · 11 docs
Floor 110p · 2 filings · 14 docs
Mezzanine8p · 1 filing · 11 docs
Basement1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS503/22/2026
CDF CUSTOM BUILDERS403/22/2026
DEAN ST PROPERTIES1003/22/2026
WMGT CONSTRUCTION1303/21/2026
DEAN ST.APARTMENTS NY LLC103/21/2026
DEAN ST APARTMENTS NY103/21/2026
DEAN ST NY APARTMENTS LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JRS CONSULTING311/23/2022
MOHAMMAD AHEAD, PE110/18/2021
BGM ENGINEERING110/05/2021
ARYEH SIEGEL ARCHITECT106/23/2021
SOUTH BAY ENGINEERING PLLC109/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC PERMIT SERVICES803/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
AVALON DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CDF CUSTOM BUILDERS INCGeneral Contractor1103/22/2026
A M B MECHANICALGeneral Contractor603/22/2026
J & G CONSTRUCTION SVCSGeneral Contractor303/21/2026
DESIGN N SAFETY INCGeneral Contractor203/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
JSB WORKS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM ENGINEERING, LLC1514311/23/2022
Building Lifecycle
All (60)Filed (7)Permit Issued (7)Signed Off (6)Violation (9)Inspection (2)Objection (4)Special Inspection (25)
12/05/2022
Signed off — Alteration
INSTALL MECHANICAL SYSTEMS AS PER PLAN
B00499702-I1
12/05/2022
Signed off — Alteration
INSTALL SPRINKLER SYSTEM
B00507100-I1
11/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
11/28/2022
Special inspection requirement — Heating Systems
RAUL VELASQUEZ MARTINEZ
11/28/2022
Special inspection requirement — Mechanical Systems
RAUL VELASQUEZ MARTINEZ
11/28/2022
Special inspection requirement — Smoke Control Systems Testing
RAUL VELASQUEZ MARTINEZ
11/28/2022
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
RAUL VELASQUEZ MARTINEZ
11/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
RAUL VELASQUEZ MARTINEZ
11/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
RAUL VELASQUEZ MARTINEZ
11/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
RAUL VELASQUEZ MARTINEZ
11/28/2022
Special inspection requirement — Maintenance information
RAUL VELASQUEZ MARTINEZ
11/23/2022
Filed — Alteration
INSTALL MECHANICAL SYSTEMS AS PER PLAN
B00499702-P1
11/21/2022
Special inspection requirement — Mechanical Systems
RAUL VELASQUEZ MARTINEZ
11/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
11/21/2022
Special inspection requirement — Heating Systems
RAUL VELASQUEZ MARTINEZ
11/21/2022
Special inspection requirement — Smoke Control Systems Testing
RAUL VELASQUEZ MARTINEZ
11/21/2022
Special inspection requirement — Energy Code Compliance Inspections
RAUL VELASQUEZ MARTINEZ
11/21/2022
Special inspection requirement — Final
RAUL VELASQUEZ MARTINEZ
11/21/2022
Special inspection requirement — Maintenance information
RAUL VELASQUEZ MARTINEZ
11/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
RAUL VELASQUEZ MARTINEZ
11/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
RAUL VELASQUEZ MARTINEZ
11/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
RAUL VELASQUEZ MARTINEZ
11/04/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/02/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/06/2022
Permit issued — Mechanical Systems
B00499702-I1-MS
09/28/2022
Signed off — Alteration
B00540054-I1
09/16/2022
Signed off — Alteration
8' plywood construction fence
B00603691-I1
09/06/2022
Signed off — Alteration
B00605747-I1
03/26/2022
Violation issued (ECB, closed)
Construction
12/30/2021
Permit issued — Sprinklers
B00507100-I1-EW-SP
12/29/2021
Violation issued (ECB, closed)
Construction
12/29/2021
Violation issued (ECB, closed)
Construction
10/20/2021
Violation issued (ECB, closed)
Construction
10/18/2021
Filed — Alteration
B00605747-I1
10/18/2021
Permit issued — Sidewalk Shed
B00605747-I1-SH
10/06/2021
Permit issued — Construction Fence
B00603691-I1-FN
10/05/2021
Filed — Alteration
8' plywood construction fence
B00603691-I1
09/30/2021
Special inspection requirement — Final
JOSEPH BADINTER
08/02/2021
Special inspection requirement — Post-installed Anchors
RAUL VELASQUEZ MARTINEZ
08/02/2021
Special inspection requirement — Seismic Isolation Systems
RAUL VELASQUEZ MARTINEZ
06/23/2021
Filed — Alteration
B00540054-I1
06/09/2021
Signed off — Alteration
B00230612-I1
06/03/2021
Permit issued — Construction Fence
B00230612-I1-FN
05/14/2021
Objection raised — Scope
05/14/2021
Objection resolved — Addressed
05/14/2021
Objection raised — Inspections
05/14/2021
Objection resolved — Addressed
05/11/2021
Permit issued — Construction Fence
B00230612-I1-FN
05/10/2021
Filed — Alteration
INSTALL SPRINKLER SYSTEM
B00507100-I1
04/20/2021
Special inspection requirement — Sprinkler Systems
RAUL VELASQUEZ MARTINEZ
04/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
04/08/2021
Filed — Alteration
INSTALL MECHANICAL SYSTEMS AS PER PLAN
B00499702-I1
11/06/2020
Permit issued — Construction Fence
B00230612-I1-FN
09/25/2019
Filed — Alteration
B00230612-I1
08/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/07/2019
Violation issued (ECB, closed)
Construction
05/07/2019
Violation issued (ECB, closed)
Construction
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/12/2018
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCDF CUSTOM BUILDERS INC10/06/2022
DOB NOWSprinklersSigned-offA M B MECHANICAL INC12/30/2021
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS10/18/2021
DOB NOWConstruction FenceSigned-offCDF CUSTOM BUILDERS INC10/06/2021
DOB NOWConstruction FenceSigned-offCDF CUSTOM BUILDERS INC06/03/2021
DOB NOWConstruction FenceSigned-offJSB WORKS INC05/11/2021
DOB NOWConstruction FenceSigned-offDESIGN N SAFETY INC11/06/2020
BISPLISSUEDPRIME PIPING & HEATING IN11/30/2022
BIS—ISSUEDCDF CUSTOM BUILDERS INC09/13/2022
BIS—ISSUEDCDF CUSTOM BUILDERS INC06/07/2022
BISPLISSUEDPRIME PIPING & HEATING IN09/16/2021
BIS—ISSUEDJSB WORKS INC05/10/2021
BIS—ISSUEDDESIGN N SAFETY INC01/21/2021
BIS—ISSUEDDESIGN N SAFETY INC11/18/2020
BISOTISSUEDCAVALRY LLC03/14/2019
3 projects · most recent 10/27/2022
General Wiring
FiledStatusContractorScope
10/27/2022CompleteGREEN STAR ELECTL CONT INGeneral Wiring
10/25/2021CompleteRICHARD NEU—
10/12/2021CompleteGREEN STAR ELECTL CONT IN—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/04/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/02/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
11/28/2022Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
11/28/2022Heating SystemsRAUL VELASQUEZ MARTINEZspecial
11/28/2022Mechanical SystemsRAUL VELASQUEZ MARTINEZspecial
11/28/2022Smoke Control Systems TestingRAUL VELASQUEZ MARTINEZspecial
11/28/2022FinalRAUL VELASQUEZ MARTINEZprogress
11/28/2022Energy Code Compliance InspectionsRAUL VELASQUEZ MARTINEZprogress
11/28/2022HVAC-R and service water heating equipmentRAUL VELASQUEZ MARTINEZenergy_progress
11/28/2022HVAC-R and service water heating system controlsRAUL VELASQUEZ MARTINEZenergy_progress
11/28/2022HVAC-R and service water piping design and insulationRAUL VELASQUEZ MARTINEZenergy_progress
11/28/2022Maintenance informationRAUL VELASQUEZ MARTINEZenergy_progress
11/21/2022Mechanical SystemsRAUL VELASQUEZ MARTINEZspecial
11/21/2022Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
11/21/2022Heating SystemsRAUL VELASQUEZ MARTINEZspecial
11/21/2022Smoke Control Systems TestingRAUL VELASQUEZ MARTINEZspecial
11/21/2022Energy Code Compliance InspectionsRAUL VELASQUEZ MARTINEZprogress
11/21/2022FinalRAUL VELASQUEZ MARTINEZprogress
11/21/2022Maintenance informationRAUL VELASQUEZ MARTINEZenergy_progress
11/21/2022HVAC-R and service water heating equipmentRAUL VELASQUEZ MARTINEZenergy_progress
11/21/2022HVAC-R and service water piping design and insulationRAUL VELASQUEZ MARTINEZenergy_progress
11/21/2022HVAC-R and service water heating system controlsRAUL VELASQUEZ MARTINEZenergy_progress
09/30/2021FinalJOSEPH BADINTERprogress
08/02/2021Post-installed AnchorsRAUL VELASQUEZ MARTINEZspecial
08/02/2021Seismic Isolation SystemsRAUL VELASQUEZ MARTINEZspecial
04/20/2021Sprinkler SystemsRAUL VELASQUEZ MARTINEZspecial
04/20/2021Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
▾Documents — 200 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
09/01/2026B00540054-I1Request digital key ↗
09/01/2026B00603691-I1Request digital key ↗
09/01/2026B00605747-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00230612-I1Request digital key ↗
▸Applications & Permits61
▸BISPLAN / WORK APPROVAL APPLICATION46
02/22/2023321964317Open ↗
02/17/2023321964317Open ↗
01/26/2023321964317Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION11
09/16/2022321964317Open ↗
09/16/2021321964317Open ↗
06/07/2021321964317Open ↗
Showing 3 of 11 on file for this type
▸BISBPP - Street Opening DOT Permit - BPP - Street Opening1
01/17/2023340842789Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/01/2021321964317Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/28/2022340842789Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/31/2022321964317Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM3
09/28/2020321964317Open ↗
09/28/2020321964317Open ↗
09/28/2020321964317Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
01/26/2023322112637Open ↗
07/18/2020321964317Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/01/2023322112637Open ↗
▸BISVERIFY TAX LOT1
05/23/2022321964317Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/29/2022321964317Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/01/2023322112637Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00507100-I1Open ↗
09/01/2026B00540054-I1Open ↗
09/01/2026B00603691-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026B00603691-I1Open ↗
08/23/2026B00499702-P1Open ↗
08/23/2026B00499702-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/05/2026B00507100-I1Open ↗
08/23/2026B00499702-P1Open ↗
08/23/2026B00499702-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/27/2019321964317Open ↗
02/21/2019321925324Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/21/2019321925324Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/10/2022340842789Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/21/2019321925324Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING7
02/17/2023321964317Open ↗
12/21/2022321964317Open ↗
12/19/2022321964317Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/29/2022321964317Open ↗
08/29/2022321964317Open ↗
▸BISEQUIPMENT USE PERMITS1
08/29/2022321964317Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
07/18/2020321964317Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
07/28/2022340842789Open ↗
06/27/2019321964317Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/10/2022340842789Open ↗
▸BISSTREET TREE SIGNOFF1
06/23/2022321964317Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/28/2021321964317Open ↗
▸BISTenant Protection Plan and Notes1
02/21/2019321925324Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/12/2021321977009Open ↗
▸BISRODENT CONTROL1
01/12/2021321977009Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/27/2019321964317Open ↗
02/21/2019321925324Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/03/2022321964317Open ↗
04/28/2021321964317Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/27/2022321964317Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00499702-I1Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY5
11/03/2022321964317Open ↗
05/01/2021321964317Open ↗
04/28/2021321964317Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
08/29/2022321964317Open ↗
04/27/2022321964317Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/27/2022321964317Open ↗
04/28/2021321964317Open ↗
▸BISSOIL REPORT1
07/18/2020321964317Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/18/2020321964317Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/28/2021321964317Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
09/27/2022321964317Open ↗
▸Approvals, Objections & Sign-offs21
▸BISSCHEDULE A - OCCUPANCY / USE14
02/17/2023321964317Open ↗
12/19/2022321964317Open ↗
12/14/2022321964317Open ↗
Showing 3 of 14 on file for this type
▸BISSUPERSEDING LETTER2
06/07/2021321964317Open ↗
06/07/2021321964317Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
01/17/2023340842789Open ↗
01/17/2023340842789Open ↗
▸BISLANDMARKS APPROVAL1
01/12/2021321977009Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
06/23/2022321964317Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/01/2021321964317Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE3
09/16/2022321964317Open ↗
04/28/2021321964317Open ↗
01/12/2021321977009Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction3
01/17/2023340842789Open ↗
01/03/2023340842789Open ↗
11/26/2019322013450Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
06/07/2021321964317Open ↗
▸BISCOST AFFIDAVIT1
02/21/2019321925324Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION8
03/07/2023321964317Open ↗
01/26/2023321964317Open ↗
01/26/2023321964317Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET7
11/01/2022322112637Open ↗
05/19/2020321964317Open ↗
11/26/2019322013450Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/10/2022340842789Open ↗
▸BISBOROUGH INTAKE FORM1
11/08/2019321964317Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/28/2022340842789Open ↗
▸Other Documents18
▸BISBPP - SUPPORTING DOCUMENTATION10
01/17/2023340842789Open ↗
01/17/2023340842789Open ↗
01/17/2023340842789Open ↗
Showing 3 of 10 on file for this type
▸BISPLOT DIAGRAM3
05/11/2023321964317Open ↗
01/26/2023322112637Open ↗
06/27/2019321964317Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/07/2021321964317Open ↗
▸BISSupporting Document: Fee Exempt1
07/28/2022340842789Open ↗
▸BISSupporting Document: Fee Deferment1
07/28/2022340842789Open ↗
▸BISLOWEST FLOOR ELEVATION1
05/07/2021321964317Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
01/03/2023340842789Open ↗