โ† Back
BuildNYC
QUEENS
155-01 99TH STREET
QUEENS ยท BIN 4626089
๐Ÿ’ฌ Discuss this project
โ€”Year Built
โ€”Stories
โ€”Building Class
โ€”Zoning
โ€”Gross Floor Area
โ€”Units
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed โ€” no permit issued1 filing
โ–พDesign Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arcadis110/26/2026
Building Lifecycle
11/04/2026
Objection raised โ€” Other
11/04/2026
Objection raised โ€” Energy
10/26/2026
Filed โ€” Alteration CO
Filing for General Construction Work for PS-293, Rehabilitation at Howard Beach Pumping Station which includes rehabilitation and resiliency of the existing pump station.
Q01474429-I1
10/26/2026
Special inspection requirement โ€” Air barrier - visual inspection
Errol Dawkins
10/26/2026
Special inspection requirement โ€” Insulation placement and R values
Errol Dawkins
9 history events on file for this building. Sign in free to see the full history. Sign in ยท Create account
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
5 filed documents on file for this building. Sign in free to see the full history. Sign in ยท Create account