| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| Q01128923 ↗ | 1 DEP PLAZA QUEENS | Alteration | Permit Issued | 11/18/2024 | 09/10/2026 | Owner NYCDEP Contractor R.J. INDUSTRIES INC Filer RPO INC. | Filing for Structural/Foundation work for PS-304 - Reconstruction at Glendale Pumping Station which includes complete rehabilitation and upg… |
| B01445340 ↗ | 44 FERRIS STREET BROOKLYN | Alteration | Filed — no permit on record | 09/09/2026 | — | Owner MILROSE Filer RPO INC. | — |
| M01310346 ↗ | 33 EAST 21 STREET MANHATTAN | Alteration | Permit Issued | 11/07/2025 | 09/08/2026 | Owner WC 28 REALTY, LLC Contractor RSM MAINTENANCE LLC | Proposed: modification to the existing sprinkler system to include installation of 23 new sprinkler heads. No change of use, egress or occup… |
| M01391946 ↗ | 208 WEST STREET MANHATTAN | Alteration | Filed — no permit on record | 08/06/2026 | — | Owner CUNY Filer BOYD CONSULTING, INC | — |
| X01424089 ↗ | 441 EAST FORDHAM ROAD BRONX | Alteration | Permit Issued | 07/10/2026 | 08/06/2026 | Owner FORDHAM UNIVERSITY Contractor DEBORAH BRADLEY CONS & MG | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIV… |
| M01093333 ↗ | 550 FDR DRIVE MANHATTAN | New Building | Permit Issued | 07/14/2025 | 08/05/2026 | Contractor IPC RESILIENCY PARTNERS Filer SMB CONSULTANT | INSTALLATION OF ONE UNIT HEATER AND EXHAUST FANS IN NEW COMFORT STATION (PUBLIC RESTROOM) IN EAST RIVER PARK. |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| Q01128923 ↗ | 1 DEP PLAZA QUEENS | Alteration | Permit Issued | 11/18/2024 | 09/10/2026 | Owner NYCDEP Contractor R.J. INDUSTRIES INC Filer RPO INC. | Filing for Structural/Foundation work for PS-304 - Reconstruction at Glendale Pumping Station which includes complete rehabilitation and upg… |
| B01445340 ↗ | 44 FERRIS STREET BROOKLYN | Alteration | Filed — no permit on record | 09/09/2026 | — | Owner MILROSE Filer RPO INC. | — |
| M01310346 ↗ | 33 EAST 21 STREET MANHATTAN | Alteration | Permit Issued | 11/07/2025 | 09/08/2026 | Owner WC 28 REALTY, LLC Contractor RSM MAINTENANCE LLC | Proposed: modification to the existing sprinkler system to include installation of 23 new sprinkler heads. No change of use, egress or occup… |
| M01391946 ↗ | 208 WEST STREET MANHATTAN | Alteration | Filed — no permit on record | 08/06/2026 | — | Owner CUNY Filer BOYD CONSULTING, INC | — |
| X01424089 ↗ | 441 EAST FORDHAM ROAD BRONX | Alteration | Permit Issued | 07/10/2026 | 08/06/2026 | Owner FORDHAM UNIVERSITY Contractor DEBORAH BRADLEY CONS & MG | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIV… |
| M01093333 ↗ | 550 FDR DRIVE MANHATTAN | New Building | Permit Issued | 07/14/2025 | 08/05/2026 | Contractor IPC RESILIENCY PARTNERS Filer SMB CONSULTANT | INSTALLATION OF ONE UNIT HEATER AND EXHAUST FANS IN NEW COMFORT STATION (PUBLIC RESTROOM) IN EAST RIVER PARK. |
| M01238849 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Permit Issued | 06/16/2025 | 07/15/2026 | Filer BOYD CONSULTING, INC | Support of Excavation work for Reach 2 - Construction of an elevated platform, including installation of landscaping, benches, and pavers on… |
| B00780802 ↗ | 842 48 STREET BROOKLYN | Alteration | Permit Issued | 10/19/2022 | 07/08/2026 | Contractor PERFETTO ENTERPRISES CO I Filer JMV ASSOCIATES LLC | Proposed new drainage work including synthetic turf system and sports equipment at JHS 220K. |
| M01238963 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Permit Issued | 07/01/2025 | 07/02/2026 | Contractor MPC PLUMBING & HEATING INC Filer BOYD CONSULTING, INC | Scope of Work: Reach 6 - Construction of flood barrier system for the BPCA north/west battery park city resiliency project includes Support… |
| M01236760 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Permit Issued | 06/07/2025 | 06/25/2026 | Contractor MPC PLUMBING & HEATING INC Filer BOYD CONSULTING, INC | Remove/replace private drainage in Pumphouse Park; install new 12 drain to existing watercourse; reconfigure drainage to separate protected … |
| B01401788 ↗ | 451 CLARKSON AVENUE BROOKLYN | Alteration | Permit Issued | 06/10/2026 | 06/22/2026 | Contractor GALVIN BROTHERS INC | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE DETENTION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE P… |
| Q01125298 ↗ | 1 DEP PLAZA QUEENS | Alteration | Permit Issued | 11/11/2024 | 06/11/2026 | Owner NYCDEP Contractor R.J. INDUSTRIES INC Filer RPO INC. | Filing Mechanical work for PS-304 - Reconstruction at Glendale Pumping Station which includes complete rehabilitation and upgrade of the exi… |
| Q01121488 ↗ | 1 DEP PLAZA QUEENS | Alteration | Permit Issued | 11/11/2024 | 06/10/2026 | Owner NYCDEP Contractor R.J. INDUSTRIES INC Filer RPO INC. | Filing for Gen Const work for PS-304 - Reconstruction at Glendale Pumping Station which includes complete rehabilitation and upgrade of the … |
| Q01393134 ↗ | 75-20 ASTORIA BOULEVARD S QUEENS | Alteration | Permit Issued | 05/22/2026 | 05/28/2026 | Contractor OPAL CONSTRUCTION CORP | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE DETENTION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE P… |
| M01364047 ↗ | 225 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 05/05/2026 | 05/14/2026 | Owner NORDSTROM, INC. Contractor BUCH CONSTRUCTION, INC Filer METROPOLIS GROUP INC | HEREWITH FILING FOR INTERIOR RENOVATIONS OF THE SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. en… |
| B01356204 ↗ | 225 STEUBEN STREET BROOKLYN | Alteration | Permit Issued | 04/03/2026 | 04/23/2026 | Contractor DEBORAH BRADLEY CONS & MG | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIV… |
| M01242515 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Permit Issued | 06/23/2025 | 04/13/2026 | Contractor MPC PLUMBING & HEATING IN Filer BOYD CONSULTING, INC | Stormwater upgrades incl. removal/abandonment of existing systems, new rain gardens, drains, permeable paving, underdrains, and new outfall … |
| M01349927 ↗ | 225 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 02/18/2026 | 03/18/2026 | Contractor BUCH CONSTRUCTION, INC | HEREWITH FILING FOR DEMOLITION OF THE SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. |
| M01331103 ↗ | 185 BROADWAY MANHATTAN | Alteration | Signed-off | 12/31/2025 | 01/27/2026 | Owner SL GREEN REALTY CORP Contractor RSM MAINTENANCE LLC Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01271983 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Permit Issued | 08/20/2025 | 01/22/2026 | Contractor FERREIRA CONSTRUCTION CO Filer BOYD CONSULTING, INC | EWP4 - (3) 6 HDPE temp waterlines in Reach 2, (2) at Stuyvesant HS, (1) at Tribecca Pointe. Mounted w/ pipe hangers as shown in the details.… |
| Q01285204 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 09/17/2025 | 01/20/2026 | Owner MACERICH Contractor SCHIMENTI CONSTRUCTION CO | Tenant improvement for RETAIL STORE # 1082 Temp - Non structural partitions, ceilings, finishes, furniture and related work under separate a… |
| M01252535 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Filed — no permit on record | 01/16/2026 | — | Filer BOYD CONSULTING, INC | — |
| M01271995 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Permit Issued | 08/20/2025 | 01/14/2026 | Contractor FERREIRA CONSTRUCTION CO Filer BOYD CONSULTING, INC | Filing Support of Excavation work for EWP5 - Construction of tide gates and stormwater lines in advance of construction of a flood barrier … |
| M01266891 ↗ | 731 5 AVENUE MANHATTAN | Alteration | Permit Issued | 08/26/2025 | 12/23/2025 | Owner TIFFANY & CO Contractor REIDY CONTRACTING GROUP | HEREWITH FILING FOR SPRINKLER SYSTEM ALTERATION ON FIRST FLOOR AT THE SERVICE ENTRANCE VESTIBULE. DEMOLISH OF CONCEALED SPRINKLER HEAD AND A… |
| M01249540 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Filed — no permit on record | 12/05/2025 | — | Filer BOYD CONSULTING, INC | — |
| Q01275440 ↗ | 75-20 ASTORIA BOULEVARD S QUEENS | Alteration | Signed-off | 10/09/2025 | 10/16/2025 | Contractor OPAL CONSTRUCTION CORP | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIV… |
| Q01285132 ↗ | 90-15 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 09/17/2025 | 09/29/2025 | Owner MACERICH Contractor SCHIMENTI CONSTRUCTION CO | Remote Space 1095 - Provide new plumbing fixtures, equipment and accessories within existing retail space. |
| M01265834 ↗ | 225 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 08/27/2025 | 09/05/2025 | Owner NORDSTROM, INC. Contractor BUCH CONSTRUCTION, INC Filer METROPOLIS GROUP INC | HEREWITH FILING FOR INTERIOR RENOVATIONS ON THE 1ST FLOOR COMMERCIAL SPACE AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| M01224430 ↗ | 401 WEST 25 STREET MANHATTAN | Alteration | Signed-off | 07/24/2025 | 08/25/2025 | Contractor GEORGE BRESLAW PLBNG LLC | PLUMBING WORK ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGER, EGRESS, OR OCCUPANCY. |
| M01226546 ↗ | 401 WEST 25 STREET MANHATTAN | Alteration | Signed-off | 07/24/2025 | 08/21/2025 | Contractor A + SPRINKLER CORP | MODIFY EXISTING SPRINKLER SYSTEM IN THE AREA OF WORK ON THE 1ST FLOOR. SPRINKLER WORK INCLUDES, REOLCATING, REPLACING, AND REMOVING SPRINKLE… |
| M01224252 ↗ | 401 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 07/24/2025 | 08/05/2025 | Contractor CLUNE CONSTRUCTION CO LP | MECHANICAL WORK ON THE 1ST FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M01197311 ↗ | 1784 BROADWAY MANHATTAN | Alteration | Signed-off | 07/07/2025 | 07/15/2025 | Contractor BUCH CONSTRUCTION, INC Filer METROPOLIS GROUP INC | HEREWITH FILING FOR ARCHITECTURE INTERIOR RENOVATIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| Q01229020 ↗ | 107-10 180 STREET QUEENS | Alteration | Signed-off | 06/12/2025 | 06/16/2025 | Owner C.A.C. INDUSTRIES, INC. Contractor C.A.C. INDUSTRIES, INC | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIV… |
| M01234177 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Filed — no permit on record | 06/04/2025 | — | Filer BOYD CONSULTING, INC | — |
| M01234180 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Filed — no permit on record | 06/04/2025 | — | Filer BOYD CONSULTING, INC | — |
| B01212973 ↗ | 652 KENT AVENUE BROOKLYN | Alteration | Signed-off | 05/23/2025 | 06/03/2025 | Contractor GALVIN BROTHERS INC | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE DETENTION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE P… |
| X01144405 ↗ | 1400 PELHAM PARKWAY SOUTH BRONX | Alteration | Signed-off | 01/09/2025 | 04/28/2025 | Contractor GALVIN BROTHERS INC | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIV… |
| X01145178 ↗ | 1400 PELHAM PARKWAY SOUTH BRONX | Alteration | Signed-off | 02/12/2025 | 02/24/2025 | Contractor GALVIN BROTHERS INC | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE DETENTION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE P… |
| M01128901 ↗ | 10 UNION SQUARE EAST MANHATTAN | Alteration | Signed-off | 12/09/2024 | 12/11/2024 | Owner MOUNT SINAI HOSPITAL Contractor CAULDWELL WINGATE CO LLC Filer METROPOLIS GROUP INC | GENERAL CONSTRUCTION FOR INTERIOR FITOUT FOR A CLINICAL SUITE ON THE 2ND FLOOR AND RELATED LAB SUPPORTING AREAS, NEW FINISHES, MATERIALS AND… |
| X01125121 ↗ | 1400 PELHAM PARKWAY SOUTH BRONX | Alteration | Signed-off | 11/08/2024 | 11/19/2024 | Contractor GALVIN BROTHERS INC | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE DETENTION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE P… |
| B00180237 ↗ | 229 LUQUER STREET | Alteration | Permit Issued | 06/18/2019 | 11/15/2024 | Contractor ARCADIS U.S., INC | Installation of temporary construction fence. No change in use, egress, and/or occupancy |
| M00928885 ↗ | 731 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/10/2023 | 10/03/2024 | Owner TIFFANY&CO Contractor ECLIPSE CONTRACTING | SCOPE OF WORK INCLUDES SPRINKLER SYSTEM ALTERATION ON 7TH FLOOR. RELOCATION, REMOVAL AND ADDITION OF NEWSPRINKLER HEADS AND ASSOCIATED PIPI… |
| B01055204 ↗ | 203 GRAND AVENUE BROOKLYN | Alteration | Signed-off | 07/08/2024 | 07/12/2024 | Contractor GALVIN BROTHERS INC | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIV… |
| M00961988 ↗ | 591 3 AVENUE MANHATTAN | Alteration | Signed-off | 12/20/2023 | 07/12/2024 | Contractor CLUNE CONSTRUCTION CO LP | CREATE VESTIBULE AND REPLACE ENTRANCE DOOR FOR THE MEDICAL OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B01046797 ↗ | 215 WILLOUGHBY AVENUE BROOKLYN | Alteration | Signed-off | 06/04/2024 | 06/13/2024 | Contractor AMC PLBG, HTG & CLNG, INC Filer ARCADIS | INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE DETENTION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE P… |
| M00935871 ↗ | 375 PEARL STREET MANHATTAN | Alteration | Signed-off | 10/12/2023 | 05/02/2024 | Owner SABEY DATA CENTERS Contractor SABEY IGM CONSTRUCTION II | Installation of a new Centrifugal water-cooled Chiller and associated infrastructure support equipment in the 3rd Floor. The chilled water … |
| M00969734 ↗ | 375 PEARL STREET MANHATTAN | Alteration | Signed-off | 12/22/2023 | 05/02/2024 | Owner SABEY DATA CENTERS Contractor SABEY IGM CONSTRUCTION II | Herewith filing to extend exist. domestic water sys. on 7th fl& new fl. drains. Modification of existing sprinkler system on 7th floor. all … |
| M00961963 ↗ | 166 DUANE STREET MANHATTAN | Alteration | Signed-off | 02/15/2024 | 03/07/2024 | Contractor CLUNE CONSTRUCTION CO LP | CREATE VESTIBULE FOR EXISTING COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00185626 ↗ | 431 HOYT STREET BROOKLYN | Alteration | Permit Issued | 06/28/2019 | 01/24/2024 | Contractor CREAMER ENVIRONMENTAL INC | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS, AND/OR OCCUPANCY |
| B00962495 ↗ | 901 4 AVENUE BROOKLYN | Alteration | Signed-off | 11/20/2023 | 12/20/2023 | Owner THE GREEN-WOOD CEMETERY Contractor GALVIN BROTHERS INC Filer JAM CONSULTANTS, INC. | PLUMBING WORK ASSOCIATED WITH THE INSTALLATION OF STORMWATER MANAGEMENT SYSTEMS(SUBSURFACE STORAGE R-TANKS AND BIOFILTER PLANTER BED) PER DE… |
| M00844925 ↗ | 51 EAST 42 STREET MANHATTAN | Alteration | Signed-off | 10/18/2023 | 10/31/2023 | Owner SL GREEN REALTY CORP Contractor CLUNE CONSTRUCTION CO LP | Removal & instillation of interior non load bearing partitions and related finishes. |
| M00887179 ↗ | 250 WEST 34 STREET MANHATTAN | Alteration | Signed-off | 07/12/2023 | 10/31/2023 | Owner VORNADO REALTY TRUST Contractor TURNER CONSTRUCTION COMPANY | Samsung - Construction work on the 26th floor as indicated on drawings. EN drawings for lighting are submitted under M00887206-I1 |
| M00502859 ↗ | 245 WEST 99 STREET MANHATTAN | Alteration | Signed-off | 05/18/2021 | 06/13/2023 | Contractor SCHIMENTI CONSTRUCTION CO | 1ST FLOOR SPACE RENOVATION AS PER PLANS FILED HEREWITH COMPLYING WITH BB 2009-025. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00853477 ↗ | 99 CHURCH STREET MANHATTAN | Alteration | Signed-off | 05/11/2023 | 05/18/2023 | Contractor FOLOR INC | APARTMENT RENOVATION APT 77A (77th FL MARKETING/62ND FL CO) WORK TO INCLUDE PARTITION, CEILING, AND DOOR MODIFICATIONS AS INDICATED ON PLANS… |
| B08044826 ↗ | 7 DEKALB AVENUE BROOKLYN | Alteration | Signed-off | 02/20/2023 | 03/14/2023 | Owner ACADIA REALTY TRUST Contractor SCHIMENTI CONSTRUCTION CO | Interior partitions and finishes as per plans filed herewith. No change to use, egress or occupancy. |
| M00812540 ↗ | 375 PEARL STREET MANHATTAN | Alteration | Signed-off | 02/07/2023 | 02/10/2023 | Owner SABEY DATA CENTERS Contractor SABEY IGM CONSTRUCTION II | Herewith filing for minor interior renovation on the 30th floor. Removed glass partitions and installed new. and installed security doors as… |
| M00769351 ↗ | 919 3 AVENUE MANHATTAN | Alteration CO | Permit Issued | 08/12/2022 | 12/02/2022 | Owner SL GREEN REALTY CORP Contractor SCHIMENTI CONSTRUCTION CO Filer RIZZO GROUP | Filing to change occupancy from theater without restrictions (use group 8) to medical offices (use group 6) on the first floor and related p… |
| Q00780790 ↗ | 189-10 GRAND CENTRAL PKWY QUEENS | Alteration | Filed — no permit on record | 10/19/2022 | — | Owner NYC SCHOOL CONSTRUCTION Filer JMV ASSOCIATES LLC | — |
| X00780811 ↗ | 550 ST ANNS AVENUE BRONX | Alteration | Filed — no permit on record | 10/19/2022 | — | Filer JMV ASSOCIATES LLC | — |
| M00666506 ↗ | 375 PEARL STREET MANHATTAN | Alteration | Signed-off | 04/19/2022 | 10/05/2022 | Owner SABEY DATA CENTERS Contractor SABEY IGM CONSTRUCTION II | Herewith filing for 7th-inter.demo INTERIOR RENOVATION AS WHITE BOX FOR TENANT IMPROVEMENT. CONSTRUCTION OF NEW PARTITIONS, AND DROPPED CEIL… |
| M00625109 ↗ | 846 WEST 30 STREET MANHATTAN | Alteration | Signed-off | 12/16/2021 | 06/29/2022 | Owner WAXMAN PROPERTIES Contractor SCHIMENTI CONSTRUCTION CO | 2ND FLOOR MEDICAL OFFICE BUILDOUT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00735677 ↗ | 919 3 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 06/28/2022 | — | Owner SL GREEN REALTY Filer RIZZO GROUP | — |
| M00743232 ↗ | 225 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 05/27/2022 | 06/21/2022 | Contractor STEADFAST DEVELOPMENT AND | Minor interior renovation to existing retail space occupied by NORDSTROM. Remove/intall non load bearing partition, flooring and ceiling fin… |
| M00616557 ↗ | 846 WEST 30 STREET MANHATTAN | Alteration CO | Permit Issued | 01/07/2022 | 04/11/2022 | Owner WAXMAN PROPERTIES Contractor SCHIMENTI CONSTRUCTION CO | FILING ALT1 APPLICAITON TO CHANGE OF USE FROM RETAIL TO MEDICAL OFFICE ON 2ND FLOOR AS PER PLANS FILED HEREWITH. |
| M00569153 ↗ | 245 WEST 99 STREET MANHATTAN | Alteration | Signed-off | 09/08/2021 | 03/23/2022 | Owner HARLORN, LLC Contractor SELF EMPLOYED Filer CNS INSPECTION SERVICES | HEREWITH FILING FITOUT OF STOREFONT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00611424 ↗ | 185 BROADWAY MANHATTAN | Alteration | Signed-off | 11/09/2021 | 12/29/2021 | Contractor SCHIMENTI CONSTRUCTION CO | Installation of new partitions, doors, ceilings and finishes on the 2nd floor (One Medical) as per plans. No change to use, egress or occup… |
| B00538981 ↗ | 229 LUQUER STREET | Alteration | Signed-off | 07/14/2021 | 12/02/2021 | Contractor CREAMER ENVIRONMENTAL INC | SUPPORT OF EXCAVATION |
| M00571335 ↗ | 375 PEARL STREET MANHATTAN | Alteration | Signed-off | 08/18/2021 | 11/17/2021 | Owner SABEY DATA CENTERS Contractor SABEY IGM CONSTRUCTION II | Herewith filing for interior demo of non load bearing partitions, ceilings, floor finishes and fixtures on the 7th floor core area as per th… |
| M00615991 ↗ | GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 10/22/2021 | — | Filer SMB CONSULTANT | — |
| M00599695 ↗ | 225 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 10/06/2021 | 10/18/2021 | Owner NORDSTROM, INC. Contractor JT MAGEN & COMPANY INC | Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or oc… |
| M00451979 ↗ | 51 EAST 42 STREET MANHATTAN | Alteration | Signed-off | 02/22/2021 | 04/07/2021 | Owner SL GREEN REALTY CORP. Contractor FOREMOST CONTRACTING & BU | INTERIOR OFFICE RENOVATIONS AND MODIFICATIONS ON THE 1ST AND 2ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00178852 ↗ | 477 SMITH STREET BROOKLYN | Alteration | Signed-off | 06/18/2019 | 11/19/2020 | Owner NATIONAL GRID Contractor CREAMER ENVIRONMENTAL INC Filer RPO INC. | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE |
| Person | Filings | Most recent |
|---|---|---|
| Lee Hagen | 24 | 04/13/2026 |
| David Fulks | 17 | 07/07/2026 |
| Russell Dudley | 16 | 06/29/2026 |
| Joseph Marrone | 15 | 08/25/2026 |
| Renato Vargas | 7 | 04/23/2026 |
| TERRY YOUNG | 4 | 08/24/2026 |
| Lucy Baraquio | 3 | 02/25/2026 |
| Timothy McDonald | 3 | 05/20/2026 |
| James Callahan | 2 | 06/18/2025 |
| James Fox | 2 | 09/10/2025 |
| John Kulbaga | 2 | 05/12/2025 |
| Muhammad Enam | 2 | 10/07/2024 |
| Paul Dunn | 2 | 06/03/2026 |
| Christopher Jedrich | 1 | 05/20/2026 |
| KIRK LOWERY | 1 | 11/05/2021 |
| LISA BOWE | 1 | 08/13/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| HIRANI | 7 | 09/08/2026 |
| Hayduk Engineering, LLC | 2 | 06/22/2026 |
| WESLER-COHEN ASSOCIATES | 2 | 07/21/2025 |
| WSP | 2 | 08/28/2025 |
| AKRF, INC. | 1 | 06/07/2023 |
| BIG ARCHITECTURE DPC | 1 | 07/21/2025 |
| CASE ENGINEERING, INC. | 1 | 02/11/2026 |
| EYP MISSION CRITICAL FACILITIES, IN | 1 | 03/11/2024 |
| JACOBS | 1 | 06/07/2023 |
| JAMES CALLAHAN | 1 | 07/13/2026 |
| KS ENGINEERS, P.C. | 1 | 06/07/2023 |
| LBI, LLC | 1 | 01/13/2026 |
| MATHEWS NIELSEN | 1 | 06/07/2023 |
| OFFICE FOR THE NEXT ENVIRONMENT ARC | 1 | 06/07/2023 |
| SETTY | 1 | 04/02/2026 |
| SEVERUD ASSOCIATES | 1 | 10/12/2023 |
| Name | Jobs together | Most recent |
|---|---|---|
| GALVIN BROTHERS INC | 8 | 06/10/2026 |
| SCHIMENTI CONSTRUCTION CO | 8 | 04/15/2026 |
| MADISON PIPE CONSULT INC | 6 | 07/13/2026 |
| SABEY IGM CONSTRUCTION II | 5 | 03/11/2024 |
| ARCADIS U.S., INC | 4 | 07/14/2021 |
| BUCH CONSTRUCTION, INC | 4 | 05/05/2026 |
| CLUNE CONSTRUCTION CO LP | 4 | 07/24/2025 |
| PAR PLUMBING CO., INC | 4 | 04/02/2026 |
| TURNER EE CRUZ A JOINT | 4 | 07/13/2026 |
| R.J. INDUSTRIES INC | 3 | 05/28/2026 |
| A-1 UNDERGRND PLMBNG CON | 2 | 06/10/2024 |
| DEBORAH BRADLEY CONS & MG | 2 | 07/10/2026 |
| FERREIRA CONSTRUCTION CO | 2 | 07/02/2026 |
| OPAL CONSTRUCTION CORP | 2 | 05/22/2026 |
| RSM MAINTENANCE LLC | 2 | 02/11/2026 |
| A + SPRINKLER CORP | 1 | 09/26/2025 |
| ALL PRO PLBG & HTG INC | 1 | 08/28/2025 |
| C.A.C. INDUSTRIES, INC | 1 | 06/12/2025 |
| CAULDWELL WINGATE CO LLC | 1 | 12/09/2024 |
| ECLIPSE CONTRACTING CORP | 1 | 01/15/2025 |
| FAST TRACK CONSTRUCTION S | 1 | 10/12/2023 |
| FOLOR INC | 1 | 02/13/2024 |
| FOREMOST CONTRACTING & BU | 1 | 05/07/2021 |
| FULL CAPACITY FIRE CORP | 1 | 08/28/2025 |
| GEORGE BRESLAW PLBNG LLC | 1 | 07/24/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| BATTERY PARK CITY AUTHORITY | 10 | 07/13/2026 |
| SABEY DATA CENTERS | 5 | 03/11/2024 |
| SL GREEN REALTY CORP | 5 | 12/31/2025 |
| 119 MANHATTAN EQUITIES LLC | 3 | 09/26/2025 |
| NORDSTROM, INC. | 3 | 05/05/2026 |
| NYCDEP | 3 | 05/28/2026 |
| MACERICH | 2 | 04/02/2026 |
| TIFFANY&CO | 2 | 08/28/2025 |
| WAXMAN PROPERTIES | 2 | 04/15/2026 |
| 1790 BROADWAY ASSOCIATES LLC | 1 | 07/07/2025 |
| ACADIA REALTY TRUST | 1 | 02/20/2023 |
| C.A.C. INDUSTRIES, INC. | 1 | 06/12/2025 |
| CUNY | 1 | 09/08/2026 |
| FORDHAM UNIVERSITY | 1 | 07/10/2026 |
| HARLORN, LLC | 1 | 09/08/2021 |
| MILROSE | 1 | 09/09/2026 |
| MOUNT SINAI HOSPITAL | 1 | 12/09/2024 |
| NATIONAL GRID | 1 | 08/26/2020 |
| NYC SCHOOL CONSTRUCTION | 1 | 10/26/2022 |
| NYC SCHOOL CONSTRUCTION AUTHORITY | 1 | 10/26/2022 |
| THE GREEN-WOOD CEMETERY | 1 | 12/18/2023 |
| VORNADO REALTY TRUST | 1 | 01/03/2025 |
| WC 28 REALTY, LLC | 1 | 02/11/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| BOYD CONSULTING, INC | 11 | 09/08/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 7 | 04/15/2026 |
| CONSTRUCTION PERMIT SERVICES | 5 | 03/11/2024 |
| RPO INC. | 5 | 09/09/2026 |
| METROPOLIS GROUP INC | 4 | 05/05/2026 |
| A1 EXPEDITING SERVICE CORP. | 3 | 10/18/2024 |
| JMV ASSOCIATES LLC | 3 | 11/04/2022 |
| OUTSOURCE CONSULTANTS, INC. | 3 | 08/28/2025 |
| RIZZO GROUP | 3 | 12/31/2025 |
| GREEN LIGHT EXPEDITING LLC | 2 | 04/02/2026 |
| SMB CONSULTANT | 2 | 07/21/2025 |
| ARCHETYPE CONSULTANTS, INC. | 1 | 01/03/2025 |
| CNS INSPECTION SERVICES | 1 | 09/08/2021 |
| JAM CONSULTANTS, INC. | 1 | 12/18/2023 |
| NYCD GROUP, INC. | 1 | 07/21/2025 |