1910Year Built
7Stories
O3Building Class
C6-3AZoning
25,090 sfGross Floor Area
6Units
LL97 Covered0 Active Violations
Office only, 7-19 stories · Owner of record: Warehouse Eyes · 4,158 sf lot · 6.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPeden and Munk4p · 3 filings · 20 docs
Floor 6Peden and Munk2p · 2 filings · 17 docs
Floor 55th floor commercial kitchen exhaust installation13p · 4 filings · 20 docs
Floor 4Fourth floor renovationUnder Construction11p · 1 filing · 16 docs
Floor 3
Floor 2
Floor 13p · 1 filing · 3 docs
CellarReplace gas boilerUnder Construction6p · 1 filing · 20 docs
Filed — no permit issuedIndependent protected bulkhead wraps4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Info 155W19 Com4510/20/2026
Warehouse Eyes2403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company410/20/2026
Konoski Engineering202/04/2026
Jennifer Dempsey112/12/2025
IP Group801/05/2023
Kce Consulting Engineering208/16/2022
Hunt Architects103/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DI Dio Architecture1603/21/2026
J. Callahan Consulting103/21/2026
Hunt Architects203/21/2026
Skyline Access103/21/2026
Premier Expediting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kitchen Exhaust SolutionGeneral Contractor303/21/2026
Sohome WorkGeneral Contractor207/08/2026
A & C Heating ServicesPlumbing208/22/2026
Crossfield Plumbing & HeatingFire Protection207/08/2026
Crossfield Plumbing & HeatingPlumbing107/08/2026
Muhan SpaceGeneral Contractor107/08/2026
Comfort Tech MechanicalGeneral Contractor107/08/2026
Good-Will MechanicalGeneral Contractor107/08/2026
Tuxedo Electrical ContractingElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851310/20/2026
Konoski Engineering9111302/04/2026
IP Group2542801/05/2023
KZ Engineering4665208/16/2022
Building Lifecycle
All (103)Filed (19)Permit Issued (11)Signed Off (6)Violation (22)Inspection (11)Objection (4)Special Inspection (30)
10/20/2026
Filed — Alteration
INSTALL CHIMNEY LINER PER PLANS.
M01442734-P1
10/19/2026
Filed — Alteration
INSTALL CHIMNEY LINER PER PLANS.
M01442734-S2
10/16/2026
Signed off — Alteration
Filing herewith for modification of Sprinkler System on 4th floor
M01330929-S1
10/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
10/13/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
10/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/13/2026
Special inspection requirement — Heating Systems
LOUIS ARENA
10/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
09/30/2026
Special inspection requirement — Final
LOUIS ARENA
09/30/2026
Special inspection requirement — Chimneys and vents
LOUIS ARENA
08/21/2026
Permit issued — Plumbing
M01442734-S1-PL
08/20/2026
Filed — Alteration
INSTALL CHIMNEY LINER PER PLANS.
M01442734-I1
08/20/2026
Filed — Alteration
INSTALL CHIMNEY LINER PER PLANS.
M01442734-S1
08/20/2026
Permit issued — Boiler Equipment
M01442734-I1-BE
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/07/2026
Special inspection requirement — Heating Systems
LOUIS ARENA
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
08/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/07/2026
Special inspection requirement — Maintenance information
LOUIS ARENA
06/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/10/2026
Filed — Alteration
IRA to assist with Condition Assessment.
M01357588-I1
02/10/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/04/2026
Filed — Alteration
Filing herewith for modification of Sprinkler System on 4th floor
M01330929-P1
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
christopher konoski
02/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
christopher konoski
02/04/2026
Special inspection requirement — Sprinkler Systems
christopher konoski
02/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/07/2026
Permit issued — Sprinklers
M01330929-S1-EW-SP
12/31/2025
Filed — Alteration
Filing herewith for modification of Sprinkler System on 4th floor
M01330929-S1
12/22/2025
Permit issued — General Construction
M01330929-I1-GC
12/12/2025
Filed — Alteration
Filing herewith for modification of Sprinkler System on 4th floor
M01330929-I1
12/09/2025
Special inspection requirement — Interior lighting power
Jennifer Dempsey
12/09/2025
Special inspection requirement — Lighting controls
Jennifer Dempsey
12/09/2025
Special inspection requirement — Final
Jennifer Dempsey
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
christopher konoski
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/28/2023
Signed off — Alteration
Modifications to the plumbing and sprinkler systems for 5th floor commercial space.
M00678892-I1
04/17/2023
Signed off — Alteration
M00678896-I1
04/17/2023
Signed off — Alteration
Install new kitchen exhaust and ductwork connected to new range hood in 5th floor commercial space and route to roof.
M00682311-I1
04/14/2023
Signed off — Alteration
Interior partition changes and finishes in existing 5th floor commercial space., new kitchen and bathroom.
M00678889-I1
01/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/10/2023
Special inspection requirement — Sprinkler Systems
IVAN POLLAK
01/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IVAN POLLAK
01/05/2023
Filed — Alteration
Modifications to the plumbing and sprinkler systems for 5th floor commercial space.
M00678892-P4
12/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/22/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/15/2022
Objection resolved — Addressed
12/03/2022
Objection raised — Scope
11/30/2022
Filed — Alteration
Modifications to the plumbing and sprinkler systems for 5th floor commercial space.
M00678892-P3
11/17/2022
Special inspection requirement — Sprinkler Systems
IVAN POLLAK
11/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
IVAN POLLAK
10/21/2022
Signed off — Alteration
Structural framing for new duct openings on 6th floor and roof level.
M00678899-I1
10/17/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/12/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/12/2022
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
08/30/2022
Filed — Alteration
Modifications to the plumbing and sprinkler systems for 5th floor commercial space.
M00678892-P2
08/30/2022
Special inspection requirement — Sprinkler Systems
IVAN POLLAK
08/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
IVAN POLLAK
08/16/2022
Filed — Alteration
Structural framing for new duct openings on 6th floor and roof level.
M00678899-P1
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA & C Heating Services08/21/2026
DOB NOWBoiler EquipmentPermit IssuedA & C Heating Services08/20/2026
DOB NOWSprinklersSigned-offCrossfield Plumbing & Heating01/07/2026
DOB NOWGeneral ConstructionPermit IssuedMuhan Space12/22/2025
DOB NOWMechanical SystemsSigned-offKitchen Exhaust Solution05/05/2022
DOB NOWStructuralSigned-offSohome Work04/02/2022
DOB NOWSprinklersSigned-offCrossfield Plumbing & Heating03/30/2022
DOB NOWMechanical SystemsSigned-offGoodwill Mechanical03/28/2022
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating03/25/2022
DOB NOWGeneral ConstructionSigned-offSohome Work03/11/2022
DOB NOWMechanical SystemsPermit IssuedComfort Tech Mechanical08/20/2021
BISOTISSUEDDynamic Construction Service08/07/2017
BISSPISSUEDJ. Caiazzo Plumbing & Heating05/26/2016
BISOTISSUEDSohome Work08/06/2014
BISPLISSUEDFlytiger P & H06/16/2014
BISOTISSUEDSohome Work06/10/2014
BISOTISSUEDJSB Enterprises11/30/2011
BISPLISSUEDThe Right Connection P&H10/27/2011
BISOTISSUEDHite Construction10/18/2011
BISPLISSUEDPipe Rite07/29/2010
BISOTISSUEDKing Rose of NY07/22/2010
BIS—ISSUEDStat Contracting02/01/2010
BISOTISSUEDStat Contracting02/01/2010
BISOTISSUEDStat Contracting10/05/2009
BISSPISSUEDJ. Caiazzo Plumbing & Heating08/04/2008
BISPLISSUEDJ. Caiazzo Plumbing & Heating08/04/2008
BISEQISSUEDT.b.r.inc08/18/1999
BIS—ISSUEDExecutive Construc Services02/18/1999
BISSPISSUEDAAA Sprinkler01/11/1999
BISPLISSUEDArmon Mechanical01/07/1999
BISEQISSUEDExecutive Construc Services12/22/1998
BISMHISSUEDExecutive Construc Services12/22/1998
BISOTISSUEDExecutive Construc Services12/22/1998
BISOTISSUEDC & D Restoration11/10/1998
BIS—ISSUEDN/A06/10/1997
BISOTISSUEDB&B Construction of Green County02/04/1997
BISSPISSUEDJulian Plumbing & Heating02/08/1996
BISPLISSUEDJulian Plumbing & Heating01/17/1996
BISMHISSUEDB&B Construction of Green County01/10/1996
BISEQISSUEDYork Scaffold Equipment04/28/1994
1 project · most recent 02/04/2026
FiledStatusContractorScope
02/04/2026Signed-offCrossfield Plumbing & Heating31 heads
1 project · most recent 02/04/2026
FiledStatusContractorScope
02/04/2026———
3 projects · most recent 10/12/2026
Boiler Controls General Wiring
FiledStatusContractorScope
10/12/2026Permit IssuedSTX ElectricalBoiler Controls
04/05/2022CompleteW 8 ElectricGeneral Wiring
07/31/2018Permit IssuedTuxedo Electrical Contracting—
1 project · most recent 02/10/2026
FiledStatusContractorScope
02/10/2026———
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/12/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/12/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
07/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
10/13/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
10/13/2026Maintenance informationLOUIS ARENAenergy_progress
10/13/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/13/2026Heating SystemsLOUIS ARENAspecial
10/13/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
09/30/2026FinalLOUIS ARENAprogress
09/30/2026Chimneys and ventsLOUIS ARENAspecial
08/07/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
08/07/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/07/2026Heating SystemsLOUIS ARENAspecial
08/07/2026Energy Code Compliance InspectionsLOUIS ARENAprogress
08/07/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/07/2026Maintenance informationLOUIS ARENAenergy_progress
02/04/2026Fire-Resistant Penetrations and Jointschristopher konoskispecial
02/04/2026Tenant Protection Plan Compliancechristopher konoskispecial
02/04/2026Sprinkler Systemschristopher konoskispecial
12/09/2025Interior lighting powerJennifer Dempseyenergy_progress
12/09/2025Lighting controlsJennifer Dempseyenergy_progress
12/09/2025FinalJennifer Dempseyprogress
12/09/2025Fire-Resistant Penetrations and Jointschristopher konoskispecial
01/10/2023Sprinkler SystemsIVAN POLLAKspecial
01/10/2023Fire-Resistant Penetrations and JointsIVAN POLLAKspecial
11/17/2022Sprinkler SystemsIVAN POLLAKspecial
11/17/2022Fire-Resistant Penetrations and JointsIVAN POLLAKspecial
08/30/2022Sprinkler SystemsIVAN POLLAKspecial
Latest 25 of 40.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Peden and MunkOfficeFloor 6, Roof
Project M00678899 Alteration · LOC Issued · 03/08/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 229 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/03/2026M00526278-I1Request digital key ↗
09/02/2026M00678889-I1Request digital key ↗
09/02/2026M00678896-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits31
▸BISWORK PERMIT APPLICATION17
08/14/2017123069838Open ↗
06/03/2016110237057Open ↗
08/13/2014122056078Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
06/05/2017123069838Open ↗
04/07/2017123069838Open ↗
11/21/2016110237057Open ↗
Showing 3 of 13 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/24/2014122056078Open ↗
▸Seals & Professional Certifications87
▸DOB NOWProgress Inspector Seal & Signature21
10/20/2026M01442734-S2Open ↗
10/20/2026M01442734-P1Open ↗
10/20/2026M01442734-P1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
08/14/2017123069838Open ↗
07/18/2017123069838Open ↗
05/02/2017110237057Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
10/20/2026M01442734-P1Open ↗
10/20/2026M01442734-S2Open ↗
09/03/2026M00526278-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
10/20/2026M01442734-P1Open ↗
10/20/2026M01442734-S2Open ↗
09/13/2026M01442734-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
06/18/2014122034930Open ↗
12/01/2011120908018Open ↗
07/20/2010120414907Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
12/01/2011120908018Open ↗
07/20/2010120414907Open ↗
07/22/2008110237057Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/21/2016110237057Open ↗
11/18/2016110237057Open ↗
06/18/2014122034930Open ↗
▸BISPC FULL REPORT1
12/10/2007110052219Open ↗
▸Trade Schedules & Equipment12
▸BISSELF-CERT PLUMBING NOTICE7
10/16/2014122034930Open ↗
07/18/2014122034930Open ↗
02/23/2012120853102Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING4
07/20/2010120414907Open ↗
10/05/2009120170607Open ↗
09/18/2009120159595Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/18/2014122034930Open ↗
▸Environmental & Asbestos31
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
10/20/2026M01442734-P1Open ↗
10/20/2026M01442734-S2Open ↗
09/03/2026M00526278-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
12/01/2011120908018Open ↗
07/20/2010120414907Open ↗
07/20/2010120414907Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/07/2017123069838Open ↗
07/10/2014122056078Open ↗
06/18/2014122034930Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/24/2009120201192Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
08/14/2017123069838Open ↗
07/18/2017123069838Open ↗
04/07/2017123069838Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
09/02/2026M00678889-I1Open ↗
09/02/2026M00678896-I1Open ↗
08/13/2026M00682311-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/24/2014122034930Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/01/2011120908018Open ↗
▸Approvals, Objections & Sign-offs14
▸BISADMINISTRATIVE OBJECTIONS7
12/01/2011120908018Open ↗
07/20/2010120414907Open ↗
11/24/2009120201192Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
05/02/2017110237057Open ↗
10/20/2016110237057Open ↗
12/24/2014122034930Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
11/24/2009120201192Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/08/2013120414907Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
04/07/2017123069838Open ↗
12/24/2014122034930Open ↗
12/24/2014122056078Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET8
04/07/2017123069838Open ↗
07/10/2014122056078Open ↗
06/18/2014122034930Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION1
11/17/2014122034930Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
11/24/2009120201192Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
08/13/2014122056078Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01357588-I1Open ↗