| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01323336 ↗ | 244 WEST 23 STREET MANHATTAN | Alteration | Permit Issued | 12/09/2025 | 09/30/2026 | Design KATZ ARCHITECTURE Owner SANDRA GREER R E INC | RENOVATION OF LOBBY, INCLUDING MINOR LAYOUT MODIFICATIONS, DOOR REPLACEMENTS, LIGHTING / ELECTRICAL / MILLWORK / FINISH UPGRADES. NO CHANGE … |
| S01419815 ↗ | 438 PORT RICHMOND AVENUE STATEN ISLAND | Alteration | Permit Issued | 09/10/2026 | 09/24/2026 | Design RyDE Owner FIRST CLASS MANAGEMENT | Interior fitout and alteration of existing commercial unit to new office space. |
| M01278739 ↗ | 150 SPRING STREET MANHATTAN | Alteration | Permit Issued | 09/11/2025 | 09/09/2026 | Design VIRALINE ARCHITECTURE LLP Owner Madison Propco, LLC | RENOVATION OF EXISTING RETAIL SPACE. NO CHANGE TO USE , OCCUPANCY OR EGRESS. |
| X01419092 ↗ | MORRIS PARK AVENUE BRONX | Alteration | Permit Issued | 07/21/2026 | 07/30/2026 | Design MG ENGINEERING D.P.C. | 1300 MORRIS PARK AVENUE - FORCHHEIMER & GOLDING LAB RENO - PLUMBING MODIFICATIONS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCC… |
| M01239027 ↗ | 33 BETHUNE STREET MANHATTAN | Alteration | Permit Issued | 06/26/2025 | 05/08/2026 | Renovations to street level building entrance and first floor lobby as per plans filed herewith. No change is proposed to use, egress or occ… | |
| M01373607 ↗ | 115 WEST 86 STREET MANHATTAN | Alteration | Permit Issued | 03/30/2026 | 05/04/2026 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR INTERIOR RENOVATION OF THE LOBBY AS PER PLANS SUBMITTED HEREWITH. |
| Name | Projects together | Most recent |
|---|---|---|
| VIRALINE ARCHITECTURE LLP | 12 | 09/11/2025 |
| MCLAREN ENGINEERING GROUP | 7 | 12/03/2020 |
| LORING CONSULTING ENGINEERS, INC. | 5 | 08/06/2024 |
| PELLOVERTON LLC | 5 | 07/12/2023 |
| ANTONIO LEO ARCHITECT | 4 | 06/18/2026 |
| EMTG CONSULTANTS INC | 3 | 07/12/2023 |
| GGA STUDIOS, DPC | 3 | 10/29/2020 |
| M. CHETRIT CONSULTING ENGINEERS P.C | 3 | 05/20/2025 |
| MOROZOV | 3 | 04/27/2022 |
| STUDIO A+T ARCHITECTS | 3 | 08/28/2023 |
| BEYER BLINDER BELLE | 2 | 05/31/2024 |
| CONRADO GALLARDO | 2 | 06/24/2025 |
| CROWN ARCHITECTURE & CONSULT., DPC | 2 | 03/05/2026 |
| ENV ARCHITECTS, DPC | 2 | 10/10/2025 |
| EP ENGINEERING LLC | 2 | 05/17/2021 |
| IMEG Consulting Corp. | 2 | 10/10/2025 |
| JACK GREEN ASSOCIATES | 2 | 11/03/2023 |
| JOHN SCHIMENTI, P.C. ARCHITECT | 2 | 11/08/2023 |
| LANDOW AND LANDOW ARCHITECTS | 2 | 09/01/2026 |
| NAPACH DESIGN GROUP | 2 | 05/15/2025 |
| PATTI & ANTHES CONSULTING ENGINEERS | 2 | 07/31/2024 |
| POSEN ARCHITECTS | 2 | 09/05/2023 |
| RODNEY D. GIBBLE CONSULTING ENGINEE | 2 | 07/10/2023 |
| S. REJEILI ARCHITECT, PLLC | 2 | 05/11/2023 |
| SARAH GORDON DRAKE ARCHITECT, LLC | 2 | 10/15/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| FIREQUEST CORP | 13 | 09/01/2026 |
| ACCESS PLUMBING CORP | 9 | 09/01/2026 |
| BEDROCK MECHANICAL INC | 2 | 01/08/2026 |
| BEDROCK PLBG. & HTG., INC | 2 | 01/08/2026 |
| A.J.'S CUSTOM HOME IMPROV | 1 | 05/20/2022 |
| ABCO-PEERLESS SPRKLR CORP | 1 | 11/03/2025 |
| BENCHMARK BUILDERS LLC | 1 | 03/03/2026 |
| DNP BUILDERS LLC | 1 | 01/28/2022 |
| M&T PLBG AND HTG CO., INC | 1 | 07/14/2025 |
| MARCO PROPERTIES I CORP | 1 | 05/20/2022 |
| METRO INCORPORATED | 1 | 02/25/2026 |
| MUGHAL GEN CONSTR. INC | 1 | 06/28/2023 |
| STRUCTURE TONE, LLC | 1 | 11/03/2025 |
| THREE PARK AVE. BLDNG CO | 1 | 06/05/2023 |
| UNIVERSAL PLUMBING INC | 1 | 12/09/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| AIMCO | 9 | 05/17/2021 |
| HANNAH SENESH COMMUNITY DAY SCHOOL | 5 | 07/12/2023 |
| ACADIA REALTY TRUST | 4 | 07/31/2024 |
| PHIPPS HOUSES | 3 | 10/10/2025 |
| AKAM ASSOCIATES, INC. | 2 | 04/10/2024 |
| ALBERT EINSTEN COLLEGE OF MEDICINE | 2 | 07/27/2026 |
| BPP ST OWNER LLC | 2 | 08/28/2023 |
| CBRE | 2 | 03/03/2026 |
| COHEN BROTHERS REALTY CORP | 2 | 11/03/2023 |
| COLUMBIA UNIVERSITY | 2 | 12/29/2025 |
| HOLY CITY PENTECOSTAL CHURCH | 2 | 12/23/2022 |
| JACK KAHN REALTY SERVICES CORP. | 2 | 08/02/2021 |
| MATRIX DEVELOPMENT GROUP | 2 | 05/18/2021 |
| PACE UNIVERSITY | 2 | 03/24/2023 |
| RUDIN | 2 | 06/18/2026 |
| VERACITY DEVELOPMENT | 2 | 04/27/2022 |
| VORNADO REALTY TRUST | 2 | 03/05/2026 |
| 120 WOOSTER LLC | 1 | 02/25/2026 |
| 185 VARICK REALTY CORPORATION | 1 | 06/18/2024 |
| 1HOTEL BROOKLYN BRIDGE | 1 | 07/14/2025 |
| 281 WEST 12 STREET LLC | 1 | 12/27/2021 |
| CENTENNIAL PROPERTIES NY INC. | 1 | 06/24/2025 |
| COHEN BROTHER REALTY AS AGENT FOR | 1 | 05/20/2025 |
| FEDEX PROPERTIES | 1 | 04/03/2025 |
| FIRST CLASS MANAGEMENT | 1 | 09/10/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| OUTSOURCE CONSULTANTS, INC. | 16 | 07/27/2026 |
| JM ZONING, LLC. | 8 | 10/10/2025 |
| JAM CONSULTANTS, INC. | 7 | 05/31/2024 |
| WILLIAM VITACCO ASSOCIATES | 6 | 06/18/2026 |
| CLARKE CONSTRUCTION CONSULTANTS | 5 | 09/11/2025 |
| J. CALLAHAN CONSULTING, INC. | 4 | 12/29/2025 |
| JANCO BUILDING CONSULTANTS, LLC. | 4 | 04/03/2025 |
| METROPOLIS GROUP INC | 4 | 09/01/2026 |
| DOMANI CONSULTING | 3 | 10/15/2025 |
| GREEN LIGHT EXPEDITING LLC | 3 | 03/30/2026 |
| A1 EXPEDITING SERVICE CORP. | 2 | 05/18/2021 |
| BOHLER ENGINEERING | 2 | 08/06/2024 |
| CROWN DESIGN & CONSULTING | 2 | 03/05/2026 |
| FRAMEWORK CONSULTANTS LLC | 2 | 05/15/2025 |
| WALTER T. GORMAN, PE, PC | 2 | 03/24/2023 |
| AK CONSULTING SERVICES, INC | 1 | 03/02/2022 |
| ANTHONY MORALI ARCHITECT PLLC | 1 | 04/10/2024 |
| Atelier de Monsalve | 1 | 02/25/2026 |
| BAY RIDGE BUILDING CONSULTANT INC. | 1 | 09/10/2021 |
| BMB BUILDING CONSULTING INC. | 1 | 12/18/2023 |
| BURNHAM NATIONWIDE INC | 1 | 03/22/2023 |
| CONVERSANO ASSOCIATES, INC. | 1 | 08/25/2022 |
| EC BUILDING CONSULTANTS, INC. | 1 | 06/26/2025 |
| I & L CONSULTING, INC. | 1 | 02/22/2022 |
| LORING CONSULTING ENGINEERS, INC, | 1 | 03/05/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01323336 ↗ | 244 WEST 23 STREET MANHATTAN | Alteration | Permit Issued | 12/09/2025 | 09/30/2026 | Design KATZ ARCHITECTURE Owner SANDRA GREER R E INC | RENOVATION OF LOBBY, INCLUDING MINOR LAYOUT MODIFICATIONS, DOOR REPLACEMENTS, LIGHTING / ELECTRICAL / MILLWORK / FINISH UPGRADES. NO CHANGE … |
| S01419815 ↗ | 438 PORT RICHMOND AVENUE STATEN ISLAND | Alteration | Permit Issued | 09/10/2026 | 09/24/2026 | Design RyDE Owner FIRST CLASS MANAGEMENT | Interior fitout and alteration of existing commercial unit to new office space. |
| M01278739 ↗ | 150 SPRING STREET MANHATTAN | Alteration | Permit Issued | 09/11/2025 | 09/09/2026 | Design VIRALINE ARCHITECTURE LLP Owner Madison Propco, LLC | RENOVATION OF EXISTING RETAIL SPACE. NO CHANGE TO USE , OCCUPANCY OR EGRESS. |
| X01419092 ↗ | MORRIS PARK AVENUE BRONX | Alteration | Permit Issued | 07/21/2026 | 07/30/2026 | Design MG ENGINEERING D.P.C. | 1300 MORRIS PARK AVENUE - FORCHHEIMER & GOLDING LAB RENO - PLUMBING MODIFICATIONS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCC… |
| M01239027 ↗ | 33 BETHUNE STREET MANHATTAN | Alteration | Permit Issued | 06/26/2025 | 05/08/2026 | Renovations to street level building entrance and first floor lobby as per plans filed herewith. No change is proposed to use, egress or occ… | |
| M01373607 ↗ | 115 WEST 86 STREET MANHATTAN | Alteration | Permit Issued | 03/30/2026 | 05/04/2026 | Design ANTONIO LEO ARCHITECT Owner RUDIN | FILING FOR INTERIOR RENOVATION OF THE LOBBY AS PER PLANS SUBMITTED HEREWITH. |
| M00966102 ↗ | 140 BROADWAY MANHATTAN | Alteration | Permit Issued | 01/04/2024 | 03/11/2026 | Owner CBRE | Replacement of loading dock and associated steel |
| M01333546 ↗ | 120 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 01/03/2026 | 03/04/2026 | Design JACOB'S CIVIL CONSULTANT Owner 120 WOOSTER LLC Filer Atelier de Monsalve | Modification of a sprinkler system in a retail store only |
| M01221466 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 05/20/2025 | 02/20/2026 | Owner VORNADO REALTY TRUST | Sprinkler work associated with the renovation of existing meeting room and open office space on the 7th floor. No change in use, egress or o… |
| M01313070 ↗ | 241 WEST 28 STREET MANHATTAN | Alteration | Signed-off | 01/07/2026 | 02/10/2026 | Design NEW YORK ENGINEERS LLC Owner MAG PARTNERS Filer METROPOLIS GROUP INC | PLUMBING WORK FOR PET SHOP ON 1ST FLOOR, NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| Q01262383 ↗ | 48-29 HUNTERS POINT AVENUE QUEENS | Alteration CO | Permit Issued | 08/28/2025 | 01/28/2026 | Design LANDOW AND LANDOW ARCHITECTS Filer METROPOLIS GROUP INC | HEREWITH FILING INTERIOR MECHANICAL MODIFICATIONS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| M01309292 ↗ | 151 EAST 58 STREET MANHATTAN | Alteration | Signed-off | 11/12/2025 | 12/16/2025 | Owner VORNADO REALTY TRUST | MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION AT 3RD, 4TH AND 6TH FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01266461 ↗ | 1054 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 10/10/2025 | 11/26/2025 | Design MEYERS+ ENGINEERS Owner IDRISS DERMATOLOGY | Sprinkler work as shown on plans filed herewith. No change in use, egress, or occupancy. |
| M00870548 ↗ | 134 GRAND STREET MANHATTAN | Alteration | Permit Issued | 05/18/2023 | 11/24/2025 | Design SYNTHESIS ARCHITECTURE Owner MACK EDGE MGMT LLC | REBUILD EXISTING ELEVATOR WITH MODIFICATIONS TO THE SHAFT FOR NEW OPENINGS. WORK IN SUB CELLAR RELATED TO SHAFT OPENINGS. REDUCED SCOPE OF W… |
| M01082387 ↗ | 215 EAST 68 STREET MANHATTAN | Alteration | Permit Issued | 10/16/2024 | 11/20/2025 | Design ANTONIO LEO ARCHITECT Owner RUDIN | Modifications to existing Sprinkler Systems as per plans filed herewith. No change in use egress or occupancy. |
| M01303211 ↗ | 17 WEST 54 STREET MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 11/14/2025 | Application filed to repair or replace non structural components of the existing canopies. All work is repair + replacement of canopy fixtu… | |
| M01303274 ↗ | 17 WEST 54 STREET MANHATTAN | Alteration | Permit Issued | 10/15/2025 | 11/14/2025 | Filer DOMANI CONSULTING | Application filed to repair or replace non structural components of the existing canopies. All work is repair + replacement of canopy fixtur… |
| M01199058 ↗ | 425 WEST 50 STREET MANHATTAN | Alteration | Permit Issued | 05/21/2025 | 11/13/2025 | Design Downtown Engineers | Installation of HVAC work for stacked dryers at basement. No change to use, occupancy, or egress. |
| M01186191 ↗ | 257 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 04/16/2025 | 11/06/2025 | Design IMEG Consulting Corp. Owner Phipps Houses Filer JM ZONING, LLC. | MODIFICATION TO THE EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01250381 ↗ | 501 WEST 218 STREET MANHATTAN | Alteration | Signed-off | 10/23/2025 | 11/06/2025 | Design JFK&M CONSULTING ENGINEERS Owner COLUMBIA UNIVERSITY | Filing for renovation of the Chrystie Field House Baseball locker room. No change of use, egress or occupancy. |
| M01228261 ↗ | 20 PRINCE STREET MANHATTAN | Alteration | Signed-off | 06/24/2025 | 09/09/2025 | Design CONRADO GALLARDO | General construction proposed to revise the ground floor storefront. All per submitted plans. No changes to use, egress, or occupancy. |
| M01204762 ↗ | 471 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 05/09/2025 | 07/29/2025 | Design VIRALINE ARCHITECTURE LLP | MODIFICATION OF SP HEADS IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01215357 ↗ | 425 WEST 50 STREET MANHATTAN | Alteration | Permit Issued | 05/01/2025 | 07/15/2025 | Design VIRALINE ARCHITECTURE LLP | The proposed project is the design and renovation of specific areas within the basement at 425 W 50th Street, NY NY 10019 for Stella Tower a… |
| M01182736 ↗ | 125 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 04/22/2025 | 07/01/2025 | Design NAPACH DESIGN GROUP | IT IS PROPOSED TO REMOVE EXISTING NON LOAD BEARING PARTITIONS DOORS AND FINISHES TO BE REPLACED WITH NEW AS PER PLANS. THERE IS NO CHANGE IN… |
| X01085222 ↗ | SACKETT AVENUE BRONX | Alteration | Permit Issued | 08/22/2024 | 07/01/2025 | Design JEFFREY BERMAN ARCHITECT | MONTEFIORE - WEILER VASCULAR SURGERY OFFICES AND WAITING ROOM - SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRES… |
| M01155513 ↗ | 257 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 03/20/2025 | 06/05/2025 | Design IMEG Consulting Corp. Owner Phipps Houses Filer JM ZONING, LLC. | STRUCURAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING OFFICE SPACE AS PER PLANS FILED HEREWITH |
| B01200622 ↗ | 60 FURMAN STREET BROOKLYN | Alteration | Signed-off | 04/01/2025 | 05/27/2025 | Design ANB Engineering PC Owner 1HOTEL BROOKLYN BRIDGE | HVAC modification- disconnect and remove existing abandoned equipment to install new Walk-in Cooler condensing unit as per plans. No change… |
| M00510725 ↗ | 660 JOE DIMAGGIO HIGHWAY MANHATTAN | Alteration | Signed-off | 08/04/2023 | 04/17/2025 | Design FISKAA ENGINEERING Owner FEDEX PROPERTIES | PROPOSE TO PROVIDE NEW HVAC UNITS AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY |
| M01153186 ↗ | 660 JOE DIMAGGIO HIGHWAY MANHATTAN | Alteration | Signed-off | 03/28/2025 | 04/03/2025 | Design SOLE PROPRIETOR | CONVERT EXISTING BREAKOUT ROOM INTO FOUR (4) OFFICES IN ARE A AND RELOCATE BREAKOUT ROOM TO AREA B WITH NEW KITCHENETTE PANTRY. EXISTING CE… |
| M00952672 ↗ | 212 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2023 | 12/09/2024 | Owner FirstService Residential Filer DOMANI CONSULTING | On the Cellar level provide new accessible toilet. On the Subcellar Level provide new staff office and lunchroom. |
| Q08050499 ↗ | 23-50 CORPORAL KENNEDY ST QUEENS | Alteration | Signed-off | 12/30/2022 | 11/12/2024 | Owner SELFHELP | PROPOSE TO UPGRADE ADA COMPLIANT BATHROOM & KITCHEN ON EXISTING APARTMENTS. ERECT NEW MINOR PARTITONS, FINSH WORKS, 1 NEW PUBLIC TOLIET ON 1… |
| M00893377 ↗ | 622 3 AVENUE MANHATTAN | Alteration | Permit Issued | 08/22/2023 | 11/06/2024 | Design VIRALINE ARCHITECTURE LLP Filer JAM CONSULTANTS, INC. | TEMP SPRINKLER LOOP IN SUPPORT OF LOBBY RENOVATION AS PER PLANS FILED HEREWITH. |
| 421572042BIS | 35-02 37 AVENUE QUEENS | — | ISSUED | 04/03/2019 | 10/09/2024 | — | MH, OT, PL, SP |
| B01072426 ↗ | 37 9 STREET BROOKLYN | Alteration | Signed-off | 07/22/2024 | 09/05/2024 | Design ALAN MARGOLIN ASSOCIATES Filer BOHLER ENGINEERING | Structural modifications of front loading dock and new equipment dunnage at backyard. There will be no change in use, egress, or occupancy. |
| B00882169 ↗ | 138 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 07/12/2023 | 09/03/2024 | Owner ACADIA REALTY TRUST | Mechanical work as shown on plans |
| B01071014 ↗ | 37 9 STREET BROOKLYN | Alteration | Signed-off | 08/07/2024 | 08/23/2024 | Design BUILDING STUDIO ARCHITECTS | Removal and installation of interior non-load bearing partitions and related finishes for tenant fit-out. There will be no change in use, eg… |
| B01072375 ↗ | 37 9 STREET BROOKLYN | Alteration | Signed-off | 08/06/2024 | 08/22/2024 | Filer BOHLER ENGINEERING | HVAC modifications and associated ductwork and related finishes for tenant fit-out. There will be no change in use, egress, or occupancy. |
| 122456859BIS | 78 HAVEN AVENUE MANHATTAN | — | ISSUED | 06/06/2017 | 08/02/2024 | — | — |
| M01057294 ↗ | 80 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 05/31/2024 | 07/26/2024 | Design BEYER BLINDER BELLE Filer JAM CONSULTANTS, INC. | DEMO SCOPE FOR UNDERCROFT SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS NOR OCCUPANCY. |
| M01074707 ↗ | 223 EAST 51 STREET MANHATTAN | Alteration | Signed-off | 07/08/2024 | 07/23/2024 | Interior renovations including the replacement of existing doors per plans filed herewith. No change in use, egress or occupancy. | |
| M00811077 ↗ | 125 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 02/02/2023 | 07/18/2024 | Filer METROPOLIS GROUP INC | HEREWITH FILING FOR INSTALLATION OF STRUCTURAL ROOF SLAB REINFORCEMENT PINNING PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS A… |
| M01056967 ↗ | 183 VARICK STREET MANHATTAN | Alteration | Signed-off | 06/17/2024 | 07/11/2024 | Design VIRALINE ARCHITECTURE LLP | Relocation of one sprinkler head. |
| X01040244 ↗ | MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 05/30/2024 | 06/06/2024 | Design PERKINS&WILL ARCHITECTS, PC | HERE WITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| B00882147 ↗ | 138 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 07/10/2023 | 04/29/2024 | Structural work as shown on plans to include installation of raised floor slab on existing floor framing. | |
| M08035680 ↗ | 125 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 03/21/2023 | 04/08/2024 | Design OLBN, INC. Filer METROPOLIS GROUP INC | HEREWITH FILING FOR ROOF ELEVATOR EXTENSION & ROOF LANDSCAPING PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| M08046447 ↗ | 125 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 02/23/2023 | 04/08/2024 | Design B SQUARED ENGINEERING,PC | HEREWITH FILING FOR ROOF STRUCTURAL MODIFICATIONS IN SUPPORT OF ELEVATOR EXTENSION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER TH… |
| M00957277 ↗ | 290 3 AVENUE MANHATTAN | Alteration | Permit Issued | 11/08/2023 | 03/01/2024 | HEREBY FILING GENERAL CONSTRUCTION SUBDIVISION OF DEMISED TENANT SPACE AS PER PLANS. | |
| M08027597 ↗ | 444 2 AVENUE MANHATTAN | Alteration CO | Permit Issued | 12/12/2022 | 02/01/2024 | Design FABIANO DESIGNS Owner PHIPPS HOUSES Filer JM ZONING, LLC. | Application file to change occupancy use of the first floor and minor outdoor renovation. |
| M00987635 ↗ | 418 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 01/24/2024 | 01/31/2024 | Design CONRADO GALLARDO | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR (MARINE LAYER) AS PER PLAN… |
| B00820092 ↗ | 342 SMITH STREET BROOKLYN | Alteration | Signed-off | 01/30/2023 | 01/25/2024 | Design PELLOVERTON LLC Filer JM ZONING, LLC. | Application filed for Architectural work on part of Basement. No change in use, occupancy, or egress. |
| B00901944 ↗ | 342 SMITH STREET BROOKLYN | Alteration | Signed-off | 07/12/2023 | 01/17/2024 | Design PELLOVERTON LLC Filer JM ZONING, LLC. | Architectural work on part of the basement, as per plans summitted herewith. No Change in use, occupancy or egress. |
| 123354342BIS | 3040 BROADWAY MANHATTAN | — | ISSUED | 07/20/2018 | 01/16/2024 | — | MH, OT, SP |
| B00882141 ↗ | 138 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 06/28/2023 | 11/16/2023 | Design WILLIAM GREEN ARCHITECTURE Owner ACADIA REALTY TRUST | General construction work as shown on plans to include new demising wall to separate retail spaces and removal of elevator. No change to use… |
| 123892608BIS | 284 BLEECKER STREET MANHATTAN | — | ISSUED | 04/05/2023 | 10/03/2023 | — | OT |
| M00906193 ↗ | 240 1 AVENUE MANHATTAN | Alteration | Signed-off | 08/28/2023 | 09/20/2023 | Design STUDIO A+T ARCHITECTS Owner BPP ST OWNER LLC | Mount Sinai - Urgent Care - Interior renovations including ,modifications to non load bearing partitions, doorways, ceiling work and related… |
| M00906203 ↗ | 240 1 AVENUE MANHATTAN | Alteration | Signed-off | 08/24/2023 | 09/20/2023 | Owner BPP ST OWNER LLC | Mount SInai - Urgent Care - Mechanical modifications as per plans filed herewith. No change in use, egress, or occupancy. |
| M00877054 ↗ | 111 8 AVENUE MANHATTAN | Alteration | Signed-off | 09/05/2023 | 09/19/2023 | Design POSEN ARCHITECTS Owner JLL | Modifications to existing spaces for handicap accessibility compliance. Work includes removal and replacement of handrails, toilet room acce… |
| M00905670 ↗ | 424 10 AVENUE MANHATTAN | Alteration | Permit Issued | 07/31/2023 | 09/14/2023 | Design STUDIO A+T ARCHITECTS | convert 2nd floor surgeons lounge to pharmacy carousel relocate lounge to 14th floor. Convert 2 offices within the existing pharmacy to new … |
| M00905712 ↗ | 424 10 AVENUE MANHATTAN | Alteration | Permit Issued | 07/27/2023 | 09/14/2023 | Design STEVEN PAUL HAMMER | Furnish and install new CAV-1, CAV-2, VAV-3 and VAV-4, supply air and return air ductwork, SDs, VAV and thermostats. Install new toilet exha… |
| M00905695 ↗ | 424 10 AVENUE MANHATTAN | Alteration | Permit Issued | 07/25/2023 | 09/13/2023 | Design SEVERUD ASSOCIATES | Existing steel beams and connections where indicated are to be reinforced for the loads imposed by the new pharmacy vault at the 2nd floor. … |
| M00864965 ↗ | 80 CLAREMONT AVENUE MANHATTAN | Alteration | Signed-off | 05/23/2023 | 08/30/2023 | Design BEYER BLINDER BELLE Filer JAM CONSULTANTS, INC. | MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATIONS. |
| M00863873 ↗ | 424 10 AVENUE MANHATTAN | Alteration | Signed-off | 05/11/2023 | 08/16/2023 | Design S. REJEILI ARCHITECT, PLLC | General construction renovations on the 4th floor of West Building. No change in use, egress, or occupancy. |
| M00864530 ↗ | 424 10 AVENUE MANHATTAN | Alteration | Signed-off | 05/30/2023 | 08/07/2023 | Design SYSKA HENNESSY GROUP | herewith filing for mechanical modification in Winston building. No change in use, egress, or occupancy. |
| M00863875 ↗ | 424 10 AVENUE MANHATTAN | Alteration | Signed-off | 05/30/2023 | 08/04/2023 | Design SYSKA HENNESSY GROUP | Herewith filing for mechanical modifications in the West building. No change in use, egress, or occupancy |
| M00661288 ↗ | 424 10 AVENUE MANHATTAN | Alteration | Signed-off | 01/28/2022 | 08/01/2023 | Design TPG ARCHITECTURE, LLP | INTERIOR RENOVATIONS INCLUDING MODIFICATION TO NON LOAD BEARING PARTITIONS,CEILING, DOORS AD REALTED CONSTURCTION AS PER PLANS FILED HEREWIT… |
| B00820026 ↗ | 342 SMITH STREET BROOKLYN | Alteration | Signed-off | 01/30/2023 | 07/20/2023 | Design PELLOVERTON LLC Filer JM ZONING, LLC. | Sprinkler application filed in conjunction with GC for work at partial area of the basement. No change in use, occupancy or egress. |
| B00850722 ↗ | 342 SMITH STREET BROOKLYN | Alteration | Signed-off | 05/01/2023 | 07/20/2023 | Design PELLOVERTON LLC Filer JM ZONING, LLC. | Sprinkler application filed in conjunction with GC. No change in use, occupancy or egress. |
| B00850731 ↗ | 342 SMITH STREET BROOKLYN | Alteration | Signed-off | 05/01/2023 | 07/18/2023 | Design PELLOVERTON LLC Filer JM ZONING, LLC. | Mechanical work filed for partial area of the basement as per plans. No change in use, occupancy or egress. |
| 321592601BIS | 990 METROPOLITAN AVENUE BROOKLYN | — | ISSUED | 04/19/2021 | 06/23/2023 | — | — |
| B00852377 ↗ | 138 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 04/10/2023 | 06/09/2023 | Owner ACADIA REALTY TRUST | Structural work as shown on plans to include infill of existing slab opening in 1st floor framing. No change to use, egress or occupancy (Ci… |
| B00852373 ↗ | 138 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 04/05/2023 | 05/16/2023 | Design WILLIAM GREEN ARCHITECTURE Owner ACADIA REALTY TRUST | General construction work as shown on plans to include new demising wall to separate retail spaces, and removal of elevator (City Point Good… |
| M00816328 ↗ | 611 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/14/2023 | 05/11/2023 | Design JACK GREEN ASSOCIATES Filer JAM CONSULTANTS, INC. | STRUCTURAL WORK ASSOCIATED WITH REMOVAL ON INTERIOR CONVENIENCE STAIR BETWEEN 20th AND 21ST FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE TO… |
| 123081529BIS | 2880 BROADWAY MANHATTAN | — | ISSUED | 10/25/2017 | 05/10/2023 | — | MH, OT, PL |
| X08052686 ↗ | MORRIS PARK AVENUE BRONX | Alteration | Signed-off | 03/22/2023 | 03/31/2023 | Design BAM ARCHITECTURE STUDIO, DPC Filer BURNHAM NATIONWIDE INC | INTERIOR COSMETIC WORK AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00836558 ↗ | 275 7 AVENUE MANHATTAN | Alteration | Signed-off | 03/23/2023 | 03/28/2023 | Design S. REJEILI ARCHITECT, PLLC Owner CBRE INC | Mount Sinai - Interior renovations related to the modifications to the HIV Program Clinic as per plans filed herewith. No change in use, egr… |
| 121205347BIS | 144 WEST 14 STREET MANHATTAN | — | ISSUED | 12/04/2019 | 03/21/2023 | — | PL |
| M08032600 ↗ | 6 EAST 87 STREET MANHATTAN | Alteration | Signed-off | 11/14/2022 | 03/17/2023 | Design VIRALINE ARCHITECTURE LLP | The proposed project is an interior Renovation of an existing space. No change in use egress or occupancy. |
| M00814407 ↗ | 81 GREENE STREET MANHATTAN | Alteration | Signed-off | 02/10/2023 | 03/06/2023 | Design FREDERICK J GOGLIA | Existing retail space - fitting room renovation: built interior partitions, patch and repair of existing GYP BD ceiling throughout sow area,… |
| M00700516 ↗ | 42 GREENE STREET MANHATTAN | Alteration | Signed-off | 04/27/2022 | 02/27/2023 | Design WILLIAM F. RYAN, JR. P.E. PC Owner ZAR PROPERTY NY | REBALANCE EXISTING AND PROVIDE NEW DUCTS AND GRILLES TO SERVE COOLING TO PROPOSED ARCHITECTURAL DESIGN. EXISTING AC-SYSTEM TO REMAIN. |
| M00445370 ↗ | 1440 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/17/2022 | 02/24/2023 | Mount Sinai-. Pharmacy Storage - Interior renovations including modifications to non load bearing partitions, ceilings, flooring, door frame… | |
| M00691576 ↗ | 1440 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/05/2022 | 02/24/2023 | Modifications to existing 4TH floor Pediatric Unit HVAC duct work to match new reflected ceiling plan filed under separate application. | |
| M00782733 ↗ | 301 EAST 40 STREET MANHATTAN | Alteration | Signed-off | 08/16/2022 | 02/24/2023 | Owner AKAM ASSOCIATES, INC. | NEW INT. & EXT. ADA RAMPS. RECONFIG EXT. PLANTERS. REPLACE ENTRY VESTIBULE & GLASS CURTAINWALL. RENOVATE LOBBY AND ELEVATOR CORRIDORS. REL… |
| M00783114 ↗ | 10 UNION SQUARE EAST MANHATTAN | Alteration | Signed-off | 08/03/2022 | 02/24/2023 | Design POSEN ARCHITECTS | renovations for ADA compliance on 3rd fl Units K,L/M&P for new push button actuators at existing doors level class2(unit K, L/M) enlarged ba… |
| M00783164 ↗ | 301 EAST 40 STREET MANHATTAN | Alteration | Signed-off | 08/16/2022 | 02/24/2023 | NEW INTERIOR AND EXTERIOR CONCRETE ADA RAMPS, NEW PRE-CAST CONCRETE PLANTERS ON POURED IN PLACE CONCRETE BENCHES, ASSOCIATED ANCHORS AND ATT… | |
| M00785734 ↗ | 10 UNION SQUARE EAST MANHATTAN | Alteration | Signed-off | 08/11/2022 | 02/24/2023 | Herewith filing for mechanical modifications to remove existing ductwork, volume dampers and diffusers, and provide with new as shown on pla… | |
| M08004244 ↗ | 1283 2 AVENUE MANHATTAN | Alteration | Signed-off | 10/18/2022 | 02/24/2023 | Design ANTONIO LEO ARCHITECT | FILING FOR INTERIOR DEMO OF CELLAR AND FIRST FLOOR AS PER PLANS SUBMITTED AS PER PLAN SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUP… |
| M08009317 ↗ | 25 WEST 81 STREET MANHATTAN | Alteration | Signed-off | 10/27/2022 | 02/24/2023 | Design ANTONIO LEO ARCHITECT | FILING FOR INTERIOR RENOVATION OF APT 11A AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M08032736 ↗ | 6 EAST 87 STREET MANHATTAN | Alteration | Signed-off | 11/15/2022 | 02/24/2023 | Modification TO EXISTING duckwork | |
| M00782932 ↗ | 301 EAST 40 STREET MANHATTAN | Alteration | Signed-off | 08/23/2022 | 02/23/2023 | Design ROSINI ENGINEERING, PC Owner AKAM ASSOCIATES, INC. | REMOVAL OF 2 EXISTING CHILLED WATER UNITS AND REPLACE WITH 1 NEW CHILLED WATER UNIT AND 2 MINI-SPLIT FAN UNITS CONNECTED TO 1 CONDENSER, ASS… |
| M00621639 ↗ | 2302 2 AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2021 | 02/06/2023 | Design SPA INTERNATIONAL P.C. | PROPOSE TO REPAIR EXISTING STRUCTURAL BEAMS AND INSTALL NEW FOOTINGS AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPA… |
| M00814087 ↗ | 39 PARK ROW MANHATTAN | Alteration | Signed-off | 01/20/2023 | 01/23/2023 | Design SOLE PROPRIETOR Owner PACE UNIVERSITY Filer WALTER T. GORMAN, PE, PC | Proposed restoration of existing sub-cellar vault area as per plan. No change of occupancy, use or egress. |
| M00802359 ↗ | 39 PARK ROW MANHATTAN | Alteration | Signed-off | 01/10/2023 | 01/12/2023 | Owner PACE UNIVERSITY Filer WALTER T. GORMAN, PE, PC | proposed temporary stabilization of existing sub-cellar vault area as per plan. No change of occupancy, egress or use. |
| M00738349 ↗ | 768 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/06/2022 | 01/06/2023 | Design BRIAN ILL DEVELOPMENT LLC Owner THE PLAZA Filer SEAY-YARBROUGH INC | installing non structural partitions, completing fire rating at walls and ceilings as required including insulation where necessary. install… |
| M00690897 ↗ | 1440 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/04/2022 | 12/10/2022 | Design STUDIO A+T ARCHITECTS | Remove and replace in kind existing restroom and floor finishing's Install new reflected ceilings and lighting in the pediatric unit wing. |
| 110422579BIS | 69 ST CLAIR PLACE MANHATTAN | — | ISSUED | 02/19/2010 | 11/16/2022 | — | — |
| M00784945 ↗ | 290 3 AVENUE MANHATTAN | Alteration | Signed-off | 08/25/2022 | 09/14/2022 | Design LANDOW AND LANDOW ARCHITECTS Owner GREYSTAR | Propose interior demo work at existing retail space on ground level. Removal of non load bearing partitions and related finishes all as per … |
| M00775687 ↗ | 307 WEST 38TH STREET MANHATTAN | Alteration | Signed-off | 08/15/2022 | 08/30/2022 | Design ARCHETYPE ARCHITECTURE | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or oc… |
| M00599286 ↗ | 2302 2 AVENUE MANHATTAN | Alteration | Signed-off | 11/10/2021 | 06/29/2022 | Design AN CONSULTING ENGINEER, PLLC | PROPOSE TO PERFORM STRUCTURAL REPAIRS TO BEEMS AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY |
| M00567826 ↗ | 26 PRINCE STREET MANHATTAN | Alteration | Signed-off | 08/27/2021 | 06/24/2022 | Design MOROZOV Owner VERACITY DEVELOPMENT | SP SYSTEMS IN EXISTING RETAIL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| 421462802BIS | 62-60 108 STREET QUEENS | — | ISSUED | 03/27/2019 | 05/31/2022 | — | PL |