← Back
BuildNYC
Shopping center, with or without parking
Cross Bay Commons
156-36 CROSS BAY BOULEVARD · BIN 4438969
💬 Discuss this project
1959Year Built
2Stories
K6Building Class
R3-2Zoning
51,859 sfGross Floor Area
34Units
LL97 Covered2 Active Violations ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: UE Cross Bay · 75,089 sf lot · 0.69 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofClub Pilates, Orangetheory Fitness +1Under Construction42p · 8 filings · 20 docs
Floor 2Club PilatesUnder Construction23p · 3 filings · 20 docs
Floor 1Club Pilates, Orangetheory Fitness +1Under Construction12p · 10 filings · 20 docs
Site & exteriorClub Pilates, Orangetheory Fitness +418p · 11 filings · 20 docs
Filed — no permit issuedQrangetheory N E S6p · 1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Urban Edge Properties7409/13/2026
A.J. Panzarella Realty2203/21/2026
CoreHaus Fitness809/13/2026
UE Cross Bay803/21/2026
United Health Group507/08/2026
J.A.S. Realty303/21/2026
HB Sun Spa Ltd Dba NY Sun Club103/22/2026
Brady & Marshak103/22/2026
Restoration103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/23/2015$27.0M—— → —$521/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dewberry Engineers407/28/2026
NS Engineers104/17/2026
AG Engineering104/05/2026
JBA106/23/2025
Salvator A. Caradonna JR204/21/2025
Engineered Design Group403/24/2025
Rama Tech303/12/2025
Design42 Architecture210/29/2024
Mei Architect605/14/2024
Maqe Architecture403/18/2024
Allen Shinfeld, P.E102/24/2024
Jose L. Pena, P.E108/13/2023
Mohammad Ahead, PE104/04/2023
HNY Consulting Engineers401/19/2023
Leon Skvirsky PE510/06/2022
HC Engineering109/16/2022
Ware Malcomb108/25/2022
Alpha Home Design104/07/2022
Frederick Taylor Associates - Architects101/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bohler Engineering103/21/2026
Jenny Flores Expediting603/21/2026
MCSS Rest603/21/2026
Louis Striar403/21/2026
Leder-Luis Architectural Design303/21/2026
Outsource Consultants1003/21/2026
Indesign Studio203/21/2026
Building Brothers1003/21/2026
All in Permit Consultants203/21/2026
JP Expedite203/21/2026
Milrose Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WA Painting & Cont SRVSspecialty_contractor1203/21/2026
HRBDX InteriorsGeneral Contractor407/08/2026
Indesign CreativeGeneral Contractor307/08/2026
Neptune Signs & AwningsSign hanger307/08/2026
JYNY ConstructionGeneral Contractor307/08/2026
Mayne Construction of LOGeneral Contractor303/21/2026
Trueblue ConstructionGeneral Contractor303/21/2026
Dynamic ElectricalElectrical203/21/2026
N-Store ServicesGeneral Contractor207/08/2026
City SignsSign hanger207/08/2026
Hawkins WebbGeneral Contractor207/08/2026
Capitol Design & MaintenanceSign hanger207/08/2026
Willdan Electrical of NYElectrical203/22/2026
Accurate Mechanical IndstrsPlumbing107/08/2026
Odyssey Plumbing & HeatingPlumbing107/08/2026
Ultimate Plumbing and HeatingPlumbing107/08/2026
VMC Plumbing & HeatingPlumbing107/08/2026
GT Electrical CompanyElectrical103/21/2026
XH&RC Plumbing and HeatingPlumbing107/08/2026
Aziz AbdulElectrical103/21/2026
KJK ElectricElectrical103/22/2026
Medco Electrical ContractingElectrical103/21/2026
Polyphase Electrical ContractorsElectrical103/21/2026
Proff ElectricalElectrical103/22/2026
J.V.S. Sprint EnterprisesGeneral Contractor107/08/2026
Active SignsSign hanger107/08/2026
American Sign & Electrical ConSign hanger107/08/2026
Signs CadSign hanger107/08/2026
Signstar NYCSign hanger107/08/2026
Z-Car-DSign hanger105/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK Engineering678204/17/2026
World Design Architecture9323106/23/2025
New Age Engineering7746603/24/2025
Carusone & Cherres Architects6166303/12/2025
Leder-Luis Architectural1553305/14/2024
Citiscape Consulting762303/18/2024
Mei Architect8095109/14/2023
Outsource Special Inspection2827301/19/2023
Building Lifecycle
All (232)Filed (45)Permit Issued (34)Signed Off (24)Violation (16)Inspection (23)Objection (60)Special Inspection (30)
07/28/2026
Filed — Alteration
INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01383754-P2
07/06/2026
Filed — Alteration
INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01383754-P1
06/26/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/27/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/26/2026
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CLUB PILATES. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01357811-I1
05/26/2026
Violation issued (ECB, open)
Unknown
04/22/2026
Permit issued — Plumbing
Q01383754-S2-PL
04/21/2026
Permit issued — Mechanical Systems
Q01383754-S1-MS
04/21/2026
Permit issued — General Construction
Q01383754-I1-GC
04/17/2026
Filed — Alteration
INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01383754-S1
04/17/2026
Filed — Alteration
INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01383754-S2
04/17/2026
Filed — Alteration
INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Q01383754-I1
04/13/2026
Permit issued — Sign
Q01357811-I1-SG
04/08/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
04/08/2026
Special inspection requirement — Shutoff dampers
Ari Kamo
04/08/2026
Special inspection requirement — Maintenance information
Ari Kamo
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
04/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
04/08/2026
Special inspection requirement — Final
Ari Kamo
04/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
04/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
04/07/2026
Special inspection requirement — Final
Ari Kamo
04/05/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CLUB PILATES. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q01357811-I1
04/02/2026
Special inspection requirement — Final
ARIEL GOLSHAN
08/04/2025
Permit issued — General Construction
Q01243452-I1-GC
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/09/2025
Violation issued (FDNY_ORDER, closed)
07/09/2025
Violation issued (FDNY_ORDER, closed)
07/09/2025
Violation issued (FDNY_ORDER, closed)
06/30/2025
Objection raised — Inspections
06/30/2025
Objection raised — Scope
06/30/2025
Objection raised — Mechanical
06/30/2025
Objection raised — Structural
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Fire_Protection
06/23/2025
Filed — Alteration
Proposed interior renovation/office fit out for Units 36I and Units 36G. No change in use egress or occupancy
Q01243452-I1
06/03/2025
Signed off — Alteration
REPLACEMENT OF RTU (1) CONDENSER, AND NEW INSTALLATION OF (4) CONDENSERS MOUNTED ON ROOFTOP MOUNTING RAIL. / MINOR INTERIOR PARTITION & (1) DOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01191898-I1
05/09/2025
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR ORANGETHEORY FITNESS.
Q01137078-I1
04/28/2025
Signed off — Alteration CO
ALTERATION CO FOR INTERIOR WORK TO NON-BEARING PARITIONS ON FIRST FLOOR WITH CHANGE OF USE * OCCUPANCY TO A HEALTH & FITNESS ESTABLISMENT (NO CHANGE IN BULK OR EGRESS). MS, PL APPLICATIONS FILED AS SUBSEQUENT APPLICATIONS.
Q00999618-S1
04/21/2025
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR ORANGETHEORY FITNESS.
Q01137078-P1
04/21/2025
Special inspection requirement — Final
SALVATOR CARADONNA
04/16/2025
Signed off — Alteration CO
ALTERATION CO FOR INTERIOR WORK TO NON-BEARING PARITIONS ON FIRST FLOOR WITH CHANGE OF USE * OCCUPANCY TO A HEALTH & FITNESS ESTABLISMENT (NO CHANGE IN BULK OR EGRESS). MS, PL APPLICATIONS FILED AS SUBSEQUENT APPLICATIONS.
Q00999618-S2
03/28/2025
Special inspection requirement — Mechanical Systems
Stephen Shishko
03/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
03/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
03/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Stephen Shishko
03/28/2025
Special inspection requirement — Shutoff dampers
Stephen Shishko
03/28/2025
Special inspection requirement — Final
Stephen Shishko
03/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
03/28/2025
Special inspection requirement — Maintenance information
Stephen Shishko
03/27/2025
Special inspection requirement — Final
SALVATOR CARADONNA
Latest 60 of 232 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAccurate Mechanical Indstrs04/22/2026
DOB NOWMechanical SystemsPermit IssuedHawkins Webb04/21/2026
DOB NOWGeneral ConstructionPermit IssuedHawkins Webb04/21/2026
DOB NOWSignSigned-offZ-Car-D04/13/2026
DOB NOWGeneral ConstructionPermit IssuedJ.V.S. Sprint Enterprises08/04/2025
DOB NOWGeneral ConstructionSigned-offWA Painting & Cont SRVS03/17/2025
DOB NOWGeneral ConstructionSigned-offWA Painting & Cont SRVS03/13/2025
DOB NOWMechanical SystemsSigned-offIndesign Creative02/13/2025
DOB NOWGeneral ConstructionPermit IssuedIndesign Creative02/13/2025
DOB NOWSignSigned-offDesthers, Joseph01/08/2025
DOB NOWSignSigned-offCapitol Design & Maintenance09/23/2024
DOB NOWMechanical SystemsSigned-offWA Painting & Cont SRVS08/06/2024
DOB NOWPlumbingSigned-offM. Spinelli PLB & Heating06/26/2024
DOB NOWGeneral ConstructionPermit IssuedHRBDX Interiors06/04/2024
DOB NOWMechanical SystemsSigned-offHRBDX Interiors05/06/2024
DOB NOWMechanical SystemsSigned-offJYNY Construction04/11/2024
DOB NOWSignSigned-offNeptune Signs & Awnings04/04/2024
DOB NOWPlumbingSigned-offXH&RC Plumbing and Heating04/01/2024
DOB NOWPlumbingSigned-offOdyssey Plumbing & Heating11/15/2023
DOB NOWGeneral ConstructionSigned-offJYNY Construction11/13/2023
DOB NOWGeneral ConstructionSigned-offTrueblue Construction11/09/2023
DOB NOWSignSigned-offCapitol Design & Maintenance04/05/2023
DOB NOWMechanical SystemsSigned-offWA Painting & Cont SRVS10/14/2022
DOB NOWSignSigned-offAmerican Sign & Electrical Con10/12/2022
DOB NOWPlumbingSigned-offUltimate Plumbing and Heating09/21/2022
DOB NOWMechanical SystemsSigned-offN-Store Services09/20/2022
DOB NOWSignPermit IssuedSigns Cad09/16/2022
DOB NOWStructuralSigned-offN-Store Services08/31/2022
DOB NOWSignSigned-offDesthers, Joseph04/12/2022
DOB NOWMechanical SystemsSigned-offMayne Construction of LO08/11/2020
DOB NOWSignSigned-offActive Signs07/20/2020
DOB NOWSignPermit IssuedSignstar NYC02/11/2019
DOB NOWSignSigned-offElmer Dawson06/05/2018
DOB NOWSignSigned-offElmer Dawson06/05/2018
BISOTISSUEDMayne Construction of LO01/22/2020
BISOTISSUEDDegiaimo Group Building11/25/2019
BISMHISSUEDDegiaimo Group Building11/25/2019
BISOTISSUEDArma Contracting08/09/2019
BISOTISSUEDDegiaimo Group Building07/31/2019
BISPLISSUEDJoseph O'Grady P & H04/10/2019
+ 44 more permits on file
2 projects · most recent 07/28/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/28/2026Permit IssuedHawkins WebbHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PEAD-AA2NL 25,000 BTU ×1
PUZ-AK24NLHZ 25,000 BTU · Condensing Unit ×1
York KE048H07B2AAAAA1A1 75,000 BTU · Rooftop Unit ×1
03/24/2025Permit IssuedIndesign CreativeAir Conditioning Systems, Ventilation Systems
Cooling
Carrier 48GCRP14M2A5 5,000 CFM · Rooftop Unit ×1
RGECZT072ACU12 2,400 CFM · Rooftop Unit ×1
Ventilation
Pennbarry DX-16-VSR 525 CFM · Exhaust Fan ×1
1 project · most recent 07/28/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/28/2026Signed-offAccurate Mechanical IndstrsGas, Water/Sanitary
23 projects · most recent 08/13/2026
General Wiring Lighting HVAC Wiring
FiledStatusContractorScope
08/13/2026CompleteNyco ElectricGeneral Wiring
03/03/2025CompleteLina ElectricGeneral Wiring
01/13/2025Permit IssuedProff Electrical—
04/12/2024CompleteL&B Electrical InternationalGeneral Wiring
04/12/2024CompleteAlessandra Electric NYCGeneral Wiring, Lighting
04/08/2024CompleteKJK ElectricGeneral Wiring
03/20/2024CompleteGoodall ElectricGeneral Wiring
02/20/2024CompleteJong Hyun Kim—
05/17/2023CompletePM Electrical MaintenanceGeneral Wiring
10/27/2022CompleteSigns Cad—
10/07/2022Permit IssuedRainbow Electric Co—
09/09/2022CompleteM.C. Electrical NYGeneral Wiring
04/18/2022CompleteAsko Electric Construction & Maintenance—
01/19/2021CompleteFusion Electric—
07/19/2020Permit IssuedRainbow Electric Co—
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
06/26/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/27/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/25/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2024Fail-Final CND-Occupancy InspectionFailView ↗
07/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2024Pass-Final Sign Permit InspectionPassView ↗
04/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
04/08/2026HVAC-R and service water heating equipmentAri Kamoenergy_progress
04/08/2026HVAC-R and service water piping design and insulationAri Kamoenergy_progress
04/08/2026HVAC-R and service water heating system controlsAri Kamoenergy_progress
04/08/2026Maintenance informationAri Kamoenergy_progress
04/08/2026Shutoff dampersAri Kamoenergy_progress
04/08/2026Mechanical SystemsAri Kamospecial
04/08/2026FinalAri Kamoprogress
04/08/2026Duct leakage testing, insulation and designAri Kamoenergy_progress
04/07/2026FinalAri Kamoprogress
04/02/2026FinalARIEL GOLSHANprogress
04/21/2025FinalSALVATOR CARADONNAprogress
03/28/2025FinalStephen Shishkoprogress
03/28/2025Maintenance informationStephen Shishkoenergy_progress
03/28/2025Shutoff dampersStephen Shishkoenergy_progress
03/28/2025Energy Code Compliance InspectionsStephen Shishkoprogress
03/28/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
03/28/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
03/28/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
03/28/2025Mechanical SystemsStephen Shishkospecial
03/27/2025FinalSALVATOR CARADONNAprogress
03/07/2025FinalRAJESH SHAHprogress
03/07/2025Mechanical SystemsJORGE CHERRESspecial
11/14/2024Interior lighting powerStephen Shishkoenergy_progress
11/14/2024Lighting controlsStephen Shishkoenergy_progress
11/14/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
Latest 25 of 76.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Club PilatesFitness / RecreationFloors 1, 2, Roof
Project Q01383754 Alteration · Permit Entire · 04/17/2026
Project Q01357811 Alteration · LOC Issued · 04/05/2026
Orangetheory FitnessFitness / RecreationFloor 1, Roof
Project Q01137078 Alteration · LOC Issued · 01/07/2025
Project Q00999618 Alteration CO · Permit Entire · 02/26/2024
Qrangetheory N E SFitness / Recreation—
Project Q01091274 Alteration · Objections · 09/04/2024
OptumMedical / Healthcare—
Project Q00845734 Alteration · LOC Issued · 04/04/2023
Northwell HealthMedical / Healthcare—
Project Q00791461 Alteration · LOC Issued · 10/06/2022
SpectrumRetailFloor 1, Roof
Project Q00743918 Alteration · LOC Issued · 09/19/2022
Project Q00743935 Alteration · LOC Issued · 09/19/2022
Project Q07997656 Alteration · LOC Issued · 09/16/2022
Project Q00781115 Alteration · LOC Issued · 08/25/2022
NY Sun ClubArts / Culture / EntertainmentFloor 1
Project Q00044449 Alteration · LOC Issued · 05/29/2018
Project Q00044783 Alteration · LOC Issued · 05/29/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 638 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch42
08/29/2026Q00044783-I1Request digital key ↗
08/29/2026Q00044449-I1Request digital key ↗
08/26/2026Q00701623-I1Request digital key ↗
Showing 3 of 42 on file for this type
▸DOB NOWPlans/Sketch - Sign2
08/28/2026Q00111861-I1Request digital key ↗
08/28/2026Q00352980-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00225594-I1Request digital key ↗
▸Applications & Permits112
▸BISPLAN / WORK APPROVAL APPLICATION59
07/11/2025420482347Open ↗
07/01/2025420613802Open ↗
04/22/2025420580641Open ↗
Showing 3 of 59 on file for this type
▸BISWORK PERMIT APPLICATION48
01/30/2020421802909Open ↗
12/04/2019421740931Open ↗
12/04/2019421740931Open ↗
Showing 3 of 48 on file for this type
▸BISIntent to Revoke Approval/Permit3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISRESCISSION OF INTENT TO REVOKE APPROVAL/PERMIT2
02/24/2016420613802Open ↗
01/28/2016420613802Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
08/01/2019420613802Open ↗
▸Seals & Professional Certifications197
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION60
03/13/2020421740931Open ↗
01/21/2020421802909Open ↗
01/14/2020440432658Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWProgress Inspector Seal & Signature48
10/04/2026Q01383754-S1Open ↗
10/04/2026Q01383754-S1Open ↗
09/23/2026Q00999618-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature44
08/28/2026Q00111861-I1Open ↗
08/28/2026Q00352980-I1Open ↗
08/25/2026Q00781115-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
10/04/2026Q01383754-S1Open ↗
09/23/2026Q00999618-I1Open ↗
09/01/2026Q00888822-P1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
01/21/2020421802909Open ↗
04/05/2019421740888Open ↗
11/25/2015420580641Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
01/21/2020421802909Open ↗
04/05/2019421740888Open ↗
09/07/2017440432676Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/07/2017440432676Open ↗
09/07/2017440432658Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/07/2017440432676Open ↗
09/07/2017440432658Open ↗
▸Trade Schedules & Equipment40
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
07/31/2019420613802Open ↗
07/25/2019421740931Open ↗
04/05/2019421740888Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
09/18/2015421212814Open ↗
Showing 1 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
09/22/2020421556060Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00999618-I1Open ↗
08/13/2026Q00999618-P2Open ↗
▸BISTenant Protection Plan and Notes1
08/19/2019420613802Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00999618-I1Open ↗
▸Environmental & Asbestos51
▸DOB NOWDEP ACP-5: Asbestos Assessment Report36
08/28/2026Q00111861-I1Open ↗
08/25/2026Q00781115-I1Open ↗
08/25/2026Q00743935-I1Open ↗
Showing 3 of 36 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
01/23/2020421802909Open ↗
09/07/2017440432676Open ↗
07/07/2017421455240Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
03/13/2020421740931Open ↗
01/23/2020421802909Open ↗
01/23/2020421802909Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
03/13/2020421740931Open ↗
06/06/2019421740888Open ↗
12/01/2018421455240Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISINTERIOR LIGHTING POWER1
08/14/2020421802909Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/28/2024420580641Open ↗
▸BISLIGHTING CONTROLS1
08/14/2020421802909Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERIOR LIGHTING POWER1
08/14/2020421802909Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/14/2020421802909Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/07/2017440432658Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00781115-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/07/2017440432676Open ↗
09/07/2017440432658Open ↗
▸Approvals, Objections & Sign-offs45
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
09/13/2024420482347Open ↗
10/14/2020421556060Open ↗
10/08/2020421556060Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
02/07/2024421082063Open ↗
06/20/2019420613802Open ↗
12/01/2016421170798Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL1
08/14/2020421802909Open ↗
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
09/12/2024420482347Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT37
10/08/2020421556060Open ↗
03/13/2020421740931Open ↗
03/13/2020421740931Open ↗
Showing 3 of 37 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
07/23/2024420580641Open ↗
07/23/2024421015582Open ↗
07/23/2024420489723Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms45
▸BISEFILING COVER SHEET24
01/21/2020421802909Open ↗
07/25/2019421740931Open ↗
07/25/2019421740931Open ↗
Showing 3 of 24 on file for this type
▸BISADDITIONAL INFORMATION14
12/11/2019421740931Open ↗
12/11/2019421740931Open ↗
09/19/2019421740931Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM5
12/06/2019440432676Open ↗
12/06/2019440432658Open ↗
03/07/2019421455240Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/07/2017440432676Open ↗
09/07/2017440432658Open ↗
▸Other Documents7
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation3
08/13/2026Q00044783-I1Open ↗
08/13/2026Q00111861-I1Open ↗
08/13/2026Q00044449-I1Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
12/01/2016421170798Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProperty Ownership Certification2
08/21/2026Q00999618-I1Open ↗
08/21/2026Q00999618-P2Open ↗