← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Saga House Condominium
157 EAST 74TH STREET · BIN 1082906
💬 Discuss this project
1986Year Built
11Stories
RMBuilding Class
R8BZoning
41,607 sfGross Floor Area
27Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 7,050 sf lot · 5.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 9Unit 9B1 filing · 3 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Unit 4BUnder Construction13p · 3 filings · 12 docs
Floor 3Unit 3A, Unit 3B, Unit 3C13p · 4 filings · 20 docs
Floor 2
Floor 1
Site & exteriorSidewalk shed installation18p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Saga House Condominium2503/21/2026
157 E 74 Inc703/21/2026
Stephen J. Nicholes M.D403/21/2026
Third Commonwealth303/21/2026
Skanconstruction203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jock Deboer, AIA109/18/2026
CES Engineering612/19/2025
Arpad Baksa Architect312/17/2025
Fiskaa Engineering409/29/2023
Stefano Morisi R.A102/23/2022
Ashraf203/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arpad Baksa Architect1203/21/2026
Rigid Structural Design203/21/2026
Just Architecture503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SajoGeneral Contractor1307/08/2026
Intersystem InstallationScaffold807/08/2026
Prat EnterprisesScaffold607/08/2026
Pratt Construction & RestorationScaffold407/08/2026
A & M Warshaw Plumbing & HeatingPlumbing407/08/2026
Breffni Mechanicalspecialty_contractor407/08/2026
Hydrokinetic Plumbing & Heating IPlumbing207/08/2026
Ajf ElectricElectrical203/21/2026
Inter Connection ElectricElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service843912/19/2025
Dyo Design Office6701509/29/2023
Building Lifecycle
All (167)Filed (17)Permit Issued (29)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (8)Objection (2)Special Inspection (30)
09/24/2026
Signed off — Alteration
Install HVAC units at 3rd floor apts. #3B & #3C indicated on drawings filed herewith No change in Use Egress or Occupancy under this application
M00676823-I1
09/18/2026
Filed — Alteration
Application filed to renovate apartment 9B to include modifications to non bearing partitions with new finishes, install 2- 1 ton HVAC units as per the plans filed herewith- no change to use, egress or occupancy
M01423056-I1
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/13/2026
Special inspection requirement — Lighting in dwelling units
07/13/2026
Special inspection requirement — Lighting controls
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/13/2026
Special inspection requirement — Insulation placement and R values
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
07/13/2026
Special inspection requirement — Post-installed Anchors
07/13/2026
Special inspection requirement — Heating Systems
06/26/2026
Special inspection requirement — Final
06/26/2026
Special inspection requirement — Mechanical Systems
06/12/2026
Permit issued — General Construction
M01225014-I1-GC
05/07/2026
Permit issued — Mechanical Systems
M01227457-I1-MS
05/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/30/2026
Signed off — Alteration
INTERIOR PLUMBING WORK IN EXISTING APT 3A. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01099552-I1
02/23/2026
Permit issued — General Construction
M01225014-I1-GC
02/19/2026
Signed off — Alteration
INTERIOR MECHANICAL WORK IN EXISTING APT 3A INCLUDING REPLACEMENT OF EXISTING WATER SOURCE HEAT PUMP AHUs AND MODIFICATIONS TO TOILET EXHAUST DUCTWORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01099559-I1
02/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/17/2026
Permit issued — Plumbing
M01227454-I1-PL
02/12/2026
Permit issued — Mechanical Systems
M01227457-I1-MS
02/11/2026
Signed off — Alteration
RENOVATION OF EXISTING APT 3A. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01098832-I1
12/19/2025
Filed — Alteration
INTERIOR PLUMBING WORK IN EXISTING APT 4B. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01227454-I1
12/19/2025
Filed — Alteration
M01227457-I1
12/17/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APT 4B. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01225014-I1
11/26/2025
Permit issued — General Construction
M01098832-I1-GC
09/24/2025
Permit issued — Mechanical Systems
M01099559-I1-MS
05/15/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
05/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
05/15/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
05/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
05/15/2025
Special inspection requirement — Final
JOHN MCMONAGLE
05/15/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
05/15/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
05/14/2025
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
05/14/2025
Special inspection requirement — Final
Arpad Baksa
05/14/2025
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
05/14/2025
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
05/14/2025
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
05/13/2025
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
05/13/2025
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
05/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
05/13/2025
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
05/02/2025
Filed — Alteration
INTERIOR MECHANICAL WORK IN EXISTING APT 3A INCLUDING REPLACEMENT OF EXISTING WATER SOURCE HEAT PUMP AHUs AND MODIFICATIONS TO TOILET EXHAUST DUCTWORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01099559-P1
05/02/2025
Filed — Alteration
RENOVATION OF EXISTING APT 3A. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01098832-P1
05/02/2025
Filed — Alteration
INTERIOR PLUMBING WORK IN EXISTING APT 3A. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01099552-P1
04/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/21/2025
Permit issued — Plumbing
M01099552-I1-PL
03/17/2025
Permit issued — Plumbing
M00676823-S1-PL
12/30/2024
Permit issued — General Construction
M01098832-I1-GC
10/23/2024
Filed — Alteration
INTERIOR MECHANICAL WORK IN EXISTING APT 3A INCLUDING REPLACEMENT OF EXISTING WATER SOURCE HEAT PUMP AHUs AND MODIFICATIONS TO TOILET EXHAUST DUCTWORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01099559-I1
10/22/2024
Cycle 9 facade report signed — SAFE
10/16/2024
Cycle 9 facade report submitted
10/11/2024
Cycle 9 facade inspection completed
10/08/2024
Filed — Alteration
INTERIOR PLUMBING WORK IN EXISTING APT 3A. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01099552-I1
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSajo06/12/2026
DOB NOWMechanical SystemsPermit IssuedBreffni Mechanical05/07/2026
DOB NOWGeneral ConstructionPermit IssuedSajo02/23/2026
DOB NOWPlumbingPermit IssuedHydrokinetic Plumbing & Heating I02/17/2026
DOB NOWMechanical SystemsPermit IssuedBreffni Mechanical02/12/2026
DOB NOWGeneral ConstructionSigned-offSajo11/26/2025
DOB NOWMechanical SystemsSigned-offBreffni Mechanical09/24/2025
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I04/21/2025
DOB NOWPlumbingPermit IssuedA & M Warshaw Plumbing & Heating03/17/2025
DOB NOWGeneral ConstructionSigned-offSajo12/30/2024
DOB NOWPlumbingPermit IssuedA & M Warshaw Plumbing & Heating04/05/2024
DOB NOWMechanical SystemsPermit IssuedSajo03/28/2024
DOB NOWGeneral ConstructionSigned-offSajo03/28/2024
DOB NOWPlumbingPermit IssuedA & M Warshaw Plumbing & Heating05/04/2023
DOB NOWMechanical SystemsPermit IssuedSajo03/20/2023
DOB NOWGeneral ConstructionSigned-offSajo03/17/2023
DOB NOWSidewalk ShedSigned-offPrat Enterprises10/14/2022
DOB NOWSupported ScaffoldSigned-offIntersystem Installation09/27/2022
DOB NOWSupported ScaffoldSigned-offIntersystem Installation07/06/2022
DOB NOWPlumbingPermit IssuedA & M Warshaw Plumbing & Heating06/03/2022
DOB NOWMechanical SystemsPermit IssuedSajo06/03/2022
DOB NOWGeneral ConstructionSigned-offSajo05/23/2022
DOB NOWSidewalk ShedSigned-offPrat Enterprises10/19/2021
DOB NOWSidewalk ShedSigned-offPrat Enterprises08/13/2021
DOB NOWSupported ScaffoldSigned-offIntersystem Installation08/02/2021
DOB NOWSidewalk ShedSigned-offPratt Construction & Res*06/03/2021
DOB NOWSidewalk ShedSigned-offPrat Enterprises05/25/2021
DOB NOWSupported ScaffoldSigned-offIntersystem Installation03/26/2021
DOB NOWSidewalk ShedSigned-offPratt Construction & Res*03/16/2021
BISOTISSUEDPrat Enterprises10/12/2022
BISOTISSUEDSicula Renovations11/10/2021
BISOTISSUEDPrat Enterprises10/18/2021
BISOTISSUEDPrat Enterprises08/20/2021
BISOTISSUEDPratt Construction & Restoration04/12/2021
BISPLISSUEDAljer Plumbing & Heating10/11/2018
BISOTISSUEDCentral Consulting & Cont07/05/2018
BISMHISSUEDChilmark Builders02/07/2018
BISOTISSUEDChilmark Builders02/07/2018
BISPLISSUEDVSP Mechanical10/20/2017
BISOTISSUEDChilmark Builders09/28/2017
+ 39 more permits on file
2 projects · most recent 09/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2026——Heating and Air Conditioning Systems
Heat / Cool
Whalen The Whalen VI Series model WA403. 12,000 BTU ×1
The Whalen VI Series model WA303 9,000 BTU ×1
09/29/2023Permit IssuedSajoHeating and Air Conditioning Systems
Heat / Cool
Whalen Model #CASV*024AB**A 22,300 BTU · Fan Coil Indoor ×2
Model #VP-A-0304-B*C 7,500 BTU ×2
Model #VP-A-0404-B*C 10,300 BTU ×2
Model #VP-A-0814-B*D 21,300 BTU ×2
model #VP-A-0814-B*D 21,300 BTU ×2
2 projects · most recent 12/19/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/19/2025Permit IssuedHydrokinetic Plumbing & Heating IGas, Water/Sanitary
09/29/2023Permit IssuedA & M Warshaw Plumbing & HeatingGas, Water/Sanitary
7 projects · most recent 05/28/2026
General Wiring
FiledStatusContractorScope
05/28/2026Permit IssuedInter Connection EletricGeneral Wiring
02/27/2025CompleteInter Connection EletricGeneral Wiring
07/31/2024CompleteInter Connection Eletric2 meters
07/24/2023CompletePrudent Electric—
05/25/2022CompleteInter Connection Eletric—
03/20/2021CompleteSteven Farkas—
11/11/2018CompleteOptimal ElectricGeneral Wiring
1 project · most recent 12/17/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
12/17/2025Permit IssuedSajoTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
07/13/2026Fire-Resistant Penetrations and Joints—special
07/13/2026Lighting in dwelling units—energy_progress
07/13/2026Lighting controls—energy_progress
07/13/2026HVAC-R and service water heating system controls—energy_progress
07/13/2026Insulation placement and R values—energy_progress
07/13/2026HVAC-R and service water piping design and insulation—energy_progress
07/13/2026HVAC-R and service water heating equipment—energy_progress
07/13/2026Fire-Resistance Rated Construction—progress
07/13/2026Energy Code Compliance Inspections—progress
07/13/2026Post-installed Anchors—special
07/13/2026Heating Systems—special
06/26/2026Final—progress
06/26/2026Mechanical Systems—special
05/15/2025HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
05/15/2025HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
05/15/2025Mechanical SystemsJOHN MCMONAGLEspecial
05/15/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/15/2025FinalJOHN MCMONAGLEprogress
05/15/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/15/2025HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
05/14/2025Post-installed AnchorsJOHN MCMONAGLEspecial
05/14/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/14/2025FinalArpad Baksaprogress
05/14/2025Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
05/14/2025Lighting controlsJOHN MCMONAGLEenergy_progress
Latest 25 of 48.
▾Documents — 347 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
10/13/2026M01423056-I1Request digital key ↗
09/04/2026M00486178-I1Request digital key ↗
09/04/2026M00493548-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits64
▸BISWORK PERMIT APPLICATION31
11/10/2021140910165Open ↗
08/23/2021140993726Open ↗
04/12/2021140993726Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION28
11/14/2025140910165Open ↗
02/18/2021140993726Open ↗
11/13/2020140910165Open ↗
Showing 3 of 28 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
04/12/2021140993726Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
04/12/2021140993726Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
11/09/2021140910165Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
06/21/2014120418235Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
11/09/2021140910165Open ↗
▸Seals & Professional Certifications89
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
08/13/2019123436683Open ↗
02/21/2019123110392Open ↗
02/21/2019123110392Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
10/13/2026M01423056-I1Open ↗
09/04/2026M00486178-I1Open ↗
09/04/2026M00493548-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/26/2026M00676823-S2Open ↗
09/26/2026M00676823-S2Open ↗
09/01/2026M01098832-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/26/2026M00676823-S2Open ↗
09/01/2026M01098832-I1Open ↗
09/01/2026M01225014-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
02/18/2021140993726Open ↗
08/12/2020140910165Open ↗
06/04/2015140356086Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/04/2015140356086Open ↗
09/29/2014140260615Open ↗
04/18/2014140186876Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
06/04/2015140356086Open ↗
09/29/2014140260615Open ↗
04/18/2014140186876Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
02/18/2021140993726Open ↗
08/12/2020140910165Open ↗
▸Trade Schedules & Equipment21
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
02/13/2019123436683Open ↗
01/22/2019123110392Open ↗
01/17/2019123110392Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING6
06/04/2015140356086Open ↗
09/29/2014140260615Open ↗
Showing 2 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
06/04/2015140356086Open ↗
09/29/2014140260615Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
08/12/2020140910165Open ↗
07/05/2018123436683Open ↗
09/08/2017123110392Open ↗
Showing 3 of 4 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
04/12/2021140993726Open ↗
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
02/18/2021140993726Open ↗
08/12/2020140910165Open ↗
06/25/2018123436683Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
10/13/2026M01423056-I1Open ↗
08/13/2026M00676823-S2Open ↗
08/13/2026M00676823-P3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
08/13/2019123436683Open ↗
02/21/2019123110392Open ↗
02/21/2019123110392Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
02/18/2021140993726Open ↗
11/12/2020140910165Open ↗
11/12/2020140910165Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
02/18/2021140993726Open ↗
08/12/2020140910165Open ↗
06/04/2015140356086Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/13/2019123436683Open ↗
02/21/2019123110392Open ↗
02/21/2019123110392Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
10/03/2023140910165Open ↗
06/21/2023140993726Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/03/2023140910165Open ↗
06/21/2023140993726Open ↗
▸BISFENESTRATION AIR LEAKAGE1
10/03/2023140910165Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/03/2023140910165Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/03/2023140910165Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY9
02/18/2021140993726Open ↗
02/18/2021140993726Open ↗
11/12/2020140910165Open ↗
Showing 3 of 9 on file for this type
▸BISPOST-INSTALLED ANCHORS1
06/21/2023140993726Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/03/2023140910165Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/03/2023140910165Open ↗
▸BISMASONRY1
06/21/2023140993726Open ↗
▸Approvals, Objections & Sign-offs25
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
11/14/2025140910165Open ↗
06/21/2023140993726Open ↗
08/13/2019123436683Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/25/2015140186876Open ↗
02/25/2015140186233Open ↗
06/21/2014120418235Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL2
10/03/2023140910165Open ↗
06/21/2023140993726Open ↗
▸BISACPE Objection Review Request1
04/17/2018123110392Open ↗
▸BISSUPERSEDING LETTER1
08/23/2021140993726Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT19
02/18/2021140993726Open ↗
08/13/2019123436683Open ↗
02/21/2019123110392Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/13/2025140910165Open ↗
06/21/2023140993726Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
11/09/2021140910165Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
11/12/2020140910165Open ↗
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET13
05/08/2018123436683Open ↗
05/08/2018123436683Open ↗
09/08/2017123110392Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM7
08/23/2021140993726Open ↗
08/13/2019123436683Open ↗
02/21/2019123110392Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
02/18/2021140993726Open ↗
08/12/2020140910165Open ↗
06/04/2015140356086Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
01/15/2019123436683Open ↗
Showing 1 of 3 on file for this type
▸Other Documents1
▸BISDepartment of Consumer Affairs (DCA) Form1
09/29/2017123110392Open ↗