← Back
Three families
158 MONITOR STREET
BROOKLYN · Greenpoint · BIN 3067151
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
2,700 sfGross Floor Area
3Units
Rent Stabilized18 Open Violations ▸FDNY Report ↗
Three families · 1,800 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof5p · 2 filings · 8 docs
Floor 32p · 1 filing · 3 docs
Floor 210p · 4 filings · 20 docs
Floor 110p · 4 filings · 20 docs
Cellar4p · 3 filings · 11 docs
Site & exterior1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/08/2020$2.1M—— → —$791/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING1003/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GRAMERCY.ELECTRIC INCGeneral Contractor603/21/2026
AAMWAY SERVICE CO INCGeneral Contractor203/21/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor107/08/2026
NM MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244101/27/2025
LEVEL EIGHT ARCHITECTURE7850210/18/2022
VALERIO ASSOCIATES, P.C.1379310/18/2022
KENDALL ENGINEERING PC4154108/04/2022
Building Lifecycle
All (55)Filed (6)Permit Issued (5)Signed Off (5)Violation (18)Inspection (3)Special Inspection (18)
05/05/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
05/06/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01168138-I1
01/28/2025
Permit issued — Solar
B01168138-I1-SL
01/27/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01168138-I1
11/27/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
06/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/04/2023
Signed off — Alteration
HEREBY FILING RENOVATION TO FIRST AND SECOND FLOOR OF THREE FAMILY DWELLING. NO CHANGE TO USE OCCUPANCY OR EGRESS
B00772620-I1
05/04/2023
Signed off — Alteration
HEREBY FILING FOR THE REMOVAL, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00692675-I1
05/04/2023
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS
B00693503-I1
05/03/2023
Signed off — Alteration
B00686501-I1
03/24/2023
Violation issued (HPD, open)
A
03/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2022
Violation issued (HPD, open)
I
10/19/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN VALERIO
10/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Otto Ruano
10/19/2022
Special inspection requirement — Final
Otto Ruano
10/19/2022
Special inspection requirement — Energy Code Compliance Inspections
Otto Ruano
10/19/2022
Special inspection requirement — Interior lighting power
Otto Ruano
10/19/2022
Special inspection requirement — Fenestration air leakage
Otto Ruano
10/19/2022
Special inspection requirement — Fenestration areas
Otto Ruano
10/19/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Otto Ruano
10/19/2022
Special inspection requirement — Insulation placement and R values
Otto Ruano
10/18/2022
Filed — Alteration
HEREBY FILING RENOVATION TO FIRST AND SECOND FLOOR OF THREE FAMILY DWELLING. NO CHANGE TO USE OCCUPANCY OR EGRESS
B00772620-P1
10/18/2022
Permit issued — Mechanical Systems
B00693503-I1-MS
10/14/2022
Permit issued — Plumbing
B00692675-I1-PL
10/11/2022
Permit issued — Structural
B00686501-I1-ST
10/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Otto Ruano
10/07/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN VALERIO
10/07/2022
Special inspection requirement — Energy Code Compliance Inspections
Otto Ruano
10/07/2022
Special inspection requirement — Final
Otto Ruano
10/07/2022
Special inspection requirement — Fenestration areas
Otto Ruano
10/07/2022
Special inspection requirement — Fenestration air leakage
Otto Ruano
10/07/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Otto Ruano
10/07/2022
Special inspection requirement — Interior lighting power
Otto Ruano
10/07/2022
Special inspection requirement — Insulation placement and R values
Otto Ruano
08/16/2022
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00692675-I1
08/04/2022
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS
B00693503-I1
07/19/2022
Permit issued — General Construction
B00772620-I1-GC
07/13/2022
Filed — Alteration
B00686501-I1
07/12/2022
Filed — Alteration
HEREBY FILING RENOVATION TO FIRST AND SECOND FLOOR OF THREE FAMILY DWELLING. NO CHANGE TO USE OCCUPANCY OR EGRESS
B00772620-I1
03/01/2022
Violation issued (HPD, open)
A
03/01/2022
Violation issued (HPD, open)
I
04/12/2021
Violation issued (HPD, open)
I
04/12/2021
Violation issued (HPD, open)
A
10/30/2019
Violation issued (HPD, open)
I
10/18/2018
Violation issued (HPD, open)
I
11/27/2017
Violation issued (HPD, open)
I
11/10/2016
Violation issued (HPD, open)
I
10/13/2015
Violation issued (HPD, open)
I
02/23/2015
Violation issued (HPD, open)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC01/28/2025
DOB NOWMechanical SystemsSigned-offAAMWAY SERVICE CO INC10/18/2022
DOB NOWPlumbingSigned-offNM MECHANICAL CORP10/14/2022
DOB NOWStructuralSigned-offGRAMERCY.ELECTRIC INC10/11/2022
DOB NOWGeneral ConstructionSigned-offGRAMERCY.ELECTRIC INC07/19/2022
2 projects · most recent 03/07/2025
General Wiring
FiledStatusContractorScope
03/07/2025CompleteBROOKYLN SOLARWORKS, LLC—
09/15/2022CompleteGRAMERCY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/19/2022Structural Stability – Alterations of existing buildingsJOHN VALERIOspecial
10/19/2022Fire-Resistant Penetrations and JointsOtto Ruanospecial
10/19/2022FinalOtto Ruanoprogress
10/19/2022Energy Code Compliance InspectionsOtto Ruanoprogress
10/19/2022Interior lighting powerOtto Ruanoenergy_progress
10/19/2022Fenestration air leakageOtto Ruanoenergy_progress
10/19/2022Fenestration areasOtto Ruanoenergy_progress
10/19/2022Fenestration and door U-factor and product ratingsOtto Ruanoenergy_progress
10/19/2022Insulation placement and R valuesOtto Ruanoenergy_progress
10/07/2022Fire-Resistant Penetrations and JointsOtto Ruanospecial
10/07/2022Structural Stability – Alterations of existing buildingsJOHN VALERIOspecial
10/07/2022Energy Code Compliance InspectionsOtto Ruanoprogress
10/07/2022FinalOtto Ruanoprogress
10/07/2022Fenestration areasOtto Ruanoenergy_progress
10/07/2022Fenestration air leakageOtto Ruanoenergy_progress
10/07/2022Fenestration and door U-factor and product ratingsOtto Ruanoenergy_progress
10/07/2022Interior lighting powerOtto Ruanoenergy_progress
10/07/2022Insulation placement and R valuesOtto Ruanoenergy_progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/29/2026B00686501-I1Request digital key ↗
08/29/2026B00772620-P1Request digital key ↗
08/29/2026B00772620-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026B00686501-I1Open ↗
08/29/2026B00772620-P1Open ↗
08/29/2026B00772620-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B00772620-P1Open ↗
08/28/2026B00772620-P1Open ↗
08/24/2026B00772620-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026B00772620-P1Open ↗
08/28/2026B00772620-P1Open ↗
08/24/2026B00772620-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/29/2026B00686501-I1Open ↗
08/29/2026B00772620-I1Open ↗
08/29/2026B00772620-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/29/2026B00772620-I1Open ↗
08/13/2026B00693503-I1Open ↗
08/13/2026B00692675-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01168138-I1Open ↗