← Back
Two stories - detached, small or mid-size
159-04 82 STREET
QUEENS · BIN 4293151
💬 Discuss this project
1985Year Built
1Stories
A1Building Class
R2Zoning
2,088 sfGross Floor Area
1Units
4 Open Violations 2 unresolved · 2 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 6,000 sf lot · 0.35 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction5p · 1 filing · 20 docs
Floor 1Under Construction7p · 1 filing · 20 docs
CellarUnder Construction6p · 1 filing · 20 docs
1 job · most recent 04/04/2025
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/04/2025Permit IssuedPROPERTY MAINTENANCE GROUAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Trane 4TTR6036J1000A 3 tons · Heat Pump Outdoor ×6
Heat / Cool
Trane 4TWR4018G1000A 18,000 BTU · Heat Pump Outdoor ×1
TEM4A0B36S31SB 3 tons · Furnace ×4
Ventilation
Trane TERVR100A9P00A 106 CFM · Erv ×7
1 job · most recent 04/04/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/04/2025Permit Issued5 BORO'S PLUMBING INCGas, Storm, Water/Sanitary
1 job · most recent 08/18/2025
General Wiring
FiledStatusContractorScope
08/18/2025Permit IssuedGREEN POWER ELECTRIC CORPGeneral Wiring
1 job · most recent 04/04/2025
Steel Wood
FiledStatusContractorScope
04/04/2025Permit IssuedPROPERTY MAINTENANCE GROUSteel, Wood
Building Lifecycle
All (16)Filed (7)Permit Issued (5)Violation (4)
09/24/2026
Permit issued — Structural
Q01038893-I1-GC-CX
07/23/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/02/2025
Violation issued (ECB, open)
Construction
12/02/2025
Violation issued (ECB, open)
Construction
11/24/2025
Violation issued (ECB, open)
Construction
10/23/2025
Permit issued — Structural
Q01038893-I1-MS
08/07/2025
Permit issued — Plumbing
Q01038893-S2-PL
07/30/2025
Permit issued — Foundation
Q01038893-I1-GC-CX
06/11/2025
Permit issued — Construction Fence
Q01040259-I1-FN
04/04/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING 1 FAMILY RESIDENCE
Q01038893-P3
02/13/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING 1 FAMILY RESIDENCE
Q01038893-P2
01/27/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING 1 FAMILY RESIDENCE
Q01038893-P1
05/10/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING 1 FAMILY RESIDENCE
Q01038893-S2
05/09/2024
Filed — Alteration
Q01040259-I1
05/09/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING 1 FAMILY RESIDENCE
Q01038893-I1
05/09/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO EXISTING 1 FAMILY RESIDENCE
Q01038893-S1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BANAY CONSULTANTS303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/15/2023$940K—Private party → Private party$450/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C704/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXCELLENT GENERAL CONTRA*General Contractor303/21/2026
BANAY CONSULTANTS LLCGeneral Contractor203/21/2026
MEGHNA CONSTRUCTIONGeneral Contractor104/09/2026
PROPERTY MAINTENANCE GROUPGeneral Contractor109/25/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADROIT ENGINEERING PLLC8885205/10/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedPROPERTY MAINTENANCE GROUP09/24/2026
DOB NOWStructuralPermit IssuedMEGHNA CONSTRUCTION10/23/2025
DOB NOWPlumbingPermit IssuedZONE PLUMBING & HEATING C08/07/2025
DOB NOWFoundationPermit IssuedBANAY CONSULTANTS LLC07/30/2025
DOB NOWConstruction FencePermit IssuedEXCELLENT GENERAL CONTRA*06/11/2025
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2026Pass-Final Antenna WithdrawalPassView ↗
04/13/2026Fail-Final Antenna WithdrawalFailView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
04/18/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesDUY HOANGspecial
04/18/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDUY HOANGspecial
04/18/2025Fire-Resistant Penetrations and JointsDUY HOANGspecial
04/18/2025Energy Code Compliance InspectionsDUY HOANGprogress
04/18/2025HVAC-R and service water piping design and insulationDUY HOANGenergy_progress
04/18/2025HVAC-R and service water heating equipmentDUY HOANGenergy_progress
04/18/2025HVAC-R and service water heating system controlsDUY HOANGenergy_progress
04/18/2025Permanent certificateDUY HOANGenergy_progress
04/18/2025Maintenance informationDUY HOANGenergy_progress
03/28/2025Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
03/28/2025Energy Code Compliance InspectionsDUY HOANGprogress
03/28/2025Footing and FoundationDUY HOANGprogress
03/28/2025Fire-Resistance Rated ConstructionDUY HOANGprogress
03/28/2025Structural Wood FrameDUY HOANGprogress
03/28/2025FinalDUY HOANGprogress
03/28/2025HVAC-R and service water heating system controlsDUY HOANGenergy_progress
03/28/2025Maintenance informationDUY HOANGenergy_progress
03/28/2025Interior lighting powerDUY HOANGenergy_progress
03/28/2025Air barrier - visual inspectionDUY HOANGenergy_progress
03/28/2025Insulation placement and R valuesDUY HOANGenergy_progress
03/28/2025Lowest Floor ElevationDUY HOANGprogress
03/28/2025Permanent certificateDUY HOANGenergy_progress
03/28/2025Ventilation and air distribution systemDUY HOANGenergy_progress
03/28/2025Fenestration and door U-factor and product ratingsDUY HOANGenergy_progress
03/28/2025Protection of exposed foundation insulationDUY HOANGenergy_progress
Latest 25 of 40.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/22/2026Q01040259-I1Request digital key ↗
08/22/2026Q01038893-P3Request digital key ↗
08/22/2026Q01038893-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
06/25/2024440817403Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/25/2024440817403Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q01038893-I1Open ↗
08/13/2026Q01038893-P1Open ↗
08/13/2026Q01038893-P2Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature28
09/02/2026Q01038893-I1Open ↗
09/02/2026Q01038893-I1Open ↗
09/02/2026Q01038893-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026Q01038893-I1Open ↗
09/02/2026Q01038893-I1Open ↗
09/02/2026Q01038893-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026Q01038893-P1Open ↗
08/22/2026Q01038893-P3Open ↗
08/22/2026Q01038893-P2Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/25/2024440817403Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/25/2024440817403Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q01038893-I1Open ↗
08/13/2026Q01038893-P1Open ↗
08/13/2026Q01038893-P2Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
06/25/2024440817403Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/22/2026Q01038893-P1Open ↗
08/22/2026Q01038893-P3Open ↗
08/22/2026Q01038893-P2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q01038893-P1Open ↗
08/13/2026Q01038893-P2Open ↗
08/13/2026Q01038893-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01038893-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
06/25/2024440817403Open ↗
▸BISADDITIONAL INFORMATION1
06/27/2024440817403Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/13/2026Q01038893-I1Open ↗
08/13/2026Q01038893-P1Open ↗
08/13/2026Q01038893-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q01038893-I1Open ↗
08/13/2026Q01038893-P2Open ↗
08/13/2026Q01038893-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/22/2026Q01038893-P2Open ↗
08/22/2026Q01038893-P1Open ↗
08/22/2026Q01038893-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/25/2024440817403Open ↗