| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01418389 ↗ | 482 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 06/17/2026 | 09/10/2026 | Design FRAME CORPORATION | TEMPORARY CONSTRUCTION PLYWOODFENCE INSTALLATION AS PER PLAN. NOCHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q01304635 ↗ | 5-39 47 ROAD QUEENS | Alteration | Permit Issued | 11/17/2025 | 07/23/2026 | Owner HALF MOON HUDSON, LLC | FILING TO ADDRESS OATH/ECB VIOLATION 39159286M & DOB VIOLATION V090425C25-02077. REMOVE (1) NON-OPERATING CHIMNEY DOWN TO ROOF AND CAP. REPA… |
| M01204949 ↗ | 232 WEST 75 STREET MANHATTAN | Alteration | Permit Issued | 04/26/2025 | 07/17/2026 | Design MTD Group Inspections, Inc. Owner Sandberg Management Filer DIMO DESIGN | Demolition and removal of existing exterior metal stair with replacement at the same egress location with new landmark compliance reinforced… |
| M01222675 ↗ | 310 WEST 140 STREET MANHATTAN | Alteration | Permit Issued | 09/30/2025 | 06/30/2026 | — | INSTALL A NEW SLIDING DOOR IN THE BASEMENT AS PER PLANS SUBMITTED. THE STRUCTURAL JOB IS FILED UNDER #M01282572. THIS APPLICATION DOES NOT C… |
| M01282572 ↗ | 310 WEST 140 STREET MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 06/29/2026 | Design JUST CONSULTING ENGINEERING | FILING SRUCUTRAL WORK TO INSTALL THE LINTEL BEAMS ON THE BACKWALL, NO CHANGE OF USAGE. |
| B01097377 ↗ | 1123 ALBEMARLE ROAD BROOKLYN | Alteration | Permit Issued | 09/18/2024 | 06/26/2026 | Design MURDOCK SOLON ARCHITECTS | INTERIOR RENOVATION WORK INCLUDING RELOCATION OF PLUMBING FIXTURES ASPER PLAN. NO CHANGE IN USE EGRESS OROCCUPANCY. RELATED GC APPLICATION J… |
| Name | Projects together | Most recent |
|---|---|---|
| MA ENGINEERING, P.C. | 8 | 05/15/2026 |
| ARC-HI-TECT ASSOCIATE INC | 5 | 07/10/2026 |
| BANGASH ASSOCIATES INC. | 2 | 08/02/2024 |
| MURDOCK SOLON ARCHITECTS | 2 | 08/04/2026 |
| 2LS CONSULTING ENGINEERING, DPC | 1 | 08/05/2025 |
| AFM INSPECTIONS & ENGINEERING, PLLC | 1 | 11/17/2025 |
| ALEX TAYLOR ARCHITECTURE | 1 | 08/05/2025 |
| ASR ENGINEERING PC | 1 | 06/10/2026 |
| CHK PLUS INC | 1 | 11/12/2025 |
| DAVID KEANE P.E., P.C. | 1 | 07/27/2023 |
| FIRMITAS ENGR'G & STRC'T DSG'N PLLC | 1 | 12/23/2024 |
| FRAME CORPORATION | 1 | 06/17/2026 |
| FRANK J QUATELA ARCHITECT P.C | 1 | 05/09/2024 |
| IVAN DESIGN ENG. ANALYSIS, PLLC | 1 | 05/07/2026 |
| JOSEPH K. BLUM CO. LLP | 1 | 09/04/2025 |
| JUST CONSULTING ENGINEERING | 1 | 03/25/2026 |
| KIT MIDDLETON ARCHITECT P.C. | 1 | 12/19/2023 |
| KZ ENGINEERING, P.C | 1 | 03/10/2026 |
| MAGNUM OPUS ARCHITECTURE P.C. | 1 | 06/26/2024 |
| MDG DESIGN GROUP | 1 | 01/09/2025 |
| MTD Group Inspections, Inc. | 1 | 04/26/2025 |
| REXRODE CHIRIGOS ARCHITECTS | 1 | 11/12/2025 |
| RIETVELD ARCHITECTS LLP | 1 | 04/24/2023 |
| RIMKUS NEW YORK PLLC | 1 | 08/14/2025 |
| RODNEY LEON ARCHITECTS PLLC | 1 | 09/19/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| DYNAMIC PLBG & SPRKLR COR | 3 | 06/05/2025 |
| A M B MECHANICAL INC | 1 | 07/10/2026 |
| C.S. SCOTT ENTERPRISES | 1 | 12/19/2023 |
| CK PLUMBING & MECH INC | 1 | 01/09/2025 |
| HARD SAFARI CORP | 1 | 11/12/2025 |
| ORANGE MECHANICAL LLC | 1 | 08/05/2025 |
| WSS GROUP, INC | 1 | 01/09/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| EXCELLENT GENERAL CONTRACTING CORP | 12 | 08/04/2026 |
| 193 Kane St Owners Corp | 1 | 12/19/2023 |
| 244 COURT ST LLC | 1 | 09/24/2023 |
| 33 N. Elliott Place Condominium | 1 | 07/29/2024 |
| EGA HOLDINGS, LLC | 1 | 01/09/2025 |
| GREENBROOK PARTNERS | 1 | 08/14/2025 |
| Galerie Buchholz | 1 | 11/12/2025 |
| HALF MOON HUDSON, LLC | 1 | 11/17/2025 |
| PERFECT CONSTRUCTION USA CORP | 1 | 08/02/2024 |
| SANDBERG MANAGEMENT | 1 | 04/26/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| DOMINION EXPEDITING | 6 | 06/10/2026 |
| MA ENGINEERING, P.C. | 5 | 05/15/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 2 | 08/04/2026 |
| ADAM MAISER | 1 | 07/27/2023 |
| AM EXPEDITING DRAFTING & DESIGN | 1 | 05/07/2026 |
| ARCHITECTURAL DESIGN SOLUTIONS | 1 | 06/05/2025 |
| DIMO DESIGN | 1 | 04/26/2025 |
| JAM CONSULTANTS, INC. | 1 | 11/12/2025 |
| JENNY FLORES EXPEDITING | 1 | 12/23/2024 |
| KIT MIDDLETON ARCHITECT P.C. | 1 | 12/19/2023 |
| M-DIS DESIGN GROUP | 1 | 01/09/2025 |
| MAGNUM OPUS ARCHITECTURE | 1 | 06/26/2024 |
| NYCCODE LLC | 1 | 08/05/2025 |
| RIMKUS NEW YORK PLLC | 1 | 08/14/2025 |
| SAMSON BUILDING CONSULTANTS, LLC | 1 | 11/11/2024 |
| STONECORE LLC | 1 | 09/19/2024 |
| SYNERGY BUILDING CONSULTANTS | 1 | 03/10/2026 |
| VSA | 1 | 09/24/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01418389 ↗ | 482 AMSTERDAM AVENUE MANHATTAN | Alteration | Permit Issued | 06/17/2026 | 09/10/2026 | Design FRAME CORPORATION | TEMPORARY CONSTRUCTION PLYWOODFENCE INSTALLATION AS PER PLAN. NOCHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q01304635 ↗ | 5-39 47 ROAD QUEENS | Alteration | Permit Issued | 11/17/2025 | 07/23/2026 | Owner HALF MOON HUDSON, LLC | FILING TO ADDRESS OATH/ECB VIOLATION 39159286M & DOB VIOLATION V090425C25-02077. REMOVE (1) NON-OPERATING CHIMNEY DOWN TO ROOF AND CAP. REPA… |
| M01204949 ↗ | 232 WEST 75 STREET MANHATTAN | Alteration | Permit Issued | 04/26/2025 | 07/17/2026 | Design MTD Group Inspections, Inc. Owner Sandberg Management Filer DIMO DESIGN | Demolition and removal of existing exterior metal stair with replacement at the same egress location with new landmark compliance reinforced… |
| M01222675 ↗ | 310 WEST 140 STREET MANHATTAN | Alteration | Permit Issued | 09/30/2025 | 06/30/2026 | — | INSTALL A NEW SLIDING DOOR IN THE BASEMENT AS PER PLANS SUBMITTED. THE STRUCTURAL JOB IS FILED UNDER #M01282572. THIS APPLICATION DOES NOT C… |
| M01282572 ↗ | 310 WEST 140 STREET MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 06/29/2026 | Design JUST CONSULTING ENGINEERING | FILING SRUCUTRAL WORK TO INSTALL THE LINTEL BEAMS ON THE BACKWALL, NO CHANGE OF USAGE. |
| B01097377 ↗ | 1123 ALBEMARLE ROAD BROOKLYN | Alteration | Permit Issued | 09/18/2024 | 06/26/2026 | Design MURDOCK SOLON ARCHITECTS | INTERIOR RENOVATION WORK INCLUDING RELOCATION OF PLUMBING FIXTURES ASPER PLAN. NO CHANGE IN USE EGRESS OROCCUPANCY. RELATED GC APPLICATION J… |
| B01323512 ↗ | 244 COURT STREET BROOKLYN | Alteration | Signed-off | 11/22/2025 | 06/23/2026 | Design MA ENGINEERING, P.C. Filer DOMINION EXPEDITING | APPLICATION TO REPAIR/REPLACE EXISTING ASPHALT ROOF,SKYLIGHT, HATCH DOOR AS PER PLAN. NO CHANGE IN USE,EGRESS AND OCCUPANCY |
| B01413229 ↗ | 50 1 PLACE BROOKLYN | Alteration | Permit Issued | 06/10/2026 | 06/22/2026 | Design ASR ENGINEERING PC Filer DOMINION EXPEDITING | APPLICATION FOR EXTERIOR FACADE STUCCO REMOVAL AT EXPOSURE #2 ,EXPOSURE#3 , REPAIR & POINTING WORK WITH AND APPLY EDISON COATING 351.NOCHANG… |
| B01271508 ↗ | 161 PROSPECT PARK WEST BROOKLYN | Alteration | Permit Issued | 08/14/2025 | 06/03/2026 | Design RIMKUS NEW YORK PLLC Owner GREENBROOK PARTNERS Filer RIMKUS NEW YORK PLLC | EXTERIOR FACADE REPAIRS AND MAINTENACE PER PLANS SUBMITTED. NO CHANGE IN USE, OCCUPANCY OR EGRESS PROPOSED UNDER THIS APPLICATION. |
| B01001670 ↗ | 33 NORTH ELLIOTT PLACE BROOKLYN | Alteration | Permit Issued | 07/29/2024 | 05/28/2026 | Design MA ENGINEERING, P.C. | APPLICATION FILING TO REMOVE EXISTING BRICK TILES AND REPLACE TO FACED BRICKS AT FRONT FACADE AS PER PLAN. NO CHANGE OF UES, EGRES AND OCCUP… |
| B01356575 ↗ | 388 HENRY STREET BROOKLYN | Alteration | Signed-off | 03/10/2026 | 05/27/2026 | Design KZ ENGINEERING, P.C | Proposed replacement of existing wood beam in the basement with new structural steel beam and concrete footing. No change in building use, e… |
| B01403236 ↗ | 53 7 AVENUE BROOKLYN | Alteration | Permit Issued | 05/15/2026 | 05/19/2026 | Design MA ENGINEERING, P.C. Filer MA ENGINEERING, P.C. | APPLICATION FILING TO RESTORE INCLUDING EXIST BROWN STONE FCADE SCRAP, STEPS, RESURFACING AND PAINTING EXISTING FACADE PER AS HISTORICAL R… |
| B01396389 ↗ | 83 DOWNING STREET BROOKLYN | Alteration | Permit Issued | 05/07/2026 | 05/18/2026 | facade repair | |
| B01225538 ↗ | 225 DEAN STREET BROOKLYN | Alteration | Signed-off | 05/14/2025 | 04/22/2026 | Design MA ENGINEERING, P.C. Filer MA ENGINEERING, P.C. | APPLICATION FILING REPAIR ROOF CORNIC, REPAIR BROWNSTONE WINDOW CELL AND RE-POINTING AT FRONT FACADE AS PER PLAN. NO CHANGE OF USE, EGRESS A… |
| M01292416 ↗ | 31 WEST 54 STREET MANHATTAN | Alteration | Signed-off | 10/03/2025 | 11/24/2025 | Design CHK PLUS INC Filer DOMINION EXPEDITING | TEMPORARY CONSTRUCTION PLYWOOD FENCE INSTALLATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q01281897 ↗ | 94-16 ATLANTIC AVENUE QUEENS | Alteration | Permit Issued | 09/09/2025 | 11/06/2025 | Design ARC-HI-TECT ASSOCIATE INC | TEMPORARY CONSTRUCTION PLYWOOD FENCE INSTALLATION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01230538 ↗ | 213 EAST 43 STREET BROOKLYN | Alteration | Permit Issued | 06/05/2025 | 11/03/2025 | Design ARC-HI-TECT ASSOCIATE INC | To remove all illegal partition to comply with ECB violation 39147008Y, 39147007M, 39147010N at cellar & do some cosmetic work due to new ow… |
| B01239979 ↗ | 478 HENRY STREET BROOKLYN | Alteration | Signed-off | 09/04/2025 | 09/26/2025 | Design JOSEPH K. BLUM CO. LLP | Facade repair project including all of the elevations, returns, and roofs as indicated in the drawings. |
| B01266763 ↗ | 69 FT GREENE PLACE BROOKLYN | Alteration | Signed-off | 08/06/2025 | 09/17/2025 | Design ARC-HI-TECT ASSOCIATE INC | APPLICATION TO REPAIR THE EXISTING FACADE. SCOPE OF WORK INCLUDES REMOVAL OF DAMAGED, LOOSE, OR DETERIORATED FACADE MATERIALS, AND CHIPPING … |
| B01111768 ↗ | 1123 ALBEMARLE ROAD BROOKLYN | Alteration CO | Permit Issued | 10/17/2024 | 08/12/2025 | Design MURDOCK SOLON ARCHITECTS | INTERIOR DEMOLITION AND CONSTRUCTION TO RECONFIGURE DWELLING UNITS AND EGRESS AS PER PLANS. |
| M01102865 ↗ | 356 EAST 57 STREET MANHATTAN | Alteration | Signed-off | 09/05/2024 | 07/01/2025 | Design MDG DESIGN GROUP Owner EGA HOLDINGS, LLC Filer M-DIS DESIGN GROUP | HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #6F. WORK INCLUDES REPLACE/RELOCATE PLUMBING FIXTURES WITH ASSOCIATED PLUMBING ELEMENTS, AND… |
| Q01040259 ↗ | 159-04 82 STREET QUEENS | Alteration | Permit Issued | 05/09/2024 | 06/11/2025 | ERECT CONSTRUCTION FENCE TO SAFE GUARD PROPERTY IN CONJUNCTION WITH ALT Q01038893. NO CHANGE TO THE USE, EGRESS, AND OCCUPANCY | |
| B08010784 ↗ | 367 12 STREET BROOKLYN | Alteration | Signed-off | 11/04/2022 | 05/28/2025 | Filer JENNY FLORES EXPEDITING | HEREBY FILING STRUCTURAL WORK FOR STOOP REPLACEMENT FOR EXISTING ONE FAMILY. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
| M01209332 ↗ | 132 WEST 13 STREET MANHATTAN | Alteration | Signed-off | 04/11/2025 | 04/16/2025 | Design MA ENGINEERING, P.C. Filer MA ENGINEERING, P.C. | APPLICATION FILING TO REPAIR EXISTING STUCCO AND REPLACE DAMAGED BRICKS AS PER PLAN AT EAST FACADE. NO CHANGE OF USE, EGRESS AND OCCUPANCY. |
| M00952471 ↗ | 450 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 10/27/2023 | 12/19/2024 | Design ALEX TAYLOR ARCHITECTURE Filer NYCCODE LLC | structural work associated with the proposed rear yard renovation as shown on the plans filed herewith. No change to use, egress, or occupan… |
| M01140031 ↗ | 3472 BROADWAY MANHATTAN | Alteration | Signed-off | 11/11/2024 | 12/06/2024 | Design SELKRIDGE ARCHITECTURE, PLLC | Restoration and repair of deteriorated and damaged brownstone facade. |
| M01112526 ↗ | 2728 BROADWAY MANHATTAN | Alteration | Signed-off | 09/19/2024 | 12/05/2024 | Design RODNEY LEON ARCHITECTS PLLC Filer STONECORE LLC | REPAIR OF EXISTING FRONT FACADE, NO CHANGE TO USE EGRESS ,OR OCCUPANCY |
| B00972886 ↗ | 193 KANE STREET BROOKLYN | Alteration | Signed-off | 12/19/2023 | 11/29/2024 | Design KIT MIDDLETON ARCHITECT P.C. Owner 193 Kane St Owners Corp | APPLICATION FILING TO REMOVE AND REPLACE EXISTING WEST SIDE FACADE STUCCO AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCCUPANCY. |
| M00843107 ↗ | 157 EAST 37 STREET MANHATTAN | Alteration | Signed-off | 04/24/2023 | 11/19/2024 | Design RIETVELD ARCHITECTS LLP | general construction associated with replacement of solarium and facade repair as shown on drawings filed herewith. no change in use, egress… |
| B01050183 ↗ | 572 1 STREET BROOKLYN | Alteration | Signed-off | 06/26/2024 | 10/18/2024 | Filer MAGNUM OPUS ARCHITECTURE | LIMITED REPAIRS TO EXTERIOR FACADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01054953 ↗ | 452 WEST 23 STREET MANHATTAN | Alteration | Signed-off | 05/21/2024 | 05/28/2024 | Design ARC-HI-TECT ASSOCIATE INC | REPAIR WORK AT THE NORTH (WEST 23RD STREET) FACADE, INCLUDING RESURFACING DETERIORATED BROWNSTONE, UTILIZING A CEMENTITIOUS STUCCO MIX, AT S… |
| B01027945 ↗ | 2077 DEAN STREET BROOKLYN | Alteration | Signed-off | 04/03/2024 | 05/22/2024 | Design BANGASH ASSOCIATES INC. Filer DOMINION EXPEDITING | APPLICATION FOR RENOVATION WORK SUCH AS REPAIR WALLS, FLOORING & CEILING SHEETROCK REPLACE, NO PLUMBING WORKS ONLY REPLACE BATHROOM & KITCHE… |
| M01048067 ↗ | 414 WEST 51 STREET MANHATTAN | Alteration | Signed-off | 05/13/2024 | 05/15/2024 | Design MA ENGINEERING, P.C. Filer DOMINION EXPEDITING | APPLICATION FOR RECONSTRUCTION OF THE EXISTING FRONT STOOP AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. |
| B00984543 ↗ | 600 EAST 5 STREET BROOKLYN | Alteration | Signed-off | 01/12/2024 | 05/13/2024 | Design MA ENGINEERING, P.C. Filer MA ENGINEERING, P.C. | APPLICATION FILING TO MINOR RENOVATION AT 1ST AND 2ND FLOOR RESIDENTIAL UNIT. NO CHANGE TO USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION. |
| B00960695 ↗ | 502 AVENUE C BROOKLYN | Alteration | Signed-off | 11/13/2023 | 01/26/2024 | Design MA ENGINEERING, P.C. Filer MA ENGINEERING, P.C. | APPLICATION FILING TO INSTALL 4 LAV, 4 WC, 3 SHOWER AT CELL, 1ST & 2ND FL, REMOVE & CAP 1 GAS STOVE & SINK AT 2ND FL. INSTALL 2 WASHER AND … |
| M00907249 ↗ | 153 AVENUE B MANHATTAN | Alteration | Signed-off | 07/27/2023 | 01/22/2024 | Design DAVID KEANE P.E., P.C. Filer ADAM MAISER | REINFORCING AND REPAIR OF AN EXISTING BROWNSTONE FRONT FACADE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| B00957504 ↗ | 575 39 STREET BROOKLYN | Alteration | Signed-off | 11/04/2023 | 01/05/2024 | Design BANGASH ASSOCIATES INC. Filer DOMINION EXPEDITING | Keep the rear yard tool room to comply with HRP complain (3928292) as per plan no change use, egress, and occupancy. |
| B00926430 ↗ | 244 COURT STREET BROOKLYN | Alteration | Signed-off | 09/24/2023 | 12/07/2023 | Design THE VSA GROUP Owner 244 COURT ST LLC Filer VSA | Parapet Replacement, as shown in filed drawings. No change to use, egress and occupancy. |