← Back
BuildNYC
Luxury hotel
Tempo by Hilton Times Square
159 WEST 48TH STREET · BIN 1090733
💬 Discuss this project
2018Year Built
35Stories
H1Building Class
C6-7TZoning
277,509 sfGross Floor Area
2Units
LL97 Covered1 Active Violation ▸
Luxury hotel · Owner of record: KCPC Aquisition · 13,153 sf lot · 21.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofEmg Industrial Chimney10p · 2 filings · 12 docs
Floor 38Pipe scaffold installation3p · 1 filing · 5 docs
Floor 37
Floor 36
Floor 35Hard Rock Hotel1p · 1 filing · 2 docs
Floor 34
Floor 33Hard Rock Hotel5p · 2 filings · 10 docs
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Main Attractions, Hard Rock Hotel3p · 2 filings · 6 docs
Floor 1Audacy, Hard Rock HotelUnder Construction12p · 4 filings · 20 docs
CellarHard Rock Hotel11p · 3 filings · 20 docs
Sub-Cellar4p · 2 filings · 12 docs
Site & exteriorHard Rock Hotel, Rockshop13p · 14 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Extell Development3810/14/2026
Exg 159W483503/21/2026
Emg Industrial Chimney807/08/2026
MVW Group803/21/2026
Stone Truss Systems703/22/2026
Night Watch Realty403/21/2026
MTB Architectural Metal Glass303/21/2026
KCPC Aquisition103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SLCE Architects1909/02/2026
Icor Associates209/02/2026
Lombardo Professional Engineering104/03/2024
SYNC Architecture211/16/2023
Asda Architecture + Design701/11/2022
Safway Atlantic912/02/2021
Tohfaz Uddin PE208/16/2021
Urban Integrations203/22/2021
Murdoch Engineering111/03/2020
KZ Engineering110/01/2020
Philip Habib & Associates110/31/2018
Ancora Engineering105/24/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code4003/21/2026
Milrose Consultants103/21/2026
A1 Expediting Service1803/21/2026
Municipal Building Consultants103/21/2026
Synergy Building Consultants303/21/2026
United Safety Consultants203/21/2026
Kazam Consultants203/21/2026
Lombardo Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Safway AtlanticScaffold2407/08/2026
Service Sign Erectors CoSign hanger707/08/2026
CS BridgeScaffold403/21/2026
Emg Industrial ChimneyScaffold407/08/2026
Spring ScaffoldingScaffold303/21/2026
Tishman InteriorsScaffold307/08/2026
Dworkin ConstructionGeneral Contractor210/14/2026
Balaton ConsultingSign hanger207/08/2026
Sconda Canvas ProductsGeneral Contractor207/08/2026
Louis L.buttermark & SonsPlumbing110/10/2026
City Electrical Sign ErectorsElectrical103/22/2026
Centric FM SolutionsGeneral Contractor107/08/2026
Tishman ConstructionGeneral Contractor107/08/2026
Colgate EnterpriseScaffold107/08/2026
A & N ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Buildingwide9501309/02/2026
Ryan Special Engineering2018111/16/2023
G. Blinn Consulting2894306/14/2021
Building Lifecycle
All (263)Filed (48)Permit Issued (41)Signed Off (22)Violation (40)Inspection (2)Objection (80)Special Inspection (30)
10/09/2026
Permit issued — Plumbing
M01450146-S1-PL
10/07/2026
Permit issued — Mechanical Systems
M01450146-S2-MS
10/06/2026
Permit issued — General Construction
M01450146-I1-GC
09/02/2026
Filed — Alteration
Mechanical work in conjunction with interior renovation.
M01450146-S1
09/02/2026
Filed — Alteration
Mechanical work in conjunction with interior renovation.
M01450146-S2
09/02/2026
Filed — Alteration
Mechanical work in conjunction with interior renovation.
M01450146-I1
09/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
ACRE QIU
09/01/2026
Special inspection requirement — Final
ACRE QIU
09/01/2026
Special inspection requirement — Mechanical Systems
ACRE QIU
09/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
ACRE QIU
08/24/2026
Special inspection requirement — Final
ACRE QIU
08/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
ACRE QIU
05/11/2026
Violation issued (HPD, open)
A
05/29/2025
Signed off — Alteration
Filing for a temporary use portable tent for seasonal use on the 2nd floor existing/approved outdoor dining terrace. No change to existing structures, use, egress or occupancy.
M00961701-I1
05/19/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/12/2025
Signed off — Alteration
M01026697-I1
02/11/2025
Permit issued — Suspended Scaffold
M01026697-I1-SC
04/05/2024
Permit issued — General Construction
M00961701-I1-GC
04/04/2024
Permit issued — Suspended Scaffold
M01026697-I1-SC
04/03/2024
Filed — Alteration
M01026697-I1
03/04/2024
Objection resolved — Addressed
03/01/2024
Objection raised — Other
02/22/2024
Filed — No Work
M00645716-P2
02/22/2024
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
12/27/2023
Signed off — Alteration
M08037617-I1
12/05/2023
Permit issued — General Construction
M00961701-I1-GC
11/16/2023
Filed — Alteration
Filing for a temporary use portable tent for seasonal use on the 2nd floor existing/approved outdoor dining terrace. No change to existing structures, use, egress or occupancy.
M00961701-I1
11/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
09/11/2023
Filed — Alteration
Portable tent for seasonal use on the 2nd floor existing approved outdoor dining terrace. No changes to existing structures, use or egress.
M00925313-I1
12/13/2022
Permit issued — General Construction
M08037617-I1-GC
11/18/2022
Filed — Alteration
M08037617-I1
09/14/2022
Special inspection requirement — Public Assembly Emergency Lighting
JACOB HAAS
09/12/2022
Signed off — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
M00650536-I1
09/12/2022
Signed off — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
M00650535-I1
09/12/2022
Signed off — Alteration
Install non-advertising sign. No change in use, egress, or occupancy.
M00650541-I1
09/12/2022
Signed off — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
M00650533-I1
09/12/2022
Signed off — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
M00650531-I1
09/12/2022
Signed off — Alteration
M00650539-I1
09/12/2022
Signed off — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
M00650540-I1
09/08/2022
Objection resolved — Addressed
08/31/2022
Objection resolved — Addressed
08/31/2022
Objection resolved — Addressed
08/31/2022
Objection resolved — Addressed
08/31/2022
Objection resolved — Addressed
07/15/2022
Objection raised — Other
07/15/2022
Objection resolved — Addressed
07/15/2022
Objection raised — Other
07/15/2022
Objection raised — Other
07/15/2022
Objection raised — Other
07/15/2022
Objection raised — Mechanical
07/15/2022
Objection raised — Other
07/06/2022
Filed — No Work
M00528185-P2
07/06/2022
Filed — No Work
M00549755-P3
07/06/2022
Special inspection requirement — Public Assembly Emergency Lighting
JACOB HAAS
06/14/2022
Signed off — Alteration
Installation of new curb cut filed in conjunction with New Building Application #123331224.
M00093480-I1
06/13/2022
Signed off — Alteration
Installation of temporary construction fence in conjunction with NB application 123331224. No change in occupancy, use, or egress.
M00042164-I1
06/06/2022
Special inspection requirement — Public Assembly Emergency Lighting
JACOB HAAS
06/03/2022
Special inspection requirement — Public Assembly Emergency Lighting
JACOB HAAS
05/25/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/23/2022
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00576843-I1
Latest 60 of 263 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedLouis L.buttermark & Sons10/09/2026
DOB NOWMechanical SystemsPermit IssuedDworkin Construction10/07/2026
DOB NOWGeneral ConstructionPermit IssuedDworkin Construction10/06/2026
DOB NOWSuspended ScaffoldSigned-offR & R Scaffolding02/11/2025
DOB NOWGeneral ConstructionSigned-offSconda Canvas Products04/05/2024
DOB NOWSuspended ScaffoldSigned-offR & R Scaffolding04/04/2024
DOB NOWGeneral ConstructionSigned-offSconda Canvas Products12/05/2023
DOB NOWGeneral ConstructionSigned-offCentric FM Solutions12/13/2022
DOB NOWCurb CutSigned-offTishman Construction05/20/2022
DOB NOWSignSigned-offService Sign Erectors Co01/16/2022
DOB NOWSignSigned-offService Sign Erectors Co01/13/2022
DOB NOWSignSigned-offService Sign Erectors Co01/13/2022
DOB NOWSignSigned-offService Sign Erectors Co01/13/2022
DOB NOWSignSigned-offService Sign Erectors Co01/12/2022
DOB NOWSignSigned-offService Sign Erectors Co01/12/2022
DOB NOWSignSigned-offService Sign Erectors Co01/12/2022
DOB NOWProtection and Mechanical MethodsSigned-offSafway Atlantic12/02/2021
DOB NOWSignSigned-offNorth Shore Neon Sign Co11/01/2021
DOB NOWSidewalk ShedSigned-offSafway Atlantic09/23/2021
DOB NOWConstruction FenceSigned-offSafway Atlantic09/22/2021
DOB NOWSupported ScaffoldSigned-offCS Bridge09/01/2021
DOB NOWSupported ScaffoldSigned-offColgate Enterprise08/17/2021
DOB NOWSupported ScaffoldSigned-offEmg Industrial Chimney05/04/2021
DOB NOWProtection and Mechanical MethodsSigned-offSafway Atlantic04/20/2021
DOB NOWProtection and Mechanical MethodsSigned-offSafway Atlantic03/02/2021
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding02/25/2021
DOB NOWSidewalk ShedSigned-offSafway Atlantic12/21/2020
DOB NOWConstruction FenceSigned-offSafway Atlantic12/18/2020
DOB NOWSignSigned-offNorth Shore Neon Sign Co11/04/2020
DOB NOWSupported ScaffoldSigned-offEmg Industrial Chimney10/22/2020
DOB NOWSupported ScaffoldSigned-offCS Bridge09/23/2020
DOB NOWConstruction FenceSigned-offSafway Atlantic09/21/2020
DOB NOWSidewalk ShedSigned-offSafway Atlantic09/21/2020
DOB NOWConstruction FenceSigned-offSafway Atlantic12/17/2019
DOB NOWSidewalk ShedSigned-offSafway Atlantic12/17/2019
DOB NOWConstruction FenceSigned-offTishman Interiors10/07/2019
DOB NOWSidewalk ShedSigned-offSafway Atlantic09/24/2019
DOB NOWConstruction FenceSigned-offSafway Atlantic09/24/2019
DOB NOWConstruction FenceSigned-offSafway Atlantic03/14/2019
DOB NOWSidewalk ShedSigned-offSafway Atlantic03/14/2019
+ 51 more permits on file
1 project · most recent 09/02/2026
Water/Sanitary
FiledStatusContractorScope
09/02/2026Permit IssuedLouis L.buttermark & SonsWater/Sanitary
17 projects · most recent 10/13/2026
General Wiring
FiledStatusContractorScope
10/13/2026Permit IssuedBigman BrothersGeneral Wiring
04/27/2026CancelledBigman BrothersGeneral Wiring
09/15/2022CompleteA & N ElectricalGeneral Wiring
01/21/2022CompleteCity Electrical Sign Erectors—
07/21/2020CompleteSolar Electric SystemsGeneral Wiring
02/05/2020CompleteSolar Electric Systems2 meters, 2 new_meters
12/09/2019CompleteSolar Electric Systems—
10/13/2019CompleteJam Electrical—
07/26/2019CompleteJam Electrical—
07/26/2019CompleteJam Electrical—
07/26/2019CompleteJam Electrical—
06/07/2019CompleteSolar Electric Systems—
05/17/2019CompleteSolar Electric Systems1 meters, 1 new_meters
04/18/2019CompleteSolar Electric Systems1 meters
03/13/2019CompleteSolar Electric Systems—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/19/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/25/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
09/02/2026Tenant Protection Plan ComplianceACRE QIUspecial
09/01/2026FinalACRE QIUprogress
09/01/2026Mechanical SystemsACRE QIUspecial
09/01/2026Tenant Protection Plan ComplianceACRE QIUspecial
08/24/2026FinalACRE QIUprogress
08/24/2026Tenant Protection Plan ComplianceACRE QIUspecial
11/15/2023Tenant Protection Plan ComplianceWilliam Ryanspecial
09/14/2022Public Assembly Emergency LightingJACOB HAASprogress
07/06/2022Public Assembly Emergency LightingJACOB HAASprogress
06/06/2022Public Assembly Emergency LightingJACOB HAASprogress
06/03/2022Public Assembly Emergency LightingJACOB HAASprogress
03/18/2022Public Assembly Emergency LightingJACOB HAASprogress
03/18/2022Public Assembly Emergency LightingJACOB HAASprogress
03/17/2022Public Assembly Emergency LightingJACOB HAASprogress
03/16/2022Public Assembly Emergency LightingJACOB HAASprogress
02/28/2022Public Assembly Emergency LightingJACOB HAASprogress
12/20/2021FinalAlfonso DEliaprogress
12/20/2021FinalAlfonso DEliaprogress
12/20/2021FinalAlfonso DEliaprogress
12/20/2021FinalAlfonso DEliaprogress
12/20/2021FinalAlfonso DEliaprogress
11/23/2021FinalTANYA CHARLESWORTHprogress
07/01/2021FinalTANYA CHARLESWORTHprogress
06/30/2021Public Assembly Emergency LightingJACOB HAASprogress
06/15/2021Post-installed AnchorsGREG BLINNspecial
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AudacyOfficeFloor 1
Project M01450146 Alteration · Permit Entire · 09/02/2026
Main AttractionsRestaurant / Food ServiceFloor 2
Project M00961701 Alteration · LOC Issued · 11/16/2023
Hard Rock HotelHotel / LodgingCellar, Floors 1, 2, 33, 35
Project M08037617 Alteration · LOC Issued · 11/18/2022
Project M00650535 Alteration · LOC Issued · 01/11/2022
Project M00650541 Alteration · LOC Issued · 01/11/2022
Project M00645722 No Work · PA Certificate of Operation Issued · 01/03/2022
Project M00645716 No Work · PA Certificate of Operation Issued · 12/17/2021
Project M00549743 No Work · PA Certificate of Operation Issued · 09/14/2021
Project M00549750 No Work · PA Certificate of Operation Issued · 09/14/2021
Project M00549755 No Work · PA Certificate of Operation Issued · 09/14/2021
Project M00399174 Alteration · LOC Issued · 11/03/2020
RockshopRetail—
Project M00650539 Alteration · LOC Issued · 01/10/2022
Emg Industrial ChimneyIndustrial / WarehouseRoof
Project M00298534 Alteration · LOC Issued · 10/01/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 928 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch22
10/07/2026M01450146-S2Request digital key ↗
10/07/2026M01450146-S1Request digital key ↗
10/07/2026M01450146-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly13
09/03/2026M00549755-P2Request digital key ↗
09/03/2026M00549755-P3Request digital key ↗
09/02/2026M00549750-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly4
09/02/2026M00698402-P1Request digital key ↗
09/02/2026M00698402-I1Request digital key ↗
09/02/2026M00698409-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
09/04/2026M00401934-I1Request digital key ↗
09/04/2026M00298534-I1Request digital key ↗
09/04/2026M00474310-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00141297-I1Request digital key ↗
08/15/2026M00141297-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00141282-I1Request digital key ↗
08/15/2026M00141282-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00399174-I1Request digital key ↗
▸Applications & Permits153
▸BISPLAN / WORK APPROVAL APPLICATION110
12/21/2023123331224Open ↗
03/17/2023123331224Open ↗
01/19/2023123551209Open ↗
Showing 3 of 110 on file for this type
▸BISWORK PERMIT APPLICATION42
06/07/2022141006293Open ↗
Showing 1 of 42 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISRESTRICTION: RESTRICTIVE DECLARATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING RESOLUTION DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/17/2022123331224Open ↗
▸Seals & Professional Certifications182
▸DOB NOWDPL-1: Design Professional Seal & Signature48
10/07/2026M01450146-I1Open ↗
10/07/2026M01450146-S2Open ↗
10/07/2026M01450146-S1Open ↗
Showing 3 of 48 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
10/08/2026M01450146-S2Open ↗
10/08/2026M01450146-I1Open ↗
10/07/2026M00528185-P2Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/08/2026M01450146-S2Open ↗
10/08/2026M01450146-I1Open ↗
10/08/2026M01450146-S2Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment86
▸BISEQUIPMENT USE PERMITS37
08/24/2022123331224Open ↗
08/24/2022123331224Open ↗
08/24/2022123331224Open ↗
Showing 3 of 37 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT16
08/24/2022123331224Open ↗
08/24/2022123331224Open ↗
08/24/2022123331224Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING16
12/22/2022123551209Open ↗
11/18/2022123551209Open ↗
07/21/2022123331224Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSTANDPIPE SYSTEMS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
05/16/2022123331224Open ↗
04/27/2022123749621Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
03/01/2022123749621Open ↗
02/28/2022123331224Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
01/20/2023123551209Open ↗
05/13/2022123331224Open ↗
04/07/2022141003161Open ↗
Showing 3 of 10 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS6
01/20/2023123551209Open ↗
06/29/2022123331224Open ↗
04/07/2022141003161Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
12/04/2023123331224Open ↗
01/20/2023123551209Open ↗
05/09/2022123687206Open ↗
Showing 3 of 5 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
09/20/2022123331224Open ↗
09/20/2022123331224Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/11/2022123331224Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/28/2022123331224Open ↗
▸BISELECTRIC MOTORS1
02/28/2022123331224Open ↗
▸BISLIGHTING CONTROLS1
05/16/2022123331224Open ↗
▸BIS* HVAC INSULATION AND SEALING1
02/28/2022123331224Open ↗
▸Inspections & Test Reports99
▸BISTECHNICAL REPORT: RESPONSIBILITY67
11/18/2022123551209Open ↗
08/31/2022140815152Open ↗
08/28/2022140815152Open ↗
Showing 3 of 67 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)4
06/07/2022141006293Open ↗
Showing 1 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISMECHANICAL SYSTEMS2
05/16/2022123331224Open ↗
02/11/2022123749621Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs80
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
01/20/2023123551209Open ↗
11/16/2022140945832Open ↗
10/26/2022141000565Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE18
03/17/2023123331224Open ↗
06/03/2022123331224Open ↗
03/28/2022123331224Open ↗
Showing 3 of 18 on file for this type
▸BISFINAL18
01/20/2023123551209Open ↗
11/15/2022140945832Open ↗
10/26/2022141000565Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSUPERSEDING LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
01/20/2023123111970Open ↗
12/16/2022123111970Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT15
09/26/2022141000565Open ↗
Showing 1 of 15 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW310
01/20/2023123551209Open ↗
10/19/2022140945832Open ↗
09/26/2022141000565Open ↗
Showing 3 of 10 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms127
▸BISADDITIONAL INFORMATION72
02/26/2024123331224Open ↗
11/30/2022123551209Open ↗
06/29/2022123331224Open ↗
Showing 3 of 72 on file for this type
▸BISBOROUGH INTAKE FORM23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISEFILING COVER SHEET14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸Other Documents30
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWAlternate Plan 14
09/03/2026M00549755-P3Open ↗
08/15/2026M00528185-P2Open ↗
08/15/2026M00549755-I1Open ↗
Showing 3 of 4 on file for this type
▸BISMAINTENANCE INFORMATION3
05/16/2022123331224Open ↗
03/01/2022123749621Open ↗
02/28/2022123687206Open ↗
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS2
02/11/2022123687206Open ↗
Showing 1 of 2 on file for this type
▸BISPERMANENT CERTIFICATE2
03/01/2022123749621Open ↗
02/28/2022123331224Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
02/28/2022123331224Open ↗
▸DOB NOWCalculations1
08/13/2026M01026697-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01026697-I1Open ↗