← Back
Office with commercial, 7-19 stories
15 WEST 21 STREET
MANHATTAN · BIN 1015531
💬 Discuss this project
1910Year Built
12Stories
O6Building Class
C6-4AZoning
137,007 sfGross Floor Area
17Units
LL97 Covered19 Open Violations 17 unresolved · 2 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: MEYSAR REALTY CORP · 11,200 sf lot · 12.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 111p · 1 filing · 2 docs
Floor 10
Floor 91p · 1 filing · 4 docs
Floor 825p · 5 filings · 20 docs
Floor 717p · 5 filings · 20 docs
Floor 6
Floor 56p · 2 filings · 20 docs
Floor 4Under Construction19p · 9 filings · 20 docs
Floor 32p · 2 filings · 12 docs
Floor 2Under Construction7p · 1 filing · 8 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GFP REAL ESTATE9909/18/2026
MEYSAR REALTY GROUP907/08/2026
ROCKLEDGE SCAFFOLD CORP703/22/2026
NEWMARK REALTY603/22/2026
NEWMARK &CO.REAL ESTAT103/22/2026
NEWMARK ASSOCS.103/22/2026
NEWARK & COMPANY103/22/2026
21 & 22 ST CO103/22/2026
OWNER OF 16 W 22 ST103/22/2026
MESYAR REALTY CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHASE 3 INTERIORS LLCGeneral Contractor1207/08/2026
BENCHMARK BUILDERS LLCGeneral Contractor407/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor403/21/2026
ROSVOGLOU DIMITRIOSElectrical303/21/2026
DIMITRIOS ROSVOGLOUElectrical303/21/2026
L.D. FLECKEN INCElectrical203/21/2026
CITRIN, JAYElectrical203/21/2026
JT MAGEN & COMPANY INCGeneral Contractor209/18/2026
SKH MECHANICAL CORPFire Protection206/28/2026
SKINNER PLMNG & HTG CORPFire Protection207/08/2026
SKINNER PLUMBING & HEATINGPlumbing207/08/2026
PACIFIC PLBG&HTG CORPPlumbing107/08/2026
STANLEY PLUMBING CO.,INCPlumbing107/08/2026
GARY SCOTTOElectrical103/21/2026
KURT EBINGERElectrical103/21/2026
TONY DE FALCOElectrical103/21/2026
BEDROCK MECHANICAL INCFire Protection109/12/2026
PACIFIC PLBG. & HTG. CORPFire Protection107/08/2026
4IR IDEAL INCGeneral Contractor104/09/2026
AUDIO STRUCTURES INCGeneral Contractor107/08/2026
MICHILLI INCGeneral Contractor107/08/2026
A&A PLUMBING CORPPlumbing106/28/2026
AGIUS PLUMBING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678808/31/2026
NASIR J. KHANZADA LLC1527408/06/2025
SKYLINE ENGINEERING, PLLC267111/22/2024
NEW YORK ENGINEERING ASSO851108/23/2024
ARCHITECTURAL ENGINEERING6111502/12/2021
W. ALLEN ENGINEERING PLLC664111/26/2019
Building Lifecycle
All (212)Filed (31)Permit Issued (30)Signed Off (9)Facade (FISP) (9)Violation (60)Inspection (7)Objection (36)Special Inspection (30)
09/17/2026
Permit issued — Mechanical Systems
M01438328-S1-MS
09/10/2026
Permit issued — Sprinklers
M01438587-I1-EW-SP
08/31/2026
Filed — Alteration
Filing herewith modification to the existing Sprinkler System on the 4th, 7th and 8th FLS. as per plans filed herewith. No change to use, egress or occupancy.
M01109584-P1
08/31/2026
Permit issued — General Construction
M01438328-I1-GC
08/31/2026
Special inspection requirement — Sprinkler Systems
Ari Kamo
08/25/2026
Filed — Alteration
Filing herewith modification to the existing Sprinkler System as per plans filed herewith. No change to use, egress or occupancy.
M01438587-I1
08/21/2026
Signed off — Alteration
Filing herewith interior renovation to the 4th, 7th & 8th FL. as per plans filed herewith. No change to use, egress or occupancy.
M01109550-I1
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
08/20/2026
Special inspection requirement — Post-installed Anchors
Ari Kamo
08/20/2026
Special inspection requirement — Sprinkler Systems
Ari Kamo
08/17/2026
Signed off — Alteration
Filing herewith Mechanical work as per plans filed herewith. No change to use, egress or occupancy.
M01109570-I1
07/30/2026
Special inspection requirement — Sprinkler Systems
Ari Kamo
06/02/2026
Special inspection requirement — Interior lighting power
Ari Kamo
06/02/2026
Special inspection requirement — Shutoff dampers
Ari Kamo
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
06/02/2026
Special inspection requirement — Maintenance information
Ari Kamo
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
06/02/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
06/02/2026
Special inspection requirement — Final
Ari Kamo
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
06/01/2026
Filed — Alteration
Filing herewith Mechanical work as per plans filed herewith. No change to use, egress or occupancy.
M01109570-P1
05/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
05/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/01/2026
Filed — Alteration
Filing herewith interior renovation to the 4th, 7th & 8th FL. as per plans filed herewith. No change to use, egress or occupancy.
M01109550-P1
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
05/01/2026
Special inspection requirement — Final
barry ludlow
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
03/30/2026
Signed off — Alteration
REPLACE BURNER ON EXISTING BOILER.
M01099034-I1
02/04/2026
Permit issued — Plumbing
M01266825-S1-PL
02/04/2026
Special inspection requirement — Interior lighting power
Ari Kamo
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
02/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
02/04/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
02/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
02/04/2026
Special inspection requirement — Final
Ari Kamo
02/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
02/04/2026
Special inspection requirement — Shutoff dampers
Ari Kamo
02/04/2026
Special inspection requirement — Maintenance information
Ari Kamo
01/21/2026
Permit issued — General Construction
M01266825-I1-GC
12/30/2025
Signed off — Alteration
M01109607-I1
12/12/2025
Permit issued — General Construction
M01109550-I1-GC
09/19/2025
Permit issued — Sprinklers
M01109584-I1-EW-SP
09/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/21/2025
Objection raised — Admin
08/21/2025
Objection resolved — Addressed
08/21/2025
Objection raised — Other
08/21/2025
Objection resolved — Addressed
08/06/2025
Filed — Alteration
PARTIAL RENOVATION OF THE EXISTING SECOND FLOOR, INCLUDING INTERIOR FLOOR, CEILING, AND INSTALLATION OF NEW SHEETROCK.
M01266825-S1
08/06/2025
Filed — Alteration
PARTIAL RENOVATION OF THE EXISTING SECOND FLOOR, INCLUDING INTERIOR FLOOR, CEILING, AND INSTALLATION OF NEW SHEETROCK.
M01266825-I1
07/28/2025
Violation issued (ECB, closed)
Construction
07/28/2025
Violation issued (ECB, closed)
Construction
07/28/2025
Violation issued (ECB, closed)
Construction
04/28/2025
Permit issued — General Construction
M01098220-I1-GC
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/29/2025
Filed — Alteration
First-floor lobby interior renovation and renovation of the entrance door.
M01098220-I1
01/07/2025
Permit issued — Mechanical Systems
M01109570-I1-MS
12/30/2024
Permit issued — Sprinklers
M01109584-I1-EW-SP
Latest 60 of 212 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedJT MAGEN & COMPANY INC09/17/2026
DOB NOWSprinklersPermit IssuedBEDROCK MECHANICAL INC09/10/2026
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC08/31/2026
DOB NOWPlumbingPermit IssuedAGIUS PLUMBING & HTG INC02/04/2026
DOB NOWGeneral ConstructionPermit IssuedPHASE 3 INTERIORS LLC01/21/2026
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC12/12/2025
DOB NOWSprinklersPermit IssuedSKH MECHANICAL CORP09/19/2025
DOB NOWGeneral ConstructionPermit IssuedPHASE 3 INTERIORS LLC04/28/2025
DOB NOWMechanical SystemsSigned-off4IR IDEAL01/07/2025
DOB NOWSprinklersPermit IssuedSKH MECHANICAL CORP12/30/2024
DOB NOWPlumbingSigned-offA&A PLUMBING CORP12/27/2024
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC12/12/2024
DOB NOWStructuralSigned-offBENCHMARK BUILDERS LLC12/12/2024
DOB NOWGeneral ConstructionPermit IssuedPHASE 3 INTERIORS LLC09/10/2024
DOB NOWBoiler EquipmentSigned-offACE-ATLAS PLBG & HTG LLC08/28/2024
DOB NOWStructuralPermit IssuedPHASE 3 INTERIORS LLC08/15/2024
DOB NOWGeneral ConstructionPermit IssuedPHASE 3 INTERIORS LLC05/01/2023
DOB NOWConstruction FencePermit IssuedPHASE 3 INTERIORS LLC09/20/2022
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP01/21/2021
DOB NOWSprinklersSigned-offSKINNER PLMNG & HTG CORP11/20/2020
DOB NOWPlumbingSigned-offSKINNER PLUMBING & HEATIN11/20/2020
DOB NOWPlumbingSigned-offSKINNER PLUMBING & HEATIN07/27/2020
DOB NOWSprinklersSigned-offSKINNER PLMNG & HTG CORP07/24/2020
DOB NOWMechanical SystemsSigned-offMICHILLI INC06/17/2020
DOB NOWMechanical SystemsSigned-offPHASE 3 INTERIORS LLC03/17/2020
DOB NOWPlumbingPermit IssuedSTANLEY PLUMBING CO.,INC02/28/2020
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP02/13/2020
DOB NOWMechanical SystemsPermit IssuedAUDIO STRUCTURES INC02/12/2020
DOB NOWPlumbingPermit IssuedPACIFIC PLBG. & HTG. CORP12/20/2019
DOB NOWPlumbingPermit IssuedPACIFIC PLBG&HTG CORP12/20/2019
BISSPISSUEDSTANLEY PLUMBING CO.,INC08/01/2024
BISSPISSUEDSTANLEY PLUMBING CO.,INC08/01/2024
BISSPISSUEDSTANLEY PLUMBING CO.,INC06/15/2023
BISOTISSUEDPHASE 3 INTERIORS LLC10/05/2022
BISOTISSUEDRELATED SERVICES LLC01/28/2022
BISOTISSUEDRELATED SERVICES LLC01/06/2021
BISOTISSUEDMICHILLI INC07/08/2020
BISOTISSUEDPHASE 3 INTERIORS LLC09/04/2019
BISOTISSUEDALANTE CONSTRUCTION CORP06/26/2019
BISOTISSUEDPHASE 3 INTERIORS LLC06/17/2019
+ 40 more permits on file
2 projects · most recent 06/01/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/01/2026Signed-off4IR IDEAL INCAir Conditioning Systems
Cooling
Mitsubishi Electric PKA-A18LA 18,000 BTU · Fan Coil Indoor ×2
PUZ-A18NKA7 18,000 BTU · Condensing Unit ×2
11/26/2019Permit IssuedAUDIO STRUCTURES INCAir Conditioning Systems—
3 projects · most recent 08/31/2026
FiledStatusContractorScope
08/31/2026Permit IssuedSKH MECHANICAL CORP—
08/25/2026Permit IssuedBEDROCK MECHANICAL INC35 heads
03/16/2021Permit IssuedPACIFIC PLBG. & HTG. CORP49 heads
4 projects · most recent 08/25/2026
Water/Sanitary
FiledStatusContractorScope
08/25/2026———
08/06/2025Permit IssuedAGIUS PLUMBING & HTG INCWater/Sanitary
03/16/2021Permit IssuedPACIFIC PLBG&HTG CORPWater/Sanitary
11/07/2019Permit IssuedSTANLEY PLUMBING CO.,INCWater/Sanitary
10 projects · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
10/16/2025Permit IssuedBRANDL ELECTRIC INC.General Wiring
01/21/2025Permit IssuedOMTA TECH INCGeneral Wiring
07/09/2021CompleteAPOLLO ELECTRIC INSDUS INGeneral Wiring
11/25/2020Permit IssuedP&H ELECT D/B/A MAGE ELEC—
09/29/2020Permit IssuedA.L. ELECTRICAL CORP.—
01/17/2020CompleteANTHONY G FERRY INC—
01/17/2020CompleteANTHONY G FERRY INC—
01/10/2020CompleteTRI CAM ELECL VENTURES LLGeneral Wiring
07/05/2019Permit IssuedWEST SHORE ELECTRIC CORPGeneral Wiring
1 project · most recent 04/18/2023
FiledStatusContractorScope
04/18/2023Permit IssuedPHASE 3 INTERIORS LLC1 scope_items
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2026Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
05/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
08/31/2026Sprinkler SystemsAri Kamospecial
08/20/2026Post-installed AnchorsAri Kamospecial
08/20/2026Sprinkler SystemsAri Kamospecial
08/20/2026Fire-Resistant Penetrations and JointsAri Kamospecial
07/30/2026Sprinkler SystemsAri Kamospecial
06/02/2026HVAC-R and service water heating system controlsAri Kamoenergy_progress
06/02/2026HVAC-R and service water piping design and insulationAri Kamoenergy_progress
06/02/2026Maintenance informationAri Kamoenergy_progress
06/02/2026Shutoff dampersAri Kamoenergy_progress
06/02/2026HVAC-R and service water heating equipmentAri Kamoenergy_progress
06/02/2026FinalAri Kamoprogress
06/02/2026Mechanical SystemsAri Kamospecial
06/02/2026Energy Code Compliance InspectionsAri Kamoprogress
06/02/2026Fire-Resistant Penetrations and JointsAri Kamospecial
06/02/2026Interior lighting powerAri Kamoenergy_progress
05/01/2026Fire-Resistant Penetrations and JointsAri Kamospecial
05/01/2026Finalbarry ludlowprogress
04/07/2026Energy Code Compliance InspectionsAri Kamoprogress
02/04/2026Interior lighting powerAri Kamoenergy_progress
02/04/2026Maintenance informationAri Kamoenergy_progress
02/04/2026HVAC-R and service water piping design and insulationAri Kamoenergy_progress
02/04/2026Shutoff dampersAri Kamoenergy_progress
02/04/2026HVAC-R and service water heating equipmentAri Kamoenergy_progress
02/04/2026HVAC-R and service water heating system controlsAri Kamoenergy_progress
02/04/2026FinalAri Kamoprogress
Latest 25 of 74.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
e.l.f. BeautyOfficeFloors 4, 7, 8
Project M01109550 Alteration · LOC Issued · 11/22/2024
Project M01109570 Alteration · LOC Issued · 11/22/2024
Project M01109579 Alteration · Permit Entire · 11/22/2024
Project M01109584 Alteration · Permit Entire · 11/22/2024
Project M00332464 Alteration · LOC Issued · 05/19/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,301 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch17
09/01/2026M00777320-I1Request digital key ↗
08/31/2026M00858038-I1Request digital key ↗
08/26/2026M01438587-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00231436-I1Request digital key ↗
09/05/2026M00231436-P1Request digital key ↗
09/04/2026M00332460-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00231436-P1Request digital key ↗
09/05/2026M00231436-I1Request digital key ↗
08/15/2026M00231436-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00239928-I1Request digital key ↗
09/04/2026M00332464-I1Request digital key ↗
08/15/2026M00231470-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/29/2026M00931532-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
09/05/2026M00238381-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00297919-I1Request digital key ↗
▸Applications & Permits282
▸BISPLAN / WORK APPROVAL APPLICATION144
01/31/2024123532187Open ↗
01/31/2024122922766Open ↗
05/12/2023121513889Open ↗
Showing 3 of 144 on file for this type
▸BISWORK PERMIT APPLICATION98
08/01/2024123532187Open ↗
08/01/2024122922766Open ↗
06/15/2023121513889Open ↗
Showing 3 of 98 on file for this type
▸DOB NOWLPC Approval/Permit26
09/15/2026M01109584-P1Open ↗
09/15/2026M01109584-I1Open ↗
08/26/2026M01438587-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPLACE OF ASSEMBLY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
09/26/2022123771383Open ↗
▸Seals & Professional Certifications286
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION140
02/06/2020123771383Open ↗
02/06/2020123771383Open ↗
02/06/2020123771383Open ↗
Showing 3 of 140 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/05/2026M00231436-P1Open ↗
09/05/2026M00231436-I1Open ↗
09/05/2026M00231436-P3Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/23/2026M01099034-I1Open ↗
09/23/2026M01099034-I1Open ↗
09/23/2026M01099034-I1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST28
08/02/2019123801047Open ↗
06/21/2019123687670Open ↗
06/18/2019123212335Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026M01109584-P1Open ↗
09/23/2026M01109584-I1Open ↗
09/23/2026M01438587-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
08/02/2019123801047Open ↗
06/21/2019123687670Open ↗
06/21/2019123687670Open ↗
Showing 3 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment132
▸BISSCHEDULE B - PLUMBING42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISSELF-CERT PLUMBING NOTICE31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
10/19/2018123532178Open ↗
10/17/2018123532178Open ↗
09/10/2018123532178Open ↗
Showing 3 of 20 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRINKLER SYSTEMS3
08/26/2024123532187Open ↗
08/26/2024122922766Open ↗
10/03/2023121513889Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLUMBING (PL) SIGNOFF1
08/02/2021123811474Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
08/02/2021123811474Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
08/02/2019123801047Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos92
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
09/05/2026M00231436-I1Open ↗
09/05/2026M00231436-P3Open ↗
09/05/2026M00231436-P1Open ↗
Showing 3 of 27 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
12/13/2020140986048Open ↗
05/08/2020123811474Open ↗
02/06/2020123771383Open ↗
Showing 3 of 25 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance54
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS33
02/06/2020123771383Open ↗
02/06/2020123771383Open ↗
10/29/2019123771409Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
08/09/2022140986048Open ↗
09/24/2021140986048Open ↗
09/07/2021123771383Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
08/09/2022140986048Open ↗
01/20/2021123687670Open ↗
06/29/2020123771409Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY13
09/26/2022123771383Open ↗
08/09/2022140986048Open ↗
09/24/2021140986048Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs143
▸BISADMINISTRATIVE OBJECTIONS42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISLANDMARKS APPROVAL41
12/13/2020140986048Open ↗
05/22/2020123811474Open ↗
02/06/2020123771383Open ↗
Showing 3 of 41 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST38
08/10/2022140986048Open ↗
08/02/2021123811474Open ↗
07/22/2021123801047Open ↗
Showing 3 of 38 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
10/06/2022123771383Open ↗
08/02/2021123811474Open ↗
Showing 2 of 6 on file for this type
▸BISSUPERSEDING LETTER3
08/01/2024122922766Open ↗
08/01/2024123532187Open ↗
06/15/2023121513889Open ↗
▸BISLANDMARKS SIGNOFF3
08/09/2022140986048Open ↗
08/02/2021123811474Open ↗
06/29/2020123771409Open ↗
▸BISFINAL1
08/26/2024123532187Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL (MH) SIGNOFF1
08/02/2021123811474Open ↗
▸Cost, Insurance & Ownership101
▸BISCOST AFFIDAVIT97
08/09/2022140986048Open ↗
01/20/2021123687670Open ↗
12/13/2020140986048Open ↗
Showing 3 of 97 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
10/22/2024123532187Open ↗
08/02/2021123811474Open ↗
07/22/2021123801047Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
08/05/2019123801047Open ↗
▸Filing & Intake Forms148
▸BISEFILING COVER SHEET63
04/13/2020123811474Open ↗
02/06/2020123771383Open ↗
10/29/2019123771409Open ↗
Showing 3 of 63 on file for this type
▸BISADDITIONAL INFORMATION57
09/02/2022123771383Open ↗
09/02/2022123771383Open ↗
02/08/2021123811474Open ↗
Showing 3 of 57 on file for this type
▸BISBOROUGH INTAKE FORM23
08/01/2024123532187Open ↗
08/01/2024122922766Open ↗
06/15/2023121513889Open ↗
Showing 3 of 23 on file for this type
▸BISeFiling Job Application Cover Sheet5
12/13/2020140986048Open ↗
Showing 1 of 5 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type