← Back
BuildNYC
Office with commercial, 7-19 stories
Universal Building
16 WEST 32ND STREET · Name © OpenStreetMap contributors · BIN 1015827
💬 Discuss this project
1908Year Built
11Stories
O6Building Class
C6-4Zoning
63,479 sfGross Floor Area
40Units
LL97 Covered1 Active Violation 1 old, status unconfirmed ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: PND · 6,550 sf lot · 9.69 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsPnd, LLC2 filings
RoofPnd, LLC1p · 1 filing · 3 docs
PenthousePnd, LLC1p · 1 filing · 3 docs
Site & exteriorHeavy duty sidewalk shed2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PND3607/08/2026
Nara Bank303/21/2026
BBCN Bank203/21/2026
111786 Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gee2000 Architect110/16/2024
New York & Company402/09/2024
Enthink Engineers107/19/2023
Doric Consultants106/09/2023
Lighthouse103/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MGJM203/21/2026
New York & Company403/21/2026
CB Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MNK Enterprises NYScaffold407/08/2026
Ariston ChimneyGeneral Contractor303/21/2026
DNS Fine BuildersScaffold307/08/2026
Tea SanGeneral Contractor107/08/2026
MGJM CoGeneral Contractor107/08/2026
Attractive Lighting ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gee2000 Architect691110/16/2024
New York Engineering Associates851502/09/2024
Doric Prof. Engineering1537106/09/2023
Building Lifecycle
All (111)Filed (7)Permit Issued (8)Signed Off (6)Facade (FISP) (12)Violation (60)Inspection (1)Special Inspection (17)
01/16/2026
Signed off — Alteration
RENOVATION OF EXISTING LOBBY ON 1ST FLOOR, PUBLIC HALLWAYS FROM 3RD TO 11TH FLOOR, NEW FINISHES, REPLACE DOORS AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EXIT.
M01108847-I1
07/07/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00905971-I1
10/22/2024
Permit issued — General Construction
M01108847-I1-GC
10/16/2024
Filed — Alteration
RENOVATION OF EXISTING LOBBY ON 1ST FLOOR, PUBLIC HALLWAYS FROM 3RD TO 11TH FLOOR, NEW FINISHES, REPLACE DOORS AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EXIT.
M01108847-I1
09/26/2024
Special inspection requirement — Fenestration air leakage
PETER GEE
09/26/2024
Special inspection requirement — Insulation placement and R values
PETER GEE
09/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PETER GEE
09/26/2024
Special inspection requirement — Fenestration areas
PETER GEE
09/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PETER GEE
09/26/2024
Special inspection requirement — Air barrier - visual inspection
PETER GEE
09/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
PETER GEE
09/10/2024
Special inspection requirement — Energy Code Compliance Inspections
PETER GEE
09/10/2024
Special inspection requirement — Final
PETER GEE
09/10/2024
Special inspection requirement — Interior lighting power
PETER GEE
07/15/2024
Permit issued — Sidewalk Shed
M00905971-I1-SH
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2024
Signed off — Alteration
Install chimney liner and replace metal extension.
M00912910-I1
04/03/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/19/2024
Signed off — Alteration
Install chimney liner and replace metal extension.
M00912910-S1
02/13/2024
Permit issued — General Construction
M00912910-S1-GC
02/09/2024
Filed — Alteration
Install chimney liner and replace metal extension.
M00912910-S1
02/09/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
02/09/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
02/07/2024
Filed — Alteration
Install chimney liner and replace metal extension.
M00912910-P1
01/23/2024
Special inspection requirement — Final
LOUIS ARENA
01/19/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
01/19/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
01/19/2024
Special inspection requirement — Chimneys and vents
LOUIS ARENA
12/21/2023
Cycle 9 facade report submitted
12/20/2023
Cycle 9 facade report signed — SWARMP
12/08/2023
Cycle 9 facade inspection completed
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/31/2023
Permit issued — Boiler Equipment
M00912910-I1-BE
08/30/2023
Filed — Alteration
Install chimney liner and replace metal extension.
M00912910-I1
08/02/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
07/19/2023
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M00905971-I1
07/19/2023
Permit issued — Sidewalk Shed
M00905971-I1-SH
06/29/2023
Signed off — Alteration
Mechanical A/C unit installation work as shown on the plan.
M00878054-I1
06/27/2023
Permit issued — Mechanical Systems
M00878054-I1-MS
06/09/2023
Filed — Alteration
Mechanical A/C unit installation work as shown on the plan.
M00878054-I1
08/19/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/19/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/19/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/30/2020
Signed off — Alteration
M00136349-I1
02/13/2020
Cycle 8 facade report signed — SWARMP
02/05/2020
Cycle 8 facade inspection completed
11/16/2019
Cycle 8 facade report submitted
11/12/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/15/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2019
Permit issued — Sidewalk Shed
M00136349-I1-SH
04/30/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/06/2019
Filed — Alteration
M00136349-I1
03/06/2019
Permit issued — Sidewalk Shed
M00136349-I1-SH
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/17/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/23/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMGJM Co10/22/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY07/15/2024
DOB NOWGeneral ConstructionSigned-offAriston Chimney02/13/2024
DOB NOWBoiler EquipmentSigned-offMmi Mechanical08/31/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises NY07/19/2023
DOB NOWMechanical SystemsSigned-offTea San06/27/2023
DOB NOWSidewalk ShedSigned-offDNS Fine Builders05/15/2019
DOB NOWSidewalk ShedSigned-offDNS Fine Builders03/06/2019
BISSPISSUEDPacific Plumbing & Heating05/16/2018
BISOTISSUEDToji Develop NY05/11/2018
BISOTISSUEDToji Develop NY03/14/2018
BIS—ISSUEDNeptune Signs & Awnings09/01/2017
BIS—ISSUEDNeptune Signs & Awnings08/18/2017
BIS—ISSUEDNeptune Signs & Awnings08/18/2017
BISMHISSUEDM.b.kim, Architect02/24/2015
BIS—ISSUEDBerger Signs05/18/2012
BIS—ISSUEDBerger Signs05/18/2012
BISPLISSUEDPlumbing & Heating Doctor06/17/2011
BISMHISSUEDSeong Sim05/05/2011
BISOTISSUEDMaru Construction01/25/2011
BISPLISSUEDQBK Plumbing & Heating02/09/2010
BISMHISSUEDJose Vieira01/19/2010
BISSPISSUEDC.R.U. Mechan & Heating08/26/2005
BISMHISSUEDSpindle08/04/2005
BISMHISSUEDTemp-Rite Refrigeration Services11/25/2003
BISOTISSUEDJoseph Inter06/12/2003
BISBLISSUEDEast Coast Mechanical06/25/2001
BIS—RE-ISSUEDMainland Plumbing & Heating07/12/2000
BISOTISSUEDWagner/Weintruab PLG & Heating Enterprises07/18/1997
BIS—ISSUEDQ&S Sing & Awning06/19/1997
BISEQISSUEDSpring Scaff11/21/1996
BISEQISSUEDLK Future Co08/13/1996
BISMHISSUEDLK Future Co08/13/1996
BISOTISSUEDL 7 K Future Co07/09/1996
BISPLISSUEDAvon Plumbing & Heating06/09/1995
BISFSISSUEDChampion Combustion05/15/1995
BISOTISSUEDDaniel Weintraub Master Plumbing05/15/1995
BISOTISSUEDCity King Decoration01/19/1995
BISSPRE-ISSUEDGould Autmatic Sprinkler Co02/09/1993
BISOTISSUEDAnson Aluminum Steel Products Co08/06/1992
+ 8 more permits on file
1 project
Gas
FiledStatusContractorScope
———Gas
7 projects · most recent 06/06/2025
General Wiring Lighting
FiledStatusContractorScope
06/06/2025CompleteAttractive Lighting Electrical—
01/14/2025CompleteEtricity Electrical CoGeneral Wiring
11/27/2024CompleteAttractive Lighting Electrical—
07/19/2023Permit IssuedRichard Neu—
02/28/2019Permit IssuedRichard Neu—
08/14/2018CompleteY.S. ElectricGeneral Wiring, Lighting
04/06/2018CompleteY.S. ElectricGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/03/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
09/26/2024Fenestration air leakagePETER GEEenergy_progress
09/26/2024Insulation placement and R valuesPETER GEEenergy_progress
09/26/2024Fire-Resistant Penetrations and JointsPETER GEEspecial
09/26/2024Fenestration areasPETER GEEenergy_progress
09/26/2024Fenestration and door U-factor and product ratingsPETER GEEenergy_progress
09/26/2024Air barrier - visual inspectionPETER GEEenergy_progress
09/26/2024Fire-Resistance Rated ConstructionPETER GEEprogress
09/10/2024Energy Code Compliance InspectionsPETER GEEprogress
09/10/2024FinalPETER GEEprogress
09/10/2024Interior lighting powerPETER GEEenergy_progress
02/09/2024Heating SystemsLOUIS ARENAspecial
02/09/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
01/23/2024FinalLOUIS ARENAprogress
01/19/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
01/19/2024Heating SystemsLOUIS ARENAspecial
01/19/2024Chimneys and ventsLOUIS ARENAspecial
08/02/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 182 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/31/2026M00878054-I1Request digital key ↗
08/29/2026M00905971-I1Request digital key ↗
08/28/2026M00912910-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00136349-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION15
05/10/2018123368042Open ↗
02/08/2018123211372Open ↗
08/24/2017123118848Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION13
05/17/2018123368042Open ↗
05/14/2018123368042Open ↗
03/15/2018123211372Open ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications56
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
10/04/2019123368042Open ↗
07/25/2018123368042Open ↗
05/10/2018123368042Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
05/10/2018123368042Open ↗
08/24/2017123118848Open ↗
08/24/2017123118857Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/06/2026M00913302-I1Open ↗
09/05/2026M00136349-I1Open ↗
08/31/2026M00878054-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M01108847-I1Open ↗
09/01/2026M01108847-I1Open ↗
09/01/2026M01108847-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00912910-I1Open ↗
09/23/2026M00912910-I1Open ↗
09/01/2026M01108847-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
05/10/2018123368042Open ↗
08/24/2017123118848Open ↗
08/24/2017123118857Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
05/23/2012121082602Open ↗
05/23/2012121082611Open ↗
01/28/2011120581183Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/21/2015140313630Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/21/2015140313630Open ↗
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE5
02/23/2012120393555Open ↗
07/15/2011120393555Open ↗
04/20/2010120221134Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS2
10/18/2011120221134Open ↗
10/18/2011120221134Open ↗
▸BISSCHEDULE B - PLUMBING2
06/30/2010120393555Open ↗
12/10/2009120221134Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/10/2018123368042Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
10/18/2011120221134Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
02/08/2018123211372Open ↗
▸BISSTREET TREE CHECKLIST1
06/30/2010120393555Open ↗
▸Environmental & Asbestos14
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
01/28/2011120581183Open ↗
06/30/2010120393555Open ↗
06/30/2010120393555Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/31/2026M00878054-I1Open ↗
08/28/2026M00912910-I1Open ↗
08/13/2026M00912910-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/08/2018123211372Open ↗
02/21/2015140313630Open ↗
05/23/2012121082602Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
05/10/2018123368042Open ↗
05/10/2018123368042Open ↗
05/10/2018123368042Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/04/2019123368042Open ↗
07/25/2018123368042Open ↗
07/17/2015140313630Open ↗
▸BISNYCECC ANALYSIS1
02/21/2015140313630Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/21/2015140313630Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/21/2015140313630Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/21/2015140313630Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
07/25/2018123368042Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
10/04/2019123368042Open ↗
07/25/2018123368042Open ↗
07/17/2015140313630Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
05/23/2012121082602Open ↗
05/23/2012121082611Open ↗
01/28/2011120581183Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
02/12/2013120393555Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
10/04/2019123368042Open ↗
07/25/2018123368042Open ↗
05/10/2018123368042Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET10
05/10/2018123368042Open ↗
02/08/2018123211372Open ↗
08/24/2017123118848Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION4
01/28/2013120393555Open ↗
05/07/2012120581183Open ↗
04/18/2012120581183Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
10/04/2019123368042Open ↗
07/25/2018123368042Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/21/2015140313630Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/29/2013121082611Open ↗
07/29/2013121082602Open ↗
05/09/2011120393555Open ↗