| Owner | Filings | Most Recent |
|---|---|---|
| DASNY | 191 | 09/23/2026 |
| RELATED SERVICES | 7 | 07/08/2026 |
| NYCDDC | 3 | 07/08/2026 |
| CUNY | 27 | 04/09/2026 |
| STEEL CONSTRUCTION LLC | 5 | 03/22/2026 |
| DORMITORY AUTHORITY OF THE STATE OF NEW YORK | 6 | 03/22/2026 |
| CUNY 042 | 5 | 03/22/2026 |
| DEPARTMENT OF EDUCATION | 1 | 03/22/2026 |
| DEPT OF EDUACATION 0 | 1 | 03/22/2026 |
| GLASS ARMOR OF NEW YORK 1 | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| NYMS CONSULTING, LLC | 1 | 08/04/2026 |
| WILLDAN ENERGY SOLUTIONS | 9 | 04/28/2026 |
| GPI | 7 | 04/02/2026 |
| JMV ARCHITECT, PLLC | 2 | 04/02/2026 |
| SBLM ARCHITECTS, PC | 8 | 04/01/2026 |
| IAQ SYSTEMS INC | 4 | 04/01/2026 |
| MICHIELLI & WYETZNER ARCHITECTS | 2 | 04/01/2026 |
| ENGINEERING GROUP ASSOCIATES, PC | 2 | 04/01/2026 |
| CSA GROUP NY ARCHITECTS & ENGINEERS | 8 | 03/04/2026 |
| PATTI & ANTHES CONSULTING ENGINEERS | 1 | 01/15/2026 |
| RAMBOLL | 2 | 12/03/2025 |
| CONAPAC SERVICES, DBA | 1 | 10/22/2025 |
| WATTS ARCHITECTS & ENGINEERS | 1 | 10/06/2025 |
| ROBERT SILMAN ASSOCIATES | 2 | 09/24/2025 |
| AHUJA PARTNERSHIP ARCHITECTS | 2 | 09/22/2025 |
| WW ENGINEERING PLLC | 4 | 04/03/2025 |
| STEPHEN ELY ARCHITECT | 4 | 01/27/2025 |
| ANDREW BARTLE, AIA | 1 | 12/31/2024 |
| HERITAGE ARCHITECTURE | 4 | 12/12/2024 |
| KPFF CONSULTING ENGINEERS | 2 | 02/26/2024 |
| KNF SERVICES CROP | 2 | 02/06/2023 |
| O'BRIEN AND GERE ENGINEERS INC. | 9 | 09/23/2022 |
| WALTER T. GORMAN, P.E., P.C. | 1 | 05/31/2022 |
| DJ ASSOCIATES ARCHITECT,PC | 2 | 05/03/2022 |
| ENTHINK ENGINEERS LLC | 2 | 04/15/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 13 | 03/21/2026 |
| AK CONSULTING SERVICES | 6 | 03/21/2026 |
| JMV ASSOCIATES | 32 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 16 | 03/21/2026 |
| HERITAGE ARCHITECTURE | 7 | 03/21/2026 |
| NYCCODE | 6 | 03/21/2026 |
| Enviornmental & Energy Solutions | 11 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 2 | 03/21/2026 |
| MUNICIPAL EXPEDITING | 2 | 03/21/2026 |
| WALTER T. GORMAN, PE, PC | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| AKS INTERNATIONAL INC | General Contractor | 28 | 07/08/2026 |
| KNIGHTSBRIDGE CONST CORP | General Contractor | 19 | 07/08/2026 |
| RELATED SERVICES LLC | General Contractor | 9 | 07/08/2026 |
| F.S. WORKS INC | Fire Protection | 8 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 7 | 07/08/2026 |
| GLASS ARMOR OF NEW YORK I | General Contractor | 6 | 07/08/2026 |
| MAVEN RESTORATION INC | General Contractor | 6 | 08/26/2026 |
| BA GLOBAL CONSTRUCTION | General Contractor | 4 | 03/21/2026 |
| GRYPHON CONSTRUCTION INC | General Contractor | 4 | 07/08/2026 |
| TEDCO GROUP INC | General Contractor | 4 | 04/09/2026 |
| I.M.P. PLBG. & HTG. CORP | Plumbing | 4 | 07/08/2026 |
| STEEL CONSTRUCTION LLC | General Contractor | 3 | 03/21/2026 |
| JUSTIN GROUP INC | General Contractor | 3 | 04/09/2026 |
| SKY HEIGHTS CONSTRUCTION | General Contractor | 3 | 03/21/2026 |
| N.B.A CONSTRUCTION INC | General Contractor | 3 | 03/21/2026 |
| FJP MECHANICAL INC | Plumbing | 3 | 09/23/2026 |
| SIMPLE AIR HVAC CORP | General Contractor | 2 | 08/07/2026 |
| EASTERN PLBG & MECH CONTR | Plumbing | 2 | 07/08/2026 |
| JAYLEX NYC CORP | General Contractor | 2 | 03/21/2026 |
| INTERSTATE MECH SVCS INC | General Contractor | 2 | 07/08/2026 |
| KRISTINE DENAPOLI | Electrical | 2 | 03/21/2026 |
| SRR HOLDINGS LLC | General Contractor | 1 | 07/08/2026 |
| VOLMAR CONSTRUCTION INC | General Contractor | 1 | 07/08/2026 |
| AERO ELECTRIC CORP | Electrical | 1 | 03/21/2026 |
| VARSITY PLBG AND HTG INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 19 | 08/04/2026 |
| FUTURE TECH CONSULTANTS O | 589 | 31 | 12/03/2025 |
| TECTONIC ENGINEERING CONS | 106 | 4 | 11/06/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 1 | 12/31/2024 |
| STRUCT. ENGINEERING INTEG | 4174 | 1 | 02/11/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Standpipe | Permit Issued | FJP MECHANICAL INC | 09/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | AMM GEN'L CONTRACTING.INC | 09/15/2026 |
| DOB NOW | Plumbing | Permit Issued | FJP MECHANICAL INC | 09/14/2026 |
| DOB NOW | Boiler Equipment | Permit Issued | FJP MECHANICAL INC | 09/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SIMPLE AIR HVAC CORP | 08/06/2026 |
| DOB NOW | General Construction | Permit Issued | MAVEN RESTORATION INC | 08/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MAVEN RESTORATION INC | 08/04/2026 |
| DOB NOW | Structural | Permit Issued | MAVEN RESTORATION INC | 08/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MAVEN RESTORATION INC | 07/08/2026 |
| DOB NOW | Structural | Permit Issued | MAVEN RESTORATION INC | 07/08/2026 |
| DOB NOW | General Construction | Permit Issued | MAVEN RESTORATION INC | 06/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | I.M.P. PLBG & HTG CORP | 06/05/2026 |
| DOB NOW | Plumbing | Permit Issued | VARSITY PLBG AND HTG INC | 05/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MARIC MECHANICAL INC | 05/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SIMPLE AIR HVAC CORP | 05/15/2026 |
| DOB NOW | General Construction | Permit Issued | SRR HOLDINGS LLC | 05/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | ASHLAR MECHANICAL CORP | 04/10/2026 |
| DOB NOW | Plumbing | Permit Issued | I.M.P. PLBG. & HTG. CORP | 03/16/2026 |
| DOB NOW | Sprinklers | Permit Issued | ASHLAR MECHANICAL CORP | 03/06/2026 |
| DOB NOW | Structural | Permit Issued | VOLMAR CONSTRUCTION INC | 02/27/2026 |
| DOB NOW | General Construction | Permit Issued | JUSTIN GROUP INC | 01/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JUSTIN GROUP INC | 01/27/2026 |
| DOB NOW | Structural | Permit Issued | GRYPHON CONSTRUCTION INC | 12/24/2025 |
| DOB NOW | General Construction | Permit Issued | GRYPHON CONSTRUCTION INC | 12/24/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | TEDCO GROUP INC | 12/17/2025 |
| DOB NOW | Plumbing | Signed-off | I.M.P. PLBG. & HTG. CORP | 12/16/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | JAYLEX NYC | 10/22/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | AKS INTERNATIONAL INC | 09/18/2025 |
| DOB NOW | Structural | Permit Issued | AKS INTERNATIONAL INC | 09/17/2025 |
| DOB NOW | General Construction | Permit Issued | AKS INTERNATIONAL INC | 09/17/2025 |
| DOB NOW | General Construction | Permit Issued | KNIGHTSBRIDGE CONST CORP | 09/03/2025 |
| DOB NOW | Sprinklers | Permit Issued | ASHLAR MECHANICAL CORP | 08/19/2025 |
| DOB NOW | General Construction | Permit Issued | KNIGHTSBRIDGE CONST CORP | 08/07/2025 |
| DOB NOW | General Construction | Permit Issued | KNIGHTSBRIDGE CONST CORP | 08/05/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | TEDCO GROUP INC | 04/10/2025 |
| DOB NOW | Structural | Permit Issued | GRYPHON CONSTRUCTION INC | 03/31/2025 |
| DOB NOW | Plumbing | Permit Issued | I.M.P. PLBG. & HTG. CORP | 03/05/2025 |
| DOB NOW | Sprinklers | Permit Issued | ASHLAR MECHANICAL CORP | 02/18/2025 |
| DOB NOW | General Construction | Permit Issued | GRYPHON CONSTRUCTION INC | 01/13/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | KNIGHTSBRIDGE CONST CORP | 08/15/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/02/2026 | Permit Issued | SIMPLE AIR HVAC CORP | Air Conditioning Systems | Cooling Vertiv DS105HUA1EI 360,000 BTU · Crac Unit ×9 DS053HUA1EI 180,000 BTU · Crac Unit ×6 DS035HUA1EI 120,000 BTU ×3 VS035HUA1EI 120,000 BTU · Crac Unit ×3 |
| 01/15/2026 | — | — | Refrigeration Systems | Refrigeration York YD RR RS H9 - EZ D 2,000 tons · Chiller ×1 |
| 09/23/2025 | — | — | Air Conditioning Systems, Heating Systems | |
| 04/03/2025 | Permit Issued | GRYPHON CONSTRUCTION INC | Ventilation Systems | Ventilation |
| 09/23/2022 | Permit Issued | AKS INTERNATIONAL INC | Cooling Towers | Cooling Tower Mueller AT120MHV 8,642,974 BTU · Cooling Tower ×1 |
| 03/06/2020 | — | — | Associated Ducts and Piping | Ducts & Piping N/A N/A Chiller ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/02/2026 | Permit Issued | I.M.P. Plumbing & Heating CORP. | 88 heads |
| 04/01/2026 | Permit Issued | AMM GEN'L CONTRACTING.INC | 135 heads |
| 12/24/2024 | — | — | — |
| 09/01/2022 | Permit Issued | ASHLAR MECHANICAL CORP | 18 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | Permit Issued | FJP MECHANICAL INC | Gas |
| 04/02/2026 | Permit Issued | VARSITY PLBG AND HTG INC | Water/Sanitary |
| 04/01/2026 | — | — | — |
| 09/23/2025 | — | — | Gas, Storm, Water/Sanitary |
| 09/23/2025 | Permit Issued | FJP MECHANICAL INC | — |
| 04/03/2025 | Permit Issued | I.M.P. PLUMBING & HEATING CORP. | Water/Sanitary |
| 12/18/2023 | Signed-off | I.M.P. PLBG. & HTG. CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | Permit Issued | GRAND LINE ELECTRIC LLC | General Wiring |
| 08/27/2026 | Permit Issued | JK ELECTRICAL INC | — |
| 06/23/2026 | Permit Issued | ARK SYSTEMS ELEC. CORP | General Wiring |
| 01/12/2026 | Permit Issued | JK ELECTRICAL INC | General Wiring |
| 11/21/2025 | Complete | MAC FHIONNGHAILE & SONS | General Wiring |
| 08/26/2025 | Complete | SUNRISE ELEC'L SERVICES | General Wiring |
| 07/29/2025 | Permit Issued | PETER J. CATANZARO, INC. | General Wiring |
| 07/29/2025 | Permit Issued | PETER J. CATANZARO, INC. | General Wiring |
| 07/29/2025 | Permit Issued | PETER J. CATANZARO, INC. | General Wiring |
| 07/29/2025 | Permit Issued | PETER J. CATANZARO, INC. | General Wiring |
| 03/05/2025 | Permit Issued | PALACE ELEC'L CONTR'S INC | General Wiring |
| 01/15/2025 | Permit Issued | REDD ELECTRICAL SVCS INC | General Wiring |
| 11/20/2024 | Permit Issued | LCJ ELEC'L CONTR'S INC | General Wiring |
| 01/13/2024 | Complete | ALLRAN ELECTRIC OF NY LLC | HVAC Wiring |
| 05/19/2023 | Permit Issued | UNISYS ELECTRIC INC. | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/01/2026 | Permit Issued | AMM GEN'L CONTRACTING.INC | Steel |
| 09/24/2025 | — | — | Steel, Concrete |
| 01/24/2022 | Permit Issued | VOLMAR CONSTRUCTION INC | 1 scope_items |
| 01/21/2020 | — | — | Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/08/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/15/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/07/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/17/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 02/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/04/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/04/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/22/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/19/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/19/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/19/2025 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 06/05/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/20/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 03/11/2025 | Pass-Final PL - Underground | Pass | View ↗ |
| 05/29/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/27/2023 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 12/29/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/29/2022 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 12/27/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/27/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/25/2026 | High-Pressure Fuel-Gas Piping (Welding) | MARISA HARTE | special |
| 05/12/2026 | Final | Firas Karkar | progress |
| 05/12/2026 | Mechanical Systems | MARISA HARTE | special |
| 05/04/2026 | Fire-Resistant Penetrations and Joints | GEORGE GHEBRYAL | special |
| 05/04/2026 | Energy Code Compliance Inspections | GEORGE GHEBRYAL | progress |
| 05/04/2026 | Final | GEORGE GHEBRYAL | progress |
| 05/04/2026 | HVAC-R and service water piping design and insulation | GEORGE GHEBRYAL | energy_progress |
| 05/04/2026 | Post-installed Anchors | GEORGE GHEBRYAL | special |
| 05/04/2026 | Mechanical Systems | GEORGE GHEBRYAL | special |
| 05/01/2026 | Structural Stability – Alterations of existing buildings | GEORGE GHEBRYAL | special |
| 05/01/2026 | Structural Steel - Details | GEORGE GHEBRYAL | special |
| 05/01/2026 | Fire-Resistant Penetrations and Joints | GEORGE GHEBRYAL | special |
| 05/01/2026 | Sprayed fire-resistant materials | GEORGE GHEBRYAL | special |
| 05/01/2026 | Sprinkler Systems | GEORGE GHEBRYAL | special |
| 05/01/2026 | Mastic and Intumescent Fire-resistant Coatings | GEORGE GHEBRYAL | special |
| 05/01/2026 | Post-installed Anchors | GEORGE GHEBRYAL | special |
| 05/01/2026 | Final | GEORGE GHEBRYAL | progress |
| 05/01/2026 | Fire-Resistant Penetrations and Joints | GEORGE GHEBRYAL | special |
| 05/01/2026 | Final | GEORGE GHEBRYAL | progress |
| 05/01/2026 | Structural Steel - Welding | GEORGE GHEBRYAL | special |
| 05/01/2026 | Structural Steel - High Strength Bolting | GEORGE GHEBRYAL | special |
| 04/22/2026 | Final | MARISA HARTE | progress |
| 04/22/2026 | Electrical motors and elevators | MARISA HARTE | energy_progress |
| 04/22/2026 | HVAC-R and service water heating equipment | MARISA HARTE | energy_progress |
| 04/22/2026 | Duct leakage testing, insulation and design | MARISA HARTE | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| City College of New York | Education | Floors 1, 2 | Project M01284945 |
| The City University of New York | Unknown | — | Project M01005211 |
| CCNY | Education | — | Project M00551317 |
| CUNY City College | Medical / Healthcare | Floor 1 | Project M00499822 |