Parsonage, rectory
160 EAST 35 STREET
MANHATTAN · Murray Hill-Kips Bay · BIN 1018531
💬 Discuss this project
1915Year Built
5Stories
M3Building Class
R8BZoning
11,500 sfGross Floor Area
1Units
0 Open Violations
Parsonage, rectory · Owner of record: 160 E35 OWNER INC. · 3,665 sf lot · 3.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof11p · 1 filing · 20 docs
Floor 512p · 1 filing · 20 docs
Floor 413p · 1 filing · 20 docs
Floor 312p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar13p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
160 E 35 OWNER INC103/22/2026
E35 OWNER1803/21/2026
BLESSED TRINITY CHURCH103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/28/2017$8.2M—CONGREGATION FOR THE LIGHT, INC. → 160 E35 OWNER INC.$717/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CELESTE UMPIERRE ARCHITECT808/02/2023
POLISE CONSULTING ENGINEERS DPC512/21/2021
ASHRAF CORP101/22/2020
GACE DPC112/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC2403/21/2026
DVA Advisors203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL INTERIORS, INCGeneral Contractor1407/08/2026
HYDRONIC CONCEPTS NY P&HPlumbing507/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor403/21/2026
BASIL, OMARElectrical103/21/2026
LEVINE, GARYElectrical103/21/2026
MOSCATI, MICHAELElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACE STRUCTURAL ENGINEERIN4961308/02/2023
Building Lifecycle
All (81)Filed (15)Permit Issued (16)Signed Off (4)Violation (6)Inspection (6)Objection (4)Special Inspection (30)
08/15/2023
Special inspection requirement — Fenestration air leakage
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Air barrier continuity plan testing
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Insulation placement and R values
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Interior lighting power
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Metering
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Exterior lighting power
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Electrical motors and elevators
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Maintenance information
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Air barrier - visual inspection
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Fenestration areas
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY UGBEBOR
08/15/2023
Special inspection requirement — Lighting controls
ANTHONY UGBEBOR
08/02/2023
Filed — Alteration CO
M00478982-P7
08/02/2023
Special inspection requirement — Lighting controls
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Interior lighting power
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Insulation placement and R values
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Air barrier - visual inspection
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Electrical motors and elevators
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Air barrier continuity plan testing
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Maintenance information
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Fenestration air leakage
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Metering
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Fenestration areas
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Exterior lighting power
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY UGBEBOR
08/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
07/25/2023
Filed — Alteration CO
M00478982-P6
06/28/2023
Filed — Alteration CO
M00478982-P5
06/14/2023
Filed — Alteration CO
M00478982-P4
05/15/2023
Filed — Alteration CO
M00478982-P3
01/23/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/16/2022
Signed off — Alteration
Removal, replacement, and installation of new plumbing fixtures and piping in conjunction with Job #123766317 and M00190370. See Scope of Work for Water/Sanitary for fixture counts.
M00190363-I1
12/08/2022
Signed off — Alteration
HEREWITH FILING FOR STRUCTURAL WORK AS PER PLANS
M00274272-I1
12/05/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/25/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/09/2022
Signed off — Alteration
Mechanical work in conjunction with Job #123766317
M00190370-I1
04/27/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/07/2022
Filed — Alteration CO
M00478982-P2
04/04/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/30/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/08/2022
Filed — Alteration CO
M00478982-P1
01/06/2022
Permit issued — Plumbing
M00190363-I1-PL
01/05/2022
Objection resolved — Addressed
12/23/2021
Objection raised — Scope
12/21/2021
Filed — Alteration
Mechanical work in conjunction with Job #123766317
M00190370-P2
12/10/2021
Permit issued — Plumbing
M00190363-I1-PL
09/29/2021
Permit issued — Structural
M00274272-I1-ST
09/23/2021
Permit issued — Mechanical Systems
M00190370-I1-MS
09/03/2021
Signed off — Alteration
M00293193-I1
08/13/2021
Permit issued — General Construction
M00478982-I1-GC
05/10/2021
Permit issued — Structural
M00274272-I1-ST
04/16/2021
Permit issued — Mechanical Systems
M00190370-I1-MS
03/25/2021
Filed — Alteration CO
M00478982-I1
01/19/2021
Permit issued — Supported Scaffold
M00293193-I1-SF
10/13/2020
Permit issued — Plumbing
M00190363-I1-PL
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHYDRONIC CONCEPTS NY P&H01/06/2022
DOB NOWPlumbingSigned-offHYDRONIC CONCEPTS NY P&H12/10/2021
DOB NOWStructuralSigned-offCENTRAL INTERIORS, INC09/29/2021
DOB NOWMechanical SystemsSigned-offCENTRAL INTERIORS, INC09/23/2021
DOB NOWGeneral ConstructionPermit IssuedCENTRAL INTERIORS, INC08/13/2021
DOB NOWStructuralSigned-offCENTRAL INTERIORS, INC05/10/2021
DOB NOWMechanical SystemsSigned-offCENTRAL INTERIORS, INC04/16/2021
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC01/19/2021
DOB NOWPlumbingSigned-offHYDRONIC CONCEPTS NY P&H10/13/2020
DOB NOWMechanical SystemsSigned-offCENTRAL INTERIORS, INC10/08/2020
DOB NOWStructuralSigned-offCENTRAL INTERIORS, INC10/08/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC01/23/2020
DOB NOWStructuralSigned-offCENTRAL INTERIORS, INC12/21/2019
DOB NOWMechanical SystemsSigned-offCENTRAL INTERIORS, INC12/05/2019
DOB NOWPlumbingSigned-offHYDRONIC CONCEPTS NY P&H09/25/2019
DOB NOWPlumbingSigned-offHYDRONIC CONCEPTS NY P&H08/23/2019
BISOTISSUEDCENTRAL INTERIORS, INC09/21/2021
BISOTISSUEDCENTRAL INTERIORS, INC09/21/2021
BISOTISSUEDCENTRAL INTERIORS, INC09/21/2021
BISOTISSUEDCENTRAL INTERIORS, INC09/21/2021
BISOTISSUEDCENTRAL INTERIORS, INC09/21/2021
BISOTISSUEDCENTRAL INTERIORS, INC04/08/2021
BISEQISSUEDCUSTOM GLASSWORKS LLC10/29/2020
BISOTISSUEDCENTRAL INTERIORS, INC10/20/2020
BISOTISSUEDCENTRAL INTERIORS, INC09/30/2020
BISOTISSUEDCENTRAL INTERIORS, INC09/30/2020
BISOTISSUEDCENTRAL INTERIORS, INC09/30/2020
BISOTISSUEDCENTRAL INTERIORS, INC06/10/2020
BISOTISSUEDCENTRAL INTERIORS, INC06/10/2020
BISOTISSUEDCENTRAL INTERIORS, INC06/10/2020
BISOTISSUEDCENTRAL INTERIORS, INC09/03/2019
BISOTISSUEDCENTRAL INTERIORS, INC07/26/2019
BISOTISSUEDCENTRAL INTERIORS, INC04/10/2019
BISOTISSUEDCENTRAL INTERIORS, INC11/15/2018
BISEQISSUEDL AND B CONSTRUCTION NY INC07/29/2003
2 projects · most recent 11/24/2021
General Wiring
FiledStatusContractorScope
11/24/2021CompleteWEBSITE ELECTRIC CORP.General Wiring
04/06/2021CompleteJAM ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/23/2023Pass-Final CND-Occupancy InspectionPassView ↗
12/05/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/25/2022Fail-Final General Construction Non-Directive 14FailView ↗
04/27/2022Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2022Fail-Final CND-Occupancy InspectionFailView ↗
03/30/2022Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 129
DateRequirementInspectorRole
08/15/2023Air barrier continuity plan testingANTHONY UGBEBORenergy_progress
08/15/2023Lighting controlsANTHONY UGBEBORenergy_progress
08/15/2023Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
08/15/2023Fire-Resistance Rated ConstructionANTHONY UGBEBORprogress
08/15/2023Energy Code Compliance InspectionsANTHONY UGBEBORprogress
08/15/2023MeteringANTHONY UGBEBORenergy_progress
08/15/2023Fenestration areasANTHONY UGBEBORenergy_progress
08/15/2023Fenestration and door U-factor and product ratingsANTHONY UGBEBORenergy_progress
08/15/2023Fenestration air leakageANTHONY UGBEBORenergy_progress
08/15/2023Interior lighting powerANTHONY UGBEBORenergy_progress
08/15/2023Air barrier - visual inspectionANTHONY UGBEBORenergy_progress
08/15/2023Maintenance informationANTHONY UGBEBORenergy_progress
08/15/2023Insulation placement and R valuesANTHONY UGBEBORenergy_progress
08/15/2023Electrical motors and elevatorsANTHONY UGBEBORenergy_progress
08/15/2023Exterior lighting powerANTHONY UGBEBORenergy_progress
08/02/2023Lighting controlsANTHONY UGBEBORenergy_progress
08/02/2023Energy Code Compliance InspectionsANTHONY UGBEBORprogress
08/02/2023Fire-Resistance Rated ConstructionANTHONY UGBEBORprogress
08/02/2023Fenestration areasANTHONY UGBEBORenergy_progress
08/02/2023MeteringANTHONY UGBEBORenergy_progress
08/02/2023Air barrier continuity plan testingANTHONY UGBEBORenergy_progress
08/02/2023Insulation placement and R valuesANTHONY UGBEBORenergy_progress
08/02/2023Exterior lighting powerANTHONY UGBEBORenergy_progress
08/02/2023Fenestration and door U-factor and product ratingsANTHONY UGBEBORenergy_progress
08/02/2023Fenestration air leakageANTHONY UGBEBORenergy_progress
Latest 25 of 129.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Khimji FoundationOfficeCellar, Floors 1–5
Project M00190370 Alteration · LOC Issued · 07/22/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 283 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch8
08/31/2026M00478982-P4Request digital key ↗
08/31/2026M00478982-P5Request digital key ↗
08/31/2026M00478982-P6Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/03/2026M00190370-I1Request digital key ↗
08/15/2026M00190370-P1Request digital key ↗
08/15/2026M00190370-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00190363-I1Request digital key ↗
08/14/2026M00190363-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00293193-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00274272-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION18
10/23/2020140970073Open ↗
09/16/2020140939260Open ↗
11/26/2019123819145Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION6
10/29/2020140970073Open ↗
10/20/2020140939260Open ↗
09/03/2019123819145Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWState DEC Permit2
08/13/2026M00190363-I1Open ↗
08/13/2026M00190363-P1Open ↗
▸BISHPD: PERMIT NOTICE1
07/19/2019123766317Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/31/2026M00478982-I1Open ↗
▸Seals & Professional Certifications155
▸DOB NOWProgress Inspector Seal & Signature119
09/30/2026M00478982-P3Open ↗
09/30/2026M00478982-P3Open ↗
09/30/2026M00478982-P3Open ↗
Showing 3 of 119 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00190363-P1Open ↗
09/05/2026M00190363-I1Open ↗
09/05/2026M00293193-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/30/2026M00478982-P3Open ↗
09/01/2026M00478982-I1Open ↗
08/29/2026M00478982-P5Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
09/03/2019123819145Open ↗
08/23/2019123819145Open ↗
07/29/2019123766317Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/23/2020140970073Open ↗
09/28/2018123468434Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/28/2018123468434Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/23/2020140970073Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/23/2020140970073Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/16/2020140939260Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
02/12/2019121189551Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist8
08/31/2026M00478982-P5Open ↗
08/31/2026M00478982-P6Open ↗
08/31/2026M00478982-P7Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes1
08/23/2019123819145Open ↗
▸BISSTREET TREE CHECKLIST1
02/12/2019121189551Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00293193-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/31/2026M00478982-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/31/2026M00478982-I1Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
09/16/2020140939260Open ↗
09/03/2019123819145Open ↗
09/28/2018123468434Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/05/2026M00190363-I1Open ↗
09/03/2026M00190370-I1Open ↗
08/31/2026M00478982-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
07/19/2019123766317Open ↗
07/18/2019123766317Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/03/2019123819145Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00274272-I1Open ↗
▸Energy Compliance10
▸BISAS-BUILT ENERGY ANALYSIS3
11/30/2021140939260Open ↗
11/30/2021123819145Open ↗
11/10/2021123766317Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/30/2021123819145Open ↗
09/16/2020140939260Open ↗
02/12/2019121189551Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/03/2019123819145Open ↗
08/23/2019123819145Open ↗
06/11/2019123766317Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/31/2026M00478982-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
11/30/2021140939260Open ↗
11/30/2021123819145Open ↗
10/26/2021123766317Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/31/2026M00478982-P5Open ↗
08/31/2026M00478982-P6Open ↗
08/31/2026M00478982-P7Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
01/27/2023140970073Open ↗
11/28/2022123468434Open ↗
12/01/2021140939260Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL2
01/27/2023140970073Open ↗
11/14/2022123468434Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
02/12/2019121189551Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT8
11/30/2021123819145Open ↗
11/15/2021123766317Open ↗
10/28/2021123766317Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/27/2023140970073Open ↗
11/14/2022123468434Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET6
08/23/2019123819145Open ↗
06/11/2019123766317Open ↗
02/08/2019121189551Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
12/03/2019123819145Open ↗
09/11/2019123819145Open ↗
09/03/2019123819145Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
11/18/2019123819145Open ↗
10/22/2019123468434Open ↗
10/21/2019123897863Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
10/23/2020140970073Open ↗
09/16/2020140939260Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/31/2026M00478982-I1Open ↗