← Back
BuildNYC
Elevator cooperative
Phoenix
160 EAST 65TH STREET · BIN 1042369
💬 Discuss this project
1968Year Built
31Stories
D4Building Class
C1-9Zoning
246,320 sfGross Floor Area
184Units
LL97 CoveredRent Stabilized2 Active Violations 1 unresolved · 1 paperwork only 1 likely answered 4 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: Phoenix Owners · 20,083 sf lot · 12.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofStructural concrete for walls and bulkheads21p · 2 filings · 20 docs
Floor 31Unit 31F4p · 1 filing · 8 docs
Floor 30
Floor 29
Floor 28
Floor 27Unit 27CUnder Construction2p · 1 filing · 3 docs
Floor 26Unit 26DEUnder Construction19p · 1 filing · 15 docs
Floor 25Unit 25EUnder Construction5p · 1 filing · 18 docs
Floor 24Plumbing work, 24th floor6p · 1 filing · 6 docs
Floor 23Plumbing fixture replacement, 3rd floor2p · 1 filing · 7 docs
Floor 22Unit 23BC1p · 1 filing · 3 docs
Floor 21Unit 21C5p · 1 filing · 4 docs
Floor 20
Floor 19Unit 19C9p · 2 filings · 18 docs
Floor 18
Floor 17
Floor 16Unit 16D4p · 1 filing · 6 docs
Floor 15Unit 15D1p · 1 filing · 5 docs
Floor 14Plumbing and constructionUnder Construction4p · 1 filing · 9 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Unit 9B16p · 1 filing · 8 docs
Floor 8
Floor 7Unit 7D5p · 2 filings · 11 docs
Floor 6
Floor 5
Floor 4
Floor 3Unit 3C6p · 2 filings · 15 docs
Floor 2Unit 2C, Unit 2ABUnder Construction5p · 2 filings · 12 docs
Floor 1Concrete wall repair and shoring33p · 5 filings · 20 docs
CellarConcrete wall repair and shoring34p · 5 filings · 20 docs
Sub-CellarConcrete wall repair and shoring4p · 1 filing · 15 docs
Site & exteriorMedRite41p · 9 filings · 20 docs
Filed — no permit issuedProtected bulkhead wraps around rooftop4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Phoenix Owners12303/22/2026
6465 Realty1703/21/2026
DDG Partners103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hierarch-E203/21/2026
Maryclare Nepogoda403/21/2026
Code403/21/2026
JM Zoning203/21/2026
Outsource Consultants1603/21/2026
LMS-Ace Services203/21/2026
D D Expeditors403/21/2026
BAC Developers Group503/21/2026
A K Expediting603/21/2026
Building Brothers603/21/2026
AE Design Solution403/21/2026
Dezignplus203/21/2026
Metropolis Group203/21/2026
Skyline Access103/21/2026
Municipal Building Consultants103/21/2026
Hovann203/21/2026
Socotec403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Empire NY InstallationsScaffold3007/08/2026
Andamio ScaffoldingScaffold1607/08/2026
Top Dog Plumbing & HeatingPlumbing507/08/2026
Two-Tone ContractingGeneral Contractor407/08/2026
Power Masters Electrical ContElectrical403/21/2026
HI-Tech Plumbing & HeatingPlumbing407/08/2026
Velocity Plumbing & HeatingPlumbing407/08/2026
Alphacraft Construction*General Contractor407/08/2026
JSD Construction GroupGeneral Contractor303/21/2026
Method General ContractorGeneral Contractor303/21/2026
Affect BuildGeneral Contractor303/21/2026
Signstar NYCSign hanger307/08/2026
Lake ContractingGeneral Contractor207/08/2026
CBB PlumbingPlumbing207/08/2026
Nova Interior RenovationsGeneral Contractor109/24/2026
Performance MechancialGeneral Contractor107/08/2026
Romel ConstructionGeneral Contractor106/28/2026
Ross & AssociatesGeneral Contractor104/09/2026
Stone & Oak InteriorsGeneral Contractor104/09/2026
The Renovated Home 1General Contractor107/08/2026
United Elite GroupGeneral Contractor107/08/2026
Adriatic Plumbing & HeatingPlumbing107/08/2026
American Standard P&H CororpPlumbing107/08/2026
P.H. WorksPlumbing107/08/2026
Schimenti Construction CoPlumbing107/08/2026
S & J IndustrialFire Protection107/08/2026
National MaintenanceElectrical103/21/2026
Xpress Plumbing and HeatingPlumbing107/01/2026
JLC Electrical ContractingElectrical103/21/2026
Cityone ElectricalElectrical103/22/2026
Elpo Electrical ContgElectrical103/22/2026
Gotham Wiring LicensedElectrical103/22/2026
Power Source Electric of NYElectrical103/21/2026
Fritzmartin ElectricElectrical103/21/2026
Adco ElectricalElectrical103/21/2026
Reliable Electrical ContractorsElectrical103/22/2026
A.R.P. Electrical Cont'gElectrical103/21/2026
Twintech ElectricElectrical103/22/2026
Belfor Long IslandGeneral Contractor104/09/2026
JP RocheGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Cube DBM6791109/15/2026
A2 Architect2504405/18/2026
Milrose Consultants2003203/24/2026
AK Engineering678103/12/2026
Millward Architecture Des9680103/02/2026
EDG2578209/30/2024
AG Engineering8899107/09/2024
Atlantic Engineeringlabor1381212/06/2023
Accardo Engineering1247212/06/2023
Marco Giardina Architectu7882102/23/2023
TSF Engineering1274512/07/2022
Outsource Special Inspection2827205/23/2022
MEP Inspections1102208/06/2020
Building Lifecycle
All (300)Filed (61)Permit Issued (70)Signed Off (25)Facade (FISP) (17)Violation (47)Inspection (22)Objection (28)Special Inspection (30)
09/23/2026
Permit issued — General Construction
M01453485-I1-GC
09/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/15/2026
Filed — Alteration
JOB FILED HEREWITH FOR INTERIOR RENOVATION OF EX. APARTMENT #2C, INCLUDING NONLOADBEARING PARTITIONS AND NEW FINISHES. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION #M01436735-I1-LA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01453485-I1
09/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
EMILY LUI
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
EMILY LUI
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EMILY LUI
06/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
06/02/2026
Permit issued — Plumbing
M01363684-S1-PL
05/29/2026
Permit issued — General Construction
M01363684-I1-GC
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
05/26/2026
Special inspection requirement — Final
Ann Macklin
05/26/2026
Special inspection requirement — Lighting in dwelling units
Ann Macklin
05/18/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 25E ON THE 25TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366651-P2
05/18/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 25E ON THE 25TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366651-P1
05/07/2026
Permit issued — Plumbing
M01366651-S1-PL
05/06/2026
Filed — Alteration
M01363684-S1
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
05/01/2026
Special inspection requirement — Lighting in dwelling units
Ann Macklin
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
05/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
05/01/2026
Special inspection requirement — Final
Ann Macklin
04/30/2026
Permit issued — General Construction
M01366651-I1-GC
04/13/2026
Violation issued (ECB, open)
Construction
04/09/2026
Special inspection requirement — Lighting in dwelling units
Christopher Drutjons
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
04/09/2026
Special inspection requirement — Final
Christopher Drutjons
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
04/03/2026
Permit issued — General Construction
M01368085-I1-GC
03/30/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 25E ON THE 25TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366651-S1
03/30/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT 25E ON THE 25TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01366651-I1
03/27/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Addressed
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIK MILLWARD
03/25/2026
Objection raised — Inspections
03/25/2026
Objection raised — Admin
03/25/2026
Objection raised — Scope
03/25/2026
Objection raised — Admin
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/24/2026
Filed — Alteration
INTERIOR RENOVATION TO APARTMENT UNIT #26DE- MINOR INTERIOR PARTITION AND PLUMBING WORK- NO CHANGE IN MEANS OF EGRESS, USE OR OCCUPANCY
M01287916-P1
03/24/2026
Filed — Alteration
INTERIOR RENOVATION TO APARTMENT UNIT #26DE- MINOR INTERIOR PARTITION AND PLUMBING WORK- NO CHANGE IN MEANS OF EGRESS, USE OR OCCUPANCY
M01287916-P2
03/24/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/13/2026
Objection raised — Admin
03/13/2026
Objection raised — Fire_Protection
03/13/2026
Objection raised — Structural
03/13/2026
Objection raised — Mechanical
03/12/2026
Filed — Alteration
INTERIOR RENOVATION AS SHOWN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. NO ALTERATIONS OF STRUCTURAL SYSTEM OR EXTERIOR OF THE BUILDING
M01368085-I1
03/02/2026
Filed — Alteration
M01363684-I1
02/24/2026
Special inspection requirement — Final
ERIK MILLWARD
01/12/2026
Signed off — Alteration
M01253483-I1
11/13/2025
Permit issued — Plumbing
M01287916-S1-PL
10/28/2025
Signed off — Alteration
RENOVATION OF EXISTING BATHROOM AND MINOR CARPENTRY AND CABINETRYWORK IN APARTMENT #21C ON THE 21ST FLOOR. NO CHANGE OF USE, OCCUPANCY, OR EGRESS. NO RISERS SHALL BE RELOCATED OR REPLACED.FOOTPRINTS OF ALL ROOMS SHALL REMAIN AS IS.
M01250658-I1
10/24/2025
Permit issued — General Construction
M01287916-I1-GC
10/08/2025
Filed — Alteration
INTERIOR RENOVATION TO APARTMENT UNIT #26DE- MINOR INTERIOR PARTITION AND PLUMBING WORK- NO CHANGE IN MEANS OF EGRESS, USE OR OCCUPANCY
M01287916-S1
10/01/2025
Filed — Alteration
INTERIOR RENOVATION TO APARTMENT UNIT #26DE- MINOR INTERIOR PARTITION AND PLUMBING WORK- NO CHANGE IN MEANS OF EGRESS, USE OR OCCUPANCY
M01287916-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNova Interior Renovations09/23/2026
DOB NOWPlumbingPermit IssuedPipeworks NYC06/02/2026
DOB NOWGeneral ConstructionPermit IssuedUnited Elite Group05/29/2026
DOB NOWPlumbingPermit IssuedXpress Plumbing and Heating05/07/2026
DOB NOWGeneral ConstructionPermit IssuedRomel Construction04/30/2026
DOB NOWGeneral ConstructionPermit IssuedBelfor Long Island04/03/2026
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp11/13/2025
DOB NOWGeneral ConstructionSigned-offRoss & Associates10/24/2025
DOB NOWGeneral ConstructionSigned-offStone & Oak Interiors09/04/2025
DOB NOWGeneral ConstructionSigned-offJP Roche09/02/2025
DOB NOWStructuralPermit IssuedLake Contracting08/27/2025
DOB NOWStructuralPermit IssuedLake Contracting08/14/2024
DOB NOWPlumbingSigned-offCBB Plumbing08/06/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding08/05/2024
DOB NOWProtection and Mechanical MethodsSigned-offAndamio Scaffolding07/29/2024
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I05/24/2024
DOB NOWGeneral ConstructionSigned-offTwo-Tone Contracting04/05/2024
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting12/07/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/11/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding08/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offAndamio Scaffolding08/01/2023
DOB NOWGeneral ConstructionSigned-offThe Renovated Home 107/31/2023
DOB NOWPlumbingSigned-offCBB Plumbing07/22/2023
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I06/15/2023
DOB NOWPlumbingSigned-offVelocity Plumbing & Heating05/18/2023
DOB NOWGeneral ConstructionSigned-offTwo-Tone Contracting03/24/2023
DOB NOWGeneral ConstructionSigned-offTwo-Tone Contracting03/16/2023
DOB NOWGeneral ConstructionSigned-offAffect Build03/02/2023
DOB NOWSprinklersSigned-offS & J Industrial11/16/2022
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding09/12/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding08/11/2022
DOB NOWProtection and Mechanical MethodsSigned-offAndamio Scaffolding08/10/2022
DOB NOWGeneral ConstructionSigned-offAlphacraft Construction*07/07/2022
DOB NOWPlumbingSigned-offVelocity Plumbing & Heating06/17/2022
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I05/28/2022
DOB NOWSupported ScaffoldPermit IssuedEmpire NY Installations I05/23/2022
DOB NOWPlumbingSigned-offVelocity Plumbing & Heating04/19/2022
DOB NOWPlumbingSigned-offTop Dog Plumbing & Heating04/09/2022
DOB NOWGeneral ConstructionSigned-offJSD Construction Group03/09/2022
DOB NOWSignSigned-offSignstar NYC03/07/2022
+ 60 more permits on file
4 projects · most recent 05/18/2026
Water/Sanitary Gas
FiledStatusContractorScope
05/18/2026Permit IssuedXpress Plumbing and HeatingGas, Water/Sanitary
03/24/2026Permit IssuedAmerican Standard P&HGas, Water/Sanitary
06/16/2021Permit IssuedTop Dog Plumbing & HeatingGas, Water/Sanitary
10/22/2019Signed-offAdriatic Plumbing & HeatingWater/Sanitary
25 projects · most recent 07/29/2026
General Wiring
FiledStatusContractorScope
07/29/2026Permit IssuedIP2 ElectricGeneral Wiring
06/03/2026Permit IssuedLens ElectricGeneral Wiring
05/11/2026Permit IssuedBronxdale ElectricGeneral Wiring
04/24/2026CompleteCobra Electrical NYC—
12/15/2025CompleteV.R. ElectricalGeneral Wiring
11/24/2025Permit IssuedCityone ElectricalGeneral Wiring
10/20/2025Permit IssuedTempest Electrical ContractingGeneral Wiring
09/03/2025CompleteApproved ElectricGeneral Wiring
06/27/2025CompleteP & Z Electric—
04/16/2025CompleteUnity Electric Co—
08/22/2024Permit IssuedR.A. Phillips Electrical ContGeneral Wiring
04/25/2024CompleteGRX Euro ElectricGeneral Wiring
11/13/2023CompleteAccurate ElectricalGeneral Wiring
07/25/2023CompleteGRX Euro ElectricGeneral Wiring
03/20/2023Permit IssuedRE-Con ElectricGeneral Wiring
1 project · most recent 08/08/2018
Scaffold
FiledStatusContractorScope
08/08/2018Permit IssuedEmpire NY Installations IScaffold
1 project · most recent 04/14/2025
FiledStatusContractorScope
04/14/2025———
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
09/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/29/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/15/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
06/06/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/09/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
09/15/2026Tenant Protection Plan ComplianceEMILY LUIspecial
09/03/2026Energy Code Compliance InspectionsEMILY LUIprogress
09/03/2026Fire-Resistant Penetrations and JointsEMILY LUIspecial
06/08/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
05/26/2026Energy Code Compliance InspectionsAnn Macklinprogress
05/26/2026FinalAnn Macklinprogress
05/26/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
05/26/2026Lighting in dwelling unitsAnn Macklinenergy_progress
05/01/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
05/01/2026FinalAnn Macklinprogress
05/01/2026Lighting in dwelling unitsAnn Macklinenergy_progress
05/01/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
05/01/2026Energy Code Compliance InspectionsAnn Macklinprogress
04/09/2026Lighting in dwelling unitsChristopher Drutjonsenergy_progress
04/09/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
04/09/2026FinalChristopher Drutjonsprogress
04/09/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
03/26/2026Fire-Resistant Penetrations and JointsERIK MILLWARDspecial
02/24/2026FinalERIK MILLWARDprogress
07/16/2025Lighting in dwelling unitsDAVID HOFMANNenergy_progress
07/16/2025Lighting controlsDAVID HOFMANNenergy_progress
07/09/2025FinalDAVID HOFMANNprogress
07/02/2025FinalJill Diamantprogress
10/02/2024Concrete - Cast-In-PlaceAnthony Stasiospecial
10/02/2024Tenant Protection Plan ComplianceARIEL GOLSHANspecial
Latest 25 of 84.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MedRiteMedical / Healthcare—
Project M00668441 Alteration · LOC Issued · 02/14/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,361 on file (BIS + DOB NOW)
▸Plans & Drawings62
▸DOB NOWPlans/Sketch55
10/04/2026M01453485-I1Request digital key ↗
09/06/2026M00062009-I1Request digital key ↗
09/06/2026M00062351-I1Request digital key ↗
Showing 3 of 55 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00230436-I1Request digital key ↗
09/05/2026M00205020-I1Request digital key ↗
09/03/2026M00269410-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00374449-I1Request digital key ↗
▸Applications & Permits251
▸BISWORK PERMIT APPLICATION124
07/22/2025123409935Open ↗
02/12/2025101819052Open ↗
01/15/2025101819052Open ↗
Showing 3 of 124 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION123
07/08/2025123409935Open ↗
06/23/2025123409935Open ↗
06/17/2025123409935Open ↗
Showing 3 of 123 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWState DEC Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications321
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION138
04/10/2020123691497Open ↗
04/10/2020123691497Open ↗
03/02/2020123769635Open ↗
Showing 3 of 138 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature62
09/27/2026M01453485-I1Open ↗
09/06/2026M00062009-I1Open ↗
09/05/2026M00187772-I1Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWProgress Inspector Seal & Signature50
09/19/2026M00661850-I1Open ↗
09/19/2026M00661850-I1Open ↗
09/01/2026M01366651-I1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/01/2026M01366651-I1Open ↗
09/01/2026M00809061-I1Open ↗
09/01/2026M00809061-I1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
06/08/2020140906250Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment77
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISEQUIPMENT USE PERMITS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection29
▸BISTenant Protection Plan and Notes22
10/30/2019123697712Open ↗
10/17/2019123786386Open ↗
08/02/2019123769635Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWTenant Protection Plan7
09/05/2026M00230436-I1Open ↗
09/04/2026M00374449-I1Open ↗
Showing 2 of 7 on file for this type
▸Environmental & Asbestos102
▸DOB NOWDEP ACP-5: Asbestos Assessment Report34
09/27/2026M01453485-I1Open ↗
09/05/2026M00230436-I1Open ↗
09/05/2026M00205020-I1Open ↗
Showing 3 of 34 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)24
10/17/2019123786386Open ↗
08/02/2019123769635Open ↗
07/10/2019123691497Open ↗
Showing 3 of 24 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)9
09/15/2020140906250Open ↗
10/30/2019123697712Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
09/03/2026M00269410-I1Open ↗
09/03/2026M00661850-I1Open ↗
09/02/2026M00583400-I1Open ↗
Showing 3 of 9 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
06/14/2019123768538Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance104
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS54
04/10/2020123691497Open ↗
04/10/2020123691497Open ↗
02/14/2020123769635Open ↗
Showing 3 of 54 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS28
10/15/2021140906250Open ↗
11/09/2020123697712Open ↗
09/16/2020123786386Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
07/21/2025123409935Open ↗
10/15/2021140906250Open ↗
10/15/2021140906250Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/03/2026M00552545-I1Open ↗
Showing 1 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
07/21/2025123409935Open ↗
09/21/2020140906250Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER1
07/21/2025123409935Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/21/2025123409935Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY18
07/21/2025123409935Open ↗
03/19/2025101819052Open ↗
01/09/2025101819052Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
03/31/2025102957034Open ↗
03/19/2025101819052Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
07/21/2025123409935Open ↗
09/15/2020140906250Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/15/2020140906250Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs100
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST52
07/29/2025123409935Open ↗
07/09/2025102957034Open ↗
04/30/2025102957034Open ↗
Showing 3 of 52 on file for this type
▸BISADMINISTRATIVE OBJECTIONS22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
06/24/2019123599668Open ↗
Showing 1 of 15 on file for this type
▸BISSUPERSEDING LETTER7
07/22/2025123409935Open ↗
02/12/2025101819052Open ↗
Showing 2 of 7 on file for this type
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
10/03/2023121857446Open ↗
09/15/2020140906250Open ↗
▸Cost, Insurance & Ownership107
▸BISCOST AFFIDAVIT105
10/03/2023121857446Open ↗
10/15/2021140906250Open ↗
11/09/2020123697712Open ↗
Showing 3 of 105 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/24/2025123409935Open ↗
10/03/2023121857446Open ↗
▸Filing & Intake Forms145
▸BISEFILING COVER SHEET54
10/30/2019123697712Open ↗
10/17/2019123786386Open ↗
08/02/2019123769635Open ↗
Showing 3 of 54 on file for this type
▸BISADDITIONAL INFORMATION45
07/08/2025123409935Open ↗
02/11/2025101819052Open ↗
09/14/2020123697712Open ↗
Showing 3 of 45 on file for this type
▸BISBOROUGH INTAKE FORM39
07/22/2025123409935Open ↗
11/03/2021123499348Open ↗
04/10/2020123691497Open ↗
Showing 3 of 39 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
06/08/2020140906250Open ↗
Showing 1 of 7 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
08/14/2020140906250Open ↗
Showing 1 of 9 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDHCR DOCUMENT2
07/09/2025102957034Open ↗
02/11/2025101819052Open ↗
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDHCR Document2
09/03/2026M00661850-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type