← Back
Primarily 1 family with 1 store or office
160 EAST 70 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1042526
💬 Discuss this project
1874Year Built
5Stories
S1Building Class
R8BZoning
5,994 sfGross Floor Area
2Units
1 Open Violation ▸
Primarily 1 family with 1 store or office · Owner of record: RLM TH LLC · 1,983 sf lot · 3.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Roof16p · 4 filings · 20 docs
Floor 610p · 1 filing · 10 docs
Floor 510p · 1 filing · 10 docs
Floor 418p · 3 filings · 20 docs
Floor 316p · 2 filings · 20 docs
Floor 217p · 3 filings · 20 docs
Floor 121p · 4 filings · 20 docs
Cellar7p · 2 filings · 20 docs
Basement1p · 1 filing · 18 docs
Sub-Basement6p · 1 filing · 18 docs
Site & exterior31p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP2107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/21/2017$10.2M—160E70 LLC → RLM TH LLC$1,698/sf building
05/11/2017$9.3M—— → —$1,560/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION2403/21/2026
NYCCODE1003/21/2026
DOMANI CONSULTING403/21/2026
DJH ARCHITECTURE P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FOUNDATIONS INTERIOR DESIGNGeneral Contractor3707/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor1007/08/2026
RD-WRIGHT INCGeneral Contractor507/08/2026
APN ELECTRICAL CORPElectrical103/22/2026
JOHN PETROCELLI CONSTRUCTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZI ENGINEERING, PC4655406/20/2024
Building Lifecycle
All (118)Filed (20)Permit Issued (36)Signed Off (8)Violation (21)Objection (24)Special Inspection (9)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/24/2025
Permit issued — General Construction
M00740043-I1-GC
05/08/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00727476-I1
05/08/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00746599-I1
03/14/2025
Signed off — Alteration
M00169909-I1
10/24/2024
Permit issued — Construction Fence
M00169909-I1-FN
10/24/2024
Permit issued — General Construction
M00740043-I1-GC
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00727476-P4
08/08/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00746599-P4
07/18/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00746623-I1
06/24/2024
Signed off — Alteration
Application is filed in conjunction with Facade alteration app#M00740043-I1 to show a demo, including temporary bracing support from CEL to 5FL plans for a facade wall. No change of use, egress or occupancy.
M00489579-I1
06/20/2024
Filed — Alteration
Application is filed in conjunction with Facade alteration app#M00740043-I1 to show a demo, including temporary bracing support from CEL to 5FL plans for a facade wall. No change of use, egress or occupancy.
M00489579-P1
06/20/2024
Permit issued — Supported Scaffold
M00746599-I1-SF
06/18/2024
Permit issued — Sidewalk Shed
M00727476-I1-SH
06/12/2024
Special inspection requirement — Final
Zahid Ismail
06/12/2024
Special inspection requirement — Post-installed Anchors
Zahid Ismail
06/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Zahid Ismail
06/12/2024
Special inspection requirement — Structural Steel - Details
Zahid Ismail
06/12/2024
Special inspection requirement — Structural Steel - Welding
Zahid Ismail
05/16/2024
Signed off — Alteration
STRUCTURAL WORK ASSOCIATED WITH THE REPLACEMENT OF EXISTING FACADE. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00740043-S1
05/15/2024
Signed off — Alteration
Application is filed in conjunction with Facade alteration app#M00740043-I1 to show a demo, including temporary bracing support from CEL to 5FL plans for a facade wall. No change of use, egress or occupancy.
M00489579-S1
08/30/2023
Permit issued — Structural
M00740043-S1-ST
08/30/2023
Permit issued — Structural
M00489579-I1-GC-CX
08/30/2023
Permit issued — Construction Fence
M00169909-I1-FN
08/30/2023
Permit issued — General Construction
M00740043-I1-GC
08/30/2023
Permit issued — Structural
M00489579-S1-ST
07/17/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00727476-P3
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/2023
Permit issued — Structural
M00489579-S1-ST
06/05/2023
Permit issued — Protection and Mechanical Methods
M00746623-I1-PM
06/02/2023
Permit issued — Structural
M00740043-S1-ST
05/30/2023
Permit issued — Supported Scaffold
M00746599-I1-SF
05/09/2023
Filed — Alteration
Application is filed in conjunction with Facade alteration app#M00740043-I1 to show a demo, including temporary bracing support from CEL to 5FL plans for a facade wall. No change of use, egress or occupancy.
M00489579-S1
05/09/2023
Filed — Alteration
M00169909-P1
05/08/2023
Special inspection requirement — Post-installed Anchors
Zahid Ismail
05/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Zahid Ismail
05/08/2023
Special inspection requirement — Final
Zahid Ismail
05/04/2023
Permit issued — Sidewalk Shed
M00727476-I1-SH
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2023
Signed off — Alteration
M00328504-I1
03/23/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00746599-P3
03/10/2023
Violation issued (ECB, closed)
Unknown
03/10/2023
Violation issued (ECB, closed)
Construction
02/09/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00727476-P2
11/22/2022
Violation issued (ECB, closed)
Construction
11/22/2022
Violation issued (ECB, closed)
Construction
11/22/2022
Violation issued (ECB, closed)
Construction
11/03/2022
Permit issued — General Construction
M00740043-I1-GC
10/31/2022
Filed — Alteration
STRUCTURAL WORK ASSOCIATED WITH THE REPLACEMENT OF EXISTING FACADE. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00740043-S1
10/28/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00746599-P2
10/05/2022
Permit issued — Construction Fence
M00328504-I1-FN
10/04/2022
Permit issued — Structural
M00489579-I1-GC-CX
09/29/2022
Permit issued — Construction Fence
M00169909-I1-FN
09/07/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00746599-P1
06/23/2022
Permit issued — Structural
M00489579-I1-GC-CX
06/21/2022
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00746623-P1
Latest 60 of 118 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFOUNDATIONS INTERIOR DESI09/24/2025
DOB NOWConstruction FenceSigned-offFOUNDATIONS INTERIOR DESI10/24/2024
DOB NOWGeneral ConstructionPermit IssuedFOUNDATIONS INTERIOR DESI10/24/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC06/20/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/18/2024
DOB NOWStructuralSigned-offFOUNDATIONS INTERIOR DESI08/30/2023
DOB NOWStructuralSigned-offFOUNDATIONS INTERIOR DESI08/30/2023
DOB NOWConstruction FenceSigned-offFOUNDATIONS INTERIOR DESI08/30/2023
DOB NOWGeneral ConstructionPermit IssuedFOUNDATIONS INTERIOR DESI08/30/2023
DOB NOWStructuralSigned-offFOUNDATIONS INTERIOR DESI08/30/2023
DOB NOWStructuralSigned-offFOUNDATIONS INTERIOR DESI06/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/05/2023
DOB NOWStructuralSigned-offFOUNDATIONS INTERIOR DESI06/02/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC05/30/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/04/2023
DOB NOWGeneral ConstructionPermit IssuedFOUNDATIONS INTERIOR DESI11/03/2022
DOB NOWConstruction FenceSigned-offFOUNDATIONS INTERIOR DESI10/05/2022
DOB NOWStructuralSigned-offFOUNDATIONS INTERIOR DESI10/04/2022
DOB NOWConstruction FenceSigned-offFOUNDATIONS INTERIOR DESI09/29/2022
DOB NOWStructuralSigned-offFOUNDATIONS INTERIOR DESI06/23/2022
DOB NOWConstruction FenceSigned-offFOUNDATIONS INTERIOR DESI06/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/10/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC06/01/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/04/2022
DOB NOWStructuralSigned-offFOUNDATIONS INTERIOR DESI11/19/2021
DOB NOWConstruction FenceSigned-offFOUNDATIONS INTERIOR DESI10/31/2021
DOB NOWGeneral ConstructionSigned-offFOUNDATIONS INTERIOR DESI10/31/2021
DOB NOWConstruction FenceSigned-offFOUNDATIONS INTERIOR DESI10/29/2021
DOB NOWConstruction FenceSigned-offFOUNDATIONS INTERIOR DESI09/30/2021
DOB NOWStructuralSigned-offFOUNDATIONS INTERIOR DESI05/20/2021
DOB NOWConstruction FenceSigned-offFOUNDATIONS INTERIOR DESI05/02/2021
DOB NOWConstruction FenceSigned-offFOUNDATIONS INTERIOR DESI03/23/2021
DOB NOWConstruction FenceSigned-offRD-WRIGHT INC01/29/2021
DOB NOWConstruction FenceSigned-offJOHN PETROCELLI CONSTRUCT06/10/2020
DOB NOWConstruction FenceSigned-offRD-WRIGHT INC03/18/2020
DOB NOWConstruction FenceSigned-offRD-WRIGHT INC07/12/2019
BISSPISSUEDAMOK INC06/05/2024
BISPLISSUEDAMOK INC06/05/2024
BISPLISSUEDAMOK INC06/05/2024
BISOTISSUEDFOUNDATIONS INTERIOR DESIGN03/20/2024
+ 32 more permits on file
11 projects · most recent 08/04/2026
General Wiring
FiledStatusContractorScope
08/04/2026Permit IssuedAPN ELECTRICAL CORPGeneral Wiring
04/18/2025CompleteAPN ELECTRICAL CORP—
08/28/2023CompleteEINSTEIN ELEC'L CORPGeneral Wiring
10/25/2022Permit IssuedCONTACT PLUS ELEC'L CORPGeneral Wiring
05/09/2022CompleteV. VASS ELECTRIC CORP—
01/25/2021CancelledSTAN ELECTRIC INCGeneral Wiring
12/13/2020CompleteSTAN ELECTRIC INC1 meters
11/25/2020Permit IssuedGANLY ELECTRICAL CORPGeneral Wiring
09/09/2019Permit IssuedGANLY ELECTRICAL CORP—
06/12/2019Permit IssuedALLTECH ELECL CONTNG CORP—
08/11/2018Permit IssuedROMCON ELECTRIC, INC—
1 project · most recent 10/31/2022
Masonry
FiledStatusContractorScope
10/31/2022Permit IssuedFOUNDATIONS INTERIOR DESIMasonry
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/12/2024FinalZahid Ismailprogress
06/12/2024Post-installed AnchorsZahid Ismailspecial
06/12/2024Structural Stability – Alterations of existing buildingsZahid Ismailspecial
06/12/2024Structural Steel - DetailsZahid Ismailspecial
06/12/2024Structural Steel - WeldingZahid Ismailspecial
05/08/2023Post-installed AnchorsZahid Ismailspecial
05/08/2023Structural Stability – Alterations of existing buildingsZahid Ismailspecial
05/08/2023FinalZahid Ismailprogress
05/17/2022FinalAlan Bermanprogress
▾Documents — 292 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch17
09/04/2026M00489579-P1Request digital key ↗
09/04/2026M00489579-S1Request digital key ↗
09/02/2026M00746623-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
09/05/2026M00169909-P1Request digital key ↗
09/05/2026M00169909-I1Request digital key ↗
09/05/2026M00328504-I1Request digital key ↗
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION42
03/31/2025123431072Open ↗
03/28/2025123431072Open ↗
03/24/2025123431072Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION25
02/21/2023123184963Open ↗
11/25/2022123184963Open ↗
05/12/2021123575586Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWLPC Approval/Permit4
08/15/2026M00489579-I1Open ↗
08/13/2026M00489579-P1Open ↗
08/13/2026M00740043-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/17/2024141025904Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/11/2025123184963Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/05/2026M00328504-I1Open ↗
09/04/2026M00489579-I1Open ↗
09/02/2026M00746623-P1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
04/30/2019123184981Open ↗
04/30/2019123184981Open ↗
12/31/2018123184963Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026M00489579-S1Open ↗
08/31/2026M00489579-S1Open ↗
08/23/2026M00489579-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/13/2019123862524Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/13/2019123862524Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026M00489579-S1Open ↗
08/23/2026M00740043-I1Open ↗
08/23/2026M00489579-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/17/2024141025904Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/17/2024141025904Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING9
03/28/2025123431072Open ↗
03/24/2025123431072Open ↗
03/20/2025123431072Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
06/19/2019123184963Open ↗
07/13/2018123184963Open ↗
Showing 2 of 4 on file for this type
▸BISSPRINKLER SYSTEMS1
08/15/2024123575586Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST2
05/17/2024141025904Open ↗
07/13/2018123184963Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026M00169909-P1Open ↗
08/13/2026M00169909-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/17/2024141025904Open ↗
▸BISSTREET TREE SIGNOFF1
02/04/2025123184963Open ↗
▸BISTenant Protection Plan and Notes1
07/13/2018123184963Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/30/2018123431072Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
04/08/2025141025904Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026M00740043-I1Open ↗
08/13/2026M00489579-I1Open ↗
08/13/2026M00489579-S1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
07/27/2018123431072Open ↗
Showing 1 of 3 on file for this type
▸Inspections & Test Reports20
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
03/14/2025123184963Open ↗
11/26/2024123431072Open ↗
11/26/2024123575586Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
03/14/2025123184963Open ↗
03/14/2025123184963Open ↗
11/26/2024123431072Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
03/14/2025123184963Open ↗
11/26/2024123431072Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
03/14/2025123184963Open ↗
03/14/2025123184963Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
03/14/2025123184963Open ↗
▸BISMASONRY1
03/14/2025123184963Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/31/2018123184963Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/14/2025123184963Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/18/2019123184963Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
03/14/2025123184963Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/05/2025123184963Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/18/2019123184963Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/26/2021123184963Open ↗
▸BISMECHANICAL SYSTEMS1
03/14/2025123184963Open ↗
▸Approvals, Objections & Sign-offs27
▸BISSUPERSEDING LETTER15
02/21/2023123184963Open ↗
11/25/2022123184963Open ↗
05/12/2021123575586Open ↗
Showing 3 of 15 on file for this type
▸BISLANDMARKS APPROVAL4
05/17/2024141025904Open ↗
10/21/2019123184963Open ↗
02/15/2019123184963Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/08/2025141025904Open ↗
01/22/2025103704181Open ↗
04/30/2019123184981Open ↗
▸BISLANDMARKS SIGNOFF2
01/22/2025103704181Open ↗
11/29/2024123431072Open ↗
▸BISFINAL1
11/26/2024123431072Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
07/13/2018123184963Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT8
05/10/2019123862524Open ↗
12/31/2018123184963Open ↗
07/13/2018123184963Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
02/04/2025123184963Open ↗
11/26/2024123431072Open ↗
11/26/2024123575586Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
12/11/2020123184963Open ↗
02/13/2019123431072Open ↗
▸Filing & Intake Forms43
▸BISBOROUGH INTAKE FORM17
02/21/2023123184963Open ↗
05/12/2021123575586Open ↗
05/12/2021123431072Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION16
11/19/2024123184963Open ↗
09/19/2023123184963Open ↗
05/18/2023123184963Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET9
05/10/2019123862524Open ↗
08/28/2018123184963Open ↗
07/13/2018123184963Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/17/2024141025904Open ↗
▸Other Documents11
▸BISDepartment of Consumer Affairs (DCA) Form3
03/19/2019123431072Open ↗
08/06/2018123184981Open ↗
08/06/2018123431072Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
11/29/2022123184963Open ↗
12/03/2020123431072Open ↗
12/31/2018123184963Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL COLD-FORMED STEEL1
03/14/2025123184963Open ↗
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
03/14/2025123184963Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00740043-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00740043-S1Open ↗