← Back
BuildNYC
Miscellaneous hospital / health care facility
160 SOUTH 2ND STREET
BROOKLYN · BIN 3063117
💬 Discuss this project
1960Year Built
5Stories
I9Building Class
R6Zoning
32,410 sfGross Floor Area
26Units
LL97 CoveredRent Stabilized1 Active Violation 6 old, status unconfirmed ▸FDNY Report ↗
Miscellaneous hospital / health care facility · Owner of record: Los Sures TPT YR15 Housing Development F Und · 8,970 sf lot · 3.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHDFC - Los Sures46p · 1 filing · 20 docs
BulkheadHDFC - Los Sures1p · 1 filing · 20 docs
Floor 4HDFC - Los Sures43p · 1 filing · 20 docs
Floor 3HDFC - Los Sures43p · 1 filing · 20 docs
Floor 2HDFC - Los Sures43p · 1 filing · 20 docs
Floor 1HDFC - Los Sures49p · 2 filings · 20 docs
BasementHDFC - Los Sures2p · 1 filing · 20 docs
Sub-BasementHDFC - Los Sures43p · 1 filing · 20 docs
Site & exterior4p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
160 South 2nd2103/21/2026
Southside United-Los Sures Management1610/13/2026
Los Sures TPT YR15 Housing Development F Und103/22/2026
160 South 4 Street103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Victor M. Morales, Architect909/30/2026
Rigid Structural Design111/18/2024
Mje Professional Services109/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eric Ramos Rodriguez Consulting603/21/2026
Rigid Structural Design203/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. ConstructionGeneral Contractor607/08/2026
MSR ConstructionScaffold203/21/2026
Reliable EnterprisesScaffold203/21/2026
Aura PlumbingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803411/14/2025
Building Lifecycle
All (141)Filed (11)Permit Issued (9)Signed Off (3)Violation (60)Inspection (1)Objection (32)Special Inspection (25)
09/30/2026
Signed off — Alteration
APPLICATION FILED HEREWITH TO REPLACE BASEBOARD ROOM HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00941925-I1
09/30/2026
Filed — Alteration
APPLICATION FILED HEREWITH TO REPLACE BASEBOARD ROOM HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00941925-P7
09/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/02/2026
Objection resolved — Addressed
08/28/2026
Objection raised — Energy
08/06/2026
Filed — Alteration
APPLICATION FILED HEREWITH TO REPLACE BASEBOARD ROOM HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00941925-P5
07/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/06/2026
Violation issued (HPD, closed)
C
06/05/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01110457-I1
05/05/2026
Violation issued (HPD, closed)
A
04/07/2026
Filed — Alteration
APPLICATION FILED HEREWITH TO REPLACE BASEBOARD ROOM HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00941925-P4
03/25/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/13/2026
Permit issued — Plumbing
B00941925-S1-PL
03/03/2026
Permit issued — General Construction
B00941925-I1-GC
03/03/2026
Permit issued — Mechanical Systems
B00941925-S2-MS
02/19/2026
Violation issued (HPD, closed)
B
01/30/2026
Permit issued — Mechanical Systems
B00941925-S2-MS
01/10/2026
Violation issued (HPD, closed)
C
01/10/2026
Violation issued (HPD, closed)
B
01/10/2026
Violation issued (HPD, closed)
C
01/10/2026
Violation issued (HPD, closed)
C
12/22/2025
Permit issued — General Construction
B00941925-I1-GC
12/22/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
12/03/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
12/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
12/03/2025
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
12/03/2025
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
12/03/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
11/25/2025
Objection raised — Admin
11/25/2025
Objection raised — Admin
11/19/2025
Violation issued (HPD, closed)
I
11/14/2025
Filed — Alteration
APPLICATION FILED HEREWITH TO REPLACE BASEBOARD ROOM HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00941925-P3
11/14/2025
Filed — Alteration
APPLICATION FILED HEREWITH TO REPLACE BASEBOARD ROOM HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00941925-P1
11/14/2025
Filed — Alteration
APPLICATION FILED HEREWITH TO REPLACE BASEBOARD ROOM HEATERS, ROOF EXHAUST FANS AND RELATED PIPING AND DUCTS. NO CHANGE IN USE. NO CHANGE IN OCCUPANCY. NO CHANGE IN EGRESS. NO CHANGE IN BULK.
B00941925-P2
11/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Ventilation and air distribution system
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/05/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/05/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
11/05/2025
Special inspection requirement — Smoke Control Systems Testing
SAMI HAJJAR P.E
07/24/2025
Signed off — Alteration
B01141314-I1
06/10/2025
Violation issued (HPD, closed)
A
03/03/2025
Violation issued (HPD, closed)
A
12/26/2024
Violation issued (HPD, closed)
C
12/26/2024
Violation issued (HPD, closed)
C
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/18/2024
Filed — Alteration
B01141314-I1
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAura Plumbing03/13/2026
DOB NOWGeneral ConstructionSigned-offA.A.D. Construction03/03/2026
DOB NOWMechanical SystemsSigned-offA.A.D. Construction03/03/2026
DOB NOWMechanical SystemsSigned-offA.A.D. Construction01/30/2026
DOB NOWGeneral ConstructionSigned-offA.A.D. Construction12/22/2025
DOB NOWProtection and Mechanical MethodsSigned-offMSR Construction11/18/2024
DOB NOWPlumbingPermit IssuedAura Plumbing11/10/2024
DOB NOWSidewalk ShedSigned-offReliable Enterprises09/12/2024
DOB NOWGeneral ConstructionSigned-offA.A.D. Construction09/05/2024
BISPLISSUEDPlumbing & Heating Doctor02/23/2007
BISBLISSUEDPlumbing & Heating Doctor01/26/2007
BISBLISSUEDPlumbing & Heating Doctor12/27/2006
BISEQISSUEDRockledge Scaffold12/14/2006
BISEQISSUEDRockledge Scaffold09/29/2006
BISEQISSUEDRockledge Scaffold04/20/2006
BIS—ISSUEDGalaxy Gen Cont03/22/2006
BISPLISSUEDPlumbing & Heating Doctor02/15/2006
BIS—ISSUEDGalaxy Gen Cont12/28/2005
BISEQISSUEDRockledge Scaffold09/02/2005
BIS—ISSUEDGalaxy Gen Cont02/07/2005
BISEQISSUEDGalaxy Gen Cont02/07/2005
1 project · most recent 09/30/2026
Heating Systems
FiledStatusContractorScope
09/30/2026Signed-offA.A.D. ConstructionHeating Systems
1 project · most recent 09/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/30/2026Signed-offAura PlumbingGas, Water/Sanitary
14 projects · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026CompleteTechno-Volt Electric—
08/11/2026CompleteTechno-Volt Electric—
08/11/2026CompleteTechno-Volt Electric—
08/11/2026CompleteTechno-Volt Electric—
08/11/2026CompleteTechno-Volt Electric—
08/11/2026CompleteTechno-Volt Electric—
08/06/2026CompleteTechno-Volt Electric—
08/06/2026CompleteTechno-Volt Electric—
08/06/2026CompleteTechno-Volt Electric—
08/06/2026CompleteTechno-Volt Electric—
08/06/2026CompleteTechno-Volt Electric—
08/06/2026CompleteTechno-Volt Electric—
11/03/2025CompleteJam Electrical—
09/16/2024CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/25/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
09/30/2026Tenant Protection Plan Compliance—special
07/30/2026Tenant Protection Plan Compliance—special
03/25/2026Tenant Protection Plan Compliance—special
12/03/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
12/03/2025FinalSAMI HAJJAR P.Eprogress
12/03/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
12/03/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/03/2025Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
12/03/2025Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
12/03/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
11/05/2025Tenant Protection Plan Compliance—special
11/05/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/05/2025Shutoff dampersSAMI HAJJAR P.Eenergy_progress
11/05/2025Ventilation and air distribution systemSAMI HAJJAR P.Eenergy_progress
11/05/2025Tenant Protection Plan Compliance—special
11/05/2025FinalSAMI HAJJAR P.Eprogress
11/05/2025Tenant Protection Plan Compliance—special
11/05/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
11/05/2025FinalSAMI HAJJAR P.Eprogress
11/05/2025Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
11/05/2025Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
11/05/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
11/05/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/05/2025Mechanical SystemsSAMI HAJJAR P.Especial
11/05/2025Smoke Control Systems TestingSAMI HAJJAR P.Especial
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026B01141314-I1Request digital key ↗
08/17/2026B00941925-I1Request digital key ↗
08/17/2026B00941925-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature11
10/05/2026B00941925-P7Open ↗
08/23/2026B01141314-I1Open ↗
08/17/2026B00941925-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026B00941925-I1Open ↗
08/27/2026B00941925-I1Open ↗
08/25/2026B00941925-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026B00941925-I1Open ↗
08/27/2026B00941925-I1Open ↗
08/25/2026B00941925-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist11
10/05/2026B00941925-P7Open ↗
08/17/2026B00941925-P5Open ↗
08/13/2026B00941925-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/17/2026B00941925-S1Open ↗
08/17/2026B00941925-I1Open ↗
08/17/2026B00941925-S2Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
10/05/2026B00941925-P7Open ↗
08/17/2026B00941925-P5Open ↗
08/13/2026B00941925-P3Open ↗
Showing 3 of 10 on file for this type
▸Other Documents1
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B01110457-I1Open ↗