160 WEST 66TH STREET · BIN 1077844
💬 Discuss this project
1989Year Built
45Stories
R4Building Class
C4-7Zoning
396,861 sfGross Floor Area
343Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFE
Condo, residential unit in elevator building · Owner of record: Three Lincoln Center Condo · 28,455 sf lot · 13.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsMechanical work 1st floor to roof1 filing
RoofAkam Associates, INC.6p · 6 filings · 20 docs
BulkheadAkam Associates, INC.1p · 1 filing · 2 docs
PenthouseUnit PHA1p · 1 filing · 20 docs
Floor 59Plumbing fixture replacementUnder Construction1 filing · 6 docs
Floor 58
Floor 57
Floor 56Gba 100 LLC4p · 3 filings · 20 docs
Floor 55
Floor 54
Floor 53Unit 53AUnder Construction5 filings · 20 docs
Floor 52Under Construction1p · 1 filing · 11 docs
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46Unit 46AUnder Construction2 filings · 8 docs
Floor 45
Floor 44
Floor 43Unit 43CUnder Construction2 filings · 6 docs
Floor 42Unit 42AB3 filings · 20 docs
Floor 41Unit 41BC1 filing · 2 docs
Floor 40Unit 40C1 filing · 11 docs
Floor 39Akam Associates, INC.2 filings · 6 docs
Floor 38
Floor 37
Floor 36
Floor 35Unit 35B1 filing · 7 docs
Floor 34Unit 34J2 filings · 9 docs
Floor 33Unit 33B1 filing · 8 docs
Floor 32Unit 32E, Unit 32H4 filings · 20 docs
Floor 31
Floor 30Unit 30A, Unit 30G, Unit 30H3 filings · 20 docs
Floor 29Unit 29B, Unit 29D, Unit 29HJ1p · 8 filings · 20 docs
Floor 28Plumbing, sprinkler, and demolition work4p · 3 filings · 20 docs
Floor 27Plumbing, sprinkler, and demolition work4p · 2 filings · 10 docs
Floor 26Plumbing, sprinkler, and demolition work4p · 2 filings · 10 docs
Floor 25Selective demolition work8p · 3 filings · 20 docs
Floor 24Unit 24F, Unit 24H2p · 6 filings · 20 docs
Floor 23Unit 23G4 filings · 20 docs
Floor 22Plumbing, sprinkler, and demolition work2 filings · 7 docs
Floor 21Unit 21D4p · 4 filings · 14 docs
Floor 20Plumbing, sprinkler, and demolition work5p · 2 filings · 10 docs
Floor 19Unit 19A4p · 5 filings · 20 docs
Floor 18Unit 18B, Unit 18D, Unit 18K8p · 7 filings · 20 docs
Floor 17Sprinkler system modification2p · 2 filings · 20 docs
Floor 16Unit 16B2 filings · 20 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11Juilliard Rose Building kitchen hood replacement1 filing · 6 docs
Floor 10
Floor 9
Floor 8
Floor 7Lincoln Center 70 Lincoln Center Plaza1p · 5 filings · 20 docs
Floor 66th floor interior renovation and structural work14p · 3 filings · 20 docs
Floor 56th floor interior renovation and structural work7p · 2 filings · 20 docs
Floor 42p · 1 filing · 19 docs
Floor 3Juilliard Rose Building kitchen hood replacement1p · 2 filings · 9 docs
Floor 2DHKT Archival Storage3p · 2 filings · 20 docs
Floor 1
Site & exteriorAkam Associates, INC.4 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lincoln Center for the Performing A18307/08/2026
3 Lincoln Centre Condominium1010/17/2026
6Face1 Properties703/21/2026
NYC Department of Housing Preservation and Development603/21/2026
Fire Department of the City of New York503/21/2026
Uwslc403/21/2026
Ayrad Property403/21/2026
Lcpa403/21/2026
Quantum Design403/21/2026
The Julliard School303/21/2026
Yomy Investments II303/21/2026
160 West 66th Street303/21/2026
Pear Tree Properties303/21/2026
3 Lincoln Center CONDO%ROSE Associates303/21/2026
GBA 100203/22/2026
NYC Department of Design and Construction203/21/2026
3 Lincoln Condo Associates203/21/2026
Three Licoln Condominium103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A Expediting2203/21/2026
Dezignplus1103/21/2026
A1 Expediting Service403/21/2026
Agouti Construction Consulting403/21/2026
DVA Advisors403/21/2026
William Vitacco Associates1903/21/2026
Nexus Consulting NYC1003/21/2026
Sol Building Consulting Services203/21/2026
Nyccode1803/21/2026
Midtown Preservation Architecture203/21/2026
M Hashas403/21/2026
Outsource Consultants603/21/2026
Quick Filing of NY203/21/2026
Boyd Consulting603/21/2026
Gregg Rothstein Architect103/21/2026
YBL NY603/21/2026
EDG303/21/2026
Anzalone Architecture803/21/2026
Socotec403/21/2026
Municipal Building Consultants303/21/2026
Sandeep Gunnala Engineering203/21/2026
Urban Expediting203/21/2026
Quick Filing203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Berdynaj ConstructionGeneral Contractor1107/25/2026
JRM Construction ManagementGeneral Contractor1007/08/2026
The Metro GroupGeneral Contractor904/09/2026
Yorke ConstructionGeneral Contractor907/08/2026
Abs ConstructionGeneral Contractor807/08/2026
Belida AssociatesGeneral Contractor807/08/2026
GDC ContractingGeneral Contractor607/08/2026
York Scaffold EquipmentScaffold507/08/2026
JKR GroupGeneral Contractor409/09/2026
A. Heating and Plumbing WorksPlumbing407/08/2026
SPK/Lewis ConstructionGeneral Contractor407/08/2026
BogenGeneral Contractor407/08/2026
Vincent Franco Consulting deGeneral Contractor303/21/2026
Dynamic Blue Water MechanicalPlumbing307/08/2026
A&H Express Plumbing & HeatingPlumbing307/08/2026
BP Mechanicalspecialty_contractor307/08/2026
Core Design & BuildersGeneral Contractor303/21/2026
BNJ ConstructionGeneral Contractor303/21/2026
Tap PlumbingPlumbing307/08/2026
Golden Construction NY CoGeneral Contractor303/21/2026
Litespeed ElectricElectrical303/22/2026
Xinos ConstructionScaffold307/08/2026
Donato PlumbingPlumbing307/08/2026
WebuildGeneral Contractor203/21/2026
Elpo Electrical ContgElectrical203/22/2026
Cavan ElectricElectrical203/21/2026
Galo General Contractor IGeneral Contractor207/08/2026
Par Plumbing CoPlumbing207/08/2026
Practical Plumbing & HeatingPlumbing207/08/2026
P.S.I. MechanicalPlumbing207/08/2026
Samuel & Sons P & HPlumbing207/08/2026
Simple Choice Plumbing and HTPlumbing207/08/2026
Manhattan Cabinetsspecialty_contractor207/08/2026
Quadrant DevelopmentGeneral Contractor203/21/2026
Tristate Plumbing ServicesPlumbing207/08/2026
United Plumbing MechanicalFire Protection207/08/2026
Xinos ConstructionGeneral Contractor204/09/2026
Standard Fire SuppFire Protection107/08/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
A.C. Morgan ElectricElectrical103/22/2026
Zatos Plumbing and HeatingPlumbing107/08/2026
Adco ElectricalElectrical103/22/2026
Millennium Maintenance & ElectricalElectrical103/21/2026
Cavan ElectricElectrical103/22/2026
RM Electric CoElectrical103/21/2026
Haber Electric CoElectrical103/22/2026
J.G.C. ElectricElectrical103/22/2026
Matros Automated ElectricalElectrical103/22/2026
McQueen EusebioElectrical103/21/2026
Skyline Electrical ContractingElectrical103/21/2026
Corporate Electric GroupElectrical103/21/2026
Moskowitz StuartElectrical103/21/2026
Dobs Elevator CompanyElectrical103/21/2026
Delta Star ElectricElectrical103/21/2026
Shuir Electrical ContractorsElectrical103/22/2026
Matros Automated ElectricalElectrical103/21/2026
Thompson MichaelElectrical103/21/2026
Warren Ostroff ElectricElectrical103/22/2026
Grandeur Hills GroupGeneral Contractor107/08/2026
Yaneck Home ImprovementGeneral Contractor104/09/2026
Yollo InteriorsGeneral Contractor107/08/2026
Accurate Mechanical IndstrsPlumbing107/08/2026
Aggressive Fire ProtectionFire Protection107/08/2026
City/Suburban PlumbingPlumbing107/08/2026
DNA Plumbing ContractorsPlumbing107/08/2026
Ethos PlumbingPlumbing107/08/2026
Five Star P&H CoPlumbing107/08/2026
Horbridge Plumbing & HeatingPlumbing107/08/2026
J. Caiazzo Plumbing & HeatingPlumbing107/08/2026
Mega PlumbingPlumbing107/08/2026
M&T Plumbing and Heating CoPlumbing107/08/2026
Par Fire ProtectionFire Protection107/08/2026
Procore MechanicalPlumbing106/28/2026
R.J.C. MechanicalPlumbing107/08/2026
Sirina Fire ProtectionFire Protection107/08/2026
Soh Par SprinklerFire Protection107/08/2026
Standard Fire ProtectionFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
P.a.collins Inspections P2168410/16/2026
Buildtech Engineering6369404/30/2026
Citiscape Consulting762411/11/2025
Jack Green Associates422410/23/2025
AK Engineering6781208/15/2025
Queens Engineering8898105/14/2025
Midtown Preservation Architects2634105/02/2025
A2 Architect25041104/21/2025
Studio Nyandak Architectu8378303/14/2025
Skyline Engineering267512/18/2024
Architecture and5545111/07/2024
Fmo Engineering1798210/23/2024
Linea3155110/23/2024
Sandeep Gunnala Engineering8482110/23/2024
Crosscheck Inspection Services5441010/17/2023
Franklin & Oak5758209/12/2023
Architecture Work Office6054302/14/2023
Arct Architecture3329302/14/2023
Jam Architecture5720101/04/2023
Christian L. Martos Engineering5965101/04/2023
Michael Patino Architectu8170110/04/2022
Outsource Special Inspection2827104/22/2022
M. International Engineering3129112/10/2021
A&B World Consulting5704112/10/2021
Rad Design & Architecture2082210/25/2021
SU Architect6857308/19/2021
LB Engineering3122203/28/2021
Richard H. Balser Engineering3028302/16/2021
Ace Structural Engineering496208/12/2020
Piro Studio7503207/13/2020
Contegiacomo and Associates1315102/27/2020
Abs Engineering4835109/04/2019
Building Lifecycle
All (300)Filed (56)Permit Issued (58)Signed Off (37)Violation (7)Inspection (46)Objection (66)Special Inspection (30)
10/16/2026
Filed — Alteration
Filing for mechanical work at the 1st floor, 15th thru 62nd, roof. No change to use, egress, or occupancy.
M01454313-I1
09/08/2026
Permit issued — General Construction
M01154378-I1-GC
09/04/2026
Special inspection requirement — Shutoff dampers
Paul Collins
09/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Collins
09/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Paul Collins
09/04/2026
Special inspection requirement — Heating Systems
Paul Collins
09/04/2026
Special inspection requirement — Maintenance information
Paul Collins
09/04/2026
Special inspection requirement — Post-installed Anchors
Paul Collins
09/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Paul Collins
09/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Collins
09/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Collins
09/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
Paul Collins
09/01/2026
Special inspection requirement — Final
Paul Collins
09/01/2026
Special inspection requirement — Mechanical Systems
Paul Collins
08/26/2026
Filed — Alteration
- CAP AND REMOVE SHOWER- REPLACE GAS STOVE- RELOCATE ONE LAV- REPLACE ONE SINK, ONE DISHWASHER, 2 LAVS, 2 TOILETS, REPLACE TUB WITH SHOWER
M01313556-P1
08/10/2026
Signed off — Alteration
Repair of existing Type 1 kitchen hoods, including connecting a replacement hood to an existing exhaust system and roof exhaust termination at the "Rose" Cafe. No change of use, egress or occupancy.
M00933200-I1
07/24/2026
Permit issued — General Construction
M01384396-I1-GC
07/24/2026
Permit issued — General Construction
M01384781-I1-GC
06/30/2026
Signed off — Alteration
M01210821-I1
06/25/2026
Permit issued — Plumbing
M01384407-I1-PL
06/23/2026
Permit issued — Plumbing
M01384786-I1-PL
06/16/2026
Objection resolved — Addressed
05/27/2026
Objection resolved — Addressed
05/27/2026
Objection resolved — Addressed
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
05/14/2026
Objection raised — Scope
05/14/2026
Objection raised — Energy
05/14/2026
Objection resolved — Addressed
05/11/2026
Objection raised — Scope
05/11/2026
Objection raised — Fire_Protection
05/11/2026
Objection raised — Scope
04/30/2026
Filed — Alteration
Minor renovation of existing apartment #43C on the 43th floor. plumbing work only
M01384786-I1
04/28/2026
Filed — Alteration
Minor renovation of existing apartment #43C on the 43th floor. Architectural/ Construction work only
M01384781-I1
04/28/2026
Filed — Alteration
interior Plumbing work of existing apartment 46A on the 46th floor. Plumbing work only.
M01384407-I1
04/28/2026
Filed — Alteration
Interior renovation of existing apartment 46A on the 46th floor architectural / construction work only.
M01384396-I1
04/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2026
Special inspection requirement — Lighting in dwelling units
Luis Pichardo
04/08/2026
Special inspection requirement — Final
Juan Ramos
04/08/2026
Special inspection requirement — Lighting in dwelling units
Luis Pichardo
04/08/2026
Special inspection requirement — Lighting controls
Luis Pichardo
04/08/2026
Special inspection requirement — Final
Juan Ramos
03/23/2026
Signed off — Alteration
INTERIOR RENOATION AND COMBINATION OF APARTMENTS 41BC ABD 41D PER TPPN #3/97. NO CHANGE TO USE, EGRESS OR OCCUPANCY. RELATED PLUMBING APPLICATION WILL BE FILED SEPERATELY BY THE PLUMBER.
M01263823-I1
03/20/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/18/2026
Permit issued — General Construction
M01314887-I1-GC
02/18/2026
Permit issued — General Construction
M01154378-I1-GC
02/04/2026
Filed — Alteration
Add a partition to create a second bedroom. Adjust entry closet.
M01352499-I1
01/26/2026
Permit issued — General Construction
M01313556-I1-GC
01/08/2026
Permit issued — Plumbing
M01313556-S1-PL
12/29/2025
Permit issued — General Construction
M01314887-I1-GC
12/17/2025
Signed off — Alteration
M01146129-I1
12/17/2025
Signed off — Alteration
Proposed installation of a temporary pipe scaffolding as per plans submitted. Work shall comply with building code, chapter 33. No changes in use, egress or occupancy.
M01225768-I1
12/17/2025
Permit issued — Plumbing
M01154378-S1-PL
12/15/2025
Objection resolved — Addressed
12/08/2025
Objection resolved — Addressed
12/04/2025
Permit issued — Sidewalk Shed
M01146129-I1-SH
12/03/2025
Permit issued — Mechanical Systems
M01154378-S2-MS
12/03/2025
Permit issued — General Construction
M01154378-I1-GC
12/02/2025
Signed off — Alteration
Renovation of unit #42AB on the 42nd Floor. General construction and plumbing work types. No change in use, egress, or occupancy.
M01122887-S1
12/02/2025
Signed off — Alteration
Renovation of unit #42AB on the 42nd Floor. General construction and plumbing work types. No change in use, egress, or occupancy.
M01122887-I1
11/19/2025
Objection resolved — Addressed
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJKR Group09/08/2026
DOB NOWGeneral ConstructionPermit IssuedBerdynaj Construction07/24/2026
DOB NOWGeneral ConstructionPermit IssuedBerdynaj Construction07/24/2026
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating06/25/2026
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating06/23/2026
DOB NOWGeneral ConstructionPermit IssuedBelida Associates02/18/2026
DOB NOWGeneral ConstructionPermit IssuedJKR Group02/18/2026
DOB NOWGeneral ConstructionPermit IssuedAbs Construction01/26/2026
DOB NOWPlumbingSigned-offTap Plumbing01/08/2026
DOB NOWGeneral ConstructionPermit IssuedBelida Associates12/29/2025
DOB NOWPlumbingPermit IssuedDonato Plumbing12/17/2025
DOB NOWSidewalk ShedSigned-offXinos Construction12/04/2025
DOB NOWGeneral ConstructionPermit IssuedJKR Group12/03/2025
DOB NOWMechanical SystemsPermit IssuedJKR Group12/03/2025
DOB NOWGeneral ConstructionSigned-offYaneck Home Improvement10/16/2025
DOB NOWStructuralPermit IssuedThe Metro Group10/10/2025
DOB NOWStructuralPermit IssuedThe Metro Group09/03/2025
DOB NOWGeneral ConstructionPermit IssuedGDC Contracting07/08/2025
DOB NOWMechanical SystemsPermit IssuedGDC Contracting07/08/2025
DOB NOWGeneral ConstructionSigned-offXinos Construction06/13/2025
DOB NOWSupported ScaffoldSigned-offXinos Construction05/14/2025
DOB NOWGeneral ConstructionPermit IssuedManhattan Cabinets05/07/2025
DOB NOWPlumbingPermit IssuedProcore Mechanical05/06/2025
DOB NOWPlumbingSigned-offSuper Plumbers04/21/2025
DOB NOWGeneral ConstructionPermit IssuedJRM Construction Management04/04/2025
DOB NOWSprinklersSigned-offLawrence J. Levine04/04/2025
DOB NOWPlumbingSigned-offTap Plumbing03/28/2025
DOB NOWGeneral ConstructionPermit IssuedXinos Construction03/20/2025
DOB NOWPlumbingSigned-offSimple Choice Plumbing and HT03/14/2025
DOB NOWPlumbingSigned-offPar Plumbing Co03/14/2025
DOB NOWPlumbingSigned-offSimple Choice Plumbing and HT02/25/2025
DOB NOWMechanical SystemsSigned-offJRM Construction Management02/13/2025
DOB NOWStructuralSigned-offJRM Construction Management02/12/2025
DOB NOWStructuralPermit IssuedThe Metro Group02/03/2025
DOB NOWGeneral ConstructionSigned-offYollo Interiors02/03/2025
DOB NOWGeneral ConstructionSigned-offJRM Construction Management01/27/2025
DOB NOWSprinklersSigned-offAggressive Fire Protection12/23/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction12/23/2024
DOB NOWPlumbingSigned-offM&T Plumbing and Heating Co12/23/2024
DOB NOWMechanical SystemsSigned-offSPK/Lewis Construction12/23/2024
+ 60 more permits on file
5 projects · most recent 10/16/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems Cooling Towers Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/16/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PKFY-M24NKMU-A 24,000 BTU · Vrf Indoor ×3
MSZ-GX36NL 3 tons · Condensing Unit ×2
MUZ-GX36NL 36,000 BTU · Ahu ×2
MXZ-SM72TL 6 tons · Vrf Outdoor ×2
PKFY-M30NKMU-A 30,000 BTU · Ahu ×1
PKFY-M36NEMU-A 36,000 BTU · Ahu ×1
— WSCH019 600 CFM · Heat Pump Outdoor ×2
WSLH096 3,200 CFM · Heat Pump Outdoor ×2
WSCH015 500 CFM · Heat Pump Outdoor ×1
WSCH0274 802 CFM · Heat Pump Outdoor ×1
WSCH030 1,005 CFM · Heat Pump Outdoor ×1
WSCH048 1,602 CFM · Heat Pump Outdoor ×1
WSCV060 2,002 CFM · Heat Pump Outdoor ×1
WSLV096 3,000 CFM · Heat Pump Outdoor ×1
__Junk__ AGC-022-43-AC-EH 7,800 CFM ×1
03/14/2025Permit IssuedJKR GroupHeating and Air Conditioning Systems
Heat / Cool
Islandaire EZ15B4LRA_E44AA 14,800 BTU · Heat Pump Outdoor ×2
EZ15B4LRA_EA44AA 14,800 BTU · Heat Pump Outdoor ×1
10/23/2024Permit IssuedThe Metro GroupCooling Towers, Heating and Air Conditioning Systems
Heat / Cool
Bell & Gossett SUB4-2 2,250,000 BTU · Heat Exchanger ×1
Alfa Laval AQBT-BFG Heat Exchanger ×1
Cooling Tower
Evapco AT 29-3K24 9,448,800 BTU · Cooling Tower ×2
09/12/2023——Air Conditioning Systems
Cooling
Above Air MCE-042S-4-000-00-1D-EC-UF2-A 42,300 BTU ×3
XP1-042S-7-00-00-00-VF-P6 52,600 BTU · Condensing Unit ×3
06/21/2021Permit IssuedGDC ContractingAir Conditioning Systems, Heating Systems
Cooling
Simon-Aire SSWSWFC 13,000 tons ×9
Heating
Simon-Aire SSWSWFC 21,500 BTU · Heat Pump Outdoor ×9
2 projects · most recent 10/17/2023
FiledStatusContractorScope
10/17/2023Signed-offUnited Plumbing Mechanical—
08/27/2020Signed-offStandard Fire Supp44 heads
10 projects · most recent 08/26/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/26/2026Signed-offTap PlumbingGas, Water/Sanitary
04/30/2026Permit IssuedA&H Express Plumbing & HeatingWater/Sanitary
04/28/2026Signed-offA&H Express Plumbing & HeatingWater/Sanitary
11/11/2025——Water/Sanitary
10/23/2025Signed-offDynamic Blue Water MechanicalGas, Water/Sanitary
04/21/2025Permit IssuedProcore MechanicalGas, Water/Sanitary
03/14/2025Permit IssuedDonato PlumbingGas, Water/Sanitary
10/17/2023Signed-offTristate Plumbing ServicesWater/Sanitary
10/04/2023Signed-offA&H Express Plumbing & HeatingGas, Water/Sanitary
08/12/2020Signed-offEthos PlumbingGas, Water/Sanitary
25 projects · most recent 10/01/2026
General Wiring
FiledStatusContractorScope
10/01/2026Permit IssuedCavan ElectricGeneral Wiring
09/14/2026Permit IssuedFiu Corp Dba Fiu ElectricGeneral Wiring
09/04/2026CompleteCavan Electric—
08/11/2026CompleteThe Metro Group ElectricGeneral Wiring
07/27/2026Permit IssuedAmor ElectricGeneral Wiring
06/09/2026CompleteCavan Electric—
06/02/2026Permit IssuedShuir Electrical ContractorsGeneral Wiring
06/02/2026Permit IssuedShuir Electrical ContractorsGeneral Wiring
04/23/2026CompleteThe Metro Group ElectricGeneral Wiring
12/16/2025Permit IssuedDceGeneral Wiring
12/09/2025CompleteShuir Electrical ContractorsGeneral Wiring
11/23/2025CompleteJ.G.C. ElectricGeneral Wiring
06/10/2025Permit IssuedTower Electric—
03/07/2025CompleteUltra ElectricGeneral Wiring
03/05/2025CompleteRobert B SamuelsGeneral Wiring
1 project · most recent 10/23/2024
Steel
FiledStatusContractorScope
10/23/2024Permit IssuedThe Metro GroupSteel
▾Field Inspections (DOB CAP) — 105
DateTypeResultReport
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 105.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/04/2026Maintenance informationPaul Collinsenergy_progress
09/04/2026HVAC-R and service water piping design and insulationPaul Collinsenergy_progress
09/04/2026Shutoff dampersPaul Collinsenergy_progress
09/04/2026HVAC-R and service water heating equipmentPaul Collinsenergy_progress
09/04/2026Energy Code Compliance InspectionsPaul Collinsprogress
09/04/2026Fire-Resistant Penetrations and JointsPaul Collinsspecial
09/04/2026Heating SystemsPaul Collinsspecial
09/04/2026Post-installed AnchorsPaul Collinsspecial
09/04/2026HVAC-R and service water heating system controlsPaul Collinsenergy_progress
09/02/2026Tenant Protection Plan CompliancePaul Collinsspecial
09/01/2026Mechanical SystemsPaul Collinsspecial
09/01/2026FinalPaul Collinsprogress
05/15/2026Fire-Resistant Penetrations and JointsLuis Pichardospecial
04/22/2026Lighting in dwelling unitsLuis Pichardoenergy_progress
04/08/2026Lighting controlsLuis Pichardoenergy_progress
04/08/2026FinalJuan Ramosprogress
04/08/2026FinalJuan Ramosprogress
04/08/2026Lighting in dwelling unitsLuis Pichardoenergy_progress
11/06/2025Post-installed AnchorsJoe Liebermanspecial
11/06/2025Lighting in dwelling unitsJoe Liebermanenergy_progress
11/06/2025FinalJoe Liebermanprogress
11/06/2025Energy Code Compliance InspectionsJoe Liebermanprogress
11/06/2025Fire-Resistant Penetrations and JointsJoe Liebermanspecial
11/04/2025Energy Code Compliance InspectionsJoe Liebermanprogress
11/04/2025Lighting in dwelling unitsJoe Liebermanenergy_progress
Latest 25 of 150.
▾Documents — 2,243 on file (BIS + DOB NOW)
▸Plans & Drawings118
▸DOB NOWPlans/Sketch100
10/17/2026M01454313-I1Request digital key ↗
09/06/2026M00088190-I1Request digital key ↗
09/03/2026M00534935-I1Request digital key ↗
Showing 3 of 100 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00202129-I1Request digital key ↗
09/05/2026M00214018-P1Request digital key ↗
09/05/2026M00214018-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00214053-I1Request digital key ↗
09/04/2026M00354115-I1Request digital key ↗
09/04/2026M00369342-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly2
09/03/2026M00548286-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00390966-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00377580-I1Request digital key ↗
▸Applications & Permits354
▸BISPLAN / WORK APPROVAL APPLICATION170
03/07/2025123842048Open ↗
01/04/2024104170255Open ↗
08/21/2023104170255Open ↗
Showing 3 of 170 on file for this type
▸BISWORK PERMIT APPLICATION169
11/10/2022104170255Open ↗
03/04/2020123842048Open ↗
01/17/2020123467612Open ↗
Showing 3 of 169 on file for this type
▸BISPLACE OF ASSEMBLY15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications606
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION236
02/19/2020123842048Open ↗
11/25/2019123773808Open ↗
08/29/2019123773808Open ↗
Showing 3 of 236 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature117
10/17/2026M01454313-I1Open ↗
09/10/2026M01313556-P1Open ↗
09/06/2026M00088190-I1Open ↗
Showing 3 of 117 on file for this type
▸DOB NOWProgress Inspector Seal & Signature110
10/08/2026M00964704-I1Open ↗
10/08/2026M00964704-I1Open ↗
10/06/2026M00548286-I1Open ↗
Showing 3 of 110 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature77
10/08/2026M00964704-I1Open ↗
09/20/2026M00914967-S1Open ↗
09/20/2026M00914967-S1Open ↗
Showing 3 of 77 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment161
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE63
02/07/2020123510441Open ↗
10/01/2019123510441Open ↗
09/27/2019123510441Open ↗
Showing 3 of 63 on file for this type
▸BISSELF-CERT PLUMBING NOTICE50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISSCHEDULE B - PLUMBING31
01/04/2024104170255Open ↗
01/23/2023104170255Open ↗
02/08/2021123467612Open ↗
Showing 3 of 31 on file for this type
▸BISEQUIPMENT USE PERMITS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection37
▸BISTenant Protection Plan and Notes26
02/27/2020123842048Open ↗
02/19/2020123842048Open ↗
08/29/2019123773808Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWTenant Protection Plan7
09/05/2026M00214018-I1Open ↗
09/05/2026M00214018-P1Open ↗
09/05/2026M00271739-I1Open ↗
Showing 3 of 7 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStreet Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos135
▸DOB NOWDEP ACP-5: Asbestos Assessment Report62
09/05/2026M00271739-I1Open ↗
09/03/2026M00526062-I1Open ↗
09/03/2026M00526062-P1Open ↗
Showing 3 of 62 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)52
02/19/2020123842048Open ↗
08/19/2019123710537Open ↗
07/03/2019123749337Open ↗
Showing 3 of 52 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance210
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS106
02/19/2020123842048Open ↗
09/11/2019123710537Open ↗
08/29/2019123773808Open ↗
Showing 3 of 106 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS50
02/25/2025123842048Open ↗
12/10/2021123526023Open ↗
05/13/2021123773808Open ↗
Showing 3 of 50 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY17
02/25/2025123842048Open ↗
12/10/2021123526023Open ↗
05/13/2021123773808Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.15
09/03/2026M00526062-I1Open ↗
09/03/2026M00578300-I1Open ↗
09/02/2026M00709386-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
02/27/2025123842048Open ↗
12/09/2022140831759Open ↗
04/01/2021123467612Open ↗
▸BISLIGHTING IN DWELLING UNITS3
02/26/2025123842048Open ↗
12/09/2022140831759Open ↗
04/01/2021123467612Open ↗
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLIGHTING CONTROLS1
12/09/2022140831759Open ↗
▸Inspections & Test Reports47
▸BISTECHNICAL REPORT: RESPONSIBILITY34
03/28/2024104170255Open ↗
02/01/2024104170255Open ↗
12/14/2021123526023Open ↗
Showing 3 of 34 on file for this type
▸BISPOST-INSTALLED ANCHORS4
02/25/2025123842048Open ↗
02/25/2025123842048Open ↗
02/25/2025123842048Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
02/25/2025123842048Open ↗
12/09/2022140831759Open ↗
12/09/2022140831759Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
02/25/2025123842048Open ↗
02/25/2025123842048Open ↗
12/09/2022140831759Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs156
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST79
07/31/2025123199289Open ↗
03/10/2025123842048Open ↗
03/28/2024104170255Open ↗
Showing 3 of 79 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter33
09/03/2026M00542098-I1Open ↗
09/03/2026M00542098-P1Open ↗
09/02/2026M00730633-I1Open ↗
Showing 3 of 33 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
11/10/2022104170255Open ↗
11/05/2020104412039Open ↗
Showing 2 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL2
03/07/2025123842048Open ↗
12/09/2022140831759Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership173
▸BISCOST AFFIDAVIT164
12/10/2021123526023Open ↗
05/17/2021123773808Open ↗
02/16/2021123749337Open ↗
Showing 3 of 164 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
07/30/2025123199289Open ↗
02/27/2025123842048Open ↗
02/08/2024104170255Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms204
▸BISEFILING COVER SHEET82
02/19/2020123842048Open ↗
08/29/2019123773808Open ↗
08/19/2019123710537Open ↗
Showing 3 of 82 on file for this type
▸BISADDITIONAL INFORMATION62
09/18/2023104170255Open ↗
05/11/2023104170255Open ↗
02/15/2021123467612Open ↗
Showing 3 of 62 on file for this type
▸BISBOROUGH INTAKE FORM52
11/10/2022104170255Open ↗
10/31/2022104170255Open ↗
02/05/2020123510441Open ↗
Showing 3 of 52 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Other Documents24
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
02/15/2021123467612Open ↗
Showing 1 of 12 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProperty Ownership Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type