Lincoln Towers
160 WEST END AVENUE · BIN 1070689
💬 Discuss this project
1963Year Built
29Stories
RMBuilding Class
R8Zoning
482,878 sfGross Floor Area
514Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 160 W END CONDOM · 120,650 sf lot · 4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 1 filing · 6 docs
Floor 121p · 1 filing · 3 docs
Floor 11
Floor 10
Floor 91p · 1 filing · 4 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarUnder Construction16p · 1 filing · 6 docs
1 job · most recent 05/10/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/10/2024——Gas, Water/Sanitary
25 jobs · most recent 07/23/2026
General Wiring Lighting
FiledStatusContractorScope
07/23/2026Permit IssuedTHE METRO GROUP ELECTRICGeneral Wiring
07/16/2026Permit IssuedARGON ELECTRICAL CORPGeneral Wiring
06/29/2026Permit IssuedAMKRO ELECTRIC INCGeneral Wiring
06/04/2026Permit IssuedAMKRO ELECTRIC INCGeneral Wiring
05/29/2026CompleteARGON ELECTRICAL CORPGeneral Wiring
04/16/2026CompleteAV GROUP ELECTRICAL LLCGeneral Wiring
04/16/2026Permit IssuedAV GROUP ELECTRICAL LLCGeneral Wiring
03/30/2026CompleteARGON ELECTRICAL CORPGeneral Wiring
02/02/2026CompleteARGON ELECTRICAL CORPGeneral Wiring
01/20/2026CompleteAMKRO ELECTRIC INCGeneral Wiring
01/15/2026CompleteTITANIUM ELECTRICAL CORPGeneral Wiring
10/23/2025CompleteAV GROUP ELECTRICAL LLCGeneral Wiring
04/28/2025CompleteARGON ELECTRICAL CORPGeneral Wiring
04/28/2025CancelledALL CITY ELECTRICAL INCGeneral Wiring
03/27/2025CompleteMAGNA ELECTRIC CORP—
1 job · most recent 06/23/2024
Sidewalk Shed
FiledStatusContractorScope
06/23/2024Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
1 job · most recent 07/01/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/01/2024Permit IssuedSTREAMLINE CONSULTANTS NYSuspended Scaffold (SC)
Building Lifecycle
All (292)Filed (33)Permit Issued (36)Signed Off (24)Facade (FISP) (15)Violation (59)Inspection (27)Objection (68)Special Inspection (30)
02/11/2026
Signed off — Alteration
M00989221-I1
02/06/2026
Signed off — Alteration
COMBINATION OF UNITS 21E AND F. REMOVE AND CONSTRUCT PARTITIONS.
M01205218-I1
01/20/2026
Permit issued — Mechanical Systems
M01326699-I1-GC-CX
01/08/2026
Filed — Alteration
M01326699-I1
12/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/04/2025
Permit issued — Suspended Scaffold
M01024746-I1-SC
10/22/2025
Signed off — Alteration
HEREWITH FILING FOR INTERIOR PARTITIONS AND DOORS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01220534-I1
10/10/2025
Violation issued (HPD, open)
B
10/10/2025
Violation issued (HPD, closed)
A
09/03/2025
Permit issued — General Construction
M01220534-I1-GC
08/18/2025
Signed off — Alteration
INTERIOR RENOVATION IN APT 7D FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01177699-I1
07/17/2025
Permit issued — General Construction
M01205218-I1-GC
06/21/2025
Filed — Alteration
HEREWITH FILING FOR INTERIOR PARTITIONS AND DOORS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01220534-I1
05/06/2025
Objection resolved — Addressed
04/30/2025
Permit issued — Suspended Scaffold
M01024746-I1-SC
04/28/2025
Violation issued (HPD, closed)
A
04/28/2025
Violation issued (HPD, closed)
A
04/28/2025
Violation issued (HPD, closed)
A
04/28/2025
Objection raised — Structural
04/17/2025
Filed — Alteration
COMBINATION OF UNITS 21E AND F. REMOVE AND CONSTRUCT PARTITIONS.
M01205218-I1
04/03/2025
Signed off — Alteration
Plumbing work filed in conjunction with apartment 24K renovation on the 24th Floor.
M00947818-I1
04/03/2025
Special inspection requirement — Final
JIWOO PARK
04/03/2025
Special inspection requirement — Lighting in dwelling units
ERIC BERLENT
04/03/2025
Special inspection requirement — Interior lighting power
ERIC BERLENT
04/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
04/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
ERIC BERLENT
04/03/2025
Special inspection requirement — Lighting controls
ERIC BERLENT
03/31/2025
Permit issued — Sidewalk Shed
M01023954-I1-SH
03/19/2025
Permit issued — General Construction
M01177699-I1-GC
03/11/2025
Objection resolved — Addressed
03/07/2025
Objection raised — Energy
03/06/2025
Objection resolved — Addressed
02/20/2025
Objection raised — Structural
02/12/2025
Permit issued — General Construction
M00989221-I1-GC
02/10/2025
Filed — Alteration
INTERIOR RENOVATION IN APT 7D FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01177699-I1
02/06/2025
Special inspection requirement — Lighting in dwelling units
JONATHAN GRAVES
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
02/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
JONATHAN GRAVES
02/06/2025
Special inspection requirement — Final
JONATHAN GRAVES
02/06/2025
Special inspection requirement — Interior lighting power
JONATHAN GRAVES
01/09/2025
Signed off — Alteration
HEREWITH IS A FILING TO REMOVE, RELOCATE, REPLACE, AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
M00958437-S1
01/09/2025
Signed off — Alteration
HEREWITH IS A FILING TO REMOVE, RELOCATE, REPLACE, AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS.
M00958437-I1
01/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/01/2024
Permit issued — General Construction
M00958437-I1-GC
09/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2024
Permit issued — General Construction
M00947818-I1-GC
07/11/2024
Permit issued — Suspended Scaffold
M01024746-P1-SC
07/11/2024
Special inspection requirement — Post-installed Anchors
Michael Lombardo
07/11/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
07/10/2024
Permit issued — Plumbing
M00958437-S1-PL
07/09/2024
Objection raised — Other
07/09/2024
Objection resolved — Addressed
07/03/2024
Permit issued — General Construction
M00958437-I1-GC
07/01/2024
Filed — Alteration
Application for the installation and use of suspended scaffold.
M01024746-P1
06/23/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01023954-P1
06/13/2024
Permit issued — General Construction
M00989221-I1-GC
05/30/2024
Objection resolved — Addressed
05/30/2024
Objection resolved — Addressed
05/10/2024
Filed — Alteration
Plumbing work filed in conjunction with apartment 24K renovation on the 24th Floor.
M00947818-I1
Latest 60 of 292 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FIRSTSERVICE RESIDENTIAL1407/08/2026
PYRAMID RESTORATION NY707/08/2026
PLATINUM SERVICES NY903/22/2026
COOPER SQUARE REALTY603/22/2026
160 WESAT END AVENUE OWNERS11303/22/2026
160 WEST END AVE CONDO903/22/2026
KREISEL103/22/2026
EUROTOUCH403/22/2026
TM CONSTRUCTION303/22/2026
EUROTOUCH GENERAL CONTRACTORS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EUROTOUCH GENR'L CONTRAC*General Contractor1607/08/2026
ARGON ELECTRICAL CORPElectrical803/22/2026
AUTHENTIC PLBG CORPPlumbing707/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor603/21/2026
STAR RENOVATIONS NY LTDGeneral Contractor407/08/2026
PYRAMID RESTORATION NY LLGeneral Contractor407/08/2026
ALL CITY ELECTRICAL INCElectrical403/22/2026
GJELOSH NICAJElectrical403/21/2026
GSA ELECTRIC CORP.Electrical403/22/2026
ADRIAN ROTARIUElectrical303/21/2026
BHY CONTRACTOR INCGeneral Contractor203/21/2026
AMKRO ELECTRIC INCElectrical203/22/2026
ANTON NICAJElectrical203/21/2026
NICAJ GJELOSHElectrical203/21/2026
SPIRO ELECTRIC INC.Electrical203/22/2026
TRIBORO ELEC'L CONTR'G COElectrical103/22/2026
CIKU CONSTRUCTION LLCGeneral Contractor104/09/2026
DEDE K CONTRACTING GRP LLGeneral Contractor104/09/2026
R. NUZZOLO ELECTRIC INCElectrical103/22/2026
JOLY'S HOME IMPROVEMENT IGeneral Contractor107/08/2026
MATCO SERVICE CORPGeneral Contractor104/09/2026
N.B.B. CONSTRUCTION INCGeneral Contractor107/08/2026
NEST BUILDERS CORPGeneral Contractor107/08/2026
RALPH ISMAEILElectrical103/21/2026
OLSI PELLUMBIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GROUP-S LLC5216101/08/2026
CATALPA SPECIAL INSPECTIO2004304/17/2025
WINTON GROUP ARCHITECTURE4343102/10/2025
LOMBARDO PROF ENGINEERING8566307/01/2024
AMALGAM DESIGN6478105/10/2024
MUNICIPAL TESTING LABORAT230203/21/2024
SUPERSTRUCTURES ENGINEERI374103/20/2024
ARC CONSULTING ENGINEERS,4083110/31/2022
ASSURE PROFESSIONAL ENGIN6962308/13/2022
BUILDTECH ENGINEERING6369107/18/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMATCO SERVICE CORP01/20/2026
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/04/2025
DOB NOWGeneral ConstructionSigned-offDEDE K CONTRACTING GRP LL09/03/2025
DOB NOWGeneral ConstructionSigned-offCIKU CONSTRUCTION LLC07/17/2025
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY04/30/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC03/31/2025
DOB NOWGeneral ConstructionSigned-offN.B.B. CONSTRUCTION INC03/19/2025
DOB NOWGeneral ConstructionSigned-offPYRAMID RESTORATION NY LL02/12/2025
DOB NOWGeneral ConstructionSigned-offEUROTOUCH GENR'L CONTRAC*10/01/2024
DOB NOWGeneral ConstructionSigned-offJOLY'S HOME IMPROVEMENT I07/23/2024
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY07/11/2024
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP07/10/2024
DOB NOWGeneral ConstructionSigned-offEUROTOUCH GENR'L CONTRAC*07/03/2024
DOB NOWGeneral ConstructionSigned-offPYRAMID RESTORATION NY LL06/13/2024
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY04/24/2024
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC04/03/2024
DOB NOWGeneral ConstructionSigned-offEUROTOUCH GENR'L CONTRAC*09/27/2023
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP06/22/2023
DOB NOWGeneral ConstructionSigned-offEUROTOUCH GENR'L CONTRAC*06/21/2023
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP11/29/2022
DOB NOWGeneral ConstructionSigned-offEUROTOUCH GENR'L CONTRAC*11/15/2022
DOB NOWGeneral ConstructionSigned-offSTAR RENOVATIONS NY LTD10/21/2022
DOB NOWGeneral ConstructionSigned-offSTAR RENOVATIONS NY LTD08/22/2022
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I08/02/2022
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP03/14/2022
DOB NOWGeneral ConstructionSigned-offEUROTOUCH GENR'L CONTRAC*03/10/2022
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP01/11/2022
DOB NOWGeneral ConstructionSigned-offEUROTOUCH GENR'L CONTRAC*01/11/2022
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP10/22/2021
DOB NOWGeneral ConstructionSigned-offEUROTOUCH GENR'L CONTRAC*10/21/2021
DOB NOWGeneral ConstructionSigned-offNEST BUILDERS CORP08/13/2021
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL08/03/2021
DOB NOWGeneral ConstructionSigned-offZAF CORPORATION06/11/2021
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP04/20/2021
DOB NOWGeneral ConstructionSigned-offBHY CONTRACTOR INC04/19/2021
DOB NOWPlumbingSigned-offM&G PLUMBING AND HEATING09/17/2019
BISOTISSUEDEUROTOUCH GENR'L CONTRAC*01/19/2021
BISOTISSUEDIGJR CONSTRUCTION INC09/10/2019
BISPLISSUEDP.S.I. MECHANICAL06/27/2019
BISOTISSUEDSLAWEK HOME IMPROVEMENT L04/26/2019
+ 46 more permits on file
▾Field Inspections (DOB CAP) — 27
DateTypeResultReport
12/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 27.
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
04/03/2025FinalJIWOO PARKprogress
04/03/2025Lighting in dwelling unitsERIC BERLENTenergy_progress
04/03/2025Interior lighting powerERIC BERLENTenergy_progress
04/03/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
04/03/2025Fire-Resistance Rated ConstructionERIC BERLENTprogress
04/03/2025Lighting controlsERIC BERLENTenergy_progress
02/06/2025Lighting in dwelling unitsJONATHAN GRAVESenergy_progress
02/06/2025Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
02/06/2025Fire-Resistance Rated ConstructionJONATHAN GRAVESprogress
02/06/2025FinalJONATHAN GRAVESprogress
02/06/2025Interior lighting powerJONATHAN GRAVESenergy_progress
07/11/2024Post-installed AnchorsMichael Lombardospecial
07/11/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
02/27/2024Fire-Resistant Penetrations and JointsCLOUD LEEspecial
01/11/2024FinalPaul Millmanprogress
01/11/2024MasonryPaul Millmanspecial
01/11/2024Tenant Protection Plan ComplianceMichael Lombardospecial
10/13/2023FinalADRIEN ALLREDprogress
10/13/2023Lighting in dwelling unitsADRIEN ALLREDenergy_progress
10/13/2023Energy Code Compliance InspectionsADRIEN ALLREDprogress
10/13/2023Post-installed AnchorsADRIEN ALLREDspecial
10/13/2023Fire-Resistant Penetrations and JointsADRIEN ALLREDspecial
02/15/2023Lighting controlsJames Metzgerenergy_progress
02/15/2023FinalJames Metzgerprogress
02/15/2023Interior lighting powerJames Metzgerenergy_progress
Latest 25 of 50.
▾Documents — 966 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch29
09/03/2026M00553182-P1Request digital key ↗
09/03/2026M00553182-I1Request digital key ↗
09/03/2026M00560858-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00224796-I1Request digital key ↗
09/04/2026M00438735-I1Request digital key ↗
08/15/2026M00408949-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00466686-I1Request digital key ↗
08/15/2026M00456293-I1Request digital key ↗
▸Applications & Permits157
▸BISWORK PERMIT APPLICATION81
01/19/2021140987500Open ↗
09/10/2019123879455Open ↗
06/27/2019140838850Open ↗
Showing 3 of 81 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION76
10/22/2021141003866Open ↗
10/18/2021141003866Open ↗
05/26/2021140987500Open ↗
Showing 3 of 76 on file for this type
▸Seals & Professional Certifications217
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION122
12/26/2019123879455Open ↗
12/26/2019123879455Open ↗
11/08/2019140764368Open ↗
Showing 3 of 122 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/04/2026M00456293-I1Open ↗
09/04/2026M00408949-I1Open ↗
09/04/2026M00438735-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/01/2026M00560806-I1Open ↗
09/01/2026M00560806-I1Open ↗
09/01/2026M00560806-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026M00560806-I1Open ↗
09/01/2026M00989221-I1Open ↗
09/01/2026M00989221-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
12/16/2020140987500Open ↗
03/26/2019140838850Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
12/16/2020140987500Open ↗
05/08/2018140764368Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/08/2018140764368Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/08/2018140764368Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment73
▸BISSELF-CERT PLUMBING NOTICE32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING26
03/26/2019140838850Open ↗
05/08/2018140764368Open ↗
Showing 2 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
08/12/2019123705785Open ↗
04/11/2019140764368Open ↗
04/01/2019140764368Open ↗
Showing 3 of 15 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes13
08/21/2019123879455Open ↗
04/03/2019123705785Open ↗
03/26/2019140838850Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00224796-I1Open ↗
08/13/2026M00438735-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
01/19/2021140987500Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos83
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
12/16/2020140987500Open ↗
03/26/2019140838850Open ↗
03/18/2019123705785Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/04/2026M00438735-I1Open ↗
09/03/2026M00553182-P1Open ↗
09/03/2026M00553182-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/27/2026M00958437-S1Open ↗
08/14/2026M00958437-I1Open ↗
08/13/2026M00224796-I1Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/10/2019123879455Open ↗
▸Energy Compliance101
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS52
12/26/2019123879455Open ↗
12/26/2019123879455Open ↗
11/08/2019140764368Open ↗
Showing 3 of 52 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS29
01/18/2022140987500Open ↗
12/26/2019123879455Open ↗
11/08/2019140764368Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.7
08/15/2026M00456293-I1Open ↗
08/13/2026M00553182-I1Open ↗
08/13/2026M00466686-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/18/2022140987500Open ↗
12/16/2020140987500Open ↗
03/26/2019140838850Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/16/2020140987500Open ↗
05/08/2018140764368Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS1
05/08/2018140764368Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/18/2022140987500Open ↗
12/16/2020140987500Open ↗
03/26/2019140838850Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/26/2018123344112Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
04/26/2018123344112Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/19/2019123705785Open ↗
▸Approvals, Objections & Sign-offs79
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST44
02/10/2022140987500Open ↗
12/26/2019123879455Open ↗
12/23/2019123879455Open ↗
Showing 3 of 44 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
04/03/2019123705785Open ↗
Showing 1 of 13 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership96
▸BISCOST AFFIDAVIT87
01/20/2022140987500Open ↗
01/18/2022140987500Open ↗
12/16/2020140987500Open ↗
Showing 3 of 87 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT9
03/16/2018123195817Open ↗
Showing 1 of 9 on file for this type
▸Filing & Intake Forms81
▸BISEFILING COVER SHEET34
07/15/2019123879455Open ↗
03/18/2019123705785Open ↗
03/18/2019123705785Open ↗
Showing 3 of 34 on file for this type
▸BISBOROUGH INTAKE FORM21
10/22/2021141003866Open ↗
12/26/2019123879455Open ↗
12/26/2019123879455Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION15
11/17/2021140987500Open ↗
08/19/2019123705785Open ↗
04/25/2019140838850Open ↗
Showing 3 of 15 on file for this type
▸BISeFiling Job Application Cover Sheet11
12/16/2020140987500Open ↗
03/26/2019140838850Open ↗
05/08/2018140764368Open ↗
Showing 3 of 11 on file for this type
▸Other Documents19
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
04/26/2018123344112Open ↗
Showing 1 of 6 on file for this type
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDHCR Document3
08/15/2026M00456293-I1Open ↗
08/15/2026M00408949-I1Open ↗
08/13/2026M00438735-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01024746-P1Open ↗
08/13/2026M01024746-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01024746-I1Open ↗
08/13/2026M01024746-P1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSD/SP FIRE PUMP TEST : FP-861
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type