Roof9p · 5 filings · 20 docs
ArchitectureCivilMechanicalStructural
Issued Permit Scope
Mechanical Systems
Structural Reinforcements related to Public Spaces.
On file for this project
31 documents · 1 drawing sheet
INSTALLATION OF 1 UNIT ON THE 5TH FLOOR AND 1 UNIT ON THE ROOF WITH A TOTAL CAPACITY OF 2 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
3 documents
Mechanical systems alterations on the 1st floor, 5th floor roof setback, and sub-cellar level; related work as per plans.
On file for this project
20 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 461p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 451p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 4411p · 2 filings · 20 docs
ArchitectureElectricalPlumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Renovate two (2) existing Hotel Model Rooms, minor removal and patching of partitions per plans filed herewith.
On file for this project
16 documents · 10 drawing sheets
Floor 431p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 421p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 411p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 401p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 391p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 381p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 371p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 361p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 351p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 341p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 331p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 321p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 311p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 301p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 291p · 1 filing · 17 docs
Plumbing
Removal and construction of interior non-bearing partitions and related finishes for Guestrooms construction floors (29-46), marketing floors (29-46) per plans filed.
On file for this project
17 documents · 1 drawing sheet
Floor 282p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 272p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 262p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 252p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 242p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 232p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 222p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 212p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 202p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 192p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 182p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 172p · 1 filing · 20 docs
ArchitecturePlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 2 drawing sheets
Floor 164p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 4 drawing sheets
Floor 156p · 2 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 5 drawing sheets
EXISTING WET SPRINKLER HEADS TO BE SHIFTED AS REQUIRED IN GUESTROOMS, EXISTING SPRINKLER HEADS WITHIN THE EXISTING GYM AREA ON THE 15TH FLOOR TO BE RELOCATED, REMOVED, OR NEW SPRINKLER HEADS INSTALLED, NEW SPRINKLER HEADS TO BE INSTALLED IN THE RESTROOMS.
On file for this project
3 documents · 1 drawing sheet
Floor 148p · 1 filing · 20 docs
ArchitectureDMPlumbing
PROPOSED WORK ON CONST. FLRS 14(15TH MARKET) & CONST. FLRS 16 TO 28 (FLRS 16-29 MARKET), MINIMAL REMOVAL & CONSTRUCTION OF INTERIOR NON-BEARING PARTITIONS, DROPPED CEILINGS IN GUESTROOMS & CORRIDORS; REMOVAL & INSTALLATION OF FLOORS, CEILINGS & DOORS.
On file for this project
26 documents · 8 drawing sheets
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 711p · 4 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
SPRINKLER DEMO AND INSTALL TEMP LOOP AS PER PLANS FILED HEREWITH.
On file for this project
6 documents · 1 drawing sheet
INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.
On file for this project
5 documents · 2 drawing sheets
INTERIOR DEMOLITION OF MECHANICAL AS PER PLANS FILED HEREWITH.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 6
Floor 515p · 5 filings · 20 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Structural Reinforcements related to Public Spaces.
On file for this project
31 documents · 4 drawing sheets
Exterior alterations of existing J-1 Hotel, installation of cosmetic finishes at building exterior per plans filed.
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF 1 UNIT ON THE 5TH FLOOR AND 1 UNIT ON THE ROOF WITH A TOTAL CAPACITY OF 2 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 410p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanical
Structural Reinforcements related to Public Spaces.
On file for this project
31 documents · 8 drawing sheets
Sprinkler demolition, modifications and upgrades related to Public Spaces per plans filed.
On file for this project
8 documents · 2 drawing sheets
Floor 33p · 2 filings · 20 docs
ArchitectureMechanicalStructural
Structural Reinforcements related to Public Spaces.
On file for this project
31 documents · 2 drawing sheets
Structural alterations on the 1st thru 3rd floors, 5th floor & 5th floor low roof, and mezzanine level; related work as per plans.
On file for this project
8 documents · 1 drawing sheet
Floor 224p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Structural Reinforcements related to Public Spaces.
On file for this project
31 documents · 19 drawing sheets
Sprinkler demolition, modifications and upgrades related to Public Spaces per plans filed.
On file for this project
8 documents · 2 drawing sheets
Removal of interior partitions on 2nd floor.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 117p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Structural Reinforcements related to Public Spaces.
On file for this project
31 documents · 14 drawing sheets
Sprinkler demolition, modifications and upgrades related to Public Spaces per plans filed.
On file for this project
8 documents · 1 drawing sheet
Exterior alterations of existing J-1 Hotel, installation of cosmetic finishes at building exterior per plans filed.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Mezzanine2p · 2 filings · 10 docs
Fire ProtectionStructural
Structural alterations on the 1st thru 3rd floors, 5th floor & 5th floor low roof, and mezzanine level; related work as per plans.
On file for this project
8 documents · 1 drawing sheet
Sprinkler system alterations on the 1st floor and sub-cellar level; related work as per plans.
On file for this project
2 documents · 1 drawing sheet
Cellar2p · 1 filing · 3 docs
Structural
Structural repair at cracked walls and slabs and patching throughout.
On file for this project
3 documents · 2 drawing sheets
Sub-Cellar3p · 3 filings · 7 docs
Fire ProtectionPlumbingStructural
Structural repair at cracked walls and slabs and patching throughout.
On file for this project
3 documents · 1 drawing sheet
Plumbing alterations on the 1st floor and sub-cellar level; related work as per plans.
On file for this project
2 documents · 1 drawing sheet
Sprinkler system alterations on the 1st floor and sub-cellar level; related work as per plans.
On file for this project
2 documents · 1 drawing sheet