DOB08/20/2024EMERGENCY WORK ORDER: AT TIME OF INSPECTION IT WAS OBSERVED ON EXPOSURE 2 (NORTH FACADE) MULTIPLE CRACKS ON CONCRETE EYEBROWS AND DETERORIATED MORTAR JOINTS. REMEDY: TAKE AND PROVIDE SAFETY MEASURES TO SECURE PUBLIC SAFETY AT EXPOSURE 2 (NORTH ELEVATION). REPAIR DAMAGED FACADE
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB02/22/2022FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB09/06/2019VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
DOB05/20/2019FAILURE TO PERFORM CATEGORY 5 INSPECTION
DOB05/20/2019FAILURE TO PERFORM CATEGORY 5 INSPECTION
DOB05/20/2019FAILURE TO PERFORM CATEGORY 5 INSPECTION
DOB06/22/2018VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB05/31/2018FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
DOB10/12/2017V-DOB VIOLATION - ACTIVE
DOB06/23/2017VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB08/07/2012V-DOB VIOLATION - ACTIVE
DOB11/19/1998VPW-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-ACTIVE