| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01264790 ↗ | 148-02 ROCKAWAY BOULEVARD QUEENS | Alteration | Permit Issued | 09/04/2025 | 03/17/2026 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | PROPOSED CANOPY |
| Q01253257 ↗ | 148-02 ROCKAWAY BOULEVARD QUEENS | Alteration | Permit Issued | 09/04/2025 | 03/16/2026 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | PROPOSED (3) 10,000 GAL. REGULAR, DIESEL & SUPER TANKS, EXISTING (6) MULTI-PRODUCT DISPENSERS WITH ASSOCIATED PIPING |
| B01219055 ↗ | 538 3 AVENUE BROOKLYN | Alteration | Signed-off | 05/05/2025 | 09/22/2025 | Design Bluelion Engineering LLC Filer VAA | Remove portion of non load bearing masonry wall after parge & seal wall as needed to make weather tight and to resolve DOB and OATH/ECB vioa… |
| Q01249854 ↗ | 108-46 MERRICK BOULEVARD QUEENS | Alteration | Signed-off | 07/07/2025 | 09/04/2025 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | PROPOSED CANOPY FASCIA ON EXISTING CANOPY COLUMNS AND BEAMS (NO CHANGES) |
| B01070564 ↗ | 538 3 AVENUE BROOKLYN | Alteration | Permit Issued | 07/22/2024 | 06/03/2025 | Design VAA Filer VAA | Propose to remove buried motor fuel tanks and install buried motor fuel tanks, piping and dispensers all as per plans filed herewith. No cha… |
| B01175675 ↗ | 538 3 AVENUE BROOKLYN | Alteration | Permit Issued | 05/01/2025 | 05/22/2025 | Design VAA Filer VAA | Propose to remove existing metal canopy & foundation and install repalcement canopy & footings over pump islands as per plans filed herewith… |
| Name | Projects together | Most recent |
|---|---|---|
| NASIR J, KHANZADA LLC | 22 | 09/04/2025 |
| HIGH POINT ENGINEERING | 12 | 03/01/2023 |
| VAA | 3 | 09/11/2025 |
| KEY CIVIL ENGINEERING PC | 2 | 06/22/2023 |
| PRIME ENGINEERING PC | 2 | 03/14/2019 |
| BRONZINO ENGINEERING, P.C. | 1 | 06/22/2023 |
| Bluelion Engineering LLC | 1 | 05/05/2025 |
| JSPECS, INC | 1 | 05/14/2025 |
| LAWRENCE R PILON, PE | 1 | 09/11/2025 |
| NELSON AND POPE | 1 | 08/28/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| RUSSO DEVELOPMENT ENTERP | 1 | 08/28/2023 |
| SUPREME BUILDERS CORP | 1 | 09/06/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| HIGH POINT ENGINEERING | 7 | 03/01/2023 |
| ATLANTIS MANAGEMENT GROUP | 5 | 09/11/2025 |
| 21 EAST 21ST STREET LLC | 1 | 08/28/2023 |
| PM | 1 | 06/22/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| NASIR J. KHANZADA LLC | 15 | 09/04/2025 |
| HIGH POINT ENGINEERING | 7 | 03/01/2023 |
| VAA | 4 | 09/11/2025 |
| JMV ASSOCIATES LLC | 1 | 05/14/2025 |
| PEROTTO CONSULTING MGT | 1 | 06/22/2023 |
| RUSSO DEVELOPMENT ENTERPR | 1 | 08/28/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01264790 ↗ | 148-02 ROCKAWAY BOULEVARD QUEENS | Alteration | Permit Issued | 09/04/2025 | 03/17/2026 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | PROPOSED CANOPY |
| Q01253257 ↗ | 148-02 ROCKAWAY BOULEVARD QUEENS | Alteration | Permit Issued | 09/04/2025 | 03/16/2026 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | PROPOSED (3) 10,000 GAL. REGULAR, DIESEL & SUPER TANKS, EXISTING (6) MULTI-PRODUCT DISPENSERS WITH ASSOCIATED PIPING |
| B01219055 ↗ | 538 3 AVENUE BROOKLYN | Alteration | Signed-off | 05/05/2025 | 09/22/2025 | Design Bluelion Engineering LLC Filer VAA | Remove portion of non load bearing masonry wall after parge & seal wall as needed to make weather tight and to resolve DOB and OATH/ECB vioa… |
| Q01249854 ↗ | 108-46 MERRICK BOULEVARD QUEENS | Alteration | Signed-off | 07/07/2025 | 09/04/2025 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | PROPOSED CANOPY FASCIA ON EXISTING CANOPY COLUMNS AND BEAMS (NO CHANGES) |
| B01070564 ↗ | 538 3 AVENUE BROOKLYN | Alteration | Permit Issued | 07/22/2024 | 06/03/2025 | Design VAA Filer VAA | Propose to remove buried motor fuel tanks and install buried motor fuel tanks, piping and dispensers all as per plans filed herewith. No cha… |
| B01175675 ↗ | 538 3 AVENUE BROOKLYN | Alteration | Permit Issued | 05/01/2025 | 05/22/2025 | Design VAA Filer VAA | Propose to remove existing metal canopy & foundation and install repalcement canopy & footings over pump islands as per plans filed herewith… |
| B01178354 ↗ | 538 3 AVENUE BROOKLYN | Alteration | Permit Issued | 02/21/2025 | 03/04/2025 | Design VAA Filer VAA | Propose to install construction fence as per plans filed herewith. No change in use egress or occupancy is proposed under this application. |
| Q01081042 ↗ | 34-10 BORDEN AVENUE QUEENS | Alteration | Signed-off | 07/16/2024 | 09/06/2024 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED FOR REPLACEMENT OF EQUIPMENT USE PERMIT, ALREADY APPROVED UNDER DOB NOW JOB # Q00703424. |
| Q00923050 ↗ | 122-01 MERRICK BOULEVARD QUEENS | Alteration | Signed-off | 08/28/2023 | 04/05/2024 | Design NELSON AND POPE Owner 21 EAST 21ST STREET LLC | ERECT 581 LF OF 8' HIGH CONSTRUCTION FENCE TO ENCLSOSE SITE |
| B00522555 ↗ | 24 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 06/08/2021 | 07/31/2023 | Design KEY CIVIL ENGINEERING PC | INSTALL TWO NEW UNDERGROUND DWFG FUEL STORAGE TANKS (ONE 12,000 GALLON REGULAR AND ONE DUAL-COMPARTMENT (8,000 GALLON PREMIUM & 4,000 GALLON… |
| B00890828 ↗ | 24 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 06/21/2023 | 07/22/2023 | Design KEY CIVIL ENGINEERING PC Owner PM Filer PEROTTO CONSULTING MGT | Installation of a temporary construction fence |
| 220671985BIS | 440 SOUNDVIEW AVENUE BRONX | — | ISSUED | 04/04/2023 | 04/12/2023 | — | PL |
| X00475903 ↗ | 440 SOUNDVIEW AVENUE BRONX | Alteration | Signed-off | 03/08/2021 | 03/30/2023 | Design HIGH POINT ENGINEERING Owner HIGH POINT ENGINEERING Filer HIGH POINT ENGINEERING | REPLACEMENT OF EXISTING STEEL CANOPY WITH NEW 1,623 SF STEEL CANOPY WITH FOOTINGS AND COLUMNS OVER FUEL DISPENSING ISLANDS (FILED UNDER SEPA… |
| X00475734 ↗ | 440 SOUNDVIEW AVENUE BRONX | Alteration | Signed-off | 03/08/2021 | 03/02/2023 | Design HIGH POINT ENGINEERING Owner HIGH POINT ENGINEERING Filer HIGH POINT ENGINEERING | Use of Mechanical Construction Equipment to lift, hoist and move material, earth and personnel on site. No change in use, egress or occupanc… |
| X00475754 ↗ | 440 SOUNDVIEW AVENUE BRONX | Alteration | Signed-off | 03/08/2021 | 02/28/2023 | Design HIGH POINT ENGINEERING Owner HIGH POINT ENGINEERING Filer HIGH POINT ENGINEERING | INSTALLATION OF A 8' HIGH WOOD CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00492749 ↗ | 34-10 BORDEN AVENUE QUEENS | Alteration | Signed-off | 04/08/2021 | 12/02/2022 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED FOR NEW 15'-0 CURB CUTWITH SPLAY ON 34 STREET |
| Q00492755 ↗ | 34-10 BORDEN AVENUE QUEENS | Alteration | Signed-off | 04/08/2021 | 12/02/2022 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED TO ENLARGE EXISTING 15'-0'' CURBCUT TO 30'-0'' WITH SPALY ON BORDER AVENUE |
| X00474743 ↗ | 1163 GARRISON AVENUE BRONX | Alteration | Signed-off | 04/21/2021 | 06/10/2022 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | Install (4) new 10,000 Gallon tanks and 5 new dispensers with new double wall piping. No change to use, egress, occupancy. |
| X00595844 ↗ | 2801 TIEMANN AVENUE BRONX | Alteration | Permit Issued | 03/23/2022 | 05/20/2022 | Design HIGH POINT ENGINEERING Owner HIGH POINT ENGINEERING Filer HIGH POINT ENGINEERING | INSTALLATION OF A FREESTANDING ID SIGN STRUCTURE (CORNER OF BARTOW AVE & TIEMANN AVE)(Sign Foundation No. 2) . NO CHANGE TO USE, EGRESS OR O… |
| B00474954 ↗ | BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 03/15/2021 | 05/17/2022 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED FOR PROPOSED (2) 17' HIGH STRUCTURAL POLES INSIDE THE PROPERTY LINE FOR GAS STATION SIGNAGE. NO CHANGE TO USE, EGRESS, OR … |
| Q00728452 ↗ | 34-10 BORDEN AVENUE QUEENS | Alteration | Signed-off | 04/29/2022 | 05/13/2022 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED TO INSTALLATION SIGN POLE STRUCTURAL PRICE |
| X00595911 ↗ | 2801 TIEMANN AVENUE BRONX | Alteration | Permit Issued | 03/23/2022 | 04/26/2022 | Design HIGH POINT ENGINEERING | INSTALLATION OF A FREESTANDING ID SIGN STRUCTURE (EAST GUN HILL ROAD) (Sign Foundation No. 1). NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| X00569956 ↗ | 440 SOUNDVIEW AVENUE BRONX | Alteration | Signed-off | 02/11/2022 | 02/18/2022 | Design HIGH POINT ENGINEERING Owner HIGH POINT ENGINEERING Filer HIGH POINT ENGINEERING | INSTALLATION OF A FREESTANDING ID SIGN STRUCTURE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| X00581583 ↗ | 2918 BOSTON ROAD BRONX | Alteration | Permit Issued | 09/24/2021 | 02/10/2022 | Design HIGH POINT ENGINEERING | INSTALLATION OF A FREESTANDING ID SIGN STRUCTURE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00465707 ↗ | 546 MORGAN AVENUE BROOKLYN | Alteration | Permit Issued | 04/06/2021 | 01/25/2022 | Design NASIR J, KHANZADA LLC | APPLICATION FILED TO REMOVE (4) 4K GALLON TANKS AND REPLACE WITH NEW (2) 12K GALLONS DOUBLE WALL FIBER GLASS TANKS AND CONNECT WITH EXISTING… |
| Q00460903 ↗ | 34-10 BORDEN AVENUE QUEENS | Alteration | Signed-off | 03/25/2021 | 01/25/2022 | Design NASIR J, KHANZADA LLC | APPLICATION FILED FOR INSTALLATION OF (1) NEW 12,000 G. REGULAR DOUBLE WALL FIBER GLASS GASOLINE TANK, (1) 12,000 G, DOUBLE WALL SPLIT (6000… |
| Q00460894 ↗ | 34-10 BORDEN AVENUE QUEENS | Alteration | Signed-off | 04/05/2021 | 01/24/2022 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED TO INSTALL FREE STANDING CANOPY |
| X00476693 ↗ | 3290 WEBSTER AVENUE BRONX | Alteration | Signed-off | 05/18/2021 | 01/20/2022 | Design NASIR J, KHANZADA LLC | Installation of (2) new 12,000 gal. tanks and 5 dispensers with piping. No change to use, egress, occupancy. |
| X00476649 ↗ | 3290 WEBSTER AVENUE BRONX | Alteration | Signed-off | 06/25/2021 | 01/19/2022 | Design NASIR J, KHANZADA LLC | APPLICATION FILED TO INSTALL NEW FREE STANDING CANOPY AT GAS STATION. (NO CHANGE IN USE, EGRESS, OR OCCUPANCY) |
| X00465561 ↗ | 902 WESTCHESTER AVENUE BRONX | Alteration | Signed-off | 03/03/2021 | 11/29/2021 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED TO REMOVE (4) 4K GALLON TANKS AND REPLACE WITH NEW (2) 10K GALLONS DOUBLE WALL FIBER GLASS TANKS AND CONNECT WITH EXISTIN… |
| X00507701 ↗ | 902 WESTCHESTER AVENUE BRONX | Alteration | Signed-off | 05/03/2021 | 11/26/2021 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED FOR TEMPORARY CONSTRUCTION FENCE INCONJUCTION WITH THE APPLICATION# X00465561-I1 |
| X00465678 ↗ | 390 EAST 161 STREET BRONX | Alteration | Signed-off | 03/03/2021 | 10/22/2021 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED TO REMOVE (4) 4K GALLON TANKS AND REPLACE WITH NEW (2) 10K GALLONS DOUBLE WALL FIBER GLASS TANKS AND CONNECT WITH EXISTIN… |
| B00390994 ↗ | BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 03/03/2021 | 10/21/2021 | Design NASIR J, KHANZADA LLC | APPLICATION FILED TO PROPOSED NEW 28'-0'' CURB CUT ON BEDFORD AVENUE |
| B00552345 ↗ | BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 07/07/2021 | 10/21/2021 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED FOR INSTALLATION OF NEW HVAC CONDENSER WITH SPLIT UNIT IN CONJUNCTION WITH ALT-1 #321905943. |
| B00507320 ↗ | 546 MORGAN AVENUE BROOKLYN | Alteration | Permit Issued | 05/03/2021 | 10/18/2021 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | APPLICATION FILED FOR TEMPORARY CONSTRUCTION FENCE IN CONJUCTION WITH APPLICATION# B00465707-I1 |
| X00507690 ↗ | 390 EAST 161 STREET BRONX | Alteration | Signed-off | 05/03/2021 | 10/14/2021 | Design NASIR J, KHANZADA LLC | APPLICATION FILED FOR TEMPORARY CONSTRUCTION FENCE INCONJUNCTION WITH THE APPLICATION # X00465678-I1 |
| B00259384 ↗ | BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 12/02/2019 | 03/31/2021 | Design NASIR J, KHANZADA LLC Filer NASIR J. KHANZADA LLC | Application filed for temporary construction fence in conjunction with DOB Job #321905943,322002088,322002097 |
| Q00483019 ↗ | 94-01 CORONA AVENUE QUEENS | Alteration | Signed-off | 03/10/2021 | 03/31/2021 | Design HIGH POINT ENGINEERING Owner HIGH POINT ENGINEERING Filer HIGH POINT ENGINEERING | REPLACEMENT OF TANK-TOP CONCRETE SLAB TO PROVIDE ADA-COMPLIANT PARKING STALLS AND ACCESS TO BUILDING. NO CHANGE TO USE. EGRESS OR OCCUPANCY. |
| B00396529 ↗ | 1760 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 09/15/2020 | 03/30/2021 | Design HIGH POINT ENGINEERING | INSTALLATION OF A 8' HIGH WOOD CONSTRUCTION FENCE FILED IN CONJUNCTION WITH THE INSTALLATION OF UNDERGROUND STORAGE TANKS FILED UNDER JOB NU… |
| 321917761BIS | 1760 FLATBUSH AVENUE BROOKLYN | — | ISSUED | 12/07/2020 | 03/29/2021 | — | OT |
| 240296470BIS | CYPRESS AVENUE BRONX | — | ISSUED | 03/19/2021 | 03/19/2021 | — | OT |
| 220538737BIS | 2527 3 AVENUE BRONX | — | ISSUED | 11/19/2020 | 02/22/2021 | — | OT, PL |
| 321905943BIS | BEDFORD AVENUE BROOKLYN | — | ISSUED | 10/26/2020 | 02/12/2021 | — | — |
| B00396537 ↗ | 1760 FLATBUSH AVENUE BROOKLYN | Alteration | Signed-off | 09/16/2020 | 12/11/2020 | Design HIGH POINT ENGINEERING | PROPOSED REPLACEMENT OF EXISTING ROOF MOUNTED HVAC UNIT WITH NEW. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| 220493099BIS | 2527 3 AVENUE BRONX | — | ISSUED | 07/15/2020 | 11/18/2020 | — | EQ, OT |
| 322002088BIS | BEDFORD AVENUE BROOKLYN | — | ISSUED | 11/09/2020 | 11/09/2020 | — | OT |
| 322002097BIS | BEDFORD AVENUE BROOKLYN | — | ISSUED | 11/02/2020 | 11/02/2020 | — | OT |
| 322045229BIS | 744 5 AVENUE BROOKLYN | — | ISSUED | 05/08/2020 | 05/08/2020 | — | OT |
| B00273053 ↗ | 744 5 AVENUE BROOKLYN | Alteration | Signed-off | 03/16/2020 | 05/07/2020 | Design HIGH POINT ENGINEERING | INSTALLATION OF A 8' WOOD CONSTRUCTION FENCE. |
| 240096472BIS | CYPRESS AVENUE BRONX | — | ISSUED | 12/05/2019 | 12/05/2019 | — | OT |
| X00141283 ↗ | 1220 EAST 233 STREET BRONX | Alteration | Signed-off | 03/14/2019 | 07/10/2019 | Design PRIME ENGINEERING PC | Installation of temporary construction fence. |
| 220543099BIS | 2284 TILLOTSON AVENUE BRONX | — | ISSUED | 06/17/2019 | 06/17/2019 | — | OT |
| Q00137664 ↗ | 116-60 SUTPHIN BOULEVARD QUEENS | Alteration | Signed-off | 03/05/2019 | 04/02/2019 | Design PRIME ENGINEERING PC | Installation of temporary construction fence. |
| 421583986BIS | 116-60 SUTPHIN BOULEVARD QUEENS | — | ISSUED | 03/26/2019 | 03/26/2019 | — | OT |
| 220541812BIS | 2284 TILLOTSON AVENUE BRONX | — | ISSUED | 03/05/2019 | 03/05/2019 | — | EQ, OT |
| Q00027666 ↗ | 152-06 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 03/16/2018 | 04/03/2018 | Design HIGH POINT ENGINEERING Owner HIGH POINT ENGINEERING Filer HIGH POINT ENGINEERING | PROPOSED INSTALLATION OF A WOOD CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| 321554368BIS | 1141 UTICA AVENUE BROOKLYN | — | ISSUED | 02/14/2018 | 03/28/2018 | — | OT |
| 421594876BIS | 152-06 NORTHERN BOULEVARD QUEENS | — | ISSUED | 03/14/2018 | 03/27/2018 | — | FS, OT |
| 220119315BIS | 699 MORRIS AVENUE BRONX | — | ISSUED | 10/18/2011 | 09/20/2017 | — | EQ |
| 220165256BIS | 699 MORRIS AVENUE BRONX | — | ISSUED | 08/30/2016 | 09/20/2017 | — | OT |
| 421336511BIS | 71-05 MYRTLE AVENUE QUEENS | — | ISSUED | 06/05/2017 | 08/10/2017 | — | OT |
| 220534394BIS | 699 MORRIS AVENUE BRONX | — | ISSUED | 09/06/2016 | 09/06/2016 | — | CC |
| 220534401BIS | 699 MORRIS AVENUE BRONX | — | ISSUED | 09/06/2016 | 09/06/2016 | — | CC |
| 220534410BIS | 699 MORRIS AVENUE BRONX | — | ISSUED | 09/06/2016 | 09/06/2016 | — | CC |
| 220100539BIS | 699 MORRIS AVENUE BRONX | — | ISSUED | 10/14/2011 | 08/30/2016 | — | OT |
| 220534429BIS | 699 MORRIS AVENUE BRONX | — | ISSUED | 08/30/2016 | 08/30/2016 | — | CC |
| 220404578BIS | 786 BURKE AVENUE BRONX | — | ISSUED | 12/14/2015 | 05/27/2016 | — | EQ, MH, OT, PL |
| 220513549BIS | 2947 JEROME AVENUE BRONX | — | ISSUED | 04/19/2016 | 04/28/2016 | — | EQ, OT |
| 421270145BIS | 114-05 FARMERS BOULEVARD QUEENS | — | ISSUED | 04/25/2016 | 04/25/2016 | — | MH |
| 220447997BIS | 1710 EAST 233 STREET BRONX | — | ISSUED | 02/12/2016 | 04/13/2016 | — | EQ |
| 220513488BIS | 2947 JEROME AVENUE BRONX | — | ISSUED | 04/08/2016 | 04/08/2016 | — | EQ, OT |
| 220449254BIS | 390 EAST 161 STREET BRONX | — | ISSUED | 10/14/2015 | 11/19/2015 | — | EQ, OT |
| 420920524BIS | 176-02 UNION TURNPIKE QUEENS | — | ISSUED | 08/15/2014 | 11/18/2015 | — | FS, OT |
| 421061371BIS | 114-05 FARMERS BOULEVARD QUEENS | — | ISSUED | 09/10/2015 | 09/10/2015 | — | OT |
| 440187209BIS | 114-05 FARMERS BOULEVARD QUEENS | — | ISSUED | 09/09/2015 | 09/09/2015 | — | EQ, OT |
| 421000008BIS | 114-05 FARMERS BOULEVARD QUEENS | — | ISSUED | 09/04/2015 | 09/04/2015 | — | OT |
| 421094746BIS | 46-61 FRANCIS LEWIS BLVD QUEENS | — | ISSUED | 08/20/2015 | 08/20/2015 | — | EQ, OT |
| 220452374BIS | 4175 BOSTON ROAD BRONX | — | ISSUED | 08/11/2015 | 08/11/2015 | — | OT |
| 240083510BIS | 1702 EAST 233 STREET BRONX | — | ISSUED | 07/09/2015 | 07/09/2015 | — | OT |
| 520134060BIS | 6778 HYLAN BOULEVARD STATEN ISLAND | — | ISSUED | 06/06/2014 | 07/07/2015 | — | EQ, OT |
| 240083262BIS | 4175 BOSTON ROAD BRONX | — | ISSUED | 03/12/2015 | 07/06/2015 | — | OT |
| 240074502BIS | 285 BRUCKNER BOULEVARD BRONX | — | ISSUED | 10/15/2014 | 04/06/2015 | — | OT |
| 220384377BIS | 4643 3 AVENUE BRONX | — | ISSUED | 11/26/2014 | 03/27/2015 | — | OT, PL |
| 420523295BIS | 128-24 ROCKAWAY BOULEVARD QUEENS | — | ISSUED | 08/30/2012 | 03/16/2015 | — | OT |
| 220395999BIS | 4643 3 AVENUE BRONX | — | ISSUED | 12/03/2014 | 12/03/2014 | — | EQ |
| 220384509BIS | 4643 3 AVENUE BRONX | — | ISSUED | 11/26/2014 | 11/26/2014 | — | OT |
| 440155911BIS | 18-21 STEINWAY PLACE QUEENS | — | ISSUED | 10/22/2014 | 10/22/2014 | — | OT |
| 421013799BIS | 176-02 UNION TURNPIKE QUEENS | — | ISSUED | 08/14/2014 | 08/14/2014 | — | EQ |
| 420914050BIS | 43-10 VAN DAM STREET QUEENS | — | ISSUED | 07/21/2014 | 07/21/2014 | — | EQ, OT |
| 420869625BIS | 17-55 FRANCIS LEWIS BLVD QUEENS | — | ISSUED | 07/08/2014 | 07/08/2014 | — | EQ, OT |
| 440146147BIS | 17-55 FRANCIS LEWIS BLVD QUEENS | — | ISSUED | 06/25/2014 | 06/25/2014 | — | EQ, OT |
| 320868753BIS | 161 ENGERT AVENUE BROOKLYN | — | ISSUED | 04/15/2014 | 04/15/2014 | — | OT |
| 320929572BIS | 1091 LORING AVENUE BROOKLYN | — | ISSUED | 04/09/2014 | 04/09/2014 | — | EQ, OT |
| 340110196BIS | 289 HAMILTON AVENUE BROOKLYN | — | ISSUED | 01/08/2014 | 01/08/2014 | — | EQ |
| 320411023BIS | 289 HAMILTON AVENUE BROOKLYN | — | ISSUED | 12/24/2013 | 12/24/2013 | — | OT |
| 220334840BIS | 1602 SEDDON STREET BRONX | — | ISSUED | 10/01/2013 | 10/01/2013 | — | OT |
| 121707297BIS | 1890 PARK AVENUE MANHATTAN | — | ISSUED | 08/26/2013 | 08/26/2013 | — | OT |
| 420558177BIS | 128-24 ROCKAWAY BOULEVARD QUEENS | — | ISSUED | 08/13/2013 | 08/20/2013 | — | MH, PL |
| 420836787BIS | 128-24 ROCKAWAY BOULEVARD QUEENS | — | ISSUED | 05/14/2013 | 05/14/2013 | — | EQ |
| 420785001BIS | 67-02 QUEENS BLVD QUEENS | — | ISSUED | 12/12/2012 | 12/12/2012 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 744 5 AVENUE ↗ | 1 | 07/08/2026 |
| 24 DUMONT AVENUE ↗ | 5 | 07/08/2026 |
| 440 SOUNDVIEW AVENUE ↗ | 11 | 07/08/2026 |
| 902 WESTCHESTER AVENUE ↗ | 3 | 07/08/2026 |
| 1220 EAST 233 STREET ↗ | 1 | 07/08/2026 |
| 34-10 BORDEN AVENUE ↗ | 11 | 07/08/2026 |
| 1163 GARRISON AVENUE ↗ | 5 | 07/08/2026 |
| BEDFORD AVENUE ↗ | 10 | 07/08/2026 |
| 538 3 AVENUE ↗ | 9 | 07/08/2026 |
| 1760 FLATBUSH AVENUE ↗ | 5 | 07/08/2026 |
| 390 EAST 161 STREET ↗ | 3 | 07/08/2026 |
| 148-02 ROCKAWAY BOULEVARD ↗ | 5 | 04/09/2026 |
| 3290 WEBSTER AVENUE ↗ | 3 | 04/09/2026 |
| 108-46 MERRICK BOULEVARD ↗ | 2 | 04/09/2026 |
| 122-01 MERRICK BOULEVARD ↗ | 1 | 04/09/2026 |
| 94-01 CORONA AVENUE ↗ | 2 | 03/21/2026 |
| 2801 TIEMANN AVENUE ↗ | 4 | 03/21/2026 |
| 2918 BOSTON ROAD ↗ | 2 | 03/21/2026 |
| 152-06 NORTHERN BOULEVARD ↗ | 2 | 03/21/2026 |
| 546 MORGAN AVENUE ↗ | 4 | 03/21/2026 |
| 116-60 SUTPHIN BOULEVARD ↗ | 2 | 03/21/2026 |