Hospital, sanitarium, mental institution
Milstein Hospital Building
161 FT WASHINGTON AVENUE · BIN 1076746
💬 Discuss this project
1989Year Built
14Stories
I1Building Class
R8Zoning
891,040 sfGross Floor Area
1Units
LL97 Covered5 Open Violations 3 unresolved · 2 paperwork only ▸FISP: SWARMP
Hospital, sanitarium, mental institution · 245,035 sf lot · 3.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
Roof17p · 5 filings · 20 docs
PenthouseUnder Construction16p · 2 filings · 15 docs
Floor 10Under Construction24p · 5 filings · 20 docs
Floor 9Under Construction119p · 4 filings · 20 docs
Floor 8Under Construction112p · 6 filings · 20 docs
Floor 7Under Construction16p · 2 filings · 19 docs
Floor 6Under Construction20p · 3 filings · 20 docs
Floor 5Under Construction19p · 3 filings · 20 docs
Floor 4Under Construction77p · 10 filings · 20 docs
Floor 3Under Construction107p · 15 filings · 20 docs
Floor 2Under Construction63p · 15 filings · 20 docs
Floor 1Under Construction39p · 7 filings · 20 docs
CellarUnder Construction51p · 5 filings · 20 docs
Sub-CellarUnder Construction41p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK PRESBYTERIAN HOSPITAL76809/19/2026
LENDLEASE US CONSTRUCTION103/22/2026
LAND/LEASEUS CONSTRUCTION103/22/2026
N.Y. PRESBYTERIAN HOSPITAL13703/22/2026
PRESBYTERIAWN HOSPITAL1903/22/2026
PREBYTERIAN HOSPITAL203/22/2026
PRESBYTERIAN HOSPITAL CIT103/22/2026
NYS MEDICAL CORP103/22/2026
NYP103/22/2026
CAULDWELL WINGATE103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL EXPEDITING21003/21/2026
HOWARD I SHAPIRO ASSOCIATES603/21/2026
SKYLINE ACCESS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSIGLI CONSTRUCTION COGeneral Contractor4608/14/2026
LENDLEASE(US)CONSTRUCTIONGeneral Contractor4207/08/2026
HELLMAN CONSTRUCTION COGeneral Contractor2507/08/2026
ALLIANCE PLUMBING CORPPlumbing1907/08/2026
SIRINA FIRE PROT CORPFire Protection1809/07/2026
SHAWMUT WOODWORKING & SUPPLYGeneral Contractor1107/08/2026
CURRENT FIRE PROTECTION INCFire Protection807/08/2026
EMPIRE GENERAL CONTRACTINGeneral Contractor707/08/2026
CARDOZA PLUMBING CORPPlumbing607/08/2026
RIEHM PLUMBING CORPPlumbing607/08/2026
P.K. CONSTRUCTION NY INCGeneral Contractor507/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection507/08/2026
FRESH MEADOW MECHANICAL CGeneral Contractor407/08/2026
E-J ELEC. INSTALLATION COElectrical403/22/2026
NYC FIRE SPRINKLER CORPFire Protection407/08/2026
PAR PLUMBING CO., INCPlumbing407/08/2026
HEMSING, ROBERTElectrical303/21/2026
SHORT, HENRYElectrical303/21/2026
VANGUARD CONSTRUCTION ANDGeneral Contractor307/08/2026
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor307/08/2026
RIEHM PLUMBING CORP.Fire Protection207/08/2026
NELSON AIR DEVICE CORPGeneral Contractor203/21/2026
IRA KATZElectrical203/21/2026
CIVETTA MECHANICAL, LLCPlumbing207/08/2026
HARLEY ELECTRIC CO., INC.Electrical203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4239107/07/2026
TECTONIC ENGINEERING CONS106403/11/2026
SKYLINE ENGINEERING, PLLC267805/15/2023
Building Lifecycle
All (300)Filed (59)Permit Issued (80)Signed Off (42)Violation (1)Inspection (60)Objection (28)Special Inspection (30)
09/18/2026
Permit issued — Supported Scaffold
M01440962-I1-SF
09/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/17/2026
Permit issued — Suspended Scaffold
M01442404-I1-SC
08/16/2026
Objection resolved — Resolved
08/16/2026
Objection resolved — Resolved
08/13/2026
Permit issued — Structural
M01258950-S1-ST
08/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/10/2026
Objection raised — Other
08/10/2026
Objection raised — Scope
08/06/2026
Filed — Alteration
IRA FACADE INSPECTION/REPAIRS
M01442404-I1
08/05/2026
Permit issued — General Construction
M01258950-I1-GC
08/03/2026
Permit issued — Mechanical Systems
M01258964-I1-MS
07/30/2026
Permit issued — Mechanical Systems
M01177036-I1-MS
07/29/2026
Permit issued — General Construction
M01177027-I1-GC
07/29/2026
Permit issued — Plumbing
M01224259-S1-EW-SP
07/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2026
Filed — Alteration
MHB GN BEHAVIORAL HEALTH: MODIFICATION TO HVAC DUCTWORK, PIPING, AND EQUIPMENT TO ACCOMMODATE THE BEHAVIORAL HEALTH RENOVATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01177036-P2
07/06/2026
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
07/06/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/02/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/02/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/02/2026
Special inspection requirement — Standpipe Systems
Young Suh
07/02/2026
Special inspection requirement — Post-installed Anchors
Young Suh
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/02/2026
Special inspection requirement — Sprinkler Systems
Young Suh
06/30/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/29/2026
Objection resolved — Addressed
06/29/2026
Special inspection requirement — Structural Steel - Details
Young Suh
06/29/2026
Special inspection requirement — Structural Steel - Welding
Young Suh
06/29/2026
Special inspection requirement — Post-installed Anchors
Young Suh
06/29/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
06/29/2026
Special inspection requirement — Final
Young Suh
06/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/25/2026
Signed off — Alteration
MHB CHILLER: MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACOMMODATE REPLACEMENT OF THE EXISTING CHILLERS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00906088-S2
06/25/2026
Signed off — Alteration
MHB CHILLER: MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACOMMODATE REPLACEMENT OF THE EXISTING CHILLERS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00906088-S1
06/24/2026
Objection raised — Other
06/23/2026
Permit issued — Sprinklers
M00705070-I1-EW-SP
06/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
06/22/2026
Special inspection requirement — Final
Young Suh
06/22/2026
Special inspection requirement — Mechanical Systems
Young Suh
06/22/2026
Special inspection requirement — Maintenance information
Young Suh
06/22/2026
Special inspection requirement — Electrical motors and elevators
Young Suh
06/18/2026
Permit issued — Plumbing
M01177036-S1-EW-SP
06/18/2026
Special inspection requirement — Sprinkler Systems
Young Suh
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
06/18/2026
Special inspection requirement — Post-installed Anchors
Young Suh
06/16/2026
Permit issued — General Construction
M01381827-I1-GC
06/11/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/10/2026
Filed — Alteration
MILSTEIN CWP: MODIFICATIONS TO HVAC DUCTWORK AND PIPING INCLUDING THE INSTALLATION OF 6 CONDENSER WATER PUMPS TO ACCOMMODATE THE CHILLER REPLACEMENT IN THE EXISTING MILSTEIN HOSPITAL BUILDING AS PER PLANS FILED HEREWITH.
M01314744-P2
06/10/2026
Filed — Alteration
MILSTEIN CWP: MODIFICATIONS TO HVAC DUCTWORK AND PIPING INCLUDING THE INSTALLATION OF 6 CONDENSER WATER PUMPS TO ACCOMMODATE THE CHILLER REPLACEMENT IN THE EXISTING MILSTEIN HOSPITAL BUILDING AS PER PLANS FILED HEREWITH.
M01314744-P1
06/10/2026
Permit issued — Sprinklers
M01224259-S1-PL
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/03/2026
Permit issued — Plumbing
M01381827-S2-PL
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC09/18/2026
DOB NOWSuspended ScaffoldPermit IssuedSUPERSTARS CONTRACTING IN08/17/2026
DOB NOWStructuralPermit IssuedCONSIGLI CONSTRUCTION CO08/13/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO08/05/2026
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO08/03/2026
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO07/30/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO07/29/2026
DOB NOWPlumbingPermit IssuedSIRINA FIRE PROT CORP07/29/2026
DOB NOWSprinklersPermit IssuedCURRENT FIRE PROTECTION INC06/23/2026
DOB NOWPlumbingPermit IssuedSIRINA FIRE PROT CORP06/18/2026
DOB NOWGeneral ConstructionPermit IssuedHELLMAN CONSTRUCTION CO06/16/2026
DOB NOWSprinklersPermit IssuedALLIANCE PLUMBING CORP06/10/2026
DOB NOWMechanical SystemsPermit IssuedHELLMAN CONSTRUCTION CO06/03/2026
DOB NOWPlumbingPermit IssuedRIEHM PLUMBING CORP.06/03/2026
DOB NOWGeneral ConstructionPermit IssuedHELLMAN CONSTRUCTION CO06/03/2026
DOB NOWPlumbingPermit IssuedRIEHM PLUMBING CORP06/03/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION04/29/2026
DOB NOWSprinklersPermit IssuedCIVETTA MECHANICAL, LLC04/29/2026
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE03/30/2026
DOB NOWMechanical SystemsPermit IssuedFRESH MEADOW MECHANICAL C03/09/2026
DOB NOWStructuralPermit IssuedFRESH MEADOW MECHANICAL C03/09/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO03/04/2026
DOB NOWMechanical SystemsSigned-offCONSIGLI CONSTRUCTION CO12/20/2025
DOB NOWStructuralSigned-offCONSIGLI CONSTRUCTION CO12/19/2025
DOB NOWSprinklersPermit IssuedCIVETTA MECHANICAL, LLC12/08/2025
DOB NOWSprinklersPermit IssuedCARDOZA PLUMBING WMBE11/26/2025
DOB NOWPlumbingPermit IssuedRAEL AUTOMATIC SPR.CO INC11/24/2025
DOB NOWPlumbingPermit IssuedSIRINA FIRE PROT CORP11/20/2025
DOB NOWSprinklersPermit IssuedCARDOZA PLUMBING WMBE11/19/2025
DOB NOWMechanical SystemsPermit IssuedNELSON AIR DEVICE CORP11/05/2025
DOB NOWStructuralPermit IssuedHUNTER ROBERTS CONSTRUCTION11/05/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC11/03/2025
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION10/29/2025
DOB NOWSprinklersSigned-offCARDOZA PLUMBING WMBE10/29/2025
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP10/06/2025
DOB NOWStandpipePermit IssuedSIRINA FIRE PROT CORP10/06/2025
DOB NOWStructuralPermit IssuedCONSIGLI CONSTRUCTION CO09/12/2025
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO09/04/2025
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO09/02/2025
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE08/28/2025
+ 60 more permits on file
7 projects · most recent 07/07/2026
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems Others Heating Systems Cooling Towers
FiledStatusContractorScopeMake / Model / Capacity
07/07/2026Permit IssuedCONSIGLI CONSTRUCTION COAir Conditioning Systems
Cooling
Vertiv DME044C 34,400 BTU · Ahu ×1
06/10/2026Permit IssuedFRESH MEADOW MECHANICAL COthers, Ventilation Systems
Other
Armstrong Air SERIES DESIGN ENVELOPE 4300 1619-250.0 1 BTU ×9
05/21/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Liebert PCW011 2,200 CFM · Crac Unit ×1
04/01/2026Signed-offCONSIGLI CONSTRUCTION COAssociated Ducts and Piping, Heating Systems
Heating
Markel P3P5110CA1N, 10 kW · Unit Heater ×2
Ducts & Piping
__Junk__ ductwork & piping 1 CFM · Ductwork ×2
08/22/2025Signed-offCONSIGLI CONSTRUCTION COAir Conditioning Systems, Associated Ducts and Piping
Cooling
York YDB3LCK1-EYDS 2,000 tons · Water Cooled Chiller ×2
Ducts & Piping
__Junk__ ductwork & piping 1 BTU · Ductwork ×2
08/12/2025Permit IssuedCONSIGLI CONSTRUCTION COAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Above Air HKC-011X1-1-00000-EC-00-SF0-HA 26,400 BTU ×1
Liebert DME020C 36,000 BTU · Crac Unit ×1
Ventilation
N/A N/A 1 BTU · Exhaust Fan ×1
Ducts & Piping
__Junk__ DUCTWORK AND PIPING 1 CFM · Ductwork ×1
05/29/2024Signed-offSHAWMUT WOODWORKING & SUPAssociated Ducts and Piping, Cooling Towers
Cooling Tower
Marley NC8414WAS Cooling Tower ×30
Ducts & Piping
__Junk__ ductwork & piping 1 BTU · Ductwork ×5
7 projects · most recent 07/07/2026
Sprinkler System
FiledStatusContractorScope
07/07/2026Permit IssuedSIRINA FIRE PROT CORP350 heads
05/29/2026Permit IssuedRIEHM PLUMBING CORPSprinkler System
05/21/2026Permit IssuedSIRINA FIRE PROT CORP6 heads
04/01/2026Permit IssuedSIRINA FIRE PROT CORP21 heads, 1 outlets
03/11/2026Permit IssuedCURRENT FIRE PROTECTION I5,213 heads
08/12/2025Permit IssuedRAEL AUTOMATIC SPR.CO INC56 heads
06/05/2025Permit IssuedSIRINA FIRE PROT CORP28 heads
7 projects · most recent 07/07/2026
Water/Sanitary Medical Gas
FiledStatusContractorScope
07/07/2026Permit IssuedCARDOZA PLUMBING WMBEMedical Gas, Water/Sanitary
05/29/2026Permit IssuedRIEHM PLUMBING CORPWater/Sanitary
05/21/2026Permit IssuedCARDOZA PLUMBING CORPMedical Gas, Water/Sanitary
04/01/2026Permit IssuedRIEHM PLUMBING CORPWater/Sanitary
03/11/2026———
08/12/2025Permit IssuedCIVETTA MECHANICAL LLCMedical Gas, Water/Sanitary
06/05/2025Permit IssuedCARDOZA PLUMBING CORPMedical Gas, Water/Sanitary
25 projects · most recent 08/04/2026
General Wiring
FiledStatusContractorScope
08/04/2026Permit IssuedTOP SHELF ELECTRIC CORP—
06/04/2026Permit IssuedALLAN BRITEWAY ELECTRICALGeneral Wiring
03/12/2026CompleteA.S.R. ELEC'L CONTR'G INCGeneral Wiring
12/02/2025Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring
11/19/2025Permit IssuedHATZEL AND BUEHLER, INCGeneral Wiring
10/24/2025Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring
07/08/2025Permit IssuedEGG ELECTRIC INC.General Wiring
02/28/2025Permit IssuedGILSTON ELEC'L CONTNG LLCGeneral Wiring
01/09/2025Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring
09/27/2024CompleteLOWY & DONNATH INC.General Wiring
09/19/2024CompleteE-J ELEC. INSTALLATION CO—
08/12/2024Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring
08/12/2024Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring
08/12/2024Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring
05/26/2024CompleteHARLEY ELECTRIC CO., INC.General Wiring
5 projects · most recent 06/10/2026
Steel Concrete
FiledStatusContractorScope
06/10/2026Permit IssuedFRESH MEADOW MECHANICAL CSteel, Concrete
05/05/2026Permit IssuedHUNTER ROBERTS CONSTRUCTISteel
08/22/2025Signed-offCONSIGLI CONSTRUCTION COConcrete
08/19/2025Permit IssuedCONSIGLI CONSTRUCTION COSteel, Concrete
06/09/2025Permit IssuedHUNTER ROBERTS CONSTRUCTISteel
2 projects · most recent 08/06/2026
FiledStatusContractorScope
08/06/2026Permit IssuedSUPERSTARS CONTRACTING IN—
10/08/2025Permit IssuedSKYLINE ACCESS LLC—
▾Field Inspections (DOB CAP) — 139
DateTypeResultReport
09/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/06/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
07/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/02/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/02/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/30/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/11/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/31/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/30/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/18/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
Latest 25 of 139.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/02/2026Post-installed AnchorsYoung Suhspecial
07/02/2026Sprinkler SystemsYoung Suhspecial
07/02/2026Standpipe SystemsYoung Suhspecial
07/02/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
06/29/2026Structural Steel - DetailsYoung Suhspecial
06/29/2026Structural Steel - High Strength BoltingYoung Suhspecial
06/29/2026Structural Steel - WeldingYoung Suhspecial
06/29/2026FinalYoung Suhprogress
06/29/2026Post-installed AnchorsYoung Suhspecial
06/22/2026Energy Code Compliance InspectionsYoung Suhprogress
06/22/2026Mechanical SystemsYoung Suhspecial
06/22/2026Electrical motors and elevatorsYoung Suhenergy_progress
06/22/2026Maintenance informationYoung Suhenergy_progress
06/22/2026FinalYoung Suhprogress
06/18/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
06/18/2026Post-installed AnchorsYoung Suhspecial
06/18/2026Sprinkler SystemsYoung Suhspecial
06/02/2026Electrical motors and elevatorsYoung Suhenergy_progress
06/02/2026Post-installed AnchorsYoung Suhspecial
06/02/2026Energy Code Compliance InspectionsYoung Suhprogress
06/02/2026Structural Steel - DetailsYoung Suhspecial
06/02/2026FinalYoung Suhprogress
06/02/2026FinalYoung Suhprogress
06/02/2026Structural Steel - WeldingYoung Suhspecial
06/02/2026Maintenance informationYoung Suhenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NewYork-PresbyterianMedical / HealthcareFloor 4
Project M00924908 Alteration · LOC Issued · 09/06/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 3,515 on file (BIS + DOB NOW)
▸Plans & Drawings127
▸DOB NOWPlans/Sketch105
09/02/2026M00677638-I1Request digital key ↗
09/02/2026M00704674-I1Request digital key ↗
09/02/2026M00704688-I1Request digital key ↗
Showing 3 of 105 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler10
09/04/2026M00346707-I1Request digital key ↗
09/04/2026M00412666-I1Request digital key ↗
09/03/2026M00478279-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing9
09/04/2026M00338098-I1Request digital key ↗
09/04/2026M00412666-I1Request digital key ↗
09/03/2026M00307578-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00307440-I1Request digital key ↗
09/04/2026M00412620-I1Request digital key ↗
09/04/2026M00421613-I1Request digital key ↗
▸Applications & Permits640
▸BISWORK PERMIT APPLICATION314
02/09/2021140980909Open ↗
01/28/2021140969922Open ↗
10/13/2020140962527Open ↗
Showing 3 of 314 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION311
10/28/2021123670232Open ↗
09/28/2021123670232Open ↗
09/15/2021123670232Open ↗
Showing 3 of 311 on file for this type
▸BISPLACE OF ASSEMBLY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/07/2020140901754Open ↗
08/07/2020140901148Open ↗
07/02/2020140895814Open ↗
▸Seals & Professional Certifications888
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION433
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 433 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature117
09/05/2026M00307440-I1Open ↗
09/04/2026M00338098-I1Open ↗
09/04/2026M00412666-I1Open ↗
Showing 3 of 117 on file for this type
▸DOB NOWProgress Inspector Seal & Signature111
09/30/2026M01258950-I1Open ↗
09/23/2026M01314744-I1Open ↗
09/23/2026M01314744-I1Open ↗
Showing 3 of 111 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature96
09/29/2026M00924914-S1Open ↗
09/23/2026M01314744-I1Open ↗
09/23/2026M00977253-I1Open ↗
Showing 3 of 96 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE11
11/19/2020140980909Open ↗
10/26/2020140969922Open ↗
10/08/2020140962527Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
11/19/2020140980909Open ↗
10/26/2020140969922Open ↗
Showing 2 of 4 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment262
▸BISSELF-CERT PLUMBING NOTICE79
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 79 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE58
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 58 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA45
09/14/2020123483104Open ↗
07/22/2020103234484Open ↗
06/24/2020123408222Open ↗
Showing 3 of 45 on file for this type
▸BISSCHEDULE B - PLUMBING28
06/26/2020123598366Open ↗
Showing 1 of 28 on file for this type
▸BISEQUIPMENT USE PERMITS19
04/26/2022122877994Open ↗
09/27/2021123355485Open ↗
10/02/2020123482472Open ↗
Showing 3 of 19 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
04/26/2022122877994Open ↗
09/27/2021123355485Open ↗
10/02/2020123482472Open ↗
Showing 3 of 11 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8510
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSIGN HANGER CERTIFICATE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-843
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection2
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos213
▸DOB NOWDEP ACP-5: Asbestos Assessment Report103
09/05/2026M00307440-I1Open ↗
09/04/2026M00338098-I1Open ↗
09/04/2026M00412666-I1Open ↗
Showing 3 of 103 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)61
11/19/2020140980909Open ↗
11/05/2020140969922Open ↗
11/04/2020140969922Open ↗
Showing 3 of 61 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
09/21/2020123483104Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS INSPECTION REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance234
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS121
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 121 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS58
03/15/2022140969922Open ↗
01/07/2022140980909Open ↗
09/24/2021123355485Open ↗
Showing 3 of 58 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY31
03/15/2022140969922Open ↗
01/07/2022140980909Open ↗
10/27/2021123670232Open ↗
Showing 3 of 31 on file for this type
▸BISTR8: Energy Code Progress Inspections9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis6
09/02/2026M00704674-I1Open ↗
09/02/2026M00704684-I1Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/19/2020140980909Open ↗
10/26/2020140969922Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/26/2022122877994Open ↗
02/04/2022123670232Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports54
▸BISTECHNICAL REPORT: RESPONSIBILITY52
03/15/2022140969922Open ↗
01/07/2022140980909Open ↗
09/24/2021123355485Open ↗
Showing 3 of 52 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs339
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST123
05/11/2022122877994Open ↗
03/29/2022123670232Open ↗
01/10/2022140980909Open ↗
Showing 3 of 123 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter116
09/05/2026M00307440-I1Open ↗
09/04/2026M00338098-I1Open ↗
09/04/2026M00412666-I1Open ↗
Showing 3 of 116 on file for this type
▸BISADMINISTRATIVE OBJECTIONS57
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 57 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION33
07/24/2020123189888Open ↗
Showing 1 of 33 on file for this type
▸BISSUPERSEDING LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership292
▸BISCOST AFFIDAVIT289
03/16/2022140969922Open ↗
03/15/2022140969922Open ↗
01/07/2022140980909Open ↗
Showing 3 of 289 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
04/26/2022122877994Open ↗
02/04/2022123670232Open ↗
07/24/2020123189888Open ↗
▸Filing & Intake Forms329
▸BISEFILING COVER SHEET183
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 183 on file for this type
▸BISADDITIONAL INFORMATION72
10/28/2021123670232Open ↗
12/07/2020140980909Open ↗
12/06/2020140980909Open ↗
Showing 3 of 72 on file for this type
▸BISBOROUGH INTAKE FORM54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 54 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET20
11/19/2020140980909Open ↗
10/26/2020140969922Open ↗
10/08/2020140962527Open ↗
Showing 3 of 20 on file for this type
▸Other Documents98
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION75
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 75 on file for this type
▸BISSupporting Document: Fee Exempt13
10/26/2020140969922Open ↗
Showing 1 of 13 on file for this type
▸BISSupporting Document: Fee Deferment4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
07/01/2020140895823Open ↗
06/09/2020140900835Open ↗
▸BISFEE EXEMPTION DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type