← Back
BuildNYC
MANHATTAN
Hotel 161 Lexington Condominium
161 LEXINGTON AVENUE · BIN 1018312
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 CoveredRent Stabilized14 Active Violations 6 unresolved · 8 paperwork only 3 likely answered 3 old, status unconfirmed ▸FISP: UNSAFE
Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4 filings
Bulkhead1 filing
Floor 13 filings
Cellar3 filings
Site & exterior6 filings
Filed — no permit issued1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRC406/27/2026
G2 Man403/21/2026
Ramada303/21/2026
17 West 32 St Hotel203/21/2026
Slate Property Group203/21/2026
Cameron Terrace103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/29/2021$29.9M—RUTLEDGE HOTEL LLC → 161 LEXINGTON AVE PROPCO LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Soni Engineering Consulting110/08/2025
New Age204/23/2025
Ashraf310/09/2024
Skyline309/14/2023
Brooker Engineering205/08/2023
Aufgang Architects201/03/2022
KZ Engineering108/12/2021
Enthink Engineers106/30/2021
New York & Company108/24/2020
Green Design212/06/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
New York & Company203/21/2026
JM Zoning1403/21/2026
Rennon Construction203/21/2026
Synergy Building Consultants103/21/2026
Atlantic Building Supply403/21/2026
AK Consulting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
United King ConstructionScaffold2006/27/2026
Rennon ConstructionScaffold1106/27/2026
SD Builders and ConstructionGeneral Contractor406/27/2026
Core Scaffold SystemsScaffold211/08/2026
Pichardo JElectrical103/21/2026
Shelby ElectricalElectrical103/21/2026
Cool Temp Sheet Metalspecialty_contractor106/27/2026
Walliccan Electrical ContractingElectrical103/21/2026
Orbit Plumbing & HeatingPlumbing106/27/2026
E-J Electric Installation CoElectrical103/22/2026
HI-Lights ElectricalElectrical103/22/2026
HI-Lights ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New Age Engineering7746204/23/2025
RI Consulting Services8904107/09/2024
Skyline Engineering267309/14/2023
Big Apple Group NY A Rma9168205/08/2023
New York Engineering Associates851108/24/2020
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 11/14/2025, status Unsafe
11/04/2026
Permit renewed — Sidewalk Shed
Renewed with changes
M01299660-I1-SH
08/28/2026
Boiler inspection report filed
Initial · no defects · Accepted
07/28/2026
Signed off — Alteration
M01123295-I1
05/29/2026
Note: at time of inspection i observed a sidewalk shed in place at expo# 1-4 with trash scattered throughout the deck of the sidewalk shed,…
ECB violation · open
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
Nothing on file for this building.
468 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account