| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01196476 ↗ | 581 GRANT AVENUE BROOKLYN | New Building | Permit Issued | 03/20/2025 | 09/24/2026 | Design MARTIN H. KAPELL | Propose Structural Work as per plan filed in conjunction with NB # B01196476. |
| B01234850 ↗ | 67 MESEROLE STREET BROOKLYN | New Building | Permit Issued | 07/14/2025 | 09/23/2026 | Design MOROZOV Filer JM ZONING, LLC. | Structural work as per plans filed. Filed subsequent to NB #B01234850. |
| B01283545 ↗ | BIN 3430613 | New Building | Permit Issued | 09/16/2025 | 09/17/2026 | Design MOROZOV Filer JM ZONING, LLC. | Sub Membrane Depressurization System work as per plans filed. Filed subsequent to NB #B01283545. |
| B00915426 ↗ | 2140 COYLE STREET BROOKLYN | New Building | Permit Issued | 08/14/2023 | 09/08/2026 | Design AMA CONSULTING ENGINEERS, PC Filer JM ZONING, LLC. | SUPPORT OF EXCAVATION WORK AS PER PLANS FILED. |
| M00755303 ↗ | 1578 LEXINGTON AVENUE MANHATTAN | New Building | Permit Issued | 11/02/2022 | 08/12/2026 | Owner Evenhar Development Corp Filer JM ZONING, LLC. | TEMP SD job in conjunction with the NB application filed to construct a new 13 story commercial building. Tax lots 57, 60, 62, 163 merged in… |
| B01309009 ↗ | 581 GRANT AVENUE BROOKLYN | Alteration | Permit Issued | 10/29/2025 | 08/03/2026 | Design Soni Engineering Consulting Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| AUFGANG ARCHITECTS | 17 | 08/14/2026 |
| SKYLINE ENGINEERING, LLC | 10 | 03/16/2026 |
| GEODESIGN INC. PC | 8 | 08/10/2026 |
| BROOKER ENGINEERING, PLLC | 7 | 08/10/2026 |
| MCNAMARA SALVIA | 5 | 08/14/2026 |
| INFINITY DESIGN CONSULTANT INC | 4 | 10/05/2022 |
| MASER CONSULTING P.A. | 4 | 10/30/2025 |
| Soni Engineering Consulting | 4 | 09/08/2026 |
| H & O ENGINEERING, DPC | 3 | 06/06/2025 |
| JAG ENGINEERING, LLC | 3 | 04/11/2022 |
| MOROZOV | 3 | 08/14/2026 |
| R.G. VANDERWEIL ENGINEERS, PC | 3 | 08/06/2026 |
| SITE SAFETY LLC | 3 | 06/20/2023 |
| HM LOKE CONSULTING ENGINEERING PC | 2 | 07/27/2021 |
| KUTNICKI BERNSTEIN ARCHITECTS | 2 | 08/06/2026 |
| LANGAN ENGINEERING | 2 | 08/14/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 2 | 08/14/2026 |
| OSPINO ENGINEERING PLLC | 2 | 10/02/2023 |
| A&D ENGINEERING, PLLC | 1 | 04/27/2021 |
| AMA CONSULTING ENGINEERS, PC | 1 | 08/10/2026 |
| AZ PROFESSIONAL ENGINEERING PC | 1 | 10/20/2025 |
| CANY ARCHITECTURE & ENGINEERING DPC | 1 | 08/16/2022 |
| DAGHER ENGINEERING PLLC | 1 | 08/10/2026 |
| DOUGLAS P. GONZALEZ | 1 | 08/10/2026 |
| G. SWITZER ARCHITECTURE, PC (GSAPC) | 1 | 10/24/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| ZAPAS CONSTRUCTION CORP | 6 | 08/10/2026 |
| A & M WARSHAW PLBG & HTG | 3 | 08/14/2026 |
| MILL BROOK FIRE PROTECTIO | 3 | 08/14/2026 |
| PACIFIC PLBG. & HTG. CORP | 3 | 06/06/2025 |
| BRYAN'S QUALITY PLUS LLC | 2 | 08/10/2026 |
| E.M.P. FIRE SPRINKLER LLC | 2 | 10/20/2025 |
| PACIFIC PLBG&HTG CORP | 2 | 11/07/2024 |
| A&M WARSHAW SERVICES LLC | 1 | 08/04/2025 |
| ALPHA SCAFFOLDING INC | 1 | 10/20/2025 |
| BAYPORT CONSTRUCTION CORP | 1 | 10/20/2025 |
| CAST CONTRACTING INC | 1 | 08/14/2026 |
| COOL TEMP SHEET METAL,INC | 1 | 09/14/2023 |
| CORE SCAFFOLD SYSTEMS INC | 1 | 12/15/2022 |
| FSNY ENVELOPE LLC | 1 | 08/10/2026 |
| G.P. MECHANICAL CORP | 1 | 08/04/2025 |
| GP MECH SERVICES INC | 1 | 08/04/2025 |
| JACK PICCINI, INC | 1 | 09/15/2022 |
| METFLOW MECHANICAL LLC | 1 | 07/01/2026 |
| NORTHEAST SPECIALIST GROU | 1 | 12/15/2022 |
| ORBIT PLBG & HTG INC | 1 | 09/14/2023 |
| STRUCTURETECH NEW YORK IN | 1 | 08/06/2026 |
| TRISTATE FIRE SPRINK INC | 1 | 07/01/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| SD BUILDERS AND CONSTRUCTION LLC | 37 | 09/08/2026 |
| RISEBORO | 5 | 06/10/2025 |
| RISEBORO COMMUNITY PARTNERSHIP | 5 | 03/16/2026 |
| WESTHAB, INC | 4 | 10/20/2025 |
| 62 HANSON PROPCO LLC | 3 | 07/25/2024 |
| EPISCOPAL HEALTH SERVICES | 2 | 10/30/2025 |
| Evenhar Development Corp | 2 | 08/06/2026 |
| BRC | 1 | 10/24/2025 |
| CAMBER PROPERTY GROUP | 1 | 10/28/2019 |
| CAST CONTRACTING INC | 1 | 08/14/2026 |
| FSNY ENVELOPE LLC | 1 | 08/10/2026 |
| NORTHEAST SPECIALIST GROUP LLC | 1 | 12/15/2022 |
| Noctua Builders LLC | 1 | 08/10/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| JM ZONING, LLC. | 39 | 08/14/2026 |
| AE DESIGN SOLUTION INC. | 5 | 09/08/2026 |
| IPAC, INC. | 2 | 10/30/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 2 | 08/14/2026 |
| SITE-SAFETY LLC | 2 | 06/20/2023 |
| BMB BUILDING CONSULTING INC. | 1 | 08/10/2026 |
| HM LOKE CONSULTING ENGINEERING PC | 1 | 07/27/2021 |
| Hierarch-E LLC | 1 | 10/02/2023 |
| LOMBARDO BUILDING CONSULTANTS | 1 | 08/10/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 08/16/2022 |
| NORTHEAST SERVICE INTERIORS | 1 | 12/15/2022 |
| RSL NY Conulting | 1 | 08/10/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01196476 ↗ | 581 GRANT AVENUE BROOKLYN | New Building | Permit Issued | 03/20/2025 | 09/24/2026 | Design MARTIN H. KAPELL | Propose Structural Work as per plan filed in conjunction with NB # B01196476. |
| B01234850 ↗ | 67 MESEROLE STREET BROOKLYN | New Building | Permit Issued | 07/14/2025 | 09/23/2026 | Design MOROZOV Filer JM ZONING, LLC. | Structural work as per plans filed. Filed subsequent to NB #B01234850. |
| B01283545 ↗ | BIN 3430613 | New Building | Permit Issued | 09/16/2025 | 09/17/2026 | Design MOROZOV Filer JM ZONING, LLC. | Sub Membrane Depressurization System work as per plans filed. Filed subsequent to NB #B01283545. |
| B00915426 ↗ | 2140 COYLE STREET BROOKLYN | New Building | Permit Issued | 08/14/2023 | 09/08/2026 | Design AMA CONSULTING ENGINEERS, PC Filer JM ZONING, LLC. | SUPPORT OF EXCAVATION WORK AS PER PLANS FILED. |
| M00755303 ↗ | 1578 LEXINGTON AVENUE MANHATTAN | New Building | Permit Issued | 11/02/2022 | 08/12/2026 | Owner Evenhar Development Corp Filer JM ZONING, LLC. | TEMP SD job in conjunction with the NB application filed to construct a new 13 story commercial building. Tax lots 57, 60, 62, 163 merged in… |
| B01309009 ↗ | 581 GRANT AVENUE BROOKLYN | Alteration | Permit Issued | 10/29/2025 | 08/03/2026 | Design Soni Engineering Consulting Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01283827 ↗ | 67 MESEROLE STREET BROOKLYN | Alteration | Permit Issued | 09/11/2025 | 07/20/2026 | Design Soni Engineering Consulting Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01233602 ↗ | 1578 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 12/10/2025 | 07/07/2026 | Filer JM ZONING, LLC. | Sprinkler work as per plans filed. Filed in conjunction with alteration# M01233602-I1. |
| M01239519 ↗ | 1578 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 10/28/2025 | 07/07/2026 | Owner Evenhar Development Corp Filer JM ZONING, LLC. | Interior fit out of community facility space to be used as a house of worship. Filed in conjunction with NB# M00755303-I1. No change to use,… |
| M01239543 ↗ | 1578 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 10/28/2025 | 07/07/2026 | — | Interior fit out of community facility space to be used as a youth-oriented community center. Filed in conjunction with NB# M00755303-I1. No… |
| B01392553 ↗ | 2140 COYLE STREET BROOKLYN | Alteration | Permit Issued | 04/24/2026 | 04/27/2026 | Design Soni Engineering Consulting Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01171181 ↗ | 1578 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 01/24/2025 | 01/26/2026 | Design PAUL PERDEK, PROF. ENG. PLLC Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01323118 ↗ | BIN 3430613 | Alteration | Permit Issued | 11/24/2025 | 01/09/2026 | Design Soni Engineering Consulting Filer AE DESIGN SOLUTION INC. | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01000922 ↗ | 2134 COYLE STREET BROOKLYN | Alteration CO | Permit Issued | 02/14/2024 | 12/10/2025 | Design AUFGANG ARCHITECTS Filer JM ZONING, LLC. | Sprinkler work filed in conjunction with Alt-CO to separate the adjoining building to have an independent sprinkler system. |
| Q01179140 ↗ | 144-02 135TH AVENUE QUEENS | Alteration | Permit Issued | 03/24/2025 | 12/01/2025 | Design SKYLINE ENGINEERING, LLC Filer JM ZONING, LLC. | Renovation of existing community facility. No change in use, egress or occupancy |
| M01288979 ↗ | 127 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 10/24/2025 | 11/12/2025 | Owner BRC | Interior renovation of existing bathrooms and sleeping areas on floor 3 through 9. No change in use , occupancy or egress proposed. |
| B01288005 ↗ | 2134 COYLE STREET BROOKLYN | Alteration | Permit Issued | 09/30/2025 | 11/03/2025 | Design GEODESIGN INC. PC Filer JM ZONING, LLC. | TEMPORARY REAR WALL SUPPORT FOR EXISTING BUILDING AS PER PLANS FILED. |
| B00873113 ↗ | 108 ST EDWARDS STREET BROOKLYN | Alteration | Signed-off | 05/12/2023 | 06/03/2025 | Design H & O ENGINEERING, DPC | PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| 421134276BIS | 144-02 135TH AVENUE QUEENS | — | ISSUED | 02/06/2024 | 05/16/2025 | — | — |
| 321921006BIS | 62 HANSON PLACE BROOKLYN | — | ISSUED | 03/08/2019 | 05/13/2025 | — | OT |
| Q00914318 ↗ | 144-02 135TH AVENUE QUEENS | Alteration | Permit Issued | 10/12/2023 | 04/02/2025 | Design SKYLINE ENGINEERING, LLC Filer JM ZONING, LLC. | STRUCTURAL WORK AS PER PLANS FILED |
| B00815591 ↗ | 326 ROCKAWAY AVENUE BROOKLYN | Alteration | Signed-off | 01/24/2023 | 03/06/2025 | Design SITE SAFETY LLC Owner RISEBORO Filer SITE-SAFETY LLC | installation of a temporary construction fence in conjunction with NB |
| B00762701 ↗ | 326 ROCKAWAY AVENUE BROOKLYN | Alteration | Signed-off | 07/07/2022 | 02/27/2025 | Design MOROZOV Owner RISEBORO Filer JM ZONING, LLC. | MECHANICAL WORK AS PER PLANS FILED. FILED IN CONJUNCTION WITH NB#321601012 |
| Q00962801 ↗ | 144-02 135TH AVENUE QUEENS | Alteration | Signed-off | 01/11/2024 | 01/23/2025 | INSTALLATION OF 8' HIGH PLYWOOD CONSTRUCTION FENCE AS PER DESIGN DRAWINGS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION | |
| Q01152478 ↗ | 144-02 135TH AVENUE QUEENS | Alteration | Signed-off | 12/23/2024 | 01/21/2025 | Design GEODESIGN INC. PC | Trenching and excavation for utilities as per plans filed. |
| B00627782 ↗ | 108 ST EDWARDS STREET BROOKLYN | New Building | Permit Issued | 12/02/2021 | 12/30/2024 | Design SKYLINE ENGINEERING, LLC Owner WESTHAB, INC Filer JM ZONING, LLC. | To erect pipe scaffold for construction of new building. No change in use, egress, occupancy. |
| 321191802BIS | JOHNSON AVENUE BROOKLYN | — | ISSUED | 04/01/2022 | 12/27/2024 | — | PL |
| 321601012BIS | 326 ROCKAWAY AVENUE BROOKLYN | — | ISSUED | 08/08/2023 | 12/27/2024 | — | — |
| B01106981 ↗ | JOHNSON AVENUE BROOKLYN | Alteration | Signed-off | 09/10/2024 | 10/02/2024 | Design AUFGANG ARCHITECTS Filer JM ZONING, LLC. | This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildin… |
| M00989741 ↗ | 320 PEARL STREET MANHATTAN | Alteration | Signed-off | 02/02/2024 | 08/23/2024 | Design AUFGANG ARCHITECTS Filer JM ZONING, LLC. | INTERIOR RENOVATION OF PARTIAL CELLAR, FIRST, SECOND AND EIGHTH FLOOR AS PER PLANS FILED. NO CHANGE IN USE EGRESS OR OCCUPANCY |
| B01073504 ↗ | 326 ROCKAWAY AVENUE BROOKLYN | Alteration | Signed-off | 07/01/2024 | 07/17/2024 | Design GEODESIGN INC. PC Filer JM ZONING, LLC. | SOE in conjunction with NB application 321601012. |
| M01006411 ↗ | 320 PEARL STREET MANHATTAN | Alteration CO | Permit Issued | 03/04/2024 | 07/03/2024 | Design AUFGANG ARCHITECTS Filer JM ZONING, LLC. | Filing Alt-CO to Convert existing hotel rooms at the 1st floor, 2nd, 8th floor and cellar, into accessory hotel spaces (offices, conference … |
| Q00777699 ↗ | 92-54 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 08/26/2022 | 06/14/2024 | Design SKYLINE ENGINEERING, LLC | INSTALL NEW EMERGENCY GENERATOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH NB#Q00623509-I1. |
| B08006866 ↗ | 108 ST EDWARDS STREET BROOKLYN | Alteration | Signed-off | 09/23/2022 | 06/06/2024 | Design SKYLINE ENGINEERING, LLC Owner WESTHAB, INC Filer JM ZONING, LLC. | Install new emergency generator as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB #B00627782-I1 |
| 123771230BIS | 60 EAST 12 STREET MANHATTAN | — | ISSUED | 12/07/2020 | 05/21/2024 | — | OT |
| Q00623509 ↗ | 92-54 QUEENS BOULEVARD QUEENS | New Building | Permit Issued | 11/08/2021 | 05/15/2024 | Design SKYLINE ENGINEERING, LLC Owner WESTHAB, INC Filer JM ZONING, LLC. | Structural work as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB#Q00623509-I1 |
| 420809780BIS | 271 BEACH 19 STREET QUEENS | — | ISSUED | 11/19/2013 | 01/08/2024 | — | — |
| Q00965620 ↗ | 144-02 135TH AVENUE QUEENS | Alteration | Signed-off | 11/28/2023 | 11/30/2023 | Design AUFGANG ARCHITECTS Filer JM ZONING, LLC. | Proposed interior demolition of existing non-structural interior partitions of existing hotel building as per plan. No change of use, egress… |
| B00942372 ↗ | 326 ROCKAWAY AVENUE BROOKLYN | Alteration | Signed-off | 10/02/2023 | 10/27/2023 | Design OSPINO ENGINEERING PLLC Filer Hierarch-E LLC | Interior and Exterior trash Chute as per plans filed herewith. No change in use, egress or occupancy. |
| B00765123 ↗ | 62 HANSON PLACE BROOKLYN | Alteration CO | Permit Issued | 07/31/2022 | 10/05/2023 | Design AUFGANG ARCHITECTS Owner 62 HANSON PROPCO LLC Filer JM ZONING, LLC. | ALT-CO FILED FOR CHANGE OF USE ON FLOORS 12 & 13 OF EXISTING PUBLIC FACILITY AND TO UPDATE PA SPACE ON 3RD FLOOR. NEW CERTIFICATE OF OCCUPAN… |
| B00748315 ↗ | 326 ROCKAWAY AVENUE BROOKLYN | Alteration | Signed-off | 06/14/2022 | 09/29/2023 | Design GEODESIGN INC. PC Owner RISEBORO Filer JM ZONING, LLC. | SUPPORT OF EXCAVATION AS PER PLANS FILED. FILED IN CONJUNCTION WITH NB# 321601012 |
| 420662982BIS | 105-02 QUEENS BOULEVARD QUEENS | — | ISSUED | 02/12/2021 | 09/15/2023 | — | PL |
| Q00709206 ↗ | 92-54 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 03/30/2022 | 09/07/2023 | Installation of construction fence 5 FT off the property line to protect the public from entering construction area | |
| Q00074406 ↗ | 105-02 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 08/28/2018 | 09/01/2023 | Filer JM ZONING, LLC. | Temporary construction fence filed in conjunction with NB#420662982. No change to use, egress or occupancy. |
| B00744719 ↗ | 326 ROCKAWAY AVENUE BROOKLYN | Alteration | Permit Issued | 06/14/2022 | 08/14/2023 | Design MCNAMARA SALVIA Owner RISEBORO Filer JM ZONING, LLC. | STRUCTURAL APPLICATION AS PER PLANS FILED. FILED IN CONJUNCTION WITH NB#321601012 |
| B00829899 ↗ | 62 HANSON PLACE BROOKLYN | Alteration | Signed-off | 07/17/2023 | 08/02/2023 | Design SKYLINE ENGINEERING, LLC Owner 62 HANSON PROPCO LLC Filer JM ZONING, LLC. | Filing for installation of a new emergency generator on the ground in conjunction with B00829904-I1. No change in use, occupancy, or egress. |
| Q00883134 ↗ | 92-54 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 06/09/2023 | 06/10/2023 | Design OSPINO ENGINEERING PLLC | Trash chute installation within the building structure as per plans filed herewith. No change in use egress or occupancy. |
| Q08052112 ↗ | 271 BEACH 19 STREET QUEENS | Alteration | Signed-off | 01/12/2023 | 06/09/2023 | Design MASER CONSULTING P.A. Filer IPAC, INC. | Redevelopment of existing paved lot into proposed parking lot, grading, utilities, landscaping, lighting & storm water (includes installatio… |
| Q00880853 ↗ | 271 BEACH 19 STREET QUEENS | Alteration | Signed-off | 05/31/2023 | 06/02/2023 | Design MASER CONSULTING P.A. | CURB CUT #1 FOR PARKING ENTRY |
| Q00880866 ↗ | 271 BEACH 19 STREET QUEENS | Alteration | Signed-off | 05/31/2023 | 06/02/2023 | Design MASER CONSULTING P.A. | CURB CUT #2 FOR DROP-OFF ENTRY |
| Q00880966 ↗ | 271 BEACH 19 STREET QUEENS | Alteration | Signed-off | 05/31/2023 | 06/02/2023 | Design MASER CONSULTING P.A. Filer IPAC, INC. | CURB CUT #3 FOR DROP-OFF EXIT |
| B08043519 ↗ | 68 HANSON PLACE BROOKLYN | Alteration | Signed-off | 04/28/2023 | 05/16/2023 | Design AUFGANG ARCHITECTS Owner 62 HANSON PROPCO LLC Filer JM ZONING, LLC. | APPLICATION FILED TO RECORD EGRESS EASEMENT AND EXTERIOR STAIR BETWEEN 62 HANSON- LOT 20 AND 68 HANSON- VACANT LOT 29 |
| 420867805BIS | 271 BEACH 19 STREET QUEENS | — | ISSUED | 11/14/2013 | 05/03/2023 | — | OT |
| 420867841BIS | 271 BEACH 19 STREET QUEENS | — | ISSUED | 12/20/2013 | 05/03/2023 | — | MH, PL, SP |
| Q00830406 ↗ | 105-02 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 02/16/2023 | 04/15/2023 | Design AUFGANG ARCHITECTS | THIS APPLICATION IS FILED FOR TEMPORARY USE PERMIT FOR A SALES OFFICE INCLUDING MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDING … |
| B08038129 ↗ | 108 ST EDWARDS STREET BROOKLYN | Alteration | Signed-off | 11/10/2022 | 04/07/2023 | Design H & O ENGINEERING, DPC | Relocation of plywood construction fence to protect side from full demolition operations as per application #322101989 |
| B00744645 ↗ | 326 ROCKAWAY AVENUE BROOKLYN | Alteration | Signed-off | 06/14/2022 | 03/30/2023 | Design MCNAMARA SALVIA Owner RISEBORO Filer JM ZONING, LLC. | FOUNDATION WORK AS PER PLANS FILED. FILED IN CONJUNCTION WITH NB#321601012 |
| B00076458 ↗ | JOHNSON AVENUE BROOKLYN | Alteration | Signed-off | 09/05/2018 | 03/09/2023 | Design SITE SAFETY LLC Filer JM ZONING, LLC. | Temporary construction fence filed in conjunction with NB#321191802. No change to use, egress or occupancy. |
| Q00060958 ↗ | 105-02 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 09/01/2021 | 02/09/2023 | Design BROOKER ENGINEERING, PLLC Filer JM ZONING, LLC. | INSTALL 24 FT. CURB CUT AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| Q00068706 ↗ | 105-02 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 09/01/2021 | 02/09/2023 | Design BROOKER ENGINEERING, PLLC | INSTALL 20 FT. CURB CUT AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| M00543920 ↗ | 60 EAST 12 STREET MANHATTAN | Alteration | Signed-off | 08/03/2021 | 12/21/2022 | Design JAMES CHAI ARCHITECT, P.C. | RENOVATE UNITS 4K, 4L ON THE 4TH FLOOR, INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS,PLUMBING, LIGHTING AND FINISH WORK. ALL PLUMBING… |
| 420826360BIS | 271 BEACH 19 STREET QUEENS | — | ISSUED | 03/28/2013 | 12/14/2022 | — | EQ |
| 220633223BIS | 2314 JEROME AVENUE BRONX | — | ISSUED | 04/09/2021 | 11/16/2022 | — | — |
| B00692882 ↗ | 62 HANSON PLACE BROOKLYN | Alteration | Signed-off | 04/12/2022 | 11/09/2022 | Design AUFGANG ARCHITECTS Filer JM ZONING, LLC. | GC WORK FILED TO RENOVATE EXISTING COMMUNITY FACILITY BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| B00711661 ↗ | 62 HANSON PLACE BROOKLYN | Alteration | Signed-off | 04/22/2022 | 11/09/2022 | Design SKYLINE ENGINEERING, LLC Filer JM ZONING, LLC. | MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING PUBLIC FACILITY. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| B00692833 ↗ | 62 HANSON PLACE BROOKLYN | Alteration | Signed-off | 04/11/2022 | 11/08/2022 | Design JAG ENGINEERING, LLC | STRUCTURAL WORK FILED TO REMOVE BULKHEAD ON 4TH FLOOR ROOF AND INFILL. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. |
| B08025090 ↗ | 170 JOHNSON AVENUE BROOKLYN | Alteration | Signed-off | 10/21/2022 | 10/25/2022 | Design SITE SAFETY LLC Filer SITE-SAFETY LLC | install temporary construction fence |
| 321386166BIS | 170 JOHNSON AVENUE BROOKLYN | — | ISSUED | 10/20/2022 | 10/20/2022 | — | OT |
| B00224633 ↗ | 170 JOHNSON AVENUE BROOKLYN | Alteration | Signed-off | 10/11/2019 | 10/19/2022 | Design BROOKER ENGINEERING, PLLC | Structural work in relation to relocation of cellar stairs. No change to use, egress, or occupancy. Filed in conjunction with job #321386166… |
| 340706374BIS | 170 JOHNSON AVENUE BROOKLYN | — | ISSUED | 10/18/2022 | 10/18/2022 | — | OT |
| X00781472 ↗ | 2314 JEROME AVENUE BRONX | Alteration | Signed-off | 08/16/2022 | 10/06/2022 | EXTERIOR FACADE AND ROOF REPAIRS. NO CHANGE IN USE EGRESS OR OCCUPANCY. | |
| M00522423 ↗ | 161 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 06/02/2021 | 10/01/2022 | Design SKYLINE ENGINEERING, LLC Filer JM ZONING, LLC. | Renovation of CEL, 001 of existing mixed use building. No change in use, occupancy, or egress. |
| Q00477808 ↗ | 138-50 QUEENS BOULEVARD QUEENS | Alteration CO | Permit Issued | 03/15/2021 | 09/29/2022 | Design AUFGANG ARCHITECTS Owner WESTHAB, INC. Filer JM ZONING, LLC. | Structural work filed in conjunction with GC application for interior and exterior renovation and conversion of a commercial office space in… |
| Q00044006 ↗ | 37-30 31 STREET QUEENS | Alteration | Signed-off | 05/17/2018 | 07/20/2022 | Design BROOKER ENGINEERING, PLLC Filer JM ZONING, LLC. | Curb cut filing in conjunction with NB# 420663561 to provide access to parking. |
| Q00467477 ↗ | 3705 30 STREET QUEENS | Alteration | Signed-off | 03/09/2021 | 07/20/2022 | Design BROOKER ENGINEERING, PLLC Filer JM ZONING, LLC. | Curb cut filing in conjunction with NB# 420663561 to provide access to manufacturing loading berth. |
| Q00467495 ↗ | 3705 30 STREET QUEENS | Alteration | Signed-off | 03/09/2021 | 07/20/2022 | Design BROOKER ENGINEERING, PLLC Filer JM ZONING, LLC. | Curb cut filing in conjunction with NB# 420663561 to provide access to commercial loading berth. |
| 321238264BIS | 555 4 AVENUE BROOKLYN | — | ISSUED | 12/07/2015 | 05/16/2022 | — | EQ |
| 123771285BIS | 60 EAST 12 STREET MANHATTAN | — | ISSUED | 12/07/2020 | 05/13/2022 | — | OT |
| 123771301BIS | 60 EAST 12 STREET MANHATTAN | — | ISSUED | 12/07/2020 | 05/13/2022 | — | OT |
| 123810215BIS | 60 EAST 12 STREET MANHATTAN | — | ISSUED | 12/12/2019 | 05/13/2022 | — | OT |
| 123812614BIS | 60 EAST 12 STREET MANHATTAN | — | ISSUED | 11/12/2019 | 05/13/2022 | — | OT |
| 210179616BIS | 1973 DALY AVENUE BRONX | — | ISSUED | 01/22/2020 | 05/12/2022 | — | PL |
| 220512728BIS | 2314 JEROME AVENUE BRONX | — | ISSUED | 09/22/2020 | 04/27/2022 | — | OT |
| X00449835 ↗ | 2314 JEROME AVENUE BRONX | Alteration | Signed-off | 01/13/2021 | 04/19/2022 | Design JAG ENGINEERING, LLC Filer JM ZONING, LLC. | STRUCTURAL WORK THROUGHOUT EXISTING ALTERED 7 STORY BUILDING WITH CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.… |
| X00532696 ↗ | 2314 JEROME AVENUE BRONX | Alteration | Signed-off | 06/10/2021 | 03/25/2022 | Design GEA CONSULTING ENGINEERS Filer JM ZONING, LLC. | INSTALL NEW EMERGENCY GENERATOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. FILED IN CONJUNCTION WITH ALT I #220633223. |
| 420663561BIS | 3705 30 STREET QUEENS | — | ISSUED | 01/23/2020 | 02/04/2022 | — | PL |
| 140912591BIS | 60 EAST 12 STREET MANHATTAN | — | ISSUED | 11/18/2021 | 11/18/2021 | — | OT |
| X00564954 ↗ | 2314 JEROME AVENUE BRONX | Alteration | Signed-off | 07/27/2021 | 07/27/2021 | INSTALLATION AND USE OF CONSTRUCTION FENCE AS PER PLANS SUBMITTED. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER #33 OF NYCBUILDING CODE. THI… | |
| 321185953BIS | 109 2 AVENUE BROOKLYN | — | ISSUED | 03/21/2017 | 06/21/2021 | — | EQ, PL |
| B00500259 ↗ | 156 15 STREET BROOKLYN | Alteration | Signed-off | 04/27/2021 | 06/15/2021 | Design A&D ENGINEERING, PLLC | Connect new 6 chimney to existing chimney on the roof. no change in use egress or occupancy |
| X00463113 ↗ | 2314 JEROME AVENUE BRONX | Alteration | Signed-off | 02/04/2021 | 05/07/2021 | Design JAG ENGINEERING, LLC Filer JM ZONING, LLC. | Filed herewith Foundation work as per plans filed. Filed in conjunction with Alt I #220633223. |
| Q00486772 ↗ | 3705 30 STREET QUEENS | Alteration | Signed-off | 03/17/2021 | 05/04/2021 | INSTALLATION AND USE OF TWO (2) DEBRIS CHUTES LOCATIONS AS PER PLANS SUBMITTED. DEBRIS CHUTES SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING … | |
| Q00047583 ↗ | 37-30 31 STREET QUEENS | Alteration | Signed-off | 06/13/2018 | 04/10/2021 | Filer JM ZONING, LLC. | Temporary construction fence filed in conjunction with NB# 420663561. |
| X00252143 ↗ | 1973 DALY AVENUE BRONX | Alteration | Signed-off | 10/28/2019 | 04/10/2021 | Owner CAMBER PROPERTY GROUP Filer JM ZONING, LLC. | Install temporary construction fence as per plans filed. No change to use, egress, or occupancy. Filed in conjunction with NB# 210179616. |
| 440653320BIS | 37-31 30 STREET QUEENS | — | ISSUED | 02/03/2021 | 02/03/2021 | — | OT |
| 440618075BIS | 37-01 30TH STREET QUEENS | — | ISSUED | 08/21/2020 | 08/21/2020 | — | OT |
| 321196503BIS | JOHNSON AVENUE BROOKLYN | — | ISSUED | 03/26/2018 | 04/17/2020 | — | EQ, PL |
| 121961868BIS | 47 3 AVENUE MANHATTAN | — | ISSUED | 09/11/2014 | 10/16/2019 | — | PL |
| 440559343BIS | 3705 30 STREET QUEENS | — | ISSUED | 09/27/2019 | 09/27/2019 | — | OT |
| 321738250BIS | 156 15 STREET BROOKLYN | — | ISSUED | 03/12/2019 | 03/12/2019 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 67 MESEROLE STREET ↗ | 10 | 09/24/2026 |
| BIN 3430613 ↗ | 1 | 09/17/2026 |
| 178 MONTROSE AVENUE ↗ | 3 | 08/27/2026 |
| 1578 LEXINGTON AVENUE ↗ | 19 | 08/26/2026 |
| 581 GRANT AVENUE ↗ | 12 | 08/26/2026 |
| 2140 COYLE STREET ↗ | 7 | 08/14/2026 |
| 172 MONTROSE AVENUE ↗ | 2 | 07/09/2026 |
| 92-54 QUEENS BOULEVARD ↗ | 50 | 07/08/2026 |
| 105-02 QUEENS BOULEVARD ↗ | 17 | 07/08/2026 |
| 108 ST EDWARDS STREET ↗ | 25 | 07/08/2026 |
| 92-54 QUEENS BOULEVARD ↗ | 17 | 07/08/2026 |
| 62 HANSON PLACE ↗ | 12 | 07/08/2026 |
| 3705 30 STREET ↗ | 5 | 07/08/2026 |
| 320 PEARL STREET ↗ | 5 | 07/08/2026 |
| 68 HANSON PLACE ↗ | 1 | 07/08/2026 |
| 170 JOHNSON AVENUE ↗ | 4 | 07/08/2026 |
| 271 BEACH 19 STREET ↗ | 6 | 07/08/2026 |
| JOHNSON AVENUE ↗ | 9 | 07/08/2026 |
| 1973 DALY AVENUE ↗ | 10 | 07/08/2026 |
| 138-50 QUEENS BOULEVARD ↗ | 21 | 07/08/2026 |
| 37-01 30TH STREET ↗ | 7 | 07/08/2026 |
| 2314 JEROME AVENUE ↗ | 10 | 07/08/2026 |
| 2134 COYLE STREET ↗ | 8 | 07/08/2026 |
| 326 ROCKAWAY AVENUE ↗ | 17 | 07/08/2026 |
| 161 LEXINGTON AVENUE ↗ | 4 | 06/27/2026 |
| 144-02 135TH AVENUE ↗ | 13 | 04/09/2026 |
| 2134 COYLE STREET ↗ | 1 | 04/09/2026 |
| 67 MESEROLE STREET ↗ | 1 | 04/09/2026 |
| 127 WEST 25 STREET ↗ | 1 | 04/09/2026 |
| 156 15 STREET ↗ | 3 | 03/21/2026 |
| 60 EAST 12 STREET ↗ | 3 | 03/21/2026 |