← Back
BuildNYC
Walk-up cooperative
161 PRESIDENT STREET
BROOKLYN · BIN 3004494
💬 Discuss this project
1900Year Built
4Stories
C6Building Class
R6AZoning
7,820 sfGross Floor Area
6Units
Rent Stabilized9 Active Violations 1 likely answered ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 161 President St Owners · 2,900 sf lot · 2.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Unit 1L, Unit 1R25p · 1 filing · 20 docs
Site & exterior11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
161 President St Owners903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
William F. Ryan, Jr. P.E.303/31/2022
Barry Structural Engineering107/19/2021
Shakespeare, Gordon, Vlado107/06/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TK Construction of NYGeneral Contractor603/21/2026
TK Construction of NYspecialty_contractor303/21/2026
Forte RenovationsGeneral Contractor103/21/2026
Hag Plumbing & HeatingPlumbing103/21/2026
Henry Myers P & HPlumbing107/08/2026
Mge Development Dba/New TechnologiesGeneral Contractor206/20/2007
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Special Engineering2018403/31/2022
Barry Structural Engineering749107/19/2021
Building Lifecycle
11/12/2025
Boiler inspection report filed
Initial · no defects · Accepted
01/23/2025
Boiler inspection report filed
Subsequent · no defects · Accepted
10/28/2024
Boiler inspection report filed
Initial · defects found · Accepted
10/19/2023
Boiler inspection report filed
Initial · no defects · Accepted
06/30/2023
Failure to file 2021 external low pressure inspection
DOB violation · open · Issued 2023; DOB's record still lists it as active
67 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTK Construction of NY08/26/2021
DOB NOWStructuralSigned-offTK Construction of NY08/26/2021
DOB NOWPlumbingSigned-offHenry Myers P & H08/26/2021
DOB NOWGeneral ConstructionSigned-offTK Construction of NY08/26/2021
BISPLISSUEDBent Mechanical02/03/2009
BISOTISSUEDForte Renovations01/28/2009
BISOTISSUEDMge Development Dba/New Technologies06/20/2007
BISOTISSUEDMge Development Dba/New Technologies06/06/2007
1 project · most recent 10/06/2021
General Wiring
FiledStatusContractorScope
10/06/2021CompleteTMF Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
07/09/2021Structural Cold-Formed SteelMICHAEL BARRYspecial
07/09/2021Structural Steel - DetailsMICHAEL BARRYspecial
07/09/2021Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
07/08/2021FinalMICHAEL BARRYprogress
07/01/2021Interior lighting powerAmy Shakespeareenergy_progress
07/01/2021FinalAmy Shakespeareprogress
07/01/2021Energy Code Compliance InspectionsAmy Shakespeareprogress
07/01/2021Fire-Resistant Penetrations and JointsWilliam Ryanspecial
43 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account