← Back
Over six families without stores
162-30 164 STREET
QUEENS · Jamaica Hills-Briarwood · BIN 4209193
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R4AZoning
7,080 sfGross Floor Area
9Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: DASS LLC · 6,000 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
Mechanical
Basement1p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DASS2807/08/2026
INDER CONSTRUCTION803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC105/09/2024
TAN ENGINEERING PC1008/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXO WORKS2003/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INDER CONSTRUCTION INCGeneral Contractor603/21/2026
EXO WORKS INCGeneral Contractor407/08/2026
RICHARD NEUElectrical103/22/2026
AVON PLBG & HTG INCPlumbing107/08/2026
I DO PLUMBING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAN ENGINEERING, P.C.12911008/26/2022
Building Lifecycle
All (69)Filed (11)Permit Issued (6)Signed Off (4)Violation (17)Inspection (3)Special Inspection (28)
01/23/2025
Signed off — Alteration
Q01048560-I1
12/03/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/09/2024
Filed — Alteration
Q01048560-I1
05/09/2024
Permit issued — Supported Scaffold
Q01048560-I1-SF
05/09/2024
Permit issued — Sidewalk Shed
Q01048560-I1-SH
11/27/2023
Violation issued (HPD, closed)
I
12/15/2022
Signed off — Alteration
Filing herewith for the installation (3) boilers ( Navien NFB-200) system in conjunction Q00549470 and Q00549484. No change to Use, Egress or Occupancy.
Q00567699-I1
12/15/2022
Signed off — Alteration
Filing herewith for the installation of a plumbing system in conjunction Q00549484 and Q00567699. No change to Use, Egress or Occupancy.
Q00549470-I1
12/15/2022
Signed off — Alteration
Filing herewith for the installation of a heating system in conjunction Q00549470 and Q00567699. No change to Use, Egress or Occupancy.
Q00549484-I1
08/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
08/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
08/30/2022
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
08/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
08/26/2022
Filed — Alteration
Filing herewith for the installation of a plumbing system in conjunction Q00549484 and Q00567699. No change to Use, Egress or Occupancy.
Q00549470-P2
08/11/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/27/2022
Filed — Alteration
Filing herewith for the installation of a plumbing system in conjunction Q00549484 and Q00567699. No change to Use, Egress or Occupancy.
Q00549470-P1
07/20/2022
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
07/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
07/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
07/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
06/09/2022
Special inspection requirement — Heating Systems
Roger Tan
06/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
06/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
06/09/2022
Special inspection requirement — Maintenance information
Roger Tan
06/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
06/09/2022
Special inspection requirement — Permanent certificate
Roger Tan
06/08/2022
Filed — Alteration
Filing herewith for the installation (3) boilers ( Navien NFB-200) system in conjunction Q00549470 and Q00549484. No change to Use, Egress or Occupancy.
Q00567699-P3
06/06/2022
Permit issued — Mechanical Systems
Q00549484-I1-MS
06/06/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/01/2022
Filed — Alteration
Filing herewith for the installation of a heating system in conjunction Q00549470 and Q00567699. No change to Use, Egress or Occupancy.
Q00549484-P2
05/27/2022
Filed — Alteration
Filing herewith for the installation (3) boilers ( Navien NFB-200) system in conjunction Q00549470 and Q00549484. No change to Use, Egress or Occupancy.
Q00567699-P2
05/26/2022
Special inspection requirement — Maintenance information
Roger Tan
05/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
05/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
05/26/2022
Special inspection requirement — Final
Roger Tan
05/26/2022
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
05/26/2022
Special inspection requirement — Mechanical Systems
Roger Tan
05/26/2022
Special inspection requirement — Heating Systems
Roger Tan
05/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
03/08/2022
Violation issued (ECB, closed)
Plumbing
02/11/2022
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
01/27/2022
Permit issued — Mechanical Systems
Q00549484-I1-MS
01/25/2022
Filed — Alteration
Filing herewith for the installation of a heating system in conjunction Q00549470 and Q00567699. No change to Use, Egress or Occupancy.
Q00549484-P1
01/25/2022
Filed — Alteration
Filing herewith for the installation (3) boilers ( Navien NFB-200) system in conjunction Q00549470 and Q00549484. No change to Use, Egress or Occupancy.
Q00567699-P1
01/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
01/24/2022
Special inspection requirement — Heating Systems
Roger Tan
01/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
01/24/2022
Special inspection requirement — Permanent certificate
Roger Tan
01/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
01/24/2022
Special inspection requirement — Maintenance information
Roger Tan
09/09/2021
Permit issued — Plumbing
Q00549470-I1-PL
09/01/2021
Permit issued — Boiler Equipment
Q00567699-I1-BE
08/19/2021
Filed — Alteration
Filing herewith for the installation of a plumbing system in conjunction Q00549484 and Q00567699. No change to Use, Egress or Occupancy.
Q00549470-I1
08/18/2021
Filed — Alteration
Filing herewith for the installation (3) boilers ( Navien NFB-200) system in conjunction Q00549470 and Q00549484. No change to Use, Egress or Occupancy.
Q00567699-I1
08/18/2021
Filed — Alteration
Filing herewith for the installation of a heating system in conjunction Q00549470 and Q00567699. No change to Use, Egress or Occupancy.
Q00549484-I1
12/04/2017
Violation issued (HPD, closed)
I
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offINDER CONSTRUCTION INC05/09/2024
DOB NOWSidewalk ShedSigned-offINDER CONSTRUCTION INC05/09/2024
DOB NOWMechanical SystemsSigned-offEXO WORKS INC06/06/2022
DOB NOWMechanical SystemsSigned-offEXO WORKS INC01/27/2022
DOB NOWPlumbingSigned-offI DO PLUMBING & HTG INC09/09/2021
DOB NOWBoiler EquipmentSigned-offAVON PLBG & HTG INC09/01/2021
2 projects · most recent 06/13/2024
Boiler Controls
FiledStatusContractorScope
06/13/2024CompleteRICHARD NEU—
10/25/2021CompleteSUPREME ELECTRIC CORPBoiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/11/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2022Pass-Final Boiler Equipment InspectionPassView ↗
02/11/2022Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/30/2022HVAC-R and service water piping design and insulationRoger Tanenergy_progress
08/30/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
08/30/2022HVAC-R and service water heating system controlsRoger Tanenergy_progress
08/30/2022HVAC-R and service water heating equipmentRoger Tanenergy_progress
07/20/2022HVAC-R and service water heating equipmentRoger Tanenergy_progress
07/20/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
07/20/2022HVAC-R and service water piping design and insulationRoger Tanenergy_progress
07/20/2022HVAC-R and service water heating system controlsRoger Tanenergy_progress
06/09/2022Heating SystemsRoger Tanspecial
06/09/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
06/09/2022HVAC-R and service water heating system controlsRoger Tanenergy_progress
06/09/2022Maintenance informationRoger Tanenergy_progress
06/09/2022HVAC-R and service water heating equipmentRoger Tanenergy_progress
06/09/2022Permanent certificateRoger Tanenergy_progress
05/26/2022Maintenance informationRoger Tanenergy_progress
05/26/2022HVAC-R and service water heating system controlsRoger Tanenergy_progress
05/26/2022HVAC-R and service water heating equipmentRoger Tanenergy_progress
05/26/2022FinalRoger Tanprogress
05/26/2022Energy Code Compliance InspectionsRoger Tanprogress
05/26/2022Mechanical SystemsRoger Tanspecial
05/26/2022Heating SystemsRoger Tanspecial
05/26/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
01/24/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
01/24/2022Heating SystemsRoger Tanspecial
01/24/2022HVAC-R and service water heating equipmentRoger Tanenergy_progress
Latest 25 of 28.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026Q00549470-I1Request digital key ↗
08/27/2026Q00549470-P2Request digital key ↗
08/27/2026Q00549470-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026Q00549470-P1Open ↗
08/27/2026Q00549470-I1Open ↗
08/26/2026Q00549484-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/28/2026Q00549470-P1Open ↗
09/23/2026Q00567699-I1Open ↗
08/31/2026Q00549470-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/28/2026Q00549470-P1Open ↗
09/23/2026Q00567699-I1Open ↗
08/31/2026Q00549470-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026Q00549470-P1Open ↗
08/27/2026Q00549470-I1Open ↗
08/26/2026Q00549484-P2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00567699-I1Open ↗
08/13/2026Q00549470-I1Open ↗
08/13/2026Q00549484-I1Open ↗