| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M00900787 ↗ | 4162 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/07/2023 | 09/29/2026 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FOOT. THE SIDEWALK SHED SHALL COMPLY WITH CHAPT… |
| X00935983 ↗ | 1910 UNIVERSITY AVENUE BRONX | Alteration | Permit Issued | 09/19/2023 | 09/29/2026 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| M00827946 ↗ | 153 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/13/2023 | 11/18/2025 | Design ASR ENGINEERING PC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B00968801 ↗ | 1 WILLOW PLACE BROOKLYN | Alteration | Permit Issued | 11/29/2023 | 09/23/2025 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| X01242307 ↗ | 1170 GERARD AVENUE BRONX | Alteration | Permit Issued | 06/17/2025 | 09/23/2025 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| X01165312 ↗ | 2472 3 AVENUE BRONX | Alteration | Permit Issued | 01/10/2025 | 09/22/2025 | Design SYED ENGINEERING, P.C. | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M00900787 ↗ | 4162 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/07/2023 | 09/29/2026 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FOOT. THE SIDEWALK SHED SHALL COMPLY WITH CHAPT… |
| X00935983 ↗ | 1910 UNIVERSITY AVENUE BRONX | Alteration | Permit Issued | 09/19/2023 | 09/29/2026 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| M00827946 ↗ | 153 5 AVENUE MANHATTAN | Alteration | Permit Issued | 02/13/2023 | 11/18/2025 | Design ASR ENGINEERING PC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B00968801 ↗ | 1 WILLOW PLACE BROOKLYN | Alteration | Permit Issued | 11/29/2023 | 09/23/2025 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| X01242307 ↗ | 1170 GERARD AVENUE BRONX | Alteration | Permit Issued | 06/17/2025 | 09/23/2025 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| X01165312 ↗ | 2472 3 AVENUE BRONX | Alteration | Permit Issued | 01/10/2025 | 09/22/2025 | Design SYED ENGINEERING, P.C. | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01248625 ↗ | 4622 18 AVENUE BROOKLYN | Alteration | Permit Issued | 06/30/2025 | 06/30/2025 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| X01232924 ↗ | 513 EAST 138 STREET BRONX | Alteration | Permit Issued | 05/29/2025 | 05/30/2025 | Design BANGASH ASSOCIATES INC. | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01224771 ↗ | 8829 FT HAMILTON PARKWAY BROOKLYN | Alteration | Permit Issued | 05/17/2025 | 05/19/2025 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| M01204310 ↗ | 885 10 AVENUE MANHATTAN | Alteration | Permit Issued | 04/04/2025 | 04/16/2025 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01204312 ↗ | 204 14 STREET BROOKLYN | Alteration | Permit Issued | 04/04/2025 | 04/04/2025 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M01202302 ↗ | 516 WEST 143 STREET MANHATTAN | Alteration | Permit Issued | 03/28/2025 | 03/31/2025 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| Q01200458 ↗ | BIN 4626285 | Alteration | Permit Issued | 03/28/2025 | 03/31/2025 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR E… |
| M01163469 ↗ | 174 7 AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 01/13/2025 | 03/04/2025 | Design SYED ENGINEERING, P.C. Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01188023 ↗ | 1753 EAST 12 STREET BROOKLYN | Alteration | Permit Issued | 02/28/2025 | 03/03/2025 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| Q01149300 ↗ | 79-14 ROOSEVELT AVENUE QUEENS | Alteration | Permit Issued | 12/03/2024 | 12/13/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01150583 ↗ | 8415 4 AVENUE BROOKLYN | Alteration | Signed-off | 12/06/2024 | 12/11/2024 | Design ASR ENGINEERING PC Owner KRAFTCON INC | PROPOSED FACADE RAPIR AS SHOWN IN PLANS. THERE IS NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| M01150712 ↗ | 520 WEST 143 STREET MANHATTAN | Alteration | Permit Issued | 12/04/2024 | 12/05/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01148446 ↗ | 8415 4 AVENUE BROOKLYN | Alteration | Signed-off | 11/27/2024 | 11/27/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| B01136623 ↗ | 102 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 11/18/2024 | 11/18/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR E… |
| Q01136624 ↗ | 7-11 SEAGIRT AVENUE QUEENS | Alteration | Signed-off | 11/07/2024 | 11/07/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01129027 ↗ | 459 SCHENECTADY AVENUE BROOKLYN | Alteration | Signed-off | 10/18/2024 | 10/18/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| Q01125667 ↗ | 86-04 117 STREET QUEENS | Alteration | Permit Issued | 10/14/2024 | 10/18/2024 | Design SYED ENGINEERING, P.C. Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01098677 ↗ | 5402 4 AVENUE BROOKLYN | Alteration | Permit Issued | 08/20/2024 | 09/18/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01109484 ↗ | 8205 3 AVENUE BROOKLYN | Alteration | Signed-off | 09/11/2024 | 09/18/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M01101352 ↗ | 545 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 08/26/2024 | 09/18/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M01103041 ↗ | 14 WEST 11 STREET MANHATTAN | Alteration | Signed-off | 08/28/2024 | 09/18/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| Q01095273 ↗ | 13-06 BAYPORT PLACE QUEENS | Alteration | Permit Issued | 08/13/2024 | 09/18/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| Q01103707 ↗ | 36-14 35 STREET QUEENS | Alteration | Signed-off | 08/29/2024 | 09/18/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| X01081286 ↗ | 2340 VALENTINE AVENUE BRONX | Alteration | Permit Issued | 07/16/2024 | 09/18/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01112351 ↗ | 215 RIDGEWOOD AVENUE BROOKLYN | Alteration | Signed-off | 09/17/2024 | 09/17/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M00854708 ↗ | 7 WEST 45 STREET MANHATTAN | Alteration | Signed-off | 04/04/2023 | 09/17/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| M01038224 ↗ | 412 WEST 148 STREET MANHATTAN | Alteration | Signed-off | 08/04/2024 | 09/17/2024 | Design SYED ENGINEERING, P.C. Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M01112349 ↗ | 308 EAST 49 STREET MANHATTAN | Alteration | Signed-off | 09/17/2024 | 09/17/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| X00996395 ↗ | 1053 BOYNTON AVENUE BRONX | Alteration | Signed-off | 01/26/2024 | 09/17/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| X00996398 ↗ | 1045 BOYNTON AVENUE BRONX | Alteration | Permit Issued | 01/26/2024 | 09/17/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| X01013275 ↗ | 2715 WEBB AVENUE BRONX | Alteration | Permit Issued | 03/03/2024 | 09/17/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| X01060196 ↗ | 3535 ROCHAMBEAU AVENUE BRONX | Alteration | Signed-off | 06/03/2024 | 09/17/2024 | Design SYED ENGINEERING, P.C. | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M00925513 ↗ | 95 EAST HOUSTON STREET MANHATTAN | Alteration | Permit Issued | 08/28/2023 | 09/09/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M01100874 ↗ | 5 EAST 10 STREET MANHATTAN | Alteration | Signed-off | 08/23/2024 | 08/23/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| Q01086009 ↗ | 108-55 39 AVENUE QUEENS | Alteration | Signed-off | 07/25/2024 | 07/25/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01074292 ↗ | 1362 OCEAN AVENUE BROOKLYN | Alteration | Signed-off | 06/29/2024 | 07/03/2024 | Design ASR ENGINEERING PC | INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR E… |
| B01072326 ↗ | 149 BERKELEY PLACE BROOKLYN | Alteration | Signed-off | 06/28/2024 | 07/01/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| M01070664 ↗ | 294 WEST 4 STREET MANHATTAN | Alteration | Permit Issued | 06/23/2024 | 06/24/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| Q01069337 ↗ | 43-44 21 STREET QUEENS | Alteration | Signed-off | 06/21/2024 | 06/24/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| Q01070049 ↗ | 110-07 73 ROAD QUEENS | Alteration | Signed-off | 06/21/2024 | 06/24/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M01062486 ↗ | 240 CABRINI BOULEVARD MANHATTAN | Alteration | Signed-off | 06/07/2024 | 06/10/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M00863824 ↗ | 7 WEST 45 STREET MANHATTAN | Alteration | Signed-off | 04/24/2023 | 06/05/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE… |
| B01058697 ↗ | 9010 5 AVENUE BROOKLYN | Alteration | Signed-off | 05/30/2024 | 05/30/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B01054255 ↗ | 382 EASTERN PARKWAY BROOKLYN | Alteration | Signed-off | 05/23/2024 | 05/23/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR E… |
| B00992812 ↗ | 1109 MANHATTAN AVENUE BROOKLYN | Alteration | Permit Issued | 01/22/2024 | 05/10/2024 | Design SYED ENGINEERING, P.C. Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| Q01048560 ↗ | 162-30 164 STREET QUEENS | Alteration | Signed-off | 05/09/2024 | 05/09/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| Q01044855 ↗ | 161-39 118 AVENUE QUEENS | Alteration | Signed-off | 05/02/2024 | 05/03/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| Q01030532 ↗ | 151-20 88 STREET QUEENS | Alteration | Signed-off | 04/24/2024 | 04/25/2024 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| Q01030533 ↗ | 151-20 88 STREET QUEENS | Alteration | Signed-off | 04/24/2024 | 04/25/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M01040169 ↗ | 639 WEST 207 STREET MANHATTAN | Alteration | Signed-off | 04/24/2024 | 04/24/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR E… |
| B01037802 ↗ | 7710 5 AVENUE BROOKLYN | Alteration | Signed-off | 04/18/2024 | 04/19/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B00956286 ↗ | 376 GREENE AVENUE BROOKLYN | Alteration | Signed-off | 11/01/2023 | 02/29/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| X00997001 ↗ | 1049 BOYNTON AVENUE BRONX | Alteration | Permit Issued | 01/29/2024 | 02/08/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| X00988164 ↗ | 36 BEDFORD PARK BLVD BRONX | Alteration | Signed-off | 01/10/2024 | 01/22/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR E… |
| B00980767 ↗ | 2970 NOSTRAND AVENUE BROOKLYN | Alteration | Signed-off | 12/21/2023 | 01/12/2024 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B00976948 ↗ | 8721 BAY PARKWAY BROOKLYN | Alteration | Permit Issued | 12/18/2023 | 12/18/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| X00965732 ↗ | 36 BEDFORD PARK BLVD BRONX | Alteration | Permit Issued | 11/21/2023 | 11/21/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| B00945498 ↗ | 5714 1 AVENUE BROOKLYN | Alteration | Permit Issued | 10/10/2023 | 10/11/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| B00941807 ↗ | 231 15 STREET BROOKLYN | Alteration | Signed-off | 10/02/2023 | 10/03/2023 | Design ASR ENGINEERING PC | INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY … |
| M00926887 ↗ | 111 CHRYSTIE STREET MANHATTAN | Alteration | Signed-off | 08/31/2023 | 08/31/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHAN… |
| B00902877 ↗ | 114 7 AVENUE BROOKLYN | Alteration | Signed-off | 07/17/2023 | 07/17/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FOOT. THE SIDEWALK SHED SHALL COMPLY WITH CHAPT… |
| B00885586 ↗ | 229 8 STREET BROOKLYN | Alteration | Signed-off | 06/06/2023 | 07/10/2023 | Design INDRAJEET VAGHA PE Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| M00900793 ↗ | 98 PARK TERRACE EAST MANHATTAN | Alteration | Signed-off | 07/07/2023 | 07/07/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FOOT. THE SIDEWALK SHED SHALL COMPLY WITH CHAPT… |
| Q00888107 ↗ | 169-21 HILLSIDE AVENUE QUEENS | Alteration | Signed-off | 06/09/2023 | 06/24/2023 | Design INDRAJEET VAGHA PE | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B00885583 ↗ | 407 9TH STREET BROOKLYN | Alteration | Signed-off | 06/06/2023 | 06/07/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| Q00778922 ↗ | 36-49 32 STREET QUEENS | Alteration | Permit Issued | 07/25/2022 | 05/16/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| Q00782065 ↗ | 36-49 32 STREET QUEENS | Alteration | Permit Issued | 08/01/2022 | 05/16/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE… |
| B00873367 ↗ | 502 90 STREET BROOKLYN | Alteration | Signed-off | 05/11/2023 | 05/11/2023 | Design INDRAJEET VAGHA PE Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| X00873363 ↗ | 932 KELLY STREET BRONX | Alteration | Signed-off | 05/11/2023 | 05/11/2023 | Design INDRAJEET VAGHA PE | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| X00867524 ↗ | 1165 SHAKESPEARE AVENUE BRONX | Alteration | Signed-off | 05/01/2023 | 05/01/2023 | Design ASR ENGINEERING PC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B00850085 ↗ | 76 7 AVENUE BROOKLYN | Alteration | Signed-off | 03/29/2023 | 03/30/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CO… |
| Q00843434 ↗ | 86-15 ELMHURST AVENUE QUEENS | Alteration | Signed-off | 03/14/2023 | 03/14/2023 | Design ASR ENGINEERING PC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| M00838151 ↗ | 30 PARK TERRACE EAST MANHATTAN | Alteration | Signed-off | 03/03/2023 | 03/03/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE… |
| M00835908 ↗ | 30 PARK TERRACE EAST MANHATTAN | Alteration | Signed-off | 03/01/2023 | 03/01/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B08016484 ↗ | 643 5TH AVENUE BROOKLYN | Alteration | Signed-off | 10/07/2022 | 02/09/2023 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B00804938 ↗ | 643 5TH AVENUE BROOKLYN | Alteration | Signed-off | 12/29/2022 | 02/07/2023 | Design SYED ENGINEERING, P.C. Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE… |
| Q00818999 ↗ | 13-15 JACKSON AVENUE QUEENS | Alteration | Signed-off | 01/27/2023 | 01/31/2023 | Design ASR ENGINEERING PC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| M00804930 ↗ | 5 WEST 131 STREET MANHATTAN | Alteration | Permit Issued | 12/30/2022 | 12/30/2022 | Design ASR ENGINEERING PC | PROPOSED INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CO… |
| B08024350 ↗ | 9008 3 AVENUE BROOKLYN | Alteration | Signed-off | 10/23/2022 | 10/25/2022 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| Q08010549 ↗ | 147-35 38 AVENUE QUEENS | Alteration | Signed-off | 10/03/2022 | 10/03/2022 | Design ASR ENGINEERING PC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE… |
| B07998447 ↗ | 8619 4 AVENUE BROOKLYN | Alteration | Signed-off | 09/06/2022 | 09/06/2022 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B00797731 ↗ | 157 4 AVENUE BROOKLYN | Alteration | Signed-off | 09/02/2022 | 09/05/2022 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CO… |
| B07996238 ↗ | 268 FURMAN STREET BROOKLYN | Alteration | Signed-off | 08/31/2022 | 09/01/2022 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B07996240 ↗ | 268 FURMAN STREET BROOKLYN | Alteration | Signed-off | 08/31/2022 | 09/01/2022 | Design ASR ENGINEERING PC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE… |
| X00797744 ↗ | 50 EAST 172 STREET BRONX | Alteration | Signed-off | 08/25/2022 | 08/25/2022 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE… |
| X00777158 ↗ | 50 EAST 172 STREET BRONX | Alteration | Signed-off | 07/25/2022 | 07/25/2022 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| Q00771505 ↗ | 42-45 KISSENA BOULEVARD QUEENS | Alteration | Signed-off | 07/11/2022 | 07/12/2022 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| M00755914 ↗ | 98 PARK TERRACE EAST MANHATTAN | Alteration | Signed-off | 06/13/2022 | 06/14/2022 | Design MOHAMMAD AHEAD, PE Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE… |
| B00750611 ↗ | 307 12 STREET BROOKLYN | Alteration | Signed-off | 06/03/2022 | 06/13/2022 | Design MOHAMMAD AHEAD, PE Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B00751475 ↗ | 745 EAST 31 STREET BROOKLYN | Alteration | Signed-off | 06/06/2022 | 06/13/2022 | Design MOHAMMAD AHEAD, PE Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| B00732459 ↗ | 72 BOGART STREET BROOKLYN | Alteration | Signed-off | 06/03/2022 | 06/09/2022 | Design ARQUITECTURA VARELA Owner 56 BOGART STREET, LLC | Window lintel replacement as per plan.no change in use, egress or occupancy with this application. |
| M00751477 ↗ | 98 PARK TERRACE EAST MANHATTAN | Alteration | Signed-off | 06/06/2022 | 06/07/2022 | Design MOHAMMAD AHEAD, PE Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| Q00744131 ↗ | 64-15 FOREST AVENUE QUEENS | Alteration | Signed-off | 05/25/2022 | 05/27/2022 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33… |
| Q00744133 ↗ | 64-15 FOREST AVENUE QUEENS | Alteration | Signed-off | 05/25/2022 | 05/27/2022 | Design ASR ENGINEERING PC Owner INDER CONSTRUCTION INC | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE… |
| Name | Jobs together | Most recent |
|---|---|---|
| ASR ENGINEERING PC | 83 | 06/30/2025 |
| MOHAMMAD AHEAD, PE | 13 | 07/25/2022 |
| SYED ENGINEERING, P.C. | 7 | 01/13/2025 |
| INDRAJEET VAGHA PE | 4 | 06/09/2023 |
| ARQUITECTURA VARELA | 1 | 06/03/2022 |
| BANGASH ASSOCIATES INC. | 1 | 05/29/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| ALPHA GROUP NY1 CORP | 6 | 06/17/2025 |
| ACE GROUP NY CORP | 1 | 01/13/2025 |
| METRO CITY CONSTRUCTION | 1 | 02/13/2023 |
| TOPLINE NYC INC | 1 | 04/04/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| 56 BOGART STREET, LLC | 1 | 06/03/2022 |
| KRAFTCON INC | 1 | 12/06/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| ADVANCED BUILDERS SERVICES | 72 | 06/30/2025 |