← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Hudson Piers
1626 AMSTERDAM AVENUE · BIN 1061768
💬 Discuss this project
1920Year Built
5Stories
D1Building Class
R7AZoning
63,000 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized8 Active Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: Hudson Piers Housing Development Funding · 15,000 sf lot · 4.2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInstall stainless steel chimney1 filing · 9 docs
Floor 1Unit 1G5p · 1 filing · 6 docs
CellarReconnect burner to gas line and meter11p · 3 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed3p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
141st Street Associates703/21/2026
Metropolitan Realty Group503/21/2026
Hudson Piers Housing Development Funding203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cornerstone105/05/2023
AP Professional Engineering106/08/2022
Gregory V. Perotto, P.E703/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sandeep Kaur103/21/2026
Perotto Group1403/21/2026
Northeast Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
East Coast MechanicalPlumbing407/08/2026
Parsons ConstructionScaffold303/21/2026
East Coast PetroleumGeneral Contractor203/21/2026
Real Deal DecorationGeneral Contractor203/21/2026
Carreras Home ImprovementPlumbing203/22/2026
Star Electrical ContractorsElectrical103/21/2026
RJ Russo Electric CoElectrical103/21/2026
BDS ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DNA Controlled Inspection554105/05/2023
Gregory V. Perotto, P.E947703/04/2022
Building Lifecycle
04/29/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/04/2026
Elevator Category 1 inspection report filed
02/26/2026
Boiler inspection report filed
Initial · no defects · Accepted
02/24/2025
Boiler inspection report filed
Initial · no defects · Accepted
07/30/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00752307-I1
138 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWise Construction Safety07/14/2023
DOB NOWSidewalk ShedSigned-offParsons Construction06/09/2022
DOB NOWPlumbingSigned-offEast Coast Mechanical02/17/2022
DOB NOWBoiler EquipmentSigned-offEast Coast Mechanical02/02/2022
DOB NOWGeneral ConstructionSigned-offEast Coast Petroleum04/15/2021
DOB NOWPlumbingSigned-offEast Coast Mechanical04/15/2021
DOB NOWBoiler EquipmentSigned-offEast Coast Mechanical04/15/2021
BISOTISSUEDBest Energy Power 201504/25/2024
BISOTISSUEDBest Energy Power 201505/23/2023
BISOTISSUEDBest Energy Power 201511/22/2022
BISOTISSUEDKings Bay Construction*09/10/2019
BISOTISSUEDCel Tech Electric02/06/2018
BISOTISSUEDCel Tech Electric11/22/2017
BISOTISSUEDTelcom Engineering GP02/25/2014
BISBLISSUEDEast Coast Mechanical03/08/2011
BISPLISSUEDEast Coast Mechanical03/08/2011
BISMHISSUEDWireless Development Services11/25/1997
7 projects · most recent 09/17/2024
General Wiring Boiler Controls
FiledStatusContractorScope
09/17/2024CompleteRobert Chimenti—
03/13/2024CompleteRJ Russo Electric Co—
06/14/2022CompleteBDS Electric—
04/25/2022CompleteRomcon ElectricBoiler Controls
10/26/2019Permit IssuedSupreme ElectricGeneral Wiring
10/21/2019Permit IssuedSupreme ElectricGeneral Wiring
10/16/2019Permit IssuedSupreme ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
04/28/2023Fire-Resistance Rated ConstructionMark Ellisprogress
03/02/2023Tenant Protection Plan ComplianceWILLIAM FITZJOHNspecial
03/02/2023FinalMark Ellisprogress
03/05/2022Fire-Resistant Penetrations and JointsGregory Perottospecial
03/05/2022Energy Code ComplianceGregory Perottoprogress
02/28/2022Fire-Resistant Penetrations and JointsGregory Perottospecial
02/28/2022Energy Code ComplianceGregory Perottoprogress
01/20/2022Heating SystemsGregory Perottospecial
01/20/2022Fire-Resistant Penetrations and JointsGregory Perottospecial
01/20/2022Lowest Floor ElevationGregory Perottoprogress
01/20/2022HVAC-R and service water heating system controlsGregory Perottoenergy_progress
01/20/2022Maintenance informationGregory Perottoenergy_progress
01/20/2022HVAC-R and service water heating equipmentGregory Perottoenergy_progress
01/05/2022HVAC-R and service water heating equipmentGregory Perottoenergy_progress
01/05/2022HVAC-R and service water heating system controlsGregory Perottoenergy_progress
01/05/2022Maintenance informationGregory Perottoenergy_progress
01/05/2022Chimneys and ventsGregory Perottospecial
01/05/2022Mechanical SystemsGregory Perottospecial
01/05/2022FinalGregory Perottoprogress
01/05/2022Lowest Floor ElevationGregory Perottoprogress
01/05/2022Heating SystemsGregory Perottospecial
01/05/2022Fire-Resistant Penetrations and JointsGregory Perottospecial
143 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account