← Back
Banking facility, with or without parking
1630 FOREST AVENUE
STATEN ISLAND · BIN 5028763
💬 Discuss this project
1958Year Built
1Stories
K7Building Class
R3-1Zoning
4,250 sfGross Floor Area
1Units
Banking facility, with or without parking · Owner of record: WALDMAN DEVELOPMENT OF NY LLC · 19,177 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 2 filings · 20 docs
Floor 1Under Construction19p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALDMAN PARTNERS809/13/2026
CONSTRUCTIONLABLLC107/25/2026
MODERN DESIGN807/08/2026
SOVEREIGH BANK NA203/21/2026
STATEN ISLAND SAVINGS BANK203/21/2026
S I SAVINGS BANK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN DESIGN303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BOLTON CONSTRUCTION LLCGeneral Contractor304/09/2026
ULTRA GENERAL CONTRACTING INC.General Contractor307/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing208/25/2026
UNFORGETTABLE CONSTRUCTGeneral Contractor107/25/2026
WALTER J.GRANDE P & H INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHERICO KING ARCHITECT PC5674208/21/2026
MXV SIA LLC9281407/13/2026
GREGORY V. PEROTTO, P.E.947406/22/2026
TROLYDIA TESTING & INSPEC4422110/07/2025
Building Lifecycle
All (62)Filed (14)Permit Issued (10)Inspection (8)Special Inspection (30)
09/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/24/2026
Permit issued — Plumbing
S01448895-I1-PL
08/21/2026
Filed — Alteration
Filing for PL work type for SONIC. Install plumbing fixtures and commercial cooking equipment. No change in use, egress or occupancy.
S01448895-I1
08/21/2026
Filed — Alteration
Install rooftop HVAC, make up air unit, kitchen exhaust system and duct work for SONIC. No change in use, egress or occupancy.
S01448880-I1
08/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
LAWRENCE MAREK
08/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
LAWRENCE MAREK
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LAWRENCE MAREK
08/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LAWRENCE MAREK
08/20/2026
Special inspection requirement — Mechanical Systems
LAWRENCE MAREK
08/20/2026
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
LAWRENCE MAREK
08/20/2026
Special inspection requirement — Final
LAWRENCE MAREK
08/20/2026
Special inspection requirement — Energy Code Compliance Inspections
LAWRENCE MAREK
08/20/2026
Special inspection requirement — Duct leakage testing, insulation and design
LAWRENCE MAREK
08/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
LAWRENCE MAREK
08/20/2026
Special inspection requirement — Maintenance information
LAWRENCE MAREK
08/20/2026
Special inspection requirement — Shutoff dampers
LAWRENCE MAREK
08/20/2026
Special inspection requirement — Ventilation and air distribution system
LAWRENCE MAREK
08/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
LAWRENCE MAREK
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE MAREK
08/20/2026
Special inspection requirement — Energy Code Compliance Inspections
LAWRENCE MAREK
08/07/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/23/2026
Permit issued — General Construction
S01427433-I1-GC
07/13/2026
Filed — Alteration
S01427433-I1
07/13/2026
Special inspection requirement — Final
Mina Makar
07/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
07/08/2026
Filed — Alteration
#8968 - PLUMBING MODIFICATIONS IN AN EXISTING ONE STORY COMMERCIAL BUILDING ASPER PLANS FOR CARE VET. NO CHANGE IS USE, OCCUPANCY, OR EGRESS
S01366398-P2
06/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
06/23/2026
Special inspection requirement — Lighting controls
Gregory Perotto
06/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
06/23/2026
Special inspection requirement — Mechanical Systems
Gregory Perotto
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
06/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
Gregory Perotto
06/23/2026
Special inspection requirement — Final
Gregory Perotto
06/23/2026
Special inspection requirement — Interior lighting power
Gregory Perotto
06/22/2026
Filed — Alteration
#8968 - PLUMBING MODIFICATIONS IN AN EXISTING ONE STORY COMMERCIAL BUILDING ASPER PLANS FOR CARE VET. NO CHANGE IS USE, OCCUPANCY, OR EGRESS
S01366398-P1
06/22/2026
Filed — Alteration
#8968 - MECHANICAL AND LIGHTING MODIFICATIONS IN AN EXISTING ONE STORY COMMERCIAL BUILDING AS PER PLANS FOR CARE VET. NO CHANGE IS USE, OCCUPANCY, OR EGRESS
S01365576-P1
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
06/04/2026
Special inspection requirement — Final
Gregory Perotto
06/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Gregory Perotto
06/03/2026
Filed — Alteration
#8968 - RENOVATION TO AN EXISTING ONE STORY COMMERCIAL BUILDING AS PER PLANS FOR CARE VET. NO CHANGE IS USE, OCCUPANCY, OR EGRESS
S01365571-P1
05/18/2026
Special inspection requirement — Lighting controls
Gregory Perotto
04/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/07/2026
Permit issued — General Construction
S01365571-I1-GC
04/02/2026
Permit issued — Plumbing
S01366398-I1-PL
03/31/2026
Permit issued — General Construction
S01365576-I1-MS
03/31/2026
Permit issued — Mechanical Systems
S01365576-I1-GC
03/24/2026
Permit issued — General Construction
S01298029-I1-GC
03/23/2026
Filed — Alteration
#8968 - PLUMBING MODIFICATIONS IN AN EXISTING ONE STORY COMMERCIAL BUILDING ASPER PLANS FOR CARE VET. NO CHANGE IS USE, OCCUPANCY, OR EGRESS
S01366398-I1
03/23/2026
Filed — Alteration
#8968 - MECHANICAL AND LIGHTING MODIFICATIONS IN AN EXISTING ONE STORY COMMERCIAL BUILDING AS PER PLANS FOR CARE VET. NO CHANGE IS USE, OCCUPANCY, OR EGRESS
S01365576-I1
03/23/2026
Filed — Alteration
#8968 - RENOVATION TO AN EXISTING ONE STORY COMMERCIAL BUILDING AS PER PLANS FOR CARE VET. NO CHANGE IS USE, OCCUPANCY, OR EGRESS
S01365571-I1
03/18/2026
Filed — Alteration
Install two HC water closets, run new water lines form meter to the fixtures, new sanitary lines. Cap off gas lines to existing 4 roof top units, replace the old gas lines with new, & reconnect the gas lines after the replacement of the roof top units.
S01326109-P2
03/03/2026
Filed — Alteration
Install two HC water closets, run new water lines form meter to the fixtures, new sanitary lines. Cap off gas lines to existing 4 roof top units, replace the old gas lines with new, & reconnect the gas lines after the replacement of the roof top units.
S01326109-P1
01/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/04/2025
Permit issued — Plumbing
S01326109-I1-PL
12/03/2025
Permit issued — General Construction
S01298029-I1-GC
12/02/2025
Filed — Alteration
Install two HC water closets, run new water lines form meter to the fixtures, new sanitary lines. Cap off gas lines to existing 4 roof top units, replace the old gas lines with new, & reconnect the gas lines after the replacement of the roof top units.
S01326109-I1
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFLOW-RIGHT PLBG & HTG COR08/24/2026
DOB NOWGeneral ConstructionPermit IssuedUNFORGETTABLE CONSTRUCT07/23/2026
DOB NOWGeneral ConstructionPermit IssuedBOLTON CONSTRUCTION LLC04/07/2026
DOB NOWPlumbingPermit IssuedWALTER J.GRANDE P & H INC04/02/2026
DOB NOWGeneral ConstructionPermit IssuedBOLTON CONSTRUCTION LLC03/31/2026
DOB NOWMechanical SystemsPermit IssuedBOLTON CONSTRUCTION LLC03/31/2026
DOB NOWGeneral ConstructionPermit IssuedULTRA GENERAL CONTRACTING INC.03/24/2026
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR12/04/2025
DOB NOWGeneral ConstructionPermit IssuedULTRA GENERAL CONTRACTING INC.12/03/2025
DOB NOWGeneral ConstructionPermit IssuedULTRA GENERAL CONTRACTING INC.10/14/2025
BISOTISSUEDNATIONAL MAINTENANCE INC09/16/2013
BIS—ISSUEDNATIONAL MAINTENANCE, INC09/16/2013
BIS—ISSUEDNATIONAL MAINTENANCE, INC08/29/2013
BIS—ISSUEDGOING SIGN & SVCNG CO,INC08/21/2006
BIS—ISSUEDFRANK TORRONE & SONS INC09/08/2000
BISOTISSUEDINTERBORO SIGN & MAINTENANCE CO.06/24/1997
BIS—ISSUEDSALVATORE CALCAGNO CONSTRUCTION04/02/1997
BISPLISSUEDRICHMOND PLBG & HEATING01/08/1997
BIS—ISSUEDSALVATORE CALCAGNO CONSTRUCTION12/19/1996
BIS—ISSUEDFRANK TORRONE AND SONS INC.10/20/1995
BISPLISSUEDACE PLUMBING & MECHANICAL CORP.08/08/1995
BISMHISSUEDNASCO, INC.06/21/1995
BISMHISSUEDNASCO, INC.04/12/1995
1 project · most recent 06/22/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/22/2026Permit IssuedBOLTON CONSTRUCTION LLCAir Conditioning Systems
Cooling
Lennox Lennox MMLD009S6S-1P 9,000 BTU · Vrf Outdoor ×2
Lennox MWMDD009S6S-1P 9,000 BTU · Rooftop Unit ×2
Rheem Rheem/Ruud RGECYB060ACT 5 tons · Rooftop Unit ×4
1 project · most recent 08/21/2026
FiledStatusContractorScope
08/21/2026——4 heads
3 projects · most recent 08/21/2026
Gas Water/Sanitary Plumbing-Sprinkler
FiledStatusContractorScope
08/21/2026Permit IssuedFLOW-RIGHT PLBG & HTG CORGas, Plumbing-Sprinkler, Water/Sanitary
07/08/2026Permit IssuedWALTER J.GRANDE P & H INCGas, Water/Sanitary
03/18/2026Signed-offFLOW-RIGHT PLBG & HTG CORGas, Water/Sanitary
6 projects · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026Permit IssuedMAC ELECT'L CONTR. INC.General Wiring
05/06/2026CompleteRIDGE ELECTRIC CORP.General Wiring
05/06/2026CompleteRIDGE ELECTRIC CORP.General Wiring
05/06/2026CompleteRIDGE ELECTRIC CORP.General Wiring
04/07/2026CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
01/15/2026Permit IssuedRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
08/21/2026HVAC-R and service water heating equipmentLAWRENCE MAREKenergy_progress
08/21/2026HVAC-R and service water heating system controlsLAWRENCE MAREKenergy_progress
08/21/2026HVAC-R and service water piping design and insulationLAWRENCE MAREKenergy_progress
08/20/2026HVAC-R and service water piping design and insulationLAWRENCE MAREKenergy_progress
08/20/2026Mechanical SystemsLAWRENCE MAREKspecial
08/20/2026Exhaust and Vent Systems in Plenums and DuctsLAWRENCE MAREKspecial
08/20/2026FinalLAWRENCE MAREKprogress
08/20/2026Energy Code Compliance InspectionsLAWRENCE MAREKprogress
08/20/2026Duct leakage testing, insulation and designLAWRENCE MAREKenergy_progress
08/20/2026HVAC-R and service water heating equipmentLAWRENCE MAREKenergy_progress
08/20/2026Maintenance informationLAWRENCE MAREKenergy_progress
08/20/2026Shutoff dampersLAWRENCE MAREKenergy_progress
08/20/2026Ventilation and air distribution systemLAWRENCE MAREKenergy_progress
08/20/2026HVAC-R and service water heating system controlsLAWRENCE MAREKenergy_progress
08/20/2026Fire-Resistant Penetrations and JointsLAWRENCE MAREKspecial
08/20/2026Energy Code Compliance InspectionsLAWRENCE MAREKprogress
07/13/2026FinalMina Makarprogress
07/13/2026Fire-Resistant Penetrations and JointsMina Makarspecial
06/23/2026HVAC-R and service water heating equipmentGregory Perottoenergy_progress
06/23/2026Lighting controlsGregory Perottoenergy_progress
06/23/2026HVAC-R and service water heating system controlsGregory Perottoenergy_progress
06/23/2026Mechanical SystemsGregory Perottospecial
06/23/2026Fire-Resistant Penetrations and JointsGregory Perottospecial
06/23/2026Fire-Resistance Rated ConstructionGregory Perottoprogress
06/23/2026FinalGregory Perottoprogress
Latest 25 of 40.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/22/2026S01448895-I1Request digital key ↗
08/22/2026S01448880-I1Request digital key ↗
08/18/2026S01298029-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
09/18/2013520160940Open ↗
09/04/2013520160959Open ↗
09/03/2013520160931Open ↗
▸BISWORK PERMIT APPLICATION3
09/18/2013520160940Open ↗
09/04/2013520160959Open ↗
09/03/2013520160931Open ↗
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature23
09/29/2026S01365576-P1Open ↗
09/29/2026S01365576-P1Open ↗
09/29/2026S01365576-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/22/2026S01448895-I1Open ↗
08/22/2026S01448880-I1Open ↗
08/18/2026S01298029-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/29/2026S01365576-P1Open ↗
09/23/2026S01448880-I1Open ↗
09/23/2026S01448895-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
09/18/2013520160940Open ↗
09/04/2013520160959Open ↗
09/03/2013520160931Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/04/2013520160959Open ↗
09/03/2013520160931Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/18/2013520160940Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/22/2026S01448895-I1Open ↗
08/22/2026S01448880-I1Open ↗
08/18/2026S01298029-I1Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS3
09/12/2013520160940Open ↗
09/04/2013520160959Open ↗
09/03/2013520160931Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
09/18/2013520160940Open ↗
09/04/2013520160959Open ↗
09/03/2013520160931Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
09/18/2013520160940Open ↗
09/04/2013520160959Open ↗
09/03/2013520160931Open ↗