← Back
Walk-up apt, over six families with stores
164 WEST 80 STREET
MANHATTAN · Upper West Side (Central) · BIN 1031797
💬 Discuss this project
1900Year Built
4Stories
C7Building Class
R8BZoning
29,825 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized3 Open Violations 1 unresolved · 2 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: AMSTERDAM 80 DEVELOPCO. · 8,480 sf lot · 3.52 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST SIDE MANAGEMENT603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZACHARY SAPINSLEY LEWIS, R.A.301/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RICHARD LEWIS ARCHITECT303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DELPHI CONSTRUCTION CORPGeneral Contractor409/17/2026
T.N.T. PLBG & HTG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METROSPEC SIA6420201/30/2024
Building Lifecycle
All (16)Filed (3)Permit Issued (3)Signed Off (2)Inspection (3)Special Inspection (5)
09/16/2026
Permit issued — Mechanical Systems
M01451355-I1-MS
08/08/2024
Signed off — Alteration
Interior renovation of existing commercial space as per plan. No change to use, egress or occupancy under this application.
M00960639-S1
08/06/2024
Signed off — Alteration
Interior renovation of existing commercial space as per plan. No change to use, egress or occupancy under this application.
M00960639-I1
03/26/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/06/2024
Permit issued — Plumbing
M00960639-S1-PL
01/30/2024
Filed — Alteration
Interior renovation of existing commercial space as per plan. No change to use, egress or occupancy under this application.
M00960639-S1
01/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
Michael Risbergs
01/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Risbergs
12/12/2023
Permit issued — General Construction
M00960639-I1-GC
11/13/2023
Filed — Alteration
Interior renovation of existing commercial space as per plan. No change to use, egress or occupancy under this application.
M00960639-I1
11/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Risbergs
11/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
Michael Risbergs
11/09/2023
Special inspection requirement — Final
Zachary Lewis
11/01/2023
Filed — Alteration
M00955599-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDELPHI CONSTRUCTION CORP09/16/2026
DOB NOWPlumbingSigned-offT.N.T. PLBG & HTG, INC02/06/2024
DOB NOWGeneral ConstructionSigned-offDELPHI CONSTRUCTION CORP12/12/2023
1 project · most recent 03/30/2024
General Wiring
FiledStatusContractorScope
03/30/2024CompleteGREEN APPLE ELECL SVCS LLGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/30/2024Tenant Protection Plan ComplianceMichael Risbergsspecial
01/29/2024Fire-Resistant Penetrations and JointsMichael Risbergsspecial
11/09/2023Fire-Resistant Penetrations and JointsMichael Risbergsspecial
11/09/2023Tenant Protection Plan ComplianceMichael Risbergsspecial
11/09/2023FinalZachary Lewisprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026M00955599-I1Request digital key ↗
08/28/2026M00960639-S1Request digital key ↗
08/28/2026M00960639-I1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/13/2026M00960639-S1Open ↗
08/13/2026M00955599-I1Open ↗
08/13/2026M00960639-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026M00955599-I1Open ↗
08/13/2026M00960639-I1Open ↗
08/13/2026M00960639-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M00960639-S1Open ↗
08/25/2026M00960639-I1Open ↗
08/25/2026M00960639-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026M00960639-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026M00955599-I1Open ↗
08/13/2026M00960639-S1Open ↗
08/13/2026M00960639-I1Open ↗
▸Other Documents2
▸DOB NOWProof of Historic Building2
08/13/2026M00960639-I1Open ↗
08/13/2026M00955599-I1Open ↗