Two family frame
165-18 78TH AVENUE
QUEENS · BIN 4150963
💬 Discuss this project
2023Year Built
2.5Stories
B2Building Class
R3-2Zoning
2,674 sfGross Floor Area
2Units
Two family frame · Owner of record: FM78 Management · 4,000 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential rooftop solar PV system installation12p · 2 filings · 20 docs
Attic22p · 1 filing · 20 docs
Floor 228p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
Cellar28p · 1 filing · 20 docs
Site & exteriorTemporary construction fence26p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/24/2023$810K—Private party → FM78 Management$303/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABC Engineering1609/25/2024
Chun Feng, Architect106/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Amergy Solar203/21/2026
ABC Engineering2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Times Construction & DevelopmentGeneral Contractor1007/08/2026
Dynasty ContractingGeneral Contractor607/08/2026
Amergy SolarGeneral Contractor303/21/2026
Eric & NG ElectricalElectrical103/22/2026
Dynasty ContractingScaffold107/08/2026
Plumbing NYCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sq. Arch4802106/20/2024
Peter R Tauberer, PE3510804/23/2024
Professional Solutions GR1756303/20/2024
Building Lifecycle
All (104)Filed (17)Permit Issued (13)Signed Off (9)Inspection (7)Objection (28)Special Inspection (30)
10/28/2024
Signed off — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-I1
10/21/2024
Special inspection requirement — Air barrier - visual inspection
PETER TAUBERER
10/21/2024
Special inspection requirement — Maintenance information
PETER TAUBERER
10/21/2024
Special inspection requirement — Fenestration areas
PETER TAUBERER
10/21/2024
Special inspection requirement — Permanent certificate
PETER TAUBERER
10/21/2024
Special inspection requirement — Energy Code Compliance Inspections
PETER TAUBERER
10/21/2024
Special inspection requirement — Protection of exposed foundation insulation
PETER TAUBERER
10/21/2024
Special inspection requirement — Air barrier — testing
PETER TAUBERER
10/21/2024
Special inspection requirement — Electric vehicle service equipment requirements
PETER TAUBERER
10/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
PETER TAUBERER
10/21/2024
Special inspection requirement — Fenestration air leakage
PETER TAUBERER
10/21/2024
Special inspection requirement — Metering
PETER TAUBERER
10/21/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PETER TAUBERER
10/21/2024
Special inspection requirement — Insulation placement and R values
PETER TAUBERER
10/21/2024
Special inspection requirement — Interior lighting power
PETER TAUBERER
09/25/2024
Filed — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-A3
09/25/2024
Special inspection requirement — Air barrier - visual inspection
PETER TAUBERER
09/25/2024
Special inspection requirement — Metering
PETER TAUBERER
09/25/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
PETER TAUBERER
09/25/2024
Special inspection requirement — Fenestration air leakage
PETER TAUBERER
09/25/2024
Special inspection requirement — Maintenance information
PETER TAUBERER
09/25/2024
Special inspection requirement — Protection of exposed foundation insulation
PETER TAUBERER
09/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
PETER TAUBERER
09/25/2024
Special inspection requirement — Fenestration areas
PETER TAUBERER
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
PETER TAUBERER
09/25/2024
Special inspection requirement — Electric vehicle service equipment requirements
PETER TAUBERER
09/25/2024
Special inspection requirement — Air barrier — testing
PETER TAUBERER
09/25/2024
Special inspection requirement — Permanent certificate
PETER TAUBERER
09/25/2024
Special inspection requirement — Interior lighting power
PETER TAUBERER
09/25/2024
Special inspection requirement — Insulation placement and R values
PETER TAUBERER
08/21/2024
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01067366-I1
06/25/2024
Permit issued — Solar
Q01067366-I1-SL
06/20/2024
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01067366-I1
06/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chun Feng
06/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
06/14/2024
Filed — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-A2
05/20/2024
Signed off — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-S6
05/17/2024
Signed off — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-S5
05/16/2024
Signed off — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-S4
05/10/2024
Signed off — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-S2
05/09/2024
Signed off — Alteration
FILE TEMPORARY CONSTRUCTION FENCE FOR QUEENS BLOCK 6973, LOT 8.
Q00857631-I1
05/07/2024
Signed off — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-S1
05/07/2024
Signed off — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-S3
05/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/01/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/23/2024
Filed — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-P9
04/16/2024
Filed — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-P8
04/15/2024
Objection resolved — Addressed
04/10/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/04/2024
Objection raised — Energy
03/25/2024
Objection resolved — Addressed
03/20/2024
Filed — New Building
TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF THE CORNER FORMED BY THE INTERSECTION OF 78TH AVE AND 166TH STREET.
Q00824153-P6
01/08/2024
Permit issued — Mechanical Systems
Q00824153-S6-MS
01/05/2024
Permit issued — Structural
Q00824153-S5-ST
01/05/2024
Permit issued — General Construction
Q00824153-I1-GC
01/05/2024
Permit issued — Foundation
Q00824153-S4-FO
01/05/2024
Permit issued — Support of Excavation
Q00824153-S3-SE
01/05/2024
Permit issued — Curb Cut
Q00824153-S1-CC
12/06/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAmergy Solar06/25/2024
DOB NOWMechanical SystemsSigned-offTimes Construction & Development01/08/2024
DOB NOWStructuralSigned-offTimes Construction & Development01/05/2024
DOB NOWGeneral ConstructionPermit IssuedTimes Construction & Development01/05/2024
DOB NOWFoundationSigned-offTimes Construction & Development01/05/2024
DOB NOWSupport of ExcavationSigned-offTimes Construction & Development01/05/2024
DOB NOWCurb CutSigned-offTimes Construction & Development01/05/2024
DOB NOWPlumbingSigned-offPlumbing Works NYC07/28/2023
DOB NOWFoundationSigned-offDynasty Contracting06/20/2023
DOB NOWStructuralSigned-offDynasty Contracting06/20/2023
DOB NOWGeneral ConstructionPermit IssuedDynasty Contracting06/17/2023
DOB NOWSupport of ExcavationSigned-offDynasty Contracting06/16/2023
DOB NOWConstruction FenceSigned-offDynasty Contracting05/15/2023
BIS—ISSUEDDynasty Contracting06/12/2023
1 project · most recent 09/25/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/25/2024Signed-offTimes Construction & DevelopmentHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-3C30NAHZ3-U1 28,600 BTU · Heat Pump Outdoor ×4
MXZ-2C20NAHZ3-U1 22,000 BTU · Heat Pump Outdoor ×2
MXZ-2C20NAHZ4-U1 22,000 BTU · Heat Pump Outdoor ×2
MXZ-3C24NAHZ3-U1 25,000 BTU · Heat Pump Outdoor ×2
MXZ-3C24NAHZ4-U1 25,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 09/25/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/25/2024Signed-offPlumbing NYCGas, Storm, Water/Sanitary
4 projects · most recent 06/17/2024
General Wiring
FiledStatusContractorScope
06/17/2024CompleteI.P. Electric—
04/03/2024CompleteEric & NG ElectricalGeneral Wiring
12/12/2023CompleteEric & NG ElectricalGeneral Wiring
08/16/2023CompleteEric & NG Electrical—
1 project · most recent 09/25/2024
Steel Concrete Masonry
FiledStatusContractorScope
09/25/2024Signed-offTimes Construction & DevelopmentSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/10/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/23/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 102
DateRequirementInspectorRole
10/21/2024Energy Code Compliance InspectionsPETER TAUBERERprogress
10/21/2024Fire-Resistance Rated ConstructionPETER TAUBERERprogress
10/21/2024Permanent certificatePETER TAUBERERenergy_progress
10/21/2024Electric vehicle service equipment requirementsPETER TAUBERERenergy_progress
10/21/2024Air barrier - visual inspectionPETER TAUBERERenergy_progress
10/21/2024Fenestration and door U-factor and product ratingsPETER TAUBERERenergy_progress
10/21/2024Protection of exposed foundation insulationPETER TAUBERERenergy_progress
10/21/2024MeteringPETER TAUBERERenergy_progress
10/21/2024Fenestration areasPETER TAUBERERenergy_progress
10/21/2024Fenestration air leakagePETER TAUBERERenergy_progress
10/21/2024Maintenance informationPETER TAUBERERenergy_progress
10/21/2024Insulation placement and R valuesPETER TAUBERERenergy_progress
10/21/2024Interior lighting powerPETER TAUBERERenergy_progress
10/21/2024Air barrier — testing PETER TAUBERERenergy_progress
09/25/2024Energy Code Compliance InspectionsPETER TAUBERERprogress
09/25/2024Fenestration air leakagePETER TAUBERERenergy_progress
09/25/2024Permanent certificatePETER TAUBERERenergy_progress
09/25/2024Electric vehicle service equipment requirementsPETER TAUBERERenergy_progress
09/25/2024Fenestration areasPETER TAUBERERenergy_progress
09/25/2024Fire-Resistance Rated ConstructionPETER TAUBERERprogress
09/25/2024Fenestration and door U-factor and product ratingsPETER TAUBERERenergy_progress
09/25/2024Insulation placement and R valuesPETER TAUBERERenergy_progress
09/25/2024Air barrier — testing PETER TAUBERERenergy_progress
09/25/2024Interior lighting powerPETER TAUBERERenergy_progress
09/25/2024Protection of exposed foundation insulationPETER TAUBERERenergy_progress
Latest 25 of 102.
▾Documents — 164 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/24/2026Q00857631-I1Request digital key ↗
08/24/2026Q00824153-A3Request digital key ↗
08/24/2026Q00824153-A2Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
10/02/2023440783537Open ↗
06/16/2023421815735Open ↗
05/15/2023440783537Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
05/10/2024440783537Open ↗
▸BISWORK PERMIT APPLICATION1
09/28/2023421815735Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/15/2023440783537Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00824153-I1Open ↗
08/13/2026Q00824153-P5Open ↗
08/13/2026Q00824153-A2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026Q00824153-A2Open ↗
08/13/2026Q00824153-A3Open ↗
08/13/2026Q00824153-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00824153-I1Open ↗
▸Seals & Professional Certifications66
▸DOB NOWProgress Inspector Seal & Signature36
08/31/2026Q00824153-S6Open ↗
08/31/2026Q00824153-S6Open ↗
08/31/2026Q00824153-S6Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/24/2026Q00857631-I1Open ↗
08/24/2026Q00824153-S2Open ↗
08/24/2026Q00824153-A3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026Q00824153-S6Open ↗
08/31/2026Q00824153-P6Open ↗
08/31/2026Q00824153-P6Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/15/2023440783537Open ↗
▸Trade Schedules & Equipment2
▸BISGAS CUT-OFF1
09/28/2023421815735Open ↗
▸BISSEWER CUT-OFF1
09/28/2023421815735Open ↗
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00824153-I1Open ↗
08/13/2026Q00824153-A2Open ↗
08/13/2026Q00824153-A3Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES SITE PLAN1
05/01/2024440783537Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
09/28/2023421815735Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/28/2023421815735Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/28/2023421815735Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/24/2023440783537Open ↗
▸BISSTREET TREE CHECKLIST1
05/15/2023440783537Open ↗
▸BISSTREET TREE SIGNOFF1
05/08/2024440783537Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00824153-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00824153-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00824153-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/28/2023421815735Open ↗
▸Inspections & Test Reports4
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026Q00824153-S4Open ↗
08/13/2026Q00824153-S3Open ↗
▸BISBPP: FIELD INSPECTION1
05/10/2024440783537Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/15/2023440783537Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION4
09/28/2023421815735Open ↗
09/28/2023421815735Open ↗
09/28/2023421815735Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
05/10/2024440783537Open ↗
▸BISCURB CUT (CC) SIGNOFF1
05/08/2024440783537Open ↗
▸BISDOB APPROVAL FOR NEW CC1
05/24/2023440783537Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01067366-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
09/28/2023421815735Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
05/10/2024440783537Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
05/10/2024440783537Open ↗
▸Filing & Intake Forms6
▸BISBOROUGH INTAKE FORM2
09/28/2023421815735Open ↗
06/16/2023421815735Open ↗
▸BISADDITIONAL INFORMATION1
10/13/2023440783537Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/15/2023440783537Open ↗
▸BISEFILING COVER SHEET1
06/16/2023421815735Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/15/2023440783537Open ↗
▸Other Documents25
▸DOB NOWSite Survey: Initial5
08/13/2026Q00824153-P5Open ↗
08/13/2026Q00824153-A2Open ↗
08/13/2026Q00824153-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q00824153-I1Open ↗
08/13/2026Q00824153-A3Open ↗
08/13/2026Q00824153-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/24/2026Q00824153-A3Open ↗
08/24/2026Q00824153-A2Open ↗
08/14/2026Q00824153-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
05/10/2024440783537Open ↗
05/15/2023440783537Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
05/24/2023440783537Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
05/25/2023440783537Open ↗
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR1
05/01/2024440783537Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
05/10/2024440783537Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/24/2023440783537Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
05/10/2024440783537Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00824153-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00824153-S3Open ↗