| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| S00574589 ↗ | 400 LAKE AVENUE STATEN ISLAND | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 08/25/2021 | 09/24/2026 | Design ANGELO S NG Contractor L2 CONSTRUCTION INC | Structural and foundation design associated with alt-co application S00574589-I1. |
| Q01127079 ↗ | 168-33 88TH AVENUE QUEENS | New Building | Permit Issued | 04/03/2025 | 09/03/2026 | Design WJY ELECTRIC INC. Owner DELCO PROPERTIES LLC Contractor MEGA GENERAL CONSTR NYC | PROPOSED FOUNDATION ^ EARTHWORK WORK TYPE IN CONJUNCTION WITH NB APP Q01127079 |
| B01181519 ↗ | 12495 FLATLANDS AVENUE BROOKLYN | New Building | Permit Issued | 03/04/2025 | 08/19/2026 | Design ROGERS CALVANICO GROUP PLLC Contractor WILCOX DEVELOPMENT CORP | STRUCTURAL APPLICATION FILED IN CONJUNCTION WITH GC APPLICATION FOR NEW BUILDING . |
| Q01282690 ↗ | 69-12 223 STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 09/13/2025 | 08/14/2026 | Contractor GREENPOINT CONSTRUCTION C | PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT FROM EXISTING ONE STORY HOUSE TO TWO STORY HOUSE, CONVERT EXISTING ONE FAMILY INTO TWO-FAMILYRE… |
| M01368025 ↗ | 17 WEST 10 STREET MANHATTAN | Alteration | Permit Issued | 06/08/2026 | 06/23/2026 | Design PAUL DENIS ASSOCIATES Contractor CENTRAL AIR CONDITIONING Filer DANIEL KREISS | Installation of split system cooling and supplemental heating. |
| Q01070777 ↗ | 60-20 246 PLACE QUEENS | New Building | Permit Issued | 07/15/2024 | 06/18/2026 | Design ABC ENGINEERING PLLC Contractor GLORY R CONSTRUCTION INC | SUBSEQUENT FILING FOR SPRINKLER WORK OF PROPOSED 2 STORY W/ CELLAR & ATTIC RESIDENTIAL BUILDING. |
| Name | Projects together | Most recent |
|---|---|---|
| POTENTIAL ENGINEERING P.C. | 27 | 11/24/2025 |
| KCE CONSULTING ENGINEERING PLLC | 7 | 09/14/2024 |
| TIMES BUILDINGS PC | 7 | 07/08/2026 |
| ABC ENGINEERING PLLC | 5 | 07/08/2026 |
| ANGELO S NG | 5 | 07/17/2026 |
| HRM ENGINEERING SERVICES, PC | 5 | 01/26/2026 |
| STRUCTURAL ENGINEERING TECHNOLOGIES | 5 | 07/07/2026 |
| THOMAS J. CURRO ARCHITECT, PC | 5 | 11/10/2022 |
| BAILEYS ENGINEERING PC | 4 | 02/19/2021 |
| REAL CREATIVE MOTION ENGINEERING SE | 4 | 04/25/2025 |
| STEEL CORE ENGINEERING PLLC | 3 | 03/01/2024 |
| ZELTA DESIGN | 3 | 04/25/2024 |
| AUTOMATED DESIGN ENGINEERING, PLLC | 2 | 08/31/2024 |
| COSTA ARCH & ENG LLP | 2 | 08/22/2024 |
| FREDA DESIGN ARCHITECT, PLLC | 2 | 05/21/2024 |
| GERALD CALIENDO ARCHITECTS | 2 | 02/26/2026 |
| JOHNSON & URBAN | 2 | 08/24/2021 |
| PROFESSIONAL SOLUTIONS GROUP | 2 | 11/08/2022 |
| SHARON ENGINEERING, P.C | 2 | 11/23/2021 |
| TAN ARCHITECT P.C | 2 | 03/06/2025 |
| WJY ELECTRIC INC. | 2 | 07/17/2026 |
| A. GIANNOPOULOS ARCHITECTS PLLC. | 1 | 11/10/2023 |
| AECOM | 1 | 06/19/2025 |
| ALNOV ENGINEERING, P.C. | 1 | 10/05/2020 |
| ALPHA ENGINEERING | 1 | 12/26/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| PARKSITE CONSTRUCTION COR | 10 | 02/26/2026 |
| LLOYD G DRUMMOND PLBG&GEN | 6 | 08/31/2024 |
| PLUMBING NYC INC | 6 | 07/08/2026 |
| DURGAJ PROPERTIES CORP | 5 | 09/14/2024 |
| V.A.N. CONSTRUCTION CORP | 5 | 07/07/2026 |
| AMOK INC | 4 | 07/07/2026 |
| PARK CONSTRUCTION CORP | 4 | 05/02/2022 |
| TIMES CONSTRUCTION & DEV | 4 | 08/07/2025 |
| MES CONSTRUCTION CORP | 3 | 04/25/2024 |
| NEW LINE CONSTRUCTION LLC | 3 | 02/28/2022 |
| ACB EQUITY LLC | 2 | 05/06/2025 |
| CAPRI CONSTRUCTION CORP | 2 | 09/15/2023 |
| HD BUILDERS NY LLC | 2 | 10/14/2024 |
| KODRA CONSTRUCTION CORP | 2 | 12/20/2021 |
| LS PLUMBING CORP | 2 | 11/27/2023 |
| MBG VENTURES LLC | 2 | 05/06/2025 |
| MINNCHIFINN INC | 2 | 12/28/2022 |
| PRIME PIPING & HEATING IN | 2 | 11/23/2021 |
| REGAL RECONSTRUCTION CORP | 2 | 11/22/2019 |
| ROCKLINE CORP | 2 | 02/13/2024 |
| SAFETY FIRE SPRINKLER COR | 2 | 04/25/2024 |
| ZEFI & CO. LLC | 2 | 02/19/2021 |
| 213 W 40TH ST MANAGEMENT | 1 | 08/09/2023 |
| A.M.K. CONTRACTING CORP | 1 | 03/27/2023 |
| A2Z CONSTRUCTION GROUP IN | 1 | 09/17/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| PARKSITE CONSTRUCTION CORP | 9 | 02/26/2026 |
| CROWN 730 INVEST, LLC | 6 | 01/21/2022 |
| PARKSITE CONSTR. CORP | 5 | 02/26/2026 |
| DURGAJ PROPERTIES CORP | 4 | 09/14/2024 |
| 8623 FLATLANDS PROPERTY LLC | 2 | 03/01/2024 |
| FSG HDFC | 2 | 08/24/2021 |
| LENOX INVESTORS LLC | 2 | 11/23/2021 |
| 11132 REALTY LLC | 1 | 02/06/2025 |
| 1HOTELS | 1 | 09/30/2022 |
| 247 18 STREET LLC | 1 | 07/07/2026 |
| 365 BAY LLC | 1 | 10/05/2020 |
| ARCHER GREEN MI ASSOCIATES, LLC | 1 | 03/11/2024 |
| AVERY HALL INVESTMENTS | 1 | 03/30/2023 |
| Axio Property Management | 1 | 10/04/2021 |
| BLACKSTONE CONSTRUCTION GROUP LLC | 1 | 07/18/2021 |
| BOND CONSTRUCTION INC | 1 | 09/21/2019 |
| CENTRAL AVENUE DEVELOPERS LLC | 1 | 09/15/2023 |
| CEZAR H LLC | 1 | 12/01/2022 |
| COMMUNITY PARENTS INC | 1 | 02/27/2023 |
| CORE MANAGEMENT NY, LLC | 1 | 12/28/2022 |
| Commerce 1155 SG LLC | 1 | 06/19/2025 |
| DELCO PROPERTIES LLC | 1 | 07/17/2026 |
| FM78 MANAGEMENT LLC | 1 | 09/25/2024 |
| H&Z BUILDING NY CORP. | 1 | 08/28/2023 |
| HALSTEAD MANAGEMENT | 1 | 04/28/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| NEXT STEP BUILDING SOLUTIONS, INC | 8 | 11/24/2025 |
| GILLMAN CONSULTING INC | 6 | 07/23/2025 |
| CLARKE CONSTRUCTION CONSULTANTS | 5 | 04/28/2025 |
| TIMES BUILDINGS ENGINEERING SERVICE | 5 | 07/08/2026 |
| ANGELO NG + ANTHONY NG ARCHITECTS | 4 | 01/26/2026 |
| COSTA ARCHITECTURE & ENGINEERING LL | 4 | 08/22/2024 |
| EPAC BUILDING CONSULTING INC | 3 | 04/25/2024 |
| ABC ENGINEERING PLLC | 2 | 07/08/2026 |
| H&Z BUILDING NY CORP. | 2 | 08/28/2023 |
| JAM CONSULTANTS, INC. | 2 | 06/19/2025 |
| MAR DESIGN SERVICES INC | 2 | 09/15/2023 |
| RIGHT WAY SERVICES NYC, INC. | 2 | 06/20/2022 |
| ADVANCED BUILDERS SERVICES | 1 | 08/09/2023 |
| AMOIA CODY ARCHITECTURE | 1 | 09/06/2022 |
| BDP EXPEDITERS GROUP | 1 | 11/20/2023 |
| CALIENDO ARCHITECT | 1 | 03/26/2026 |
| CB ENGINEERING | 1 | 05/06/2025 |
| DANIEL KREISS | 1 | 06/09/2026 |
| FIRST CLASS MANAGEMENT CONTRACTING | 1 | 09/14/2024 |
| GERALD J. CALIENDO R.A., P.C. | 1 | 02/26/2026 |
| GREEN LIGHT EXPEDITING LLC | 1 | 02/27/2023 |
| HM CONSULTING & EXPEDITING INC. | 1 | 05/11/2026 |
| LAND PLANNING & ENGINEERING CONSULT | 1 | 08/08/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 01/26/2026 |
| ROGER BUILDING MANAGEMENT INC | 1 | 03/26/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| S00574589 ↗ | 400 LAKE AVENUE STATEN ISLAND | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 08/25/2021 | 09/24/2026 | Design ANGELO S NG Contractor L2 CONSTRUCTION INC | Structural and foundation design associated with alt-co application S00574589-I1. |
| Q01127079 ↗ | 168-33 88TH AVENUE QUEENS | New Building | Permit Issued | 04/03/2025 | 09/03/2026 | Design WJY ELECTRIC INC. Owner DELCO PROPERTIES LLC Contractor MEGA GENERAL CONSTR NYC | PROPOSED FOUNDATION ^ EARTHWORK WORK TYPE IN CONJUNCTION WITH NB APP Q01127079 |
| B01181519 ↗ | 12495 FLATLANDS AVENUE BROOKLYN | New Building | Permit Issued | 03/04/2025 | 08/19/2026 | Design ROGERS CALVANICO GROUP PLLC Contractor WILCOX DEVELOPMENT CORP | STRUCTURAL APPLICATION FILED IN CONJUNCTION WITH GC APPLICATION FOR NEW BUILDING . |
| Q01282690 ↗ | 69-12 223 STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 09/13/2025 | 08/14/2026 | Contractor GREENPOINT CONSTRUCTION C | PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT FROM EXISTING ONE STORY HOUSE TO TWO STORY HOUSE, CONVERT EXISTING ONE FAMILY INTO TWO-FAMILYRE… |
| M01368025 ↗ | 17 WEST 10 STREET MANHATTAN | Alteration | Permit Issued | 06/08/2026 | 06/23/2026 | Design PAUL DENIS ASSOCIATES Contractor CENTRAL AIR CONDITIONING Filer DANIEL KREISS | Installation of split system cooling and supplemental heating. |
| Q01070777 ↗ | 60-20 246 PLACE QUEENS | New Building | Permit Issued | 07/15/2024 | 06/18/2026 | Design ABC ENGINEERING PLLC Contractor GLORY R CONSTRUCTION INC | SUBSEQUENT FILING FOR SPRINKLER WORK OF PROPOSED 2 STORY W/ CELLAR & ATTIC RESIDENTIAL BUILDING. |
| Q01153968 ↗ | 46-73 54 ROAD QUEENS | New Building | Permit Issued | 02/04/2025 | 06/09/2026 | Design AECOM Owner Commerce 1155 SG LLC Contractor GA INDUSTRIES INC Filer JAM CONSULTANTS, INC. | Structural for an electric vehicle charging facility |
| M00970034 ↗ | 730 5 AVENUE MANHATTAN | Alteration | Permit Issued | 04/11/2024 | 05/12/2026 | Owner JSM Project Management Contractor NORWOOD DESIGN& BUILD INC Filer GILLMAN CONSULTING INC | Hereby filing to remove and install sprinkler heads with related piping for apartment renovation as shown on plans filed herewith. NO change… |
| M01008543 ↗ | 168 EAST 7 STREET MANHATTAN | Alteration | Permit Issued | 03/20/2024 | 04/10/2026 | Owner STAR CITIES MANAGEMENT Contractor THE METRO GROUP, INC | WORK IS LIMITED TO EXISTING MECHANICAL ROOM AND THE REAR FACADE FOR NEW VENT INSTALLATION |
| X00240958 ↗ | 3055 SEDGWICK AVENUE BRONX | Alteration | Signed-off | 05/12/2020 | 02/05/2026 | Design TIMES BUILDINGS PC Contractor PARK MANAGEMENT USA CORP Filer RELIABLE EXPEDITING | FILING FOR STRUCTURE WORK TYPE IN CONJUNCTION WITH NB APPLICATION # 220712058 |
| Q01305706 ↗ | 42-19 24 STREET QUEENS | Alteration | Permit Issued | 10/23/2025 | 01/30/2026 | Design POTENTIAL ENGINEERING P.C. Contractor PARKSITE CONSTRUCTION COR | Support of Excavation at sidewalk/street, pile and reinforced concrete pile cap foundation for the installation of pre-cast concrete con edi… |
| Q01322752 | 22-29 90 STREET QUEENS | Alteration | Permit Issued | 11/24/2025 | 01/28/2026 | Design POTENTIAL ENGINEERING P.C. Contractor PARKSITE CONSTRUCTION COR | APPL FOR SUPPORT-OF-EXCAV @ SIDEWALK/STREET FOR THE INSTALLATION OF REINFORCED CONCRETE MAT SLAB & WALLS FOR THE (4) COMPARTMENT CON EDISON… |
| Q01060451 ↗ | 64-03 251 STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 06/07/2024 | 01/14/2026 | Design TAN ARCHITECT P.C Contractor ALL BOROUGH GROUP SVC INC Filer DESIGN GROUP IN H&K LLC | VERTICAL AND HORIZONTAL ENLARGEMENT OF SINGLE-FAMILY RESIDENCE WHERE, PURSUANT TO THE EXTENT OF THE PROPOSED WORK AS WELL AS BB 2016-012, TH… |
| M01196029 ↗ | 339 WEST 55 STREET MANHATTAN | Alteration | Signed-off | 04/28/2025 | 12/02/2025 | Design POTENTIAL ENGINEERING P.C. Owner HALSTEAD MANAGEMENT Contractor KAUFMAN MANUFACTURING GRO | REPLACEMENT OF METAL STAIR IN THE CELLAR. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01259623 ↗ | 255 WEST 34 STREET MANHATTAN | Alteration | Permit Issued | 07/30/2025 | 09/30/2025 | Design POTENTIAL ENGINEERING P.C. Contractor PARKSITE CONSTRUCTION COR | Application filed for temporary shoring and support of excavation only in order to install Con Edison Transformer Vaults under separate appl… |
| B01262777 ↗ | 452 UNION STREET BROOKLYN | Alteration | Signed-off | 08/05/2025 | 09/18/2025 | Design POTENTIAL ENGINEERING P.C. Contractor PARKSITE CONSTRUCTION COR | APPLICATION FILED FOR SUPPORT-OF-EXCAVATION AT SIDEWALK/STREET FOR INSTALLATION OF PRECAST CONCRETE CON EDISON VAULTS |
| Q08037894 ↗ | 25-23 NEWTOWN AVENUE QUEENS | New Building | Permit Issued | 11/16/2022 | 09/11/2025 | Design GERALD CALIENDO ARCHITECTS Contractor PARKSITE CONSTRUCTION COR | PROPOSED NEW SEVEN (7) STORY TWENTY-SEVEN (27) DWELLING UNIT RESIDENTIAL BUILDING WITH (14) PARKING SPACES ON THE GROUND |
| Q00398926 ↗ | 176-55 KILDARE ROAD QUEENS | Alteration | Signed-off | 09/25/2020 | 08/28/2025 | Design RAS PE CONSULTING ENGINEERS Contractor V.A.N. CONSTRUCTION CORP | HEREWITH FILING FOR STRUCTURAL DESIGN OF 2 STOREY ALT-1 BUILDING |
| X00685476 ↗ | 3831 PUTNAM AVENUE WEST BRONX | New Building | Permit Issued | 03/22/2022 | 08/25/2025 | Design CB ENGINEERING PC Contractor ACB EQUITY LLC Filer CB ENGINEERING | SOE IN CONJUNCTION WITH NB |
| B00803280 ↗ | 249 18 STREET | New Building | Permit Issued | 12/22/2022 | 06/23/2025 | Design Z ARCHITECTURE PLLC Owner 247 18 STREET LLC Contractor V.A.N. CONSTRUCTION CORP Filer YBL NY INC | proposed support of excavation design |
| X01028981 ↗ | 47GAR TIER STREET BRONX | New Building | Permit Issued | 05/21/2024 | 06/10/2025 | Design FREDA DESIGN ARCHITECT, PLLC Contractor H & J MANAGEMENT REALTY | CONSTRUCT A ONE-STORY MASONRY BUILDING FOR ONE PARKING SPACE ACCESSORY TO A TWO-FAMILY HOUSE FILED UNDER BIS 220563584 ON THE SAME LOT |
| Q07995214 ↗ | 111-32 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 02/28/2023 | 05/09/2025 | Design ZHENG & ASSOCIATES LLC Owner 11132 REALTY LLC Contractor EXPERT FIRE SPRINKLER,LLC | FILE PLUMBING AND SPRINKLER APPLICATION FOR PROPOSED NEW BUILDING. |
| Q01214447 ↗ | 54-12 48 STREET QUEENS | Alteration | Signed-off | 04/25/2025 | 04/30/2025 | Design POTENTIAL ENGINEERING P.C. Contractor PARKSITE CONSTRUCTION COR | Application filed for temporary excavatiuon and shoring only for conedison vaults and blockhouse installation (to be filed by others) |
| Q00798700 ↗ | 35-18 221 STREET QUEENS | New Building | Permit Issued | 10/11/2022 | 03/13/2025 | Design ABC ENGINEERING PLLC Contractor TIMES CONSTRUCTION & DEV | SUBSEQUENT FILING FOR PLUMBING & SPRINKLER WORK OF A PROPOSED 2-1/2 STORY W/ CELLAR RESIDENTIAL BUILDING. |
| Q07993423 ↗ | 35-18 221 STREET QUEENS | New Building | Permit Issued | 10/11/2022 | 03/13/2025 | Design ABC ENGINEERING PLLC Contractor TIMES CONSTRUCTION & DEV | SUBSEQUENT FILING FOR PLUMBING & SPRINKLER WORK OF A PROPOSED 2-1/2 STORY W/ CELLAR RESIDENTIAL BUILDING. |
| Q08019649 ↗ | 35-18 221 STREET QUEENS | New Building | Permit Issued | 10/13/2022 | 03/13/2025 | Design ABC ENGINEERING PLLC Contractor TIMES CONSTRUCTION & DEV | SUBSEQUENT FILING FOR PLUMBING & SPRINKLER WORK OF A PROPOSED 2-1/2 STORY W/ CELLAR RESIDENTIAL BUILDING. |
| M01171645 ↗ | 57 EAST 90 STREET MANHATTAN | Alteration | Signed-off | 01/30/2025 | 03/03/2025 | Design POTENTIAL ENGINEERING P.C. Owner NTT-90 LLC Contractor REIS EY, INC | WORK IS LIMITED TO INTERIOR CELLAR INDOOR POOL GUNITE REMOVAL FOR THE PURPOSES OF IDENTIFYING LEAK LOCATION. NO STRUCTURAL WORK IN SCOPE. NO… |
| B07993595 ↗ | 160 EXETER STREET BROOKLYN | New Building | Permit Issued | 08/31/2022 | 02/24/2025 | Design ZPROEKT ARCHITECTURE Contractor LEON D. DEMATTEIS CONSTR | SUPPORT OF EXCAVATION FOR NEW BUILDING FOUNDATION. |
| B01151001 ↗ | 192 BANKER STREET BROOKLYN | Alteration | Signed-off | 01/07/2025 | 02/14/2025 | Design POTENTIAL ENGINEERING P.C. Contractor PARKSITE CONSTRUCTION COR | ENCOMPASSES THE SUPPORT OF EXCAVATION AND PLACEMENT OF PILE CAPS/MAT SLAB(S) OVER HELICAL PILES FOR THE FUTURE INSTALLATION OF PRECAST CONCR… |
| M08029551 ↗ | 1412 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 11/08/2022 | 02/05/2025 | Design PROFESSIONAL SOLUTIONS GROUP Contractor CENTRAL CONSTRUCTION MANAGEMENT | Installation of Temporary Construction Equipment, Outrigger Beams and Slings for Two (2) Point Suspended Scaffold Platforms. [Special Rigger… |
| M00991628 ↗ | 32 WASHINGTON SQUARE W MANHATTAN | Alteration | Permit Issued | 02/06/2024 | 11/13/2024 | Contractor ROCKLINE CORP | REPLACE /RELOCATE EXISTING PLUMBING FIXTURES . PROVIDE SANITARY /WATER PIPING TO THE PLUMBING FIXTURES IN RENOVATED APARTMENT #7E. THIS FIL… |
| M01120266 ↗ | 170 WEST 225 STREET MANHATTAN | Alteration | Signed-off | 10/04/2024 | 11/13/2024 | Design POTENTIAL ENGINEERING P.C. Contractor PARKSITE CONSTRUCTION COR | SUPPORT-OF-EXCAVATION AT SIDEWALK/STREETAND APPLYING 2'-0' OF GRAVEL/FILL AT BOTTOM OFEXCAVATED PIT FOR THE INSTALLATION OF CON EDISON VAULT… |
| M01090589 ↗ | 2326 BROADWAY MANHATTAN | Alteration | Signed-off | 08/20/2024 | 09/05/2024 | Design POTENTIAL ENGINEERING P.C. Contractor PARKSITE CONSTRUCTION COR | SUPPORT OF EXCAVATION FOR THE INSTALLATION OF CON EDISON TRANSFORMER VAULT AT THE SIDEWALK. |
| X00672809 ↗ | 811 ELSMERE PLACE BRONX | New Building | Permit Issued | 02/06/2022 | 08/13/2024 | Owner DURGAJ PROPERTIES CORP Contractor DURGAJ PROPERTIES | New 4 Story Residential Building |
| B00692944 ↗ | 2047 PEARSON STREET BROOKLYN | Alteration | Permit Issued | 03/10/2022 | 05/16/2024 | Design M. BAZAC ARCHITECT Contractor I'MPRO SOLUTIONS LLC | WE PROPOSED TO BUILD A NEW BALCONY AT REAR SIDE OF EXISTING BUILDING. THERE IS NO CHANGE OF EGRESS, USE OR OCCUPANCY. |
| Q01045483 ↗ | 144-49 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 05/09/2024 | 05/10/2024 | Design POTENTIAL ENGINEERING P.C. Contractor PARKSITE CONSTRUCTION COR | Support of Excavation at Sidewalk/Street for installation of Con Edison Vaults |
| X00779629 ↗ | 1769 JEROME AVENUE BRONX | Alteration | Signed-off | 08/18/2022 | 03/22/2024 | Design ZELTA DESIGN Owner HOME BUILDERS 1 L.P Contractor MES CONSTRUCTION CORP | PLUMBING AND SPRINKLER WORK |
| X00215393 ↗ | 3055 SEDGWICK AVENUE BRONX | Alteration | Signed-off | 01/22/2020 | 03/15/2024 | Design HRM ENGINEERING SERVICES, PC Contractor AJC PLUMBING & HTG CORP | FILING PLUMBING WORK TYPE IN CONJUNCTION WITH NB APPLICATION # 220712058 |
| Q00679489 ↗ | 31-29 CRESCENT STREET QUEENS | Alteration | Signed-off | 03/09/2022 | 02/15/2024 | Design COSTA ARCH & ENG LLP Owner PARKSITE CONSTR. CORP Contractor FIVE BOROUGH NYC LLC | installation of new sprinkler and standpipe system associated w/ NB 420667736 |
| Q00612545 ↗ | 92-29 168 STREET QUEENS | Alteration | Signed-off | 10/21/2021 | 02/12/2024 | Design ZELTA DESIGN Contractor MES CONSTRUCTION CORP | PLUMBING AND SPRINKLER WORKS |
| Q00824153 ↗ | 165-18 78 AVENUE QUEENS | New Building | Permit Issued | 02/27/2023 | 01/08/2024 | Design ABC ENGINEERING PLLC Owner FM78 MANAGEMENT LLC Contractor TIMES CONSTRUCTION & DEV | TOTAL 18 FEET PAIRED CURB CUT (9 FEET CURB CUT FRONTING SUBJECT LOT #8) LOCATED ON THE SOUTH SIDE OF 78TH AVE DISTANT 159.14 FEET WEST OF TH… |
| X00639080 ↗ | BROADWAY BRONX | Alteration | Permit Issued | 11/30/2021 | 12/15/2023 | Design ANGELO S NG Contractor MBG VENTURES LLC | FILING FOUNDATION WORK TYPE IN CONJUNCTION WITH NB APP# 220725561 |
| B00491901 ↗ | 8623 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 03/30/2021 | 11/30/2023 | Design STEEL CORE ENGINEERING PLLC Contractor V.A.N. CONSTRUCTION CORP | NEW VRF HVAC SYSTEM AND DUCTWORK FOR NEW BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| B00949564 ↗ | 2733 EAST 27 STREET BROOKLYN | Alteration | Signed-off | 10/26/2023 | 11/17/2023 | Contractor LS PLUMBING CORP | Application filed to create a BL work type for 10 new boilers under primary application # 321921523. All work and gas piping filed under pri… |
| X00618203 ↗ | 3377 SEDGWICK AVENUE BRONX | Alteration | Signed-off | 02/28/2022 | 11/13/2023 | Contractor NEW LINE CONSTRUCTION LLC | Filing Foundation for new 6 story residential masonry building. |
| Q00313871 ↗ | 115-34 117TH STREET QUEENS | Alteration | Permit Issued | 03/10/2020 | 10/19/2023 | Design JLS DESIGNS Contractor HAR JI PLUMBING& HEAT COR | installation of plumbing and gas fixtures |
| Q00400613 ↗ | 176-55 KILDARE ROAD QUEENS | Alteration | Signed-off | 09/18/2020 | 10/13/2023 | Design GERALD CALIENDO ARCHITECTS Contractor AMOK INC | HEREWITH FILING ALTERATION TYPE TWO IN CONJUNCTION WITH ALT-1 #421946960 FOR PLUMBING WORK IN CELLAR, FIRST, SECOND, AND OSP AS PER PLANS FI… |
| X00454189 ↗ | 113 EAST 184 STREET BRONX | Alteration | Signed-off | 01/22/2021 | 10/02/2023 | Contractor NEW LINE CONSTRUCTION LLC | FOUNDATIONS FOR NEW 8 STORY MASONRY BUILDING IN ASSOCIATION WITH NB 240294686, SOE-X00454189-I1 |
| X00215399 ↗ | 3055 SEDGWICK AVENUE BRONX | Alteration | Signed-off | 01/22/2020 | 09/27/2023 | Design HRM ENGINEERING SERVICES, PC Contractor AJC SPRINKLER CORP | FILING FOR SPRINKLER WORK TYPE IN CONJUNCTION WITH NB APPLICATION # 220712058 |
| B00929584 ↗ | 2440 FULTON STREET BROOKLYN | Alteration | Signed-off | 09/15/2023 | 09/20/2023 | Design POTENTIAL ENGINEERING P.C. Contractor CAPRI CONSTRUCTION CORP Filer MAR DESIGN SERVICES INC | SUPPORT-OF-EXCAVATION AT SIDEWALK/STREET FOR INSTALLATION OF CON EDISON VAULTS AS PER PLANS, NO CHANGE IN USE OCCUPANCY OR EGRESS. |
| Q00448831 ↗ | 26-31 200 STREET QUEENS | Alteration | Signed-off | 01/12/2021 | 08/29/2023 | Design AMOIA CODY ARCHITECTURE Contractor NEW YORK PARK PLBG&HTG CO Filer AMOIA CODY ARCHITECTURE | PLUMBING CHANGES IN CONJUNCTION WITH HORIZONTAL ADDITION TO EXISTING ONE-FAMILY DWELLING. RENOVATION TO EXISTING GARAGE UNDER SEPARATE APPLI… |
| Q00363603 ↗ | 31-29 CRESCENT STREET QUEENS | Alteration | Signed-off | 09/15/2021 | 08/01/2023 | Design COSTA ARCH & ENG LLP Owner PARKSITE CONSTR. CORP Contractor SCHILLCO MECAHNICAL INC | INSTALLATION OF A NEW MECHANICAL SYSTEM FOR A 7 STORY NEW BUILDING. |
| Q00641301 ↗ | 134-16 35 AVENUE QUEENS | Alteration | Signed-off | 03/23/2022 | 05/31/2023 | Design HRM ENGINEERING SERVICES, PC Owner H&Z BUILDING NY CORP. Contractor FULL CIRCLE PLUMBING CORP Filer H&Z BUILDING NY CORP. | Filing plumbing work on the cellar, 1st to 12th floor, ROOF, in conjunction with GC application#Q00549624. |
| B00492789 ↗ | 8623 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 03/30/2021 | 05/19/2023 | Design STEEL CORE ENGINEERING PLLC Contractor AMOK INC | NEW WET AND DRY SPRINKLER SYSTEM FOR NEW BUILDING |
| B00759341 ↗ | 118 DOUGLASS STREET BROOKLYN | Alteration | Signed-off | 06/20/2022 | 05/01/2023 | Design POTENTIAL ENGINEERING P.C. Contractor ROCKLINE CORP | Interior renovation with non-bearing partitions work with new accessory access door opening from garage all confined to unit # 1. No change… |
| B00842709 ↗ | 204 4 AVENUE BROOKLYN | Alteration | Signed-off | 03/30/2023 | 04/21/2023 | Design POTENTIAL ENGINEERING P.C. Owner AVERY HALL INVESTMENTS Contractor CAPRI CONSTRUCTION CORP Filer MAR DESIGN SERVICES INC | SUPPORT-OF-EXCAVATION AT SIDEWALK/STREETFOR INSTALLATION OF CON EDISON VAULTS ANDTHE SUPPORTING PILE/CONCRETE PILE CAP, NO CHANGE IN USE OCC… |
| X00359306 ↗ | 2449 MATTHEWS AVENUE BRONX | Alteration | Permit Issued | 04/23/2021 | 04/03/2023 | Contractor PETER MICELI PLUMBING | HEREWITH FILED PLUMBING AND SPRINKLERS WORK APPLICATION AND PLANS IN CONJUNCTION WITH JOB No. 220732027. NO CHANGE TO USE, EGRESS OR OCCUPA… |
| S00843091 ↗ | HIGHLAND AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/27/2023 | 03/29/2023 | Design POTENTIAL ENGINEERING P.C. Contractor A.M.K. CONTRACTING CORP | PROVIDE SHORING TO SUPPORT EXCAVATION. |
| B00799217 ↗ | 256 FLUSHING AVENUE BROOKLYN | Alteration | Permit Issued | 09/02/2022 | 02/27/2023 | Owner SELA GROUP LLC Contractor 213 W 40TH ST MANAGEMENT | SUBSEQUESNT FILING FOR TEMPORARY CONSTRUCTION FENCE |
| X00516673 ↗ | 631 EAST TREMONT AVENUE BRONX | Alteration | Permit Issued | 07/18/2021 | 01/27/2023 | Design ZELTA DESIGN Contractor ROCK E SMALL PLBG&HTG INC | PLUMBING AND SPRINKLER WORK |
| X00247632 ↗ | 2311 ANDREWS AVENUE NORTH BRONX | Alteration | Signed-off | 11/09/2020 | 01/13/2023 | Contractor NEW LINE CONSTRUCTION LLC | FILING SUPER STRUCTURAL PLANS IN ASSOCIATION WITH BIS NB JOB # 220708651 AND DOB NOW FENCE JOB # X00338618. NO CHANGE TO USE, EGRESS, BULK A… |
| X00798468 ↗ | 811 ELSMERE PLACE BRONX | Alteration | Signed-off | 11/22/2022 | 12/16/2022 | Owner DURGAJ PROPERTIES CORP Contractor DURGAJ PROPERTIES | FILING STRUCTURAL IN CONJUNCTION WITH JOB X00798322 , X00798289, X00672809 |
| Q00686022 ↗ | 31-29 CRESCENT STREET QUEENS | Alteration | Signed-off | 05/02/2022 | 11/28/2022 | Contractor PARK CONSTRUCTION CORP | HEREWITH FILING STRUCTURAL WORK FILED IN CONJUNCTION WITH NB 420667736 |
| X00798322 ↗ | 811 ELSMERE PLACE BRONX | Alteration | Signed-off | 11/02/2022 | 11/25/2022 | Owner DURGAJ PROPERTIES CORP Contractor DURGAJ PROPERTIES | FILING FOUNDATION IN CONJUNCTION WITH JOB X00672809, X00798289, X00798468 |
| X00798289 ↗ | 811 ELSMERE PLACE BRONX | Alteration | Signed-off | 10/04/2022 | 11/21/2022 | Contractor DURGAJ PROPERTIES | FILING SUPPORT OF EXCAVATION IN CONJUNCTION WITH JOB #X00798322, #X00798468, #X00798322-I1 |
| X00210494 ↗ | 3055 SEDGWICK AVENUE BRONX | Alteration | Signed-off | 01/23/2020 | 11/15/2022 | Design HRM ENGINEERING SERVICES, PC Contractor HD BUILDERS NY LLC | FILING OF MECHANICAL WORK TYPE IN CONJUNCTION WITH NB APPLICATION # 220712058 |
| Q00612330 ↗ | 31-29 CRESCENT STREET QUEENS | Alteration | Signed-off | 11/03/2021 | 10/31/2022 | Owner PARKSITE CONSTR. CORP Contractor PARK CONSTRUCTION CORP | UNDERPINNING ASSOCIATED WITH NB APPLICATION |
| M08005137 ↗ | 1412 AVENUE OF THE AMER MANHATTAN | Alteration | Filed — no permit on record | 09/30/2022 | — | Design POTENTIAL ENGINEERING P.C. Owner 1HOTELS | — |
| B00592859 ↗ | 3841 CYPRESS AVENUE BROOKLYN | Alteration | Signed-off | 12/26/2021 | 06/20/2022 | Design ALPHA ENGINEERING Contractor DFC CONSTRUCTION INC | ALTERATION TOAN EXISTING SINGLE-FAMILY DWELLING |
| X00753141 ↗ | 811 ELSMERE PLACE BRONX | Alteration | Signed-off | 06/13/2022 | 06/15/2022 | Owner DURGAJ PROPERTIES CORP Contractor DURGAJ PROPERTIES | Filing a PAA to remove the Demo Job # and replace it with the NB job # X00672809. The SE, FO and ST jobs all have X00798322, X00798289 and … |
| B00492680 ↗ | 8623 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 04/05/2021 | 06/07/2022 | Design STEEL CORE ENGINEERING PLLC Contractor AMOK INC Filer BDP EXPEDITERS GROUP | NEW PLUMBING SYSTEM FOR NEW BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| Q00682204 ↗ | 31-29 CRESCENT STREET QUEENS | Alteration | Signed-off | 04/07/2022 | 06/07/2022 | Owner PARKSITE CONSTR. CORP Contractor PARK CONSTRUCTION CORP | FOUNDATION WORK AND RETAINING WALL ASSOCIATED WITH NB |
| B00610064 ↗ | 295 DECATUR STREET BROOKLYN | Alteration | Signed-off | 11/08/2021 | 04/20/2022 | Owner COMMUNITY PARENTS INC Contractor DNA PLUMBING CONTR. INC | Replace one gas meter in basement and replace gas piping thru the building and replace existing hot water heater with new one as shown on su… |
| M00563986 ↗ | 242 MULBERRY STREET MANHATTAN | Alteration CO | Permit Issued | 08/18/2021 | 04/01/2022 | Design FREDA DESIGN ARCHITECT, PLLC Owner CORE MANAGEMENT NY, LLC Contractor MINCHIFINN INC | APPLICATION FILED TO CONVERT EXISTING APARTMENT ON FIRST FLOOR TO COMMERCIAL STORE, REPLACE EXISTING WOOD FLOOR BEAMS IN STORE ONLY WITH NEW… |
| M00670274 ↗ | 242 MULBERRY STREET MANHATTAN | Alteration | Signed-off | 02/11/2022 | 04/01/2022 | Design BNJ ENGINEERING PC Contractor MINCHIFINN INC | remove portion of first floor wood beams, reinforce existing masonry columns place steel beams and reinforced concrete deck |
| Q00612409 ↗ | 31-29 CRESCENT STREET QUEENS | Alteration | Signed-off | 11/02/2021 | 03/25/2022 | Contractor PARK CONSTRUCTION CORP | Support of Excavation associated w/ NB filing |
| B00528507 ↗ | 27 CROWN STREET BROOKLYN | Alteration | Signed-off | 06/22/2021 | 03/15/2022 | Contractor JIA WEI CONSTRUCTION INC | INTERIOR RENOVATION IN APT 2A FILED IN CONJUNCTION WITH DOB NOW PL AS A SUBSEQUENT DOC. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M00653632 ↗ | 730 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 01/05/2022 | — | Design POTENTIAL ENGINEERING P.C. Owner CROWN 730 INVEST, LLC Filer GILLMAN CONSULTING INC | — |
| X00258865 ↗ | 804 E. 219TH STREET BRONX | Alteration | Signed-off | 02/19/2020 | 12/29/2021 | Contractor LLOYD G. DRUMMOND | New sprinkler system for new (3) family dwelling filed in conjunction with job 220715956. |
| M00522002 ↗ | 730 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 12/13/2021 | — | Design POTENTIAL ENGINEERING P.C. Owner CROWN 730 INVEST, LLC Filer GILLMAN CONSULTING INC | — |
| M00642786 ↗ | 730 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 12/13/2021 | — | Design POTENTIAL ENGINEERING P.C. Owner CROWN 730 INVEST, LLC Filer GILLMAN CONSULTING INC | — |
| Q00505548 ↗ | 99 TENNIS PLACE QUEENS | Alteration | Signed-off | 05/21/2021 | 12/08/2021 | Design ISSA KHORASANCHI P.E. Contractor V.A.N. CONSTRUCTION CORP | PROVIDE UNDER PINNING FOR THE EXISTING FOUNDATION WALLS TO ACHIEVE HIGHER FLOOR TO CEILING HEIGHTS. |
| X00637836 ↗ | BROADWAY BRONX | Alteration | Filed — no permit on record | 11/29/2021 | — | Design TIMES BUILDINGS PC Filer ABC ENGINEERING PLLC | — |
| M00609748 ↗ | 730 5 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 11/19/2021 | — | Design POTENTIAL ENGINEERING P.C. Owner CROWN 730 INVEST, LLC Filer GILLMAN CONSULTING INC | — |
| M00602293 ↗ | 64 GRAND STREET MANHATTAN | Alteration | Permit Issued | 10/04/2021 | 11/03/2021 | Design POTENTIAL ENGINEERING P.C. Owner Axio Property Management Contractor SPLEN CONSTRUCTION INC | Local Law 11/98 facade repair for brick repointing at front (primary) elevation with recladding of roof top-bulk head and replacement EMR sh… |
| B00474275 ↗ | 295 DECATUR STREET BROOKLYN | Alteration | Signed-off | 04/14/2021 | 10/19/2021 | Design POTENTIAL ENGINEERING P.C. Contractor KODRA CONSTRUCTION CORP | INTERIOR RENOVATION WITH NON-BEARING PARTITION WORK LIMITED TO LEVEL 003 ON EXISTING 2 FAMILY DWELLING 4 STORY BRICK BUILDING. No change in … |
| X00233230 ↗ | 804 E. 219TH STREET BRONX | Alteration | Signed-off | 03/03/2020 | 09/16/2021 | Contractor LLOYD G DRUMMOND PLBG&GEN | PLUMBING WORK FILED IN CONJUNCTION WITH JOB 220715956 FOR NEW 3-FAMILY RESIDENCE |
| X00233135 ↗ | 800 BARNES AVENUE BRONX | Alteration | Signed-off | 03/03/2020 | 09/15/2021 | Contractor LLOYD G DRUMMOND PLBG&GEN | PLUMBING WORK FILED IN CONJUCTION WITH JOB 220713967 FOR NEW 3-FAMILY DWELLING |
| X00258857 ↗ | 800 BARNES AVENUE BRONX | Alteration | Signed-off | 12/18/2019 | 09/15/2021 | Contractor LLOYD G. DRUMMOND | New sprinkler system for new (3) family dwelling filed in conjunction with job 220713967. |
| X00332902 ↗ | 2311 ANDREWS AVENUE NORTH BRONX | Alteration | Signed-off | 06/21/2020 | 08/25/2021 | Owner CEZAR H LLC Contractor LLOYD G. DRUMMOND | Install sprinkler system per the plans filed herewith and in conjunction with NB#220708651. The system is hydraulically calculated. There is… |
| X00225706 ↗ | 629 WARING AVENUE BRONX | Alteration | Signed-off | 11/05/2019 | 08/23/2021 | Design BAILEYS ENGINEERING PC Contractor ZEFI & CO. LLC | FILING SUPER STRUCTURAL PLANS IN ASSOCIATION WITH BIS NB JOB # 220633688 AND DOB NOW FENCE JOB # X00172654. |
| B00501857 ↗ | 8623 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 04/16/2021 | 08/20/2021 | Design LEONID KRUPNIK, P.E. Contractor V.A.N. CONSTRUCTION CORP | FOUNDATION AND STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION 340777010 |
| X00331502 ↗ | 2439 BARKER AVENUE BRONX | Alteration | Signed-off | 02/19/2021 | 08/18/2021 | Design BAILEYS ENGINEERING PC Contractor ZEFI & CO. LLC | FILING SUPER STRUCTURAL PLANS IN ASSOCIATION WITH BIS NB JOB #220720655 AND DOB NOW FENCE JOB # ********* |
| B00340150 ↗ | 2317 WEST 12 STREET BROOKLYN | Alteration | Signed-off | 05/21/2020 | 07/13/2021 | Design HPL ENGINEERING P.C. Owner MingJi Development Group Contractor CATMAN PLUMBING INC Filer H&Z BUILDING NY CORP. | SUBMIT PLUMBING WORK ON 1ST, 2ND, 3RD FLOOR, ROOF & OPEN SPACE, IN CONJUNCTION WITH NB APPLICATION #321594556. |
| X00267503 ↗ | 800 BARNES AVENUE BRONX | Alteration | Signed-off | 01/10/2020 | 06/24/2021 | Contractor F & A CARPENTRY CORP | Structural Work filed in conjunction with NB 220713967 and NB 220716063 |
| Q00287732 ↗ | 173-07 GRAND CENTRAL PKWY QUEENS | Alteration | Signed-off | 08/04/2020 | 05/02/2021 | Design JX FLAME SOLUTION INC Contractor NICHOLAS SUIDA | HEREWITH FILING PLUMBING APPLICATION CONJUNCTION WITH DOB ALT-1 APPLICATION: 420666791 |
| B00218708 ↗ | 95 GRATTAN STREET BROOKLYN | Alteration | Signed-off | 09/20/2019 | 04/06/2021 | Design SHARON ENGINEERING, P.C Owner LENOX INVESTORS LLC Contractor A M B MECHANICAL INC Filer SPEEDY EXPEDITING INC | PLUMBING AND SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB. |
| B00218775 ↗ | 97 GRATTAN STREET BROOKLYN | Alteration | Signed-off | 09/20/2019 | 04/06/2021 | Design SHARON ENGINEERING, P.C Owner LENOX INVESTORS LLC Contractor PRIME PIPING & HEATING IN Filer SPEEDY EXPEDITING INC | PLUMBING AND SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB. |
| X00225696 ↗ | 3554 CARLISLE PLACE BRONX | Alteration | Signed-off | 09/21/2019 | 02/10/2021 | Design BAILEYS ENGINEERING PC Owner BOND CONSTRUCTION INC Contractor BOND CONSTRUCTION INC | FILING SUPER STRUCTURAL PLANS IN ASSOCIATION WITH BIS NB JOB # 220689529 AND DOB NOW FENCE JOB #X00193019 . |
| M00255205 ↗ | 730 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/22/2019 | 11/23/2020 | Design POTENTIAL ENGINEERING P.C. Owner CROWN 730 INVEST LLC Contractor REGAL RECONSTRUCTION CORP Filer GILLMAN CONSULTING INC | Hereby Filing to demolish the 11th floor structural slab as shown on drawings filed herewith. |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/31/2026 | Concrete - Cast-In-Place | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/31/2026 | Wall Panels, Curtain Walls, and Veneers | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/31/2026 | Subgrade Inspections | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/31/2026 | Exterior Insulation and Finish Systems (EIFS) | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/31/2026 | Sprayed fire-resistant materials | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/31/2026 | Fire-Resistant Penetrations and Joints | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/31/2026 | Masonry | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/31/2026 | Lighting controls | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/31/2026 | Exterior lighting power | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/31/2026 | Fenestration air leakage | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/31/2026 | Fenestration and door U-factor and product ratings | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/31/2026 | Fenestration areas | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/31/2026 | Air barrier - visual inspection | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/31/2026 | Maintenance information | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/31/2026 | Lighting in dwelling units | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/31/2026 | Insulation placement and R values | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/31/2026 | Metering | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/31/2026 | Interior lighting power | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Exterior lighting power | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Lighting controls | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Maintenance information | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Fenestration areas | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Air barrier - visual inspection | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Interior lighting power | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Fenestration and door U-factor and product ratings | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Metering | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Insulation placement and R values | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Fenestration air leakage | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Lighting in dwelling units | 249 18 STREET | SAMER ABOU-GHAIDA | energy_progress |
| 07/06/2026 | Wall Panels, Curtain Walls, and Veneers | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/06/2026 | Subgrade Inspections | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/06/2026 | Sprayed fire-resistant materials | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/06/2026 | Masonry | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/06/2026 | Exterior Insulation and Finish Systems (EIFS) | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 07/06/2026 | Concrete - Cast-In-Place | 249 18 STREET | SAMER ABOU-GHAIDA | special |
| 06/09/2026 | Interior lighting power | 17 WEST 10 STREET | — | energy_progress |
| 05/31/2026 | Fire-Resistant Penetrations and Joints | 69-12 223 STREET | — | special |
| 05/12/2026 | Duct leakage testing, insulation and design | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | energy_progress |
| 05/12/2026 | HVAC-R and service water heating equipment | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | energy_progress |
| 05/12/2026 | Lighting controls | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | energy_progress |
| 05/12/2026 | Maintenance information | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | energy_progress |
| 05/12/2026 | Interior lighting power | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | energy_progress |
| 05/12/2026 | Electrical motors and elevators | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | energy_progress |
| 05/12/2026 | Exterior lighting power | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | energy_progress |
| 05/12/2026 | Metering | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | energy_progress |
| 05/12/2026 | Mechanical Systems | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | special |
| 05/12/2026 | Final | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | progress |
| 05/12/2026 | HVAC-R and service water piping design and insulation | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | energy_progress |
| 05/12/2026 | HVAC-R and service water heating system controls | 25-23 NEWTOWN AVENUE | SAMER ABOU-GHAIDA | energy_progress |